| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M08006066 ↗ | 160 CENTRAL PARK SOUTH MANHATTAN | Alteration | Signed-off | 11/30/2022 | 09/08/2026 | Mechanical work as shown on plans for three specialty Hotel suites on 15th, 25th and 31st construction floors (Marketing floors 16th, 26th a… | |
| M01102577 ↗ | 1 TIMES SQUARE MANHATTAN | Alteration | Signed-off | 01/29/2025 | 06/16/2026 | Design AMA CONSULTING ENGINEERS, PC Owner JAMESTOWN OTS Filer GILLMAN CONSULTING INC | Hereby filing to replace and install new plumbing fixtures for tenant fit out as shown on plans filed herewith. No change to use, occupancy … |
| M01159718 ↗ | 1 TIMES SQUARE MANHATTAN | Alteration | Signed-off | 04/02/2025 | 06/16/2026 | Design KENNETH PARK ARCHITECTS Owner JAMESTOWN OTS Filer GILLMAN CONSULTING INC | Hereby filing to remove, replace, and install new plumbing fixtures with related piping for tenant fit out as shown on plans filed herewith. |
| M00930715 | 10 BATTERY PLACE MANHATTAN | Alteration | Permit Issued | 09/14/2023 | 05/20/2026 | Design BORIS SIRUNYAN Owner NYC PARKS & RECREATION Filer METROPOLIS GROUP INC | INSTALLATION OF CONSTUCTION FENCE , NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| M01159731 ↗ | 1 TIMES SQUARE MANHATTAN | Alteration | Permit Issued | 04/02/2025 | 02/19/2026 | Design KENNETH PARK ARCHITECTS Owner JAMESTOWN OTS Filer GILLMAN CONSULTING INC | Hereby filing to replace and relocate plumbing fixtures for tenant fit out as shown on plans filed herewith. No change to use, occupancy or … |
| X01112380 | 3424 KOSSUTH AVENUE BRONX | Alteration | Permit Issued | 09/30/2024 | 02/06/2026 | Design SYSKA HENNESSY GROUP | HVAC and mechanical modifications on floors Basement, 1B , 3, 4, 6 & 13. |
| Name | Projects together | Most recent |
|---|---|---|
| AMA Consulting Engineers | 4 | 05/01/2026 |
| Desimone Consulting Engineers | 4 | 05/01/2026 |
| Kenneth Park Architects | 3 | 05/01/2026 |
| Keystone Structural Group | 3 | 04/04/2024 |
| DJM Consulting Engineering | 2 | 03/06/2024 |
| Dxu | 2 | 04/05/2023 |
| Montroy Demarco Architecture | 2 | 11/12/2024 |
| Patti & Anthes Consulting Engineers | 2 | 05/13/2024 |
| William Green Architecture | 2 | 05/13/2024 |
| 2LS Consulting Engineering | 1 | 04/19/2024 |
| Altieriseborwieber | 1 | 05/14/2024 |
| Archytecx Design and Architecture | 1 | 11/18/2025 |
| Array Architects | 1 | 08/12/2026 |
| Boris Sirunyan | 1 | 09/14/2023 |
| Case Engineering | 1 | 11/28/2022 |
| Concessi Engineering | 1 | 11/12/2024 |
| Douglas P. Gonzalez | 1 | 04/24/2025 |
| Env Architects | 1 | 10/04/2023 |
| Fiskaa Engineering | 1 | 10/19/2023 |
| Halsey McCormack Helmer | 1 | 02/02/2024 |
| HKC Engineering | 1 | 05/12/2024 |
| Jongseo Kim Architect | 1 | 06/27/2024 |
| Lakhani & Jordan | 1 | 07/31/2026 |
| Lilker Associates Consulting Engineering | 1 | 02/02/2024 |
| MG Engineering | 1 | 09/21/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Metrocity Group | 4 | 05/01/2026 |
| Sirina Fire Protection | 4 | 05/01/2026 |
| Advanced Plumbing, Mechanical & Sprinkler | 2 | 05/13/2024 |
| Pace Plumbing | 2 | 05/14/2024 |
| Advanced Plumbing Mechanical | 1 | 05/13/2024 |
| Alliance Plumbing | 1 | 02/02/2024 |
| Archer Consultants Group | 1 | 02/02/2024 |
| Battery Park Construction | 1 | 09/14/2023 |
| Capitol Fire Sprinkler | 1 | 04/19/2024 |
| Case Plumbing | 1 | 11/12/2024 |
| VMC Plumbing & Heating | 1 | 11/12/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Jamestown Ots | 4 | 05/01/2026 |
| Urban Edge Properties | 4 | 03/06/2024 |
| 60 Orchard Street | 2 | 10/19/2023 |
| Acadia Realty Trust | 2 | 05/13/2024 |
| American Museum of Natural History | 1 | 05/14/2024 |
| Bellevue Hospital | 1 | 08/12/2026 |
| Colonnade Management | 1 | 10/04/2023 |
| NYC Department of Parks and Recreation | 1 | 09/14/2023 |
| Strategic Hotels and Resorts | 1 | 11/03/2022 |
| Thor Equities | 1 | 11/22/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| GGONZALEZ@BOHLERENG | 4 | 03/06/2024 |
| Gillman Consulting | 4 | 05/01/2026 |
| William Vitacco Associates | 3 | 05/13/2024 |
| K & M DOB Consulting | 2 | 06/27/2024 |
| Meridian Code Consultants | 2 | 04/05/2023 |
| Metropolis Group | 2 | 08/12/2026 |
| Burnham Nationwide | 1 | 10/19/2023 |
| Caso & Associates | 1 | 02/02/2024 |
| Domani Consulting | 1 | 04/19/2024 |
| Integrated | 1 | 09/24/2024 |
| Jam Consultants | 1 | 11/12/2024 |
| Janco Building Consultants | 1 | 10/04/2023 |
| Mbe Code & Zoning | 1 | 05/14/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M08006066 ↗ | 160 CENTRAL PARK SOUTH MANHATTAN | Alteration | Signed-off | 11/30/2022 | 09/08/2026 | Mechanical work as shown on plans for three specialty Hotel suites on 15th, 25th and 31st construction floors (Marketing floors 16th, 26th a… | |
| M01102577 ↗ | 1 TIMES SQUARE MANHATTAN | Alteration | Signed-off | 01/29/2025 | 06/16/2026 | Design AMA CONSULTING ENGINEERS, PC Owner JAMESTOWN OTS Filer GILLMAN CONSULTING INC | Hereby filing to replace and install new plumbing fixtures for tenant fit out as shown on plans filed herewith. No change to use, occupancy … |
| M01159718 ↗ | 1 TIMES SQUARE MANHATTAN | Alteration | Signed-off | 04/02/2025 | 06/16/2026 | Design KENNETH PARK ARCHITECTS Owner JAMESTOWN OTS Filer GILLMAN CONSULTING INC | Hereby filing to remove, replace, and install new plumbing fixtures with related piping for tenant fit out as shown on plans filed herewith. |
| M00930715 | 10 BATTERY PLACE MANHATTAN | Alteration | Permit Issued | 09/14/2023 | 05/20/2026 | Design BORIS SIRUNYAN Owner NYC PARKS & RECREATION Filer METROPOLIS GROUP INC | INSTALLATION OF CONSTUCTION FENCE , NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| M01159731 ↗ | 1 TIMES SQUARE MANHATTAN | Alteration | Permit Issued | 04/02/2025 | 02/19/2026 | Design KENNETH PARK ARCHITECTS Owner JAMESTOWN OTS Filer GILLMAN CONSULTING INC | Hereby filing to replace and relocate plumbing fixtures for tenant fit out as shown on plans filed herewith. No change to use, occupancy or … |
| X01112380 | 3424 KOSSUTH AVENUE BRONX | Alteration | Permit Issued | 09/30/2024 | 02/06/2026 | Design SYSKA HENNESSY GROUP | HVAC and mechanical modifications on floors Basement, 1B , 3, 4, 6 & 13. |
| X01110924 | 3424 KOSSUTH AVENUE BRONX | Alteration | Permit Issued | 09/24/2024 | 02/02/2026 | Design MOODY-NOLAN ARCHITECTURE Filer INTEGRATED | Interior renovation on floors 1B , 3, 4, 6 & 13. |
| M01267698 ↗ | 1 TIMES SQUARE MANHATTAN | Alteration | Signed-off | 08/14/2025 | 11/20/2025 | Owner JAMESTOWN OTS Filer GILLMAN CONSULTING INC | Hereby filing to remove and install sprinkler heads with related piping for tenant fit out as shown on plans filed herewith. |
| X01112675 | 3424 KOSSUTH AVENUE BRONX | Alteration | Permit Issued | 09/24/2024 | 05/13/2025 | Design DOUGLAS P. GONZALEZ | Structural modification consisting of new core drill openings through existing slabs and infill of existing slab openings. |
| Q00933708 | 161-25 GRAND CENTRAL PARKWAY QUEENS | Alteration | Permit Issued | 10/16/2023 | 05/07/2025 | Filer CASO & ASSOCIATES,INC. | Related sprinkler modification for a portion of the 4 fl N building. PAA1 description in comments |
| B01107975 | 141 FLUSHING AVENUE BROOKLYN | Alteration | Permit Issued | 11/08/2024 | 02/05/2025 | Design CONCESSI ENGINEERING, P.C. Filer JAM CONSULTANTS, INC. | PLUMBING AND SPRINKLER WORK ASSOCIATED WITH OFFICE RENOVATION AS PER PLANS FILED HEREWITH. |
| M08013670 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/06/2022 | 07/24/2024 | Design ARRAY ARCHITECTS Owner BELLEVUE HOSPITAL Filer METROPOLIS GROUP INC | HEREWITH FILING GENERAL CONSTRUCTION WORK FOR 19TH FLOOR FORENSIC EXPANSION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL… |
| M08013693 | 462 1ST AVENUE MANHATTAN | Alteration | Permit Issued | 12/06/2022 | 07/24/2024 | Design LAKHANI & JORDAN | HEREWITH FILING FOR MECHANICAL MODIFICATIONS IN THE 19TH FLR FORENSIC UNIT PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPL… |
| M01043237 | 200 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 05/14/2024 | 07/22/2024 | Design ALTIERISEBORWIEBER LLC Filer MBE CODE & ZONING LLC | Renovation of Building #20, 5th FL offices, and renovation of Building #10 for the lower-level Men's and Women's bathrooms. No change of occ… |
| B00888854 ↗ | 445 GOLD STREET BROOKLYN | Alteration | Signed-off | 08/03/2023 | 06/11/2024 | Design WILLIAM GREEN ARCHITECTURE Owner ACADIA REALTY TRUST | Structural work for tenant space Sephora as shown on plans |
| B00892038 ↗ | 1 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 08/03/2023 | 03/15/2024 | Owner ACADIA REALTY TRUST | Structural work for tenant space Sephora as shown on plans |
| B00894694 | 21 FLUSHING AVENUE BROOKLYN | Alteration | Signed-off | 09/20/2023 | 03/15/2024 | Filer DOMANI CONSULTING | The mechanical scope is distribution of ductwork. No change in use, occupancy or egress |
| M00869025 ↗ | 30 WALL STREET MANHATTAN | Alteration | Permit Issued | 10/04/2023 | 03/14/2024 | Design ENV ARCHITECTS, DPC Owner COLONNADE MANAGEMENT | PROPOSE TO RENOVATE EXISTING OFFICE SPACES AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY. |
| M00870250 ↗ | 30 WALL STREET MANHATTAN | Alteration | Permit Issued | 09/21/2023 | 03/14/2024 | Design MG ENGINEERING D.P.C. | PROPOSE TO INSTALL AND REROUTE DUCTWORK AND PIPING AS PER PLANS FILED HEREWITH. |
| X08019607 ↗ | 1967 TURNBULL AVENUE BRONX | Alteration | Signed-off | 09/14/2023 | 09/27/2023 | Design STUDIO 5 PARTNERSHIP | Removal and installation of interior non-load bearing walls and interior renovations (Unit 9). No change to use, egress, or occupancy. |
| X08019958 ↗ | 1967 TURNBULL AVENUE BRONX | Alteration | Signed-off | 09/13/2023 | 09/19/2023 | Design DJM CONSULTING ENGINEERING Owner URBAN EDGE PROPERTIES Filer GGONZALEZ@BOHLERENG.COM | New HVAC units and HVAC modification and associated ductwork as per plans (Unit 9). There will be no change in use, egress, or occupancy |
| X08019909 ↗ | 1967 TURNBULL AVENUE BRONX | Alteration | Signed-off | 09/14/2023 | 09/18/2023 | Design KEYSTONE STRUCTURAL GROUP | Hereby filing plans for structural work associated with renovations (Unit 9). No change in use, egress, or occupancy. |
| M00903325 ↗ | 320 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/28/2023 | 08/16/2023 | Design JONGSEO KIM ARCHITECT PC | RENOVATION OF EXISTING OFFICE SPACES INCLUDING MODIFICATION OF PARTITIONS, FLOORING, AND CEILING. LIGHTING, AND MINOR CARPENTRY WORKS. NO CH… |
| M00903364 ↗ | 320 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/31/2023 | 08/16/2023 | Design HKC ENGINEERING P.C. | INSTALLATION OF AC UNIT AND MODIFICATION OF DUCT WORKS, CEILING DIFFUSERS AND RETURN GRILLES. |
| M08051875 ↗ | 19 BOND STREET MANHATTAN | Alteration | Signed-off | 04/04/2023 | 06/23/2023 | Design FISKAA ENGINEERING Owner 60 Orchard Street LLC Filer BURNHAM NATIONWIDE INC | MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M08051863 ↗ | 19 BOND STREET MANHATTAN | Alteration | Signed-off | 04/05/2023 | 06/22/2023 | Design DXU LLC Owner 60 Orchard Street LLC | INTERIOR COSMETIC WORK AS PER PLANS FILED HERE WITH. NO CHANGE IN USE,EGREES OR OCCUPPANCY. |
| X08011167 ↗ | 1967 TURNBULL AVENUE BRONX | Alteration | Signed-off | 11/01/2022 | 06/22/2023 | Design DJM CONSULTING ENGINEERING Owner URBAN EDGE PROPERTIES Filer GGONZALEZ@BOHLERENG.COM | New HVAC units and HVAC modification and associated ductwork as per plans (Unit 11a/11b). There will be no change in use, egress, or occupan… |
| X08011411 ↗ | 1967 TURNBULL AVENUE BRONX | Alteration | Signed-off | 10/31/2022 | 06/22/2023 | Design KEYSTONE STRUCTURAL GROUP Owner URBAN EDGE PROPERTIES Filer GGONZALEZ@BOHLERENG.COM | Hereby filing plans for structural work associated with renovations (Unit 11a/11b). No change in use, egress, or occupancy. |
| X08011529 ↗ | 1967 TURNBULL AVENUE BRONX | Alteration | Signed-off | 12/05/2022 | 06/22/2023 | Design KEYSTONE STRUCTURAL GROUP Owner URBAN EDGE PROPERTIES Filer GGONZALEZ@BOHLERENG.COM | Hereby filing application for the Foundation work associated with renovations (Unit 11a/11b). No change to use, egress, or occupancy. |
| M08006044 ↗ | 160 CENTRAL PARK SOUTH MANHATTAN | Alteration | Signed-off | 11/03/2022 | 02/21/2023 | Design MLG ARCHITECTS | General alterations to three specialty Hotel suites on 15th, 25th and 31st construction floors (Marketing floors 16th, 26th and 32nd floor) |
| M08000591 ↗ | 929 BROADWAY MANHATTAN | Alteration | Signed-off | 11/28/2022 | 12/09/2022 | Design CASE ENGINEERING, INC. | MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| M08000458 ↗ | 929 BROADWAY MANHATTAN | Alteration | Signed-off | 11/22/2022 | 12/07/2022 | Design DXU LLC Owner THOR EQUITIES, LLC | INTERIOR RENOVATION ON EXISTING COMMERCIAL SPACE AS PER PLANS FIILED HEREWITH. NO CHANGE IN EGRESS,USE OR OCCUPANCY. |
| Building | Filings | Most Recent |
|---|---|---|
| 160 CENTRAL PARK SOUTH ↗ | 2 | 09/10/2026 |
| 1 TIMES SQUARE ↗ | 14 | 07/08/2026 |
| 3424 KOSSUTH AVENUE ↗ | 8 | 06/28/2026 |
| 141 FLUSHING AVENUE ↗ | 6 | 07/08/2026 |
| 462 1ST AVENUE ↗ | 7 | 07/08/2026 |
| 200 CENTRAL PARK WEST ↗ | 3 | 03/21/2026 |
| 445 GOLD STREET ↗ | 4 | 07/08/2026 |
| 161-25 GRAND CENTRAL PARKWAY ↗ | 6 | 07/08/2026 |
| 21 FLUSHING AVENUE ↗ | 10 | 07/08/2026 |
| 1 DEKALB AVENUE ↗ | 4 | 07/08/2026 |
| 30 WALL STREET ↗ | 6 | 07/08/2026 |
| 1967 TURNBULL AVENUE ↗ | 29 | 07/08/2026 |
| 10 BATTERY PLACE ↗ | 1 | 07/08/2026 |
| 320 PARK AVENUE ↗ | 6 | 03/21/2026 |
| 19 BOND STREET ↗ | 8 | 07/08/2026 |
| 929 BROADWAY ↗ | 6 | 03/21/2026 |