Elevator cooperative
The Beresford
211 CENTRAL PARK WEST · BIN 1031141
💬 Discuss this project
1929Year Built
20Stories
D4Building Class
R10AZoning
600,613 sfGross Floor Area
183Units
LL97 CoveredRent Stabilized5 Open Violations 3 unresolved · 2 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: BERESFORD APT INC · 40,350 sf lot · 14.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 20 docs
Floor 20Under Construction46p · 5 filings · 20 docs
Floor 19Under Construction40p · 3 filings · 20 docs
Floor 1810p · 3 filings · 20 docs
Floor 17Under Construction53p · 2 filings · 20 docs
Floor 16Under Construction56p · 4 filings · 20 docs
Floor 158p · 5 filings · 20 docs
Floor 14Under Construction15p · 3 filings · 20 docs
Floor 132p · 1 filing · 14 docs
Floor 12
Floor 11Under Construction16p · 1 filing · 20 docs
Floor 10Under Construction18p · 2 filings · 20 docs
Floor 912p · 2 filings · 20 docs
Floor 8Under Construction20p · 3 filings · 20 docs
Floor 7
Floor 6
Floor 5Under Construction27p · 5 filings · 20 docs
Floor 46p · 3 filings · 20 docs
Floor 3Under Construction27p · 1 filing · 20 docs
Floor 2
Floor 19p · 2 filings · 15 docs
Cellar11p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLAS ELLIMAN PROPERTY MANAGEMENT2209/13/2026
CPW TERRACE TRUST1007/08/2026
SOLSTICE RESIDENTIAL GROUP3907/08/2026
888 PARK504/09/2026
ANDAMIO SCAFFOLDING LLC903/22/2026
BERESFORD APT INC SOLSTIC403/22/2026
AKAM ASSOCIATES903/22/2026
DNA CONSTRACTING LLC103/22/2026
OWNER OF 211 CENTRAL PARK103/22/2026
AKAM ASSOC. AGENT103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES2603/21/2026
J CALLAHAN CONSULTING4603/21/2026
JAM CONSULTANTS, INC.1203/21/2026
DVA Advisors603/21/2026
OUTSOURCE CONSULTANTS, INC.403/21/2026
AGOUTI CONSTRUCTION CONSULTING2203/21/2026
CODE1203/21/2026
IOAD1203/21/2026
RESOLUTION EXPEDITING1203/21/2026
ANDRA CONSTANTIN EXPEDITER1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC INSTALLATION CORP.General Contractor2907/08/2026
AM&G WATERPROOFING LLCGeneral Contractor1707/08/2026
UBERTO, LTDGeneral Contractor1304/09/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor903/21/2026
RUSK APARTMENT, LLCGeneral Contractor807/08/2026
BAR CONSTRUCTION SERVICESGeneral Contractor807/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor807/08/2026
SILVERLINING INTERIORSGeneral Contractor707/08/2026
FANUKA INCGeneral Contractor707/08/2026
V. DISALVO CONTRACTING COGeneral Contractor604/09/2026
DONATO PLUMBING, INCPlumbing607/08/2026
S. DONADIC INCGeneral Contractor607/08/2026
SUPERIOR HVAC INCGeneral Contractor607/08/2026
RUSK RENOVATIONS, INCGeneral Contractor607/08/2026
KILLOWEN CONSTRUCTION INGeneral Contractor507/31/2026
CEPRINE CONSTRUCTION INCGeneral Contractor504/09/2026
DEBONO BROS. BUILDERS & DGeneral Contractor407/08/2026
ORBIT PLBG & HTG INCPlumbing408/25/2026
KLDNY INCGeneral Contractor307/08/2026
ARK-POL PLUMBING CORPPlumbing307/08/2026
LANE REFRIGERATION CO.,INGeneral Contractor307/08/2026
INS DYNAMICS INCGeneral Contractor304/09/2026
VELLA INTERIORS INCGeneral Contractor307/08/2026
EINSTEIN ELEC'L CORPElectrical303/22/2026
ARI GROUP, INCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746408/05/2026
MICHAEL PATINO ARCHITECTU81701407/13/2026
A DEGREE OF FREEDOM STRUC925305/18/2026
CHRISTIAN L. MARTOS ENGIN5965804/13/2026
MCALPINE ARCHITECTURE PC5694304/13/2026
SPECIAL TESTING & CONSULT1688603/09/2026
DOMANI INSPECTION SERVICE8431002/04/2026
HOTTENROTH & JOSEPH ARCHI11601212/01/2025
SD TESTING & INSPECTION S7010411/14/2025
ARCO ENGINEERING PC3769310/27/2025
Building Lifecycle
All (300)Filed (57)Permit Issued (61)Signed Off (27)Facade (FISP) (6)Violation (1)Inspection (43)Objection (75)Special Inspection (30)
09/30/2026
Permit issued — Structural
M01239666-S1-ST
09/28/2026
Permit issued — Plumbing
M01203789-S1-PL
08/24/2026
Permit issued — Plumbing
M01239666-S3-PL
08/20/2026
Signed off — Alteration
New masonry through wall opening for AC unit as per plans filed herewith. No change to use, egress or occupancy.
M01241602-I1
08/06/2026
Objection resolved — Resolved
08/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
08/06/2026
Special inspection requirement — Chimneys and vents
Stephen Shishko
08/06/2026
Special inspection requirement — Mechanical Systems
Stephen Shishko
08/06/2026
Special inspection requirement — Final
Stephen Shishko
08/05/2026
Filed — Alteration
INSTALL NEW CHIMNEY LINER FOR FIREPLACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01295961-P1
08/05/2026
Objection raised — Scope
07/31/2026
Objection resolved — Resolved
07/31/2026
Objection resolved — Addressed
07/30/2026
Permit issued — Mechanical Systems
M01206087-S1-MS
07/29/2026
Objection raised — Cost
07/29/2026
Objection raised — Scope
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
07/28/2026
Special inspection requirement — Chimneys and vents
Stephen Shishko
07/28/2026
Special inspection requirement — Mechanical Systems
Stephen Shishko
07/28/2026
Special inspection requirement — Final
Stephen Shishko
07/23/2026
Permit issued — Structural
M01206087-S3-ST
07/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/14/2026
Permit issued — General Construction
M01206087-I1-GC
07/13/2026
Filed — Alteration
Replace doors in existing openings and replace existing windows with doors in modify masonry openings. No change to use, egress or occupancy.
M01271828-I1
07/08/2026
Permit issued — Structural
M01241602-I1-GC-CX
07/01/2026
Signed off — Alteration
M08030913-I1
07/01/2026
Signed off — Alteration
Modification to the plumbing system including relocate and new fixtures and piping and cap gas, remove 1 gas meter as per plans filed herewith. No change to use, egress, or occupancy.
M01153978-S3
07/01/2026
Signed off — Alteration
Modification to the plumbing system including relocate and new fixtures and piping and cap gas, remove 1 gas meter as per plans filed herewith. No change to use, egress, or occupancy.
M01153978-S1
07/01/2026
Signed off — Alteration
Modification to the plumbing system including relocate and new fixtures and piping and cap gas, remove 1 gas meter as per plans filed herewith. No change to use, egress, or occupancy.
M01153978-S2
07/01/2026
Signed off — Alteration
Modification to the plumbing system including relocate and new fixtures and piping and cap gas, remove 1 gas meter as per plans filed herewith. No change to use, egress, or occupancy.
M01153978-I1
06/30/2026
Filed — Alteration
Four window replacements in modified masonry openings and seven louvers in modified and new masonry openings. No change to use, egress or occupancy.
M01418452-I1
06/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2026
Permit issued — Structural
M01241602-I1-GC-CX
06/15/2026
Permit issued — General Construction
M01215589-I1-GC
06/12/2026
Objection resolved — Resolved
06/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2026
Permit issued — Mechanical Systems
M01206087-S1-MS
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Scope
06/01/2026
Special inspection requirement — Masonry
Dominic Cullen
06/01/2026
Special inspection requirement — Final
Dominic Cullen
06/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
LAWRENCE GREEN
06/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dominic Cullen
05/26/2026
Filed — Alteration
Structural work file in conjunction with a new convenience stair and new lintel for the enlarged window openings.
M01215589-P5
05/20/2026
Filed — Alteration
MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01382885-S1
05/20/2026
Filed — Alteration
MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01382885-S2
05/20/2026
Filed — Alteration
MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01382885-I1
05/19/2026
Signed off — Alteration
INSTALLATION OF NEW HEATING AND AIR CONDITIONING SYSTEM AND NEW EXHAUST SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01204272-I1
05/18/2026
Filed — Alteration
New masonry through wall opening for AC unit as per plans filed herewith. No change to use, egress or occupancy.
M01241602-P1
05/18/2026
Permit issued — Plumbing
M01206087-S2-PL
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/13/2026
Special inspection requirement — Final
Dominic Cullen
05/13/2026
Special inspection requirement — Masonry
Dominic Cullen
05/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dominic Cullen
05/05/2026
Special inspection requirement — Post-installed Anchors
04/30/2026
Permit issued — Mechanical Systems
M01295961-I1-MS
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedUBERTO, LTD09/30/2026
DOB NOWPlumbingPermit IssuedFIVE STAR P&H CO,INC09/28/2026
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC08/24/2026
DOB NOWMechanical SystemsPermit IssuedKILLOWEN CONSTRUCTION IN07/30/2026
DOB NOWStructuralPermit IssuedKILLOWEN CONSTRUCTION IN07/23/2026
DOB NOWGeneral ConstructionPermit IssuedKILLOWEN CONSTRUCTION IN07/14/2026
DOB NOWStructuralSigned-offHAMILTON AIR COMPANY, INC.07/08/2026
DOB NOWStructuralSigned-offHAMILTON AIR COMPANY, INC.06/17/2026
DOB NOWGeneral ConstructionPermit IssuedSILVERLINING INTERIORS06/15/2026
DOB NOWMechanical SystemsPermit IssuedKILLOWEN CONSTRUCTION IN06/08/2026
DOB NOWPlumbingPermit IssuedR.J.C. MECHANICAL CORP05/18/2026
DOB NOWMechanical SystemsSigned-offFLUE TECH INC04/30/2026
DOB NOWStructuralPermit IssuedSILVERLINING INTERIORS04/28/2026
DOB NOWPlumbingSigned-offZATOS PLBG AND HTG INC04/27/2026
DOB NOWMechanical SystemsPermit IssuedSILVERLINING INTERIORS04/27/2026
DOB NOWPlumbingPermit IssuedFORTE EXPRESS P & H INC04/27/2026
DOB NOWPlumbingPermit IssuedSMART PLBG & HTG CORP04/23/2026
DOB NOWGeneral ConstructionPermit IssuedKILLOWEN CONSTRUCTION IN04/22/2026
DOB NOWGeneral ConstructionSigned-offPRODIGY CONSTRUCTION INC04/20/2026
DOB NOWMechanical SystemsPermit IssuedBHD GROUP LLC03/27/2026
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC03/27/2026
DOB NOWGeneral ConstructionPermit IssuedBHD GROUP LLC03/26/2026
DOB NOWGeneral ConstructionPermit IssuedUBERTO, LTD02/27/2026
DOB NOWStructuralSigned-offLEEDING BUILDERS GROUP LC02/10/2026
DOB NOWGeneral ConstructionPermit IssuedFANUKA02/02/2026
DOB NOWMechanical SystemsPermit IssuedFANUKA02/02/2026
DOB NOWStructuralPermit IssuedFANUKA02/02/2026
DOB NOWMechanical SystemsSigned-offV. DISALVO CONTRACTING CO01/05/2026
DOB NOWStructuralSigned-offV. DISALVO CONTRACTING CO01/05/2026
DOB NOWGeneral ConstructionSigned-offV. DISALVO CONTRACTING CO12/30/2025
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP12/24/2025
DOB NOWGeneral ConstructionPermit IssuedUBERTO, LTD11/21/2025
DOB NOWMechanical SystemsPermit IssuedALL MAKES HTG & A/C CORP11/07/2025
DOB NOWGeneral ConstructionPermit IssuedRG DECORATING & PAINTING11/06/2025
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC11/03/2025
DOB NOWPlumbingPermit IssuedFIVE STAR P&H CO,INC10/27/2025
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC10/15/2025
DOB NOWMechanical SystemsPermit IssuedUBERTO, LTD10/09/2025
DOB NOWGeneral ConstructionSigned-offRUSK RENOVATIONS, INC10/03/2025
DOB NOWMechanical SystemsSigned-offRUSK RENOVATIONS, INC10/02/2025
+ 60 more permits on file
15 projects · most recent 08/05/2026
Air Conditioning Systems Heating and Air Conditioning Systems Others Heating Systems Ventilation Systems Generators
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026Signed-offFLUE TECH INCOthers
Other
Lifetime Chimney Supply FURAN FLEX RWV 1 BTU · Chimney ×1
Heatshield CHAMBER COAT 1 BTU ×1
05/26/2026Permit IssuedSILVERLINING INTERIORSHeating and Air Conditioning Systems
Heat / Cool
Daikin REYA168AATJA 156,000 BTU · Vrf Outdoor ×2
05/20/2026——Air Conditioning Systems
Cooling
Task MODEL# TYC021-30K 29,900 BTU · Condensing Unit ×1
04/13/2026Permit IssuedKILLOWEN CONSTRUCTION INAir Conditioning Systems
Cooling
Ephoca AIO Ceiling Ducted with ERV ADP10R4H1 14,000 BTU · Ductwork ×4
03/11/2026Permit IssuedUBERTO, LTDHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PURY-EP120TNU-A1 135,000 BTU · Vrf Outdoor ×4
11/14/2025Permit IssuedBHD GROUP LLCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems
Cooling
Task Applied Products TYC021TW-30K 29,900 BTU · Condensing Unit ×6
Heat / Cool
Ephoca APK10R3H2 8,900 BTU · Erv ×4
Heating
Berko CUH935 6,824 BTU · Electric Heater ×2
10/27/2025Permit IssuedHUDSON GREEN CRAFT LLCAir Conditioning Systems
Cooling
Above Air VCU-H-0024-1-X 2 tons · Condensing Unit ×1
VCU-H-0024-1-X,, MCA 13.7 2 tons · Condensing Unit ×1
Magic-Aire CHA08PA 800 CFM ×1
DUCO8FA 800 CFM ×1
09/26/2025Signed-offRUSK RENOVATIONS, INCAir Conditioning Systems, Ventilation Systems
Cooling
Task TYC021TWEC-30K-3619-A 29,700 BTU · Condensing Unit ×15
TYC021TWEC-25k-3619-A 25,500 BTU · Condensing Unit ×5
Ventilation
Panasonic FV-0522VQ1, FV-20NLF1 175 CFM · Exhaust Fan ×8
Greenheck SQ120-VG 375 CFM · Kitchen Exhaust ×5
Vortex VTX-400 175 CFM · Exhaust Fan ×2
08/07/2025Permit IssuedFLUE TECH INCOthers
Other
Lifetime Chimney Supply FURAN FLEX RWV 1 BTU · Chimney ×1
U.S. Draft Co. CBX13 7,900 CFM · Exhaust Fan ×1
07/31/2025Permit IssuedALL MAKES HTG & A/C CORPAir Conditioning Systems
Cooling
Carrier FMC4X3000AL 30,000 BTU · Fan Coil Indoor ×2
Task TYC021TW-30K 30,000 BTU · Condensing Unit ×2
06/06/2025Signed-offARI GROUP, INCAir Conditioning Systems
Cooling
Task TYC021TW-25K-3616-S 2 tons · Condensing Unit ×2
TYC021TW-25K-3619-A 2 tons · Condensing Unit ×1
08/28/2024Permit IssuedPAM AIR CONDITIONING INCAir Conditioning Systems
Cooling
Ice Air PTAC-2, PTAC-3, 8RS1618-R02 16,200 BTU · Ptac ×4
PTAC-1, 8RS1613-R02 12,600 BTU · Ptac ×2
05/16/2022——Air Conditioning Systems
Cooling
Goodman ASPT61D14A 60,000 BTU · Condensing Unit ×1
GSX140601K 2,000 CFM · Ahu ×1
11/13/2019Permit IssuedAEGIS ENERGY SERVICES LLCGenerators
Generators
__Junk__ POWERVERTER 4,000 BTU · Generator ×1
09/03/2019Signed-offSUPERIOR HVAC INCAir Conditioning Systems
Cooling
Above Air VCU-C-030-1 30,000 BTU · Condensing Unit ×2
Carrier FPMBNC030 30,000 BTU · Fan Coil Indoor ×1
First Company 30HXC 30,000 BTU · Fan Coil Indoor ×1
13 projects · most recent 05/26/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/26/2026Permit IssuedFORTE EXPRESS P & H INCGas, Water/Sanitary
05/20/2026——Gas, Water/Sanitary
04/13/2026Permit IssuedR.J.C. MECHANICAL CORPWater/Sanitary
03/11/2026Permit IssuedORBIT PLBG & HTG INCGas, Water/Sanitary
12/01/2025Signed-offDYNAMIC BLUE WATER MECHGas, Water/Sanitary
11/14/2025Permit IssuedSMART PLBG & HTG CORPGas, Water/Sanitary
10/27/2025Permit IssuedDONATO PLUMBING, INCGas, Water/Sanitary
09/26/2025Signed-offZATOS PLBG AND HTG INCWater/Sanitary
07/31/2025Permit IssuedFIVE STAR P&H CO,INCGas, Water/Sanitary
06/23/2025Signed-offDEMAR MECHANICAL INCGas, Water/Sanitary
11/13/2019Permit IssuedEH PLUMBING & HEATING CORGas
10/24/2019——Gas, Water/Sanitary
08/26/2019Signed-offBRANCH PLUMBING LLCWater/Sanitary
25 projects · most recent 09/24/2026
General Wiring
FiledStatusContractorScope
09/24/2026CompleteVERTEX ELECTRIC CORP.—
07/14/2026Permit IssuedA.DAVINO ELEC'L CONT'G COGeneral Wiring
06/17/2026CompleteT. MCCAFFREY-T. MCGOVERN1 meters
04/27/2026Permit IssuedTOP NOTCH ELECTRIC INCGeneral Wiring
04/13/2026CompleteAMSTERDAM ELECTRIC CORPGeneral Wiring
03/10/2026Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
02/19/2026Permit IssuedZIP ELECTRIC INCGeneral Wiring
11/03/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
10/20/2025CompleteAPOLLO ELECTRIC INC.General Wiring
10/16/2025Permit IssuedLENS ELECTRIC, INCGeneral Wiring
09/17/2025Permit IssuedBELMONT ELECTRICAL, INCGeneral Wiring
09/15/2025Permit IssuedEINSTEIN ELEC'L CORP—
09/15/2025Permit IssuedEINSTEIN ELEC'L CORPGeneral Wiring
09/11/2025Permit IssuedALBA ELECTRIC CORPGeneral Wiring
04/03/2025CompleteEINSTEIN ELEC'L CORPGeneral Wiring
6 projects · most recent 05/26/2026
Steel Concrete Masonry
FiledStatusContractorScope
05/26/2026Permit IssuedSILVERLINING INTERIORSSteel, Concrete
05/18/2026Signed-offHAMILTON AIR COMPANY, INCMasonry
04/13/2026Permit IssuedKILLOWEN CONSTRUCTION INSteel, Concrete
03/11/2026Permit IssuedUBERTO, LTDSteel, Concrete
11/14/2025Permit IssuedSMART PLBG & HTG CORPSteel
09/26/2025Signed-offRUSK RENOVATIONS, INC1 scope_items
3 projects · most recent 04/15/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/15/2024Permit IssuedDYNAMIX SCAFFOLD GROUP LLScaffold
01/02/2019Permit IssuedDYNAMIC INSTALLATION CORPSidewalk Shed
12/28/2018Permit IssuedDYNAMIC INSTALLATION CORPScaffold
1 project · most recent 04/01/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/01/2024——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 96
DateTypeResultReport
07/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2026Fail-Final Boiler Equipment InspectionFailView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/06/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/04/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
Latest 25 of 96.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/06/2026Tenant Protection Plan ComplianceStephen Shishkospecial
08/06/2026FinalStephen Shishkoprogress
08/06/2026Mechanical SystemsStephen Shishkospecial
08/06/2026Chimneys and ventsStephen Shishkospecial
07/28/2026FinalStephen Shishkoprogress
07/28/2026Mechanical SystemsStephen Shishkospecial
07/28/2026Chimneys and ventsStephen Shishkospecial
07/28/2026Tenant Protection Plan ComplianceStephen Shishkospecial
06/01/2026FinalDominic Cullenprogress
06/01/2026Structural Stability – Alterations of existing buildingsDominic Cullenspecial
06/01/2026Tenant Protection Plan ComplianceLAWRENCE GREENspecial
06/01/2026MasonryDominic Cullenspecial
05/13/2026Structural Stability – Alterations of existing buildingsDominic Cullenspecial
05/13/2026MasonryDominic Cullenspecial
05/13/2026FinalDominic Cullenprogress
05/13/2026Tenant Protection Plan Compliance—special
05/05/2026Post-installed Anchors—special
04/09/2026Fire-Resistant Penetrations and Joints—special
04/09/2026Fire-Resistant Penetrations and Joints—special
04/03/2026Final—progress
04/03/2026Mechanical Systems—special
03/30/2026Structural Steel - DetailsMichael Patinospecial
03/30/2026FinalMichael Patinoprogress
03/30/2026Structural Steel - High Strength BoltingMichael Patinospecial
03/30/2026Concrete - Cast-In-PlaceMichael Patinospecial
Latest 25 of 150.
▾Documents — 3,586 on file (BIS + DOB NOW)
▸Plans & Drawings183
▸DOB NOWPlans/Sketch155
09/03/2026M00491833-I1Request digital key ↗
09/03/2026M00510660-I1Request digital key ↗
09/03/2026M00487187-P4Request digital key ↗
Showing 3 of 155 on file for this type
▸DOB NOWPlans/Sketch - Plumbing11
09/05/2026M00197186-I1Request digital key ↗
09/05/2026M00240383-I1Request digital key ↗
09/05/2026M00245242-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems10
09/05/2026M00197188-I1Request digital key ↗
09/05/2026M00240176-I1Request digital key ↗
09/05/2026M00245245-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/05/2026M00240388-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00112828-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00112824-I1Request digital key ↗
▸Applications & Permits747
▸BISWORK PERMIT APPLICATION315
06/05/2025122955882Open ↗
06/04/2025122955882Open ↗
05/16/2025122955882Open ↗
Showing 3 of 315 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION280
04/04/2025100457569Open ↗
04/04/2025100457569Open ↗
03/21/2025121934210Open ↗
Showing 3 of 280 on file for this type
▸DOB NOWLPC Approval/Permit147
09/05/2026M00197188-I1Open ↗
09/05/2026M00245242-I1Open ↗
09/05/2026M00191482-P1Open ↗
Showing 3 of 147 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWState DEC Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications786
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION340
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 340 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature183
09/05/2026M00112828-I1Open ↗
09/05/2026M00112824-I1Open ↗
09/05/2026M00199922-I1Open ↗
Showing 3 of 183 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature125
09/30/2026M01079082-I1Open ↗
09/28/2026M00795899-P1Open ↗
09/26/2026M08030913-I1Open ↗
Showing 3 of 125 on file for this type
▸DOB NOWProgress Inspector Seal & Signature79
09/30/2026M01079082-I1Open ↗
09/26/2026M08030913-I1Open ↗
09/23/2026M00902014-P1Open ↗
Showing 3 of 79 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment242
▸BISSELF-CERT PLUMBING NOTICE74
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 74 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE65
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 65 on file for this type
▸BISSCHEDULE B - PLUMBING52
05/28/2022123579948Open ↗
05/18/2022123579948Open ↗
08/18/2021102966239Open ↗
Showing 3 of 52 on file for this type
▸BISEQUIPMENT USE PERMITS35
08/08/2025121934210Open ↗
08/08/2025121934210Open ↗
08/08/2025121934210Open ↗
Showing 3 of 35 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT16
08/08/2025121934210Open ↗
08/04/2025121934210Open ↗
Showing 2 of 16 on file for this type
▸Safety & Tenant Protection139
▸BISTenant Protection Plan and Notes48
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸DOB NOWTenant Protection Plan23
09/05/2026M00197188-I1Open ↗
09/05/2026M00245242-I1Open ↗
09/05/2026M00191482-P1Open ↗
Showing 3 of 23 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM17
11/13/2020123853339Open ↗
Showing 1 of 17 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Environmental & Asbestos220
▸DOB NOWDEP ACP-5: Asbestos Assessment Report84
09/05/2026M00112828-I1Open ↗
09/05/2026M00197188-I1Open ↗
09/05/2026M00245242-I1Open ↗
Showing 3 of 84 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)58
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 58 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form31
09/03/2026M00191968-I1Open ↗
09/02/2026M00686189-I1Open ↗
08/31/2026M00643435-I1Open ↗
Showing 3 of 31 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance157
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS74
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 74 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS36
08/31/2023123855943Open ↗
03/02/2023123579948Open ↗
12/13/2021120617092Open ↗
Showing 3 of 36 on file for this type
▸BISTR8: Energy Code Progress Inspections13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
03/02/2023123579948Open ↗
12/13/2021120617092Open ↗
12/13/2021120617092Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWEN2: As Built Energy Analysis7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
06/16/2021122741612Open ↗
12/01/2020123713847Open ↗
Showing 2 of 3 on file for this type
▸Inspections & Test Reports69
▸BISTECHNICAL REPORT: RESPONSIBILITY57
08/04/2025121934210Open ↗
08/04/2025121934210Open ↗
04/04/2025100457569Open ↗
Showing 3 of 57 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
08/04/2025121934210Open ↗
08/31/2023123855943Open ↗
05/09/2023123864283Open ↗
Showing 3 of 4 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19753
06/06/2025100457569Open ↗
06/06/2025100457569Open ↗
04/09/2024103912116Open ↗
▸BISPOST-INSTALLED ANCHORS3
10/26/2022122963267Open ↗
10/26/2022122963267Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs347
▸BISLANDMARKS APPROVAL117
06/09/2025100457569Open ↗
Showing 1 of 117 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST97
08/04/2025121934210Open ↗
06/09/2025100457569Open ↗
04/18/2024103912116Open ↗
Showing 3 of 97 on file for this type
▸BISADMINISTRATIVE OBJECTIONS41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION34
07/18/2022122955882Open ↗
10/23/2020123853339Open ↗
Showing 2 of 34 on file for this type
▸BISLANDMARKS SIGNOFF18
08/04/2025121934210Open ↗
04/11/2024103912116Open ↗
08/18/2023123855943Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDEP Variance (V5) letter18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSUPERSEDING LETTER16
03/21/2025122955882Open ↗
02/12/2025122955882Open ↗
12/03/2020123864283Open ↗
Showing 3 of 16 on file for this type
▸BISFINAL5
08/04/2025121934210Open ↗
08/31/2023123855943Open ↗
06/02/2023123864283Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership230
▸BISCOST AFFIDAVIT200
03/02/2023123579948Open ↗
10/26/2022122963267Open ↗
04/05/2022123855943Open ↗
Showing 3 of 200 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW313
08/04/2025121934210Open ↗
04/09/2024103912116Open ↗
09/01/2023123855943Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms324
▸BISEFILING COVER SHEET119
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 119 on file for this type
▸BISADDITIONAL INFORMATION117
08/25/2023123864283Open ↗
07/29/2022123579948Open ↗
04/07/2022123855943Open ↗
Showing 3 of 117 on file for this type
▸BISBOROUGH INTAKE FORM64
03/21/2025122955882Open ↗
03/12/2025122955882Open ↗
02/28/2025122955882Open ↗
Showing 3 of 64 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents93
▸DOB NOWProof of Historic Building60
09/01/2026M00795874-I1Open ↗
08/31/2026M00795899-I1Open ↗
08/31/2026M00795899-P1Open ↗
Showing 3 of 60 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7793
04/09/2024103912116Open ↗
03/31/2023102966239Open ↗
03/31/2023102966239Open ↗
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWWaiver Document2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSupporting Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type