← Back
BuildNYC
Predominantly retail with other uses
21 FLUSHING AVENUE
BROOKLYN · BIN 3421807
💬 Discuss this project
1955Year Built
4Stories
K4Building Class
M1-4Zoning
289,262 sfGross Floor Area
10Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: NYC Department of Small Business Services · 286,189 sf lot · 1.01 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 5ECCO Retail, (FFR 5hwdlo //& +175p · 9 filings · 17 docs
Floor 4ECCO USA, Wegmans Food Markets +146p · 8 filings · 15 docs
Floor 3GKL Studio, Next Step Labs +132p · 5 filings · 16 docs
Floor 2Viventium, Refoundry58p · 4 filings · 15 docs
Floor 1Wegmans Food MarketsUnder Construction27p · 4 filings · 14 docs
Site & exteriorWegmans Food Markets5p · 6 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B.N.Y. Development603/21/2026
ZDG303/22/2026
Coastal General Contracting203/22/2026
E.C. Contracting203/21/2026
NYC Department of Small Business Services103/22/2026
Oriliving103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cannon Design1108/24/2026
Shea502/25/2026
Carl Jentz Zirbel, RA102/13/2026
Christopher Teeter508/28/2025
Ravi Raj Architect208/30/2024
Montroy Architecture204/19/2024
Abs Engineering802/26/2024
2L Engineering209/21/2023
Jack Green Associates208/02/2022
GKV Architects108/02/2022
Crawford Practice110/20/2021
Mesh Architectures307/09/2021
Osso Architecture106/22/2021
Murdoch Engineering105/07/2021
Gregory M. Steinmetz, PE204/15/2021
Leon Skvirsky PE404/22/2019
Amm Engineering101/31/2019
Baileys Engineering111/20/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Domani Consulting3503/21/2026
Louis Striar203/21/2026
Milrose Consultants2003/21/2026
Building Brothers803/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Coastal Building MaintainGeneral Contractor1406/28/2026
Sweet Group of NYGeneral Contractor1007/08/2026
Tri Borough ScaffoldingScaffold907/08/2026
Salt ConstructionGeneral Contractor607/08/2026
National MaintenanceSign hanger407/08/2026
Tomco Mechanicalspecialty_contractor407/08/2026
Inter Connection ElectricElectrical303/22/2026
Kenneth Fisk ElectricElectrical303/22/2026
Darby Construction ServiceGeneral Contractor303/21/2026
C James Plumbing & HeatingPlumbing307/08/2026
H Bronner & Son Plumbing & HeatingPlumbing307/08/2026
Metro Mechanical GroupPlumbing307/08/2026
MP RenovationsGeneral Contractor303/21/2026
C. James Plumbing & HeatingFire Protection207/08/2026
B & G Electrical Contracting of NY IElectrical203/22/2026
Horizon Retail ConstructionGeneral Contractor207/08/2026
CielaGeneral Contractor207/08/2026
New York Ladder & ScaffoldScaffold203/21/2026
RZ Project ManagementGeneral Contractor207/08/2026
LTB Mechanicalspecialty_contractor203/21/2026
Metrotech MechanicalPlumbing107/08/2026
M&G Plumbing and HeatingPlumbing107/08/2026
PipestylistsPlumbing107/08/2026
CSM ElectricElectrical103/22/2026
Redgrave Electl MaintnceElectrical103/21/2026
Glendale Electl ContngElectrical103/22/2026
GS ElectricElectrical103/22/2026
HI-Rite ElectricElectrical103/22/2026
KGB Electrical ContractingElectrical103/22/2026
Pacific Electrical ContractingElectrical103/22/2026
Patriot ElectricElectrical103/22/2026
Transform Electl Contractors IElectrical103/22/2026
2323 DevelopmentGeneral Contractor104/09/2026
Chelsea DevelopersGeneral Contractor104/09/2026
CS RenovationGeneral Contractor107/08/2026
Textures RenovationsGeneral Contractor107/08/2026
Signs CadSign hanger107/08/2026
Accurate MechanicalFire Protection107/08/2026
AmokFire Protection107/08/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Capitol Fire Sprinkler CoFire Protection107/08/2026
Jem Fire PreventionFire Protection107/08/2026
Metro Mechanical GroupFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8431102/25/2026
Assure Professional Engineering6962508/28/2025
Milrose Consultants2003403/17/2025
Abs Engineering48351008/30/2024
Jack Green Associates422108/02/2022
Mesh Architectures4330207/09/2021
ARCHITECTURE+CONSTRUCTION1326206/22/2021
Building Lifecycle
All (300)Filed (52)Permit Issued (60)Signed Off (37)Violation (22)Inspection (21)Objection (78)Special Inspection (30)
09/16/2026
Signed off — Alteration
SUBSEQUENT PLUMBING SCOPE TO INTIIAL ALTERATION FOR TRF PRODUCE/COFFEE. MINOR WORK INCLUDES WATER, GAS PIPING AND DRAINAGE. AS PER PLANS FILED HEREWITH.
B01134923-S1
09/10/2026
Signed off — Alteration
SUBSEQUENT PLUMBING SCOPE TO INTIIAL ALTERATION. MINOR WORK INCLUDES PIPING AND DRAINAGE. AS PER PLANS FILED HEREWITH.
B01134808-S1
08/24/2026
Filed — Alteration
SUBSEQUENT PLUMBING SCOPE TO INTIIAL ALTERATION. MINOR WORK INCLUDES PIPING AND DRAINAGE. AS PER PLANS FILED HEREWITH.
B01134808-P2
06/24/2026
Signed off — Alteration
SUBSEQUENT FILING FOR REFRIGERANTION SYSTEMS AS PER PLANS FILED HEREWITH.
B01134896-S2
06/12/2026
Permit issued — Plumbing
B01134808-S2-PL
06/02/2026
Signed off — Alteration
Ductwork adjustment to split the tenant space on the 4th floor - Suite 401/402. No change in use, occupancy or egress.
B01272479-I1
06/02/2026
Signed off — Alteration
Ductwork adjustment to split the tenant space on the 4th floor - Suite 401/402. No change in use, occupancy or egress.
B01272479-S1
03/24/2026
Special inspection requirement — Final
JOHN MCMONAGLE
03/24/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
03/16/2026
Objection resolved — Addressed
03/16/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
03/16/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
03/16/2026
Special inspection requirement — Final
JOHN MCMONAGLE
03/06/2026
Objection resolved — Addressed
03/05/2026
Permit issued — General Construction
B01357900-I1-GC
03/03/2026
Objection raised — Scope
03/03/2026
Objection raised — Admin
02/25/2026
Filed — Alteration
Ductwork adjustment to split the tenant space on the 4th floor - Suite 401/402. No change in use, occupancy or egress.
B01272479-P1
02/25/2026
Filed — Alteration
Ductwork adjustment to split the tenant space on the 4th floor - Suite 401/402. No change in use, occupancy or egress.
B01272479-P2
02/24/2026
Filed — Alteration
SUBSEQUENT PLUMBING SCOPE TO INTIIAL ALTERATION. MINOR WORK INCLUDES PIPING AND DRAINAGE. AS PER PLANS FILED HEREWITH.
B01134808-P1
02/13/2026
Filed — Alteration
B01357900-I1
12/22/2025
Permit issued — Mechanical Systems
B01272479-S1-MS
12/19/2025
Permit issued — General Construction
B01272479-I1-GC
11/21/2025
Objection raised — Energy
11/21/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
10/23/2025
Permit issued — Mechanical Systems
B01277931-I1-GC-CX
10/21/2025
Objection resolved — Addressed
10/20/2025
Objection raised — Cost
10/20/2025
Objection raised — Scope
10/20/2025
Objection raised — Cost
10/07/2025
Filed — Alteration
Ductwork adjustment to split the tenant space on the 4th floor - Suite 401/402. No change in use, occupancy or egress.
B01272479-I1
10/07/2025
Filed — Alteration
Ductwork adjustment to split the tenant space on the 4th floor - Suite 401/402. No change in use, occupancy or egress.
B01272479-S1
10/06/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/19/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/19/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2025
Objection resolved — Addressed
09/04/2025
Objection raised — Other
08/28/2025
Filed — Alteration
CONSTRUCTION SCOPE OF WORK: INSTALLATION OF DROP SOFFIT AND LOUVER REPLACEMENT AT FACADE. MECHANCIAL SCOPE OF WORK: EXHAUST VENT AND FRESH AIR INSTAKE WITH ERV . NO CHANGE IN USE OCCUPANCY OR ERGESS.
B01277931-I1
08/26/2025
Special inspection requirement — Final
GUNJAN KHANDWALA
08/26/2025
Special inspection requirement — Mechanical Systems
GUNJAN KHANDWALA
08/07/2025
Permit issued — General Construction
B01134808-I1-GC
08/07/2025
Permit issued — General Construction
B01134923-I1-GC
08/07/2025
Permit issued — General Construction
B01134896-I1-GC
04/29/2025
Permit issued — Mechanical Systems
B01134923-S1-MS
04/29/2025
Permit issued — Mechanical Systems
B01134808-S1-MS
04/29/2025
Permit issued — Mechanical Systems
B01134896-S2-MS
03/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/25/2025
Filed — Alteration
SUBSEQUENT PLUMBING SCOPE TO INTIIAL ALTERATION FOR TRF PRODUCE/COFFEE. MINOR WORK INCLUDES WATER, GAS PIPING AND DRAINAGE. AS PER PLANS FILED HEREWITH.
B01134923-S2
03/25/2025
Permit issued — Plumbing
B01134808-S2-PL
03/24/2025
Permit issued — Sprinklers
B01134896-S1-PL
03/24/2025
Permit issued — Plumbing
B01134896-S1-EW-SP
03/17/2025
Filed — Alteration
SUBSEQUENT PLUMBING SCOPE TO INTIIAL ALTERATION FOR TRF PRODUCE/COFFEE. MINOR WORK INCLUDES WATER, GAS PIPING AND DRAINAGE. AS PER PLANS FILED HEREWITH.
B01134923-S1
03/17/2025
Filed — Alteration
SUBSEQUENT PLUMBING SCOPE TO INTIIAL ALTERATION. MINOR WORK INCLUDES PIPING AND DRAINAGE. AS PER PLANS FILED HEREWITH.
B01134808-S1
03/17/2025
Filed — Alteration
SUBSEQUENT FILING FOR REFRIGERANTION SYSTEMS AS PER PLANS FILED HEREWITH.
B01134896-S2
03/17/2025
Filed — Alteration
SUBSEQUENT PLUMBING SCOPE TO INTIIAL ALTERATION. MINOR WORK INCLUDES PIPING AND DRAINAGE. AS PER PLANS FILED HEREWITH.
B01134808-S2
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMetro Mechanical Group06/12/2026
DOB NOWGeneral ConstructionPermit Issued2323 Development03/05/2026
DOB NOWMechanical SystemsSigned-offHorizon Retail Construction12/22/2025
DOB NOWGeneral ConstructionSigned-offHorizon Retail Construction12/19/2025
DOB NOWMechanical SystemsPermit IssuedChelsea Developers10/23/2025
DOB NOWGeneral ConstructionPermit IssuedCoastal Building Maintain08/07/2025
DOB NOWGeneral ConstructionPermit IssuedCoastal Building Maintain08/07/2025
DOB NOWGeneral ConstructionPermit IssuedCoastal Building Maintain08/07/2025
DOB NOWMechanical SystemsSigned-offTomco Mechanical04/29/2025
DOB NOWMechanical SystemsSigned-offTomco Mechanical04/29/2025
DOB NOWMechanical SystemsSigned-offTomco Mechanical04/29/2025
DOB NOWPlumbingPermit IssuedMetro Mechanical Group03/25/2025
DOB NOWPlumbingPermit IssuedMetro Mechanical Group03/24/2025
DOB NOWSprinklersPermit IssuedMetro Mechanical Group03/24/2025
DOB NOWGeneral ConstructionPermit IssuedCoastal Building Maintain01/29/2025
DOB NOWGeneral ConstructionPermit IssuedCoastal Building Maintain01/29/2025
DOB NOWGeneral ConstructionPermit IssuedCoastal Building Maintain01/29/2025
DOB NOWPlumbingSigned-offH Bronner & Son Plumbing & HT10/09/2024
DOB NOWSprinklersSigned-offJem Fire Prevention05/09/2024
DOB NOWPlumbingSigned-offT & T Plumbing05/09/2024
DOB NOWPlumbingSigned-offH Bronner & Son Plumbing & HT05/06/2024
DOB NOWPlumbingSigned-offH Bronner & Son Plumbing & HT04/10/2024
DOB NOWMechanical SystemsSigned-offRZ Project Management04/09/2024
DOB NOWGeneral ConstructionSigned-offCiela03/22/2024
DOB NOWGeneral ConstructionSigned-offCiela03/22/2024
DOB NOWGeneral ConstructionSigned-offSweet Group of NY03/15/2024
DOB NOWMechanical SystemsSigned-offSweet Group of NY03/14/2024
DOB NOWGeneral ConstructionSigned-offRZ Project Management03/14/2024
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co10/16/2023
DOB NOWMechanical SystemsSigned-offSweet Group of NY10/02/2023
DOB NOWGeneral ConstructionSigned-offSweet Group of NY10/02/2023
DOB NOWSprinklersSigned-offAmok05/04/2023
DOB NOWPlumbingSigned-offC James Plumbing & Heating03/28/2023
DOB NOWSprinklersSigned-offC. James Plumbing & Heating03/28/2023
DOB NOWPlumbingSigned-offC James Plumbing & Heating11/04/2022
DOB NOWSprinklersSigned-offC. James Plumbing & Heating11/02/2022
DOB NOWGeneral ConstructionSigned-offSalt Construction09/26/2022
DOB NOWMechanical SystemsSigned-offSalt Construction09/26/2022
DOB NOWPlumbingSigned-offC James Plumbing & Heating03/29/2022
DOB NOWGeneral ConstructionSigned-offTextures Renovations01/17/2022
+ 54 more permits on file
3 projects · most recent 08/28/2025
Refrigeration Systems Others
FiledStatusContractorScopeMake / Model / Capacity
08/28/2025Permit IssuedChelsea DevelopersOthers
Other
__Junk__ RENEWAIRE 200 CFM · Erv ×1
03/25/2025Permit IssuedCoastal Building MaintainRefrigeration Systems
Refrigeration
— HILL PHOENIX - O4UM 21,000 BTU ×2
HILL PHOENIX - ON5DM 27,000 BTU ×2
03/17/2025Permit IssuedCoastal Building MaintainRefrigeration Systems
Refrigeration
— HILL PHOENIX - ON5DM 10,000 BTU ×1
1 project · most recent 03/17/2025
Sprinkler System
FiledStatusContractorScope
03/17/2025Permit IssuedMetro Mechanical GroupSprinkler System
3 projects · most recent 08/24/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/24/2026Permit IssuedMetro Mechanical GroupGas, Water/Sanitary
03/25/2025——Gas, Water/Sanitary
03/17/2025Permit IssuedMetro Mechanical GroupWater/Sanitary
25 projects · most recent 03/23/2026
General Wiring
FiledStatusContractorScope
03/23/2026CompleteLaredo Electric—
01/07/2026CompleteRedgrave Electl MaintnceGeneral Wiring
09/27/2025CompleteCSM Electric—
07/25/2025CompleteCSM Electric—
03/13/2025CompleteB & G Electrical Contracting of NY IGeneral Wiring
03/13/2025CompleteB & G Electrical Contracting of NY IGeneral Wiring
03/13/2025CompleteB & G Electrical Contracting of NY IGeneral Wiring
10/01/2024CompleteKGB Electrical ContractingGeneral Wiring
07/29/2024CompleteLive Wire Electric 1General Wiring
04/29/2024CompleteCSM ElectricGeneral Wiring
04/25/2024CompleteHI-Rite ElectricGeneral Wiring
03/11/2024CompletePacific Electrical ContractingGeneral Wiring
03/21/2023CompleteTwintech ElectricGeneral Wiring
07/13/2022CompleteAll Boro ElectricGeneral Wiring
06/30/2022CancelledRainbow Electric CoGeneral Wiring
1 project · most recent 08/24/2026
FiledStatusContractorScope
08/24/2026Permit IssuedMetro Mechanical Group1 scope_items
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
09/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/19/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/17/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
08/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/11/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
03/24/2026FinalJOHN MCMONAGLEprogress
03/24/2026Mechanical SystemsJOHN MCMONAGLEspecial
03/16/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
03/16/2026FinalJOHN MCMONAGLEprogress
03/16/2026Lighting controlsJOHN MCMONAGLEenergy_progress
03/16/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
03/16/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
08/26/2025FinalGUNJAN KHANDWALAprogress
08/26/2025Mechanical SystemsGUNJAN KHANDWALAspecial
02/27/2025Mechanical SystemsChristopher Drutjonsspecial
02/27/2025FinalChristopher Drutjonsprogress
02/27/2025Mechanical SystemsChristopher Drutjonsspecial
02/27/2025FinalChristopher Drutjonsprogress
02/05/2025Sprinkler SystemsChristopher Drutjonsspecial
10/30/2024FinalARAM PLIGIANprogress
10/30/2024FinalARAM PLIGIANprogress
10/30/2024FinalARAM PLIGIANprogress
08/28/2024Fire-Resistant Penetrations and JointsAlex Schwartzspecial
08/28/2024Energy Code Compliance InspectionsAlex Schwartzprogress
08/28/2024FinalAlex Schwartzprogress
08/28/2024Electrical motors and elevatorsAlex Schwartzenergy_progress
08/28/2024Interior lighting powerAlex Schwartzenergy_progress
08/28/2024Lighting controlsAlex Schwartzenergy_progress
08/28/2024MeteringAlex Schwartzenergy_progress
02/23/2024Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
Latest 25 of 87.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
ECCO USAOfficeFloor 4
Project B01272479 Alteration · LOC Issued · 10/07/2025
Wegmans Food MarketsSupermarketFloors 1, 4
Project B01134808 Alteration · Permit Entire · 01/15/2025
Project B01134896 Alteration · Permit Entire · 01/15/2025
Project B01134923 Alteration · Permit Entire · 01/15/2025
Project B00997270 Alteration · LOC Issued · 02/15/2024
Project B01002911 Alteration · LOC Issued · 02/15/2024
Project B00145289 Alteration · LOC Issued · 04/22/2019
Project B00145337 Alteration · LOC Issued · 04/22/2019
Project B00145345 Alteration · LOC Issued · 04/22/2019
Project B00145347 Alteration · LOC Issued · 04/22/2019
GKL StudioOfficeFloor 3
Project B00984391 Alteration · LOC Issued · 02/23/2024
ViventiumOfficeFloor 2
Project B00894694 Alteration · LOC Issued · 09/20/2023
(FFR 5hwdlo //&RetailFloor 5
Project B00778982 Alteration · LOC Issued · 08/02/2022
ECCO RetailRetailFloors 4, 5
Project B00779080 Alteration · LOC Issued · 08/02/2022
Project B00779129 Alteration · LOC Issued · 08/02/2022
Project B00523961 Alteration · LOC Issued · 05/21/2021
Project B00492962 Alteration · LOC Issued · 04/15/2021
Project B00493942 Alteration · LOC Issued · 04/15/2021
Donovan StudiosOfficeFloor 3
Project B00608220 Alteration · LOC Issued · 10/20/2021
Next Step LabsLaboratoryFloor 3
Project B00545749 Alteration · LOC Issued · 07/09/2021
Project B00546149 Alteration · LOC Issued · 07/09/2021
CLL CreativeOfficeFloor 5
Project B00538734 Alteration · LOC Issued · 06/22/2021
Project B00538884 Alteration · LOC Issued · 06/21/2021
RefoundryOfficeFloor 2
Project B00458328 Alteration · LOC Issued · 01/25/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 893 on file (BIS + DOB NOW)
▸Plans & Drawings57
▸DOB NOWPlans/Sketch46
09/03/2026B00002675-I1Request digital key ↗
09/01/2026B00478754-I1Request digital key ↗
09/01/2026B00523961-I1Request digital key ↗
Showing 3 of 46 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/02/2026B00145345-I1Request digital key ↗
09/02/2026B00145289-I1Request digital key ↗
09/02/2026B00145347-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00354889-I1Request digital key ↗
08/14/2026B00354889-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00343715-I1Request digital key ↗
08/15/2026B00343715-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00124808-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00355541-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00458328-I1Request digital key ↗
▸Applications & Permits134
▸BISPLAN / WORK APPROVAL APPLICATION65
11/21/2024321183599Open ↗
02/27/2023340733237Open ↗
02/09/2023340733237Open ↗
Showing 3 of 65 on file for this type
▸BISWORK PERMIT APPLICATION42
04/24/2023340733237Open ↗
04/03/2023321947346Open ↗
03/08/2023340733237Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISPLACE OF ASSEMBLY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFLOOD ZONE DESIGN CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications206
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION60
03/17/2020321714007Open ↗
03/11/2020321906540Open ↗
02/22/2020340687652Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature57
09/03/2026B00002675-I1Open ↗
09/02/2026B00124808-I1Open ↗
09/02/2026B00145345-I1Open ↗
Showing 3 of 57 on file for this type
▸DOB NOWProgress Inspector Seal & Signature41
09/23/2026B01134808-P3Open ↗
09/23/2026B00984391-P2Open ↗
09/02/2026B01002911-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/23/2026B00984391-P2Open ↗
09/02/2026B01002911-I1Open ↗
09/02/2026B01134896-S2Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/02/2020340733237Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/01/2020340733237Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment79
▸BISEQUIPMENT USE PERMITS41
12/21/2019321692584Open ↗
12/21/2019321692584Open ↗
11/01/2019321183599Open ↗
Showing 3 of 41 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
12/21/2019321692584Open ↗
11/01/2019321183599Open ↗
11/01/2019321183599Open ↗
Showing 3 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
12/16/2019321183599Open ↗
12/12/2019321780774Open ↗
12/04/2019321780774Open ↗
Showing 3 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/24/2019321183599Open ↗
▸Safety & Tenant Protection3
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/11/2020321906540Open ↗
02/18/2020321713936Open ↗
10/29/2019321692584Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
09/01/2026B00538734-I1Open ↗
08/14/2026B00492962-I1Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/26/2023340733237Open ↗
08/13/2020340733237Open ↗
07/15/2020340733237Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
10/12/2023340733237Open ↗
05/25/2023321183599Open ↗
12/07/2020321587332Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
03/17/2020321713936Open ↗
10/29/2019321692584Open ↗
10/29/2019321692584Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/02/2020340733237Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
10/26/2020321183599Open ↗
▸Inspections & Test Reports51
▸BISTECHNICAL REPORT: RESPONSIBILITY15
04/04/2023321947346Open ↗
07/27/2021321183599Open ↗
07/27/2021321183599Open ↗
Showing 3 of 15 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION11
10/29/2019321692584Open ↗
10/29/2019321692584Open ↗
10/29/2019321692584Open ↗
Showing 3 of 11 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
10/29/2019321692584Open ↗
Showing 1 of 4 on file for this type
▸BISHYDRO FLOW TEST LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs115
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST34
10/31/2023340733237Open ↗
04/05/2023321947346Open ↗
07/17/2021321555241Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)22
09/01/2026B00538884-I1Open ↗
09/01/2026B00538734-I1Open ↗
08/15/2026B00493942-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)18
09/01/2026B00538884-I1Open ↗
09/01/2026B00538734-I1Open ↗
08/15/2026B00493942-I1Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
03/17/2020321713936Open ↗
01/06/2020321183599Open ↗
Showing 2 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
11/21/2024321183599Open ↗
04/24/2020321183599Open ↗
04/23/2020321183599Open ↗
Showing 3 of 13 on file for this type
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)5
10/12/2023340733237Open ↗
05/25/2023321183599Open ↗
07/17/2021321555241Open ↗
Showing 3 of 5 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)3
07/15/2020340733237Open ↗
05/28/2020321906540Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER3
02/22/2023340733237Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL2
10/12/2023340733237Open ↗
03/11/2022321947346Open ↗
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT29
10/26/2023340733237Open ↗
02/27/2023340733237Open ↗
02/17/2023340733237Open ↗
Showing 3 of 29 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
10/30/2023340733237Open ↗
07/17/2021321555241Open ↗
12/07/2020321587332Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms114
▸BISADDITIONAL INFORMATION61
12/11/2024321183599Open ↗
03/03/2023340733237Open ↗
05/28/2020340428317Open ↗
Showing 3 of 61 on file for this type
▸BISBOROUGH INTAKE FORM29
09/10/2021321780774Open ↗
09/10/2021321688492Open ↗
03/28/2020321714007Open ↗
Showing 3 of 29 on file for this type
▸BISEFILING COVER SHEET19
03/11/2020321906540Open ↗
Showing 1 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/01/2020340733237Open ↗
Showing 1 of 5 on file for this type
▸Other Documents30
▸BISBPP - SUPPORTING DOCUMENTATION15
02/02/2021340428317Open ↗
05/28/2020340428317Open ↗
05/28/2020340428317Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation4
08/13/2026B00145289-I1Open ↗
08/13/2026B00145347-I1Open ↗
Showing 2 of 4 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/12/2019321947346Open ↗
10/29/2019321692584Open ↗
▸BISOTCR MONITOR CERTFICATION2
11/12/2019321183599Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISUnknown1
11/14/2019321692584Open ↗
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
02/02/2021340428317Open ↗
▸DOB NOWHydraulic Calculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type