← Back
BuildNYC
Elevator apt, fireproof without stores
210 WEST 16TH STREET
MANHATTAN · BIN 1013777
💬 Discuss this project
1925Year Built
6.5Stories
D3Building Class
R8BZoning
33,547 sfGross Floor Area
52Units
LL97 CoveredRent Stabilized4 Active Violations 1 unresolved · 3 paperwork only ▸
Elevator apt, fireproof without stores · Owner of record: United Chelsea · 8,983 sf lot · 3.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLandmark Resource LLCUnder Construction2p · 2 filings · 13 docs
PenthouseLandmark Resource LLCUnder Construction3p · 2 filings · 20 docs
Floor 6Landmark Resource LLC1p · 1 filing · 11 docs
Floor 5Landmark Resource LLCUnder Construction12p · 3 filings · 20 docs
Floor 4Landmark Resource LLC1p · 1 filing · 11 docs
Floor 3Landmark Resource LLC1p · 1 filing · 11 docs
Floor 2Landmark Resource LLCUnder Construction12p · 3 filings · 20 docs
Floor 1Landmark Resource LLC1p · 1 filing · 11 docs
CellarLandmark Resource LLCUnder Construction11p · 4 filings · 20 docs
BasementUnder Construction1p · 1 filing · 10 docs
Sub-BasementLandmark Resource LLC1p · 1 filing · 11 docs
Site & exteriorSidewalk shed and pipe scaffolding installationUnder Construction19p · 2 filings · 5 docs
Filed — no permit issuedRear facade repair and pointing2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
United Chelsea5203/22/2026
Landmark Resources3007/08/2026
Ruradan103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company1403/21/2026
Leder-Luis Architectural Design403/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Topline NYC ContractingScaffold303/21/2026
United HayGeneral Contractor304/11/2026
Bell Fuel OilPlumbing207/08/2026
Approved Oil Co BrooklynGeneral Contractor203/21/2026
Titan Services USAScaffold206/27/2026
Nationwide MechanicalPlumbing107/08/2026
Jeco Electrical ServiceElectrical103/21/2026
Alef Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joseph Botta, PE1139203/22/2024
New York Engineering Associates851702/17/2023
Building Lifecycle
All (122)Filed (13)Permit Issued (11)Signed Off (4)Violation (60)Inspection (3)Objection (6)Special Inspection (25)
08/13/2026
Objection raised — Cost
08/13/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
04/28/2026
Permit issued — Supported Scaffold
M01375540-I1-SH
04/28/2026
Permit issued — Sidewalk Shed
M01375540-I1-SF
04/27/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLD, AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01375540-I1
03/29/2026
Violation issued (HPD, closed)
C
01/09/2026
Permit issued — General Construction
M01014506-I1-GC
01/04/2026
Violation issued (HPD, closed)
C
01/13/2025
Permit issued — General Construction
M01014506-I1-GC
06/03/2024
Objection raised — Scope
05/29/2024
Filed — Alteration
Renovation of Apartments 3C and 6F.
M01014506-P1
05/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/16/2024
Special inspection requirement — Lighting in dwelling units
Julio Leder-Luis
05/16/2024
Special inspection requirement — Insulation placement and R values
Julio Leder-Luis
05/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Julio Leder-Luis
05/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
Julio Leder-Luis
04/25/2024
Permit issued — General Construction
M01014506-I1-GC
04/15/2024
Permit issued — Plumbing
M01014526-I1-PL
04/04/2024
Objection resolved — Addressed
03/28/2024
Objection raised — Scope
03/22/2024
Filed — Alteration
Renovation of Apartments 3C and 6F.
M01014506-I1
03/22/2024
Filed — Alteration
Remove and plug 1 stove in apartment 3C and Remove and plug 1 stove in apartment 6F.
M01014526-I1
03/22/2024
Filed — Alteration
Repair and Pointing of rear facade.
M00995607-I1
03/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/10/2023
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING AND CONNECT TO REPLACE BURNER.
M00745803-I1
10/10/2023
Signed off — Alteration
INSTALL CHIMNEY LINER.
M00745820-I1
10/10/2023
Signed off — Alteration
REPLACE BOILER AND OIL BURNER. 5000 GALLON OIL TANK TO BE REPLACED WITH TWO (2) 275 GALLON OIL TANKS. CHANGE GRADE OF OIL FROM #4 TO #2.
M00745778-I1
09/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/21/2023
Permit issued — Plumbing
M00745803-I1-PL
05/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/28/2023
Violation issued (ECB, closed)
Elevators
02/22/2023
Violation issued (HPD, closed)
C
02/22/2023
Violation issued (HPD, closed)
C
02/22/2023
Violation issued (HPD, closed)
C
02/22/2023
Violation issued (HPD, closed)
C
02/22/2023
Violation issued (HPD, closed)
C
02/22/2023
Violation issued (HPD, closed)
C
02/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
02/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
02/21/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
02/21/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
02/21/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
02/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/17/2023
Filed — Alteration
REPLACE BOILER AND OIL BURNER. 5000 GALLON OIL TANK TO BE REPLACED WITH TWO (2) 275 GALLON OIL TANKS. CHANGE GRADE OF OIL FROM #4 TO #2.
M00745778-P2
02/17/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/17/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
02/17/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
02/17/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
02/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
02/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
02/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
09/27/2022
Signed off — Alteration
M00745101-I1
06/29/2022
Special inspection requirement — Final
LOUIS ARENA
06/29/2022
Special inspection requirement — Chimneys and vents
LOUIS ARENA
06/27/2022
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING AND CONNECT TO REPLACE BURNER.
M00745803-P1
06/27/2022
Filed — Alteration
REPLACE BOILER AND OIL BURNER. 5000 GALLON OIL TANK TO BE REPLACED WITH TWO (2) 275 GALLON OIL TANKS. CHANGE GRADE OF OIL FROM #4 TO #2.
M00745778-P1
06/27/2022
Filed — Alteration
INSTALL CHIMNEY LINER.
M00745820-P1
06/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
06/21/2022
Permit issued — General Construction
M00745820-I1-GC
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedTitan Services USA04/28/2026
DOB NOWSidewalk ShedPermit IssuedTitan Services USA04/28/2026
DOB NOWGeneral ConstructionPermit IssuedUnited Hay01/09/2026
DOB NOWGeneral ConstructionPermit IssuedUnited Hay01/13/2025
DOB NOWGeneral ConstructionPermit IssuedUnited Hay04/25/2024
DOB NOWPlumbingPermit IssuedNationwide Mechanical04/15/2024
DOB NOWPlumbingSigned-offApproved Energy09/21/2023
DOB NOWGeneral ConstructionSigned-offApproved Oil Co Brooklyn06/21/2022
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn06/07/2022
DOB NOWPlumbingSigned-offApproved Energy06/04/2022
DOB NOWSupported ScaffoldSigned-offTopline NYC Contracting05/31/2022
BISPLISSUEDNationwide Mechanical01/19/2022
BIS—ISSUEDUnited Hay02/27/2020
BISPLISSUEDNationwide Mechanical02/12/2020
BISOTISSUEDUnited Hay01/27/2020
BISEQISSUEDBilly Enterprises08/02/2017
BISOTISSUEDUnited Hay12/03/2013
BIS—ISSUEDUnited Hay10/29/2013
BISPLISSUEDJ. Barone & Co07/18/2013
BISPLISSUEDJ. Barone & Co01/02/2013
BISOTISSUEDUnited Hay09/28/2012
BIS—ISSUEDDavid Turner Architect02/15/2011
BISPLISSUEDJ. Barone & Co02/15/2011
BISOTISSUEDDavid Turner Architect07/26/2010
BISEQISSUEDH & B Construction NY06/02/2010
BISPLISSUEDJ. Barone & Co02/12/2010
BISOTISSUEDDavid Turner Architect10/19/2009
BISOTISSUEDDavid Turner Architect09/22/2009
BISOTISSUEDDavid Turner Architect02/02/2009
BISOTISSUEDDavid Turner Architect09/10/2008
BISOTISSUEDDavid Turner Architect03/18/2008
BISOTISSUEDDavid Turner Architect11/26/2007
BISOTISSUEDDavid Turner Architect03/24/2006
BISPLISSUEDWagner Ziv Plumbing and Heating04/10/2003
BISOTISSUEDDavid Turner Architect07/08/2002
BIS—ISSUEDDavid Turner Architect03/20/2002
BISOTISSUEDReld Cop03/08/2002
BISOTISSUEDDavid Turner Architect02/08/2002
BISPLISSUEDTheodore Wagner Plumbing and Heating01/23/2002
BISPLISSUEDTheodore Wagner PLG. & Heating08/09/2001
+ 3 more permits on file
1 project · most recent 03/22/2024
Gas
FiledStatusContractorScope
03/22/2024Permit IssuedNationwide MechanicalGas
3 projects · most recent 03/20/2026
General Wiring
FiledStatusContractorScope
03/20/2026Permit IssuedHigh Quality Electric of NYC—
06/07/2022CompleteDemand Electric—
05/06/2019Permit IssuedJeco Electrical ServiceGeneral Wiring
1 project · most recent 04/27/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/27/2026Permit IssuedTitan Services USAScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/17/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/22/2024Tenant Protection Plan Compliance—special
05/16/2024Lighting in dwelling unitsJulio Leder-Luisenergy_progress
05/16/2024Insulation placement and R valuesJulio Leder-Luisenergy_progress
05/16/2024Energy Code Compliance InspectionsJulio Leder-Luisprogress
05/16/2024Fire-Resistance Rated ConstructionJulio Leder-Luisprogress
03/05/2024Tenant Protection Plan Compliance—special
02/21/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
02/21/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
02/21/2023Maintenance informationLOUIS ARENAenergy_progress
02/21/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
02/21/2023Heating SystemsLOUIS ARENAspecial
02/21/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
02/17/2023Maintenance informationLOUIS ARENAenergy_progress
02/17/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
02/17/2023Heating SystemsLOUIS ARENAspecial
02/17/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
02/17/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
02/17/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/29/2022FinalLOUIS ARENAprogress
06/29/2022Chimneys and ventsLOUIS ARENAspecial
06/27/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/21/2022Chimneys and ventsLOUIS ARENAspecial
06/21/2022FinalLOUIS ARENAprogress
06/21/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
05/25/2022FinalMOHAMMAD AHEADprogress
▾Documents — 248 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/02/2026M00745101-I1Request digital key ↗
09/02/2026M00745803-I1Request digital key ↗
09/02/2026M00745803-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION34
01/09/2024102514557Open ↗
04/14/2023110326120Open ↗
04/14/2023121858070Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION16
02/28/2020102514557Open ↗
02/14/2020123574168Open ↗
01/27/2020123574168Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
04/06/2020102514557Open ↗
04/06/2020102514557Open ↗
04/06/2020102514557Open ↗
▸Seals & Professional Certifications66
▸DOB NOWProgress Inspector Seal & Signature15
10/06/2026M01014506-P1Open ↗
10/06/2026M01014506-P1Open ↗
10/06/2026M01014506-P1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
08/01/2018123574168Open ↗
07/23/2018140669756Open ↗
06/20/2018123574168Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026M00745101-I1Open ↗
09/02/2026M00745803-P1Open ↗
09/02/2026M00745803-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
12/05/2013121858070Open ↗
08/23/2012121348238Open ↗
06/07/2010120370179Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/29/2026M00745803-I1Open ↗
09/27/2026M00745803-P1Open ↗
09/23/2026M00745778-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
08/23/2012121348238Open ↗
06/02/2010120369975Open ↗
03/13/2008110110656Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/01/2017140669756Open ↗
12/05/2013121858070Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/01/2017140669756Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/01/2017140669756Open ↗
▸BISPC FULL REPORT1
11/07/2007110014207Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING4
09/07/2020123574168Open ↗
12/05/2013121858070Open ↗
08/23/2012121348238Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/20/2018123574168Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
08/28/2008110326120Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
03/14/2013121348238Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
06/20/2018123574168Open ↗
12/05/2013121858070Open ↗
08/23/2012121348238Open ↗
▸BISTenant Protection Plan and Notes2
06/20/2018123574168Open ↗
08/01/2017140669756Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/02/2026M00745803-I1Open ↗
09/02/2026M00745803-P1Open ↗
09/02/2026M00745778-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
07/26/2010120403465Open ↗
10/07/2009120170331Open ↗
07/08/2009120098704Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
05/20/2019123574168Open ↗
08/24/2018123574168Open ↗
08/01/2017140669756Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/02/2010120369975Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
10/07/2019123574168Open ↗
06/20/2018123574168Open ↗
06/01/2018121348238Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
08/30/2022123574168Open ↗
08/30/2022123574168Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/10/2022123574168Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/01/2018121348238Open ↗
▸BISINTERIOR LIGHTING POWER1
08/30/2022123574168Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/10/2022123574168Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00745778-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/02/2026M00745778-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/30/2022123574168Open ↗
08/10/2022123574168Open ↗
08/02/2017140669756Open ↗
Showing 3 of 4 on file for this type
▸BISDOB FINAL INSPECTION REQUIRED1
08/30/2022123574168Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/30/2022123574168Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/30/2022123574168Open ↗
▸Approvals, Objections & Sign-offs14
▸BISADMINISTRATIVE OBJECTIONS8
08/23/2012121348238Open ↗
07/02/2010120403465Open ↗
06/02/2010120369975Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/31/2022123574168Open ↗
07/23/2018140669756Open ↗
06/01/2018121348238Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/15/2020102514557Open ↗
07/03/2019123574168Open ↗
07/23/2018140669756Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT13
08/10/2022123574168Open ↗
10/08/2019123574168Open ↗
06/20/2018123574168Open ↗
Showing 3 of 13 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT6
01/27/2020123574168Open ↗
12/05/2013121858070Open ↗
01/04/2013121348238Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
02/28/2020102514557Open ↗
10/22/2018102514557Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/30/2022123574168Open ↗
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET8
06/20/2018123574168Open ↗
12/05/2013121858070Open ↗
08/23/2012121348238Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
10/17/2019102514557Open ↗
09/12/2019102514557Open ↗
09/03/2019102514557Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
08/31/2022123574168Open ↗
08/31/2022123574168Open ↗
12/23/2021123574168Open ↗
▸BISeFiling Job Application Cover Sheet3
08/28/2008110326120Open ↗
03/13/2008110110656Open ↗
08/01/2017140669756Open ↗
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M00745820-P1Open ↗
08/16/2026M00745803-I1Open ↗