0Year Built
—Stories
U4Building Class
C4-4AZoning
0 sfGross Floor Area
0Units
9 Open Violations 1 unresolved · 8 paperwork only ▸FDNY Report ↗
Telephone utility · Owner of record: VERIZON NEW YORK INC · 32,015 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction24p · 3 filings · 16 docs
Floor 5Under Construction12p · 1 filing · 6 docs
Floor 4Under Construction12p · 1 filing · 6 docs
Floor 3Under Construction32p · 4 filings · 20 docs
Floor 2Under Construction32p · 5 filings · 20 docs
Floor 1Under Construction29p · 3 filings · 16 docs
CellarUnder Construction31p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERIZON7207/08/2026
STEEL CONSTRUCTION504/09/2026
VERIZON WIRELESS303/22/2026
NEW YORK TEL. CO.703/22/2026
NEW YORK TELEPHONE CO303/22/2026
NYNEX103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANGELA RIVERA103/21/2026
JAM CONSULTANTS, INC.1803/21/2026
AE DESIGN SOLUTION603/21/2026
LOUIS STRIAR203/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TISHMAN INTERIORS CORPGeneral Contractor1907/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor807/08/2026
KING HOIST & SCAFFOLDINGGeneral Contractor803/21/2026
MATRONE ANTHONYElectrical103/21/2026
RAMDATH, JAIDATHElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
SPENELLI, RICHARDElectrical103/21/2026
VINCENT FERRARAElectrical103/21/2026
PAR FIRE PROTECTION LLCFire Protection107/08/2026
STEEL CONSTRUCTION LLCGeneral Contractor104/09/2026
EKG PLUMBING & HEATING LLPlumbing107/08/2026
ANTHONY MATRONEElectrical103/21/2026
SIGNSTAR NYCScaffold107/08/2026
FERRARA VINCENTElectrical103/21/2026
FISCHER & MAKOOI ARCHITE*Electrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER5441012/16/2024
Building Lifecycle
All (196)Filed (17)Permit Issued (26)Signed Off (8)Violation (60)Inspection (5)Objection (50)Special Inspection (30)
11/05/2025
Permit issued — Sidewalk Shed
B01313047-I1-SH
11/04/2025
Filed — Alteration
B01313047-I1
11/03/2025
Permit issued — Mechanical Systems
B00888849-I1-MS
11/03/2025
Permit issued — General Construction
B00920534-I1-GC
10/09/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00944279-I1
08/11/2025
Violation issued (FDNY_NOV, closed)
01/29/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00944281-I1
01/27/2025
Signed off — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM
B00940323-I1
01/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/09/2025
Permit issued — Boiler Equipment
B00888921-I1-BE
01/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/16/2024
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM
B00940323-P1
11/20/2024
Signed off — Alteration
B00920619-I1
10/29/2024
Violation issued (FDNY_NOV, closed)
10/16/2024
Permit issued — Sidewalk Shed
B00944281-I1-SH
10/11/2024
Permit issued — Supported Scaffold
B00944279-I1-SF
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00944279-P1
09/10/2024
Permit issued — Mechanical Systems
B00888849-I1-MS
09/10/2024
Permit issued — General Construction
B00920534-I1-GC
09/10/2024
Permit issued — Structural
B00920619-I1-ST
08/20/2024
Signed off — Alteration
General construction for installation of new floor mounted AC rack units in a network room. Prepare space for new network equipment.
B00923388-I1
08/19/2024
Signed off — Alteration
Renovations to existing 2nd floor space for new network equipment with cold-aisle containment and in-row cooling and remote air-cooled condensers on the roof.
B00923341-I1
05/10/2024
Permit issued — Sprinklers
B00940323-I1-EW-SP
05/08/2024
Objection resolved — Addressed
03/26/2024
Permit issued — Mechanical Systems
B00923341-I1-MS
03/04/2024
Objection resolved — Addressed
02/29/2024
Objection resolved — Addressed
02/02/2024
Permit issued — General Construction
B00923388-I1-GC
01/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/29/2024
Objection raised — Admin
01/29/2024
Objection resolved — Addressed
01/29/2024
Objection raised — Admin
01/29/2024
Objection resolved — Addressed
01/29/2024
Objection raised — Fire_Protection
01/29/2024
Objection raised — Admin
01/29/2024
Objection resolved — Addressed
01/29/2024
Objection resolved — Addressed
01/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/25/2024
Objection resolved — Addressed
01/24/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/11/2024
Objection raised — Structural
01/11/2024
Objection resolved — Addressed
01/11/2024
Objection raised — Fire_Protection
01/11/2024
Objection raised — Scope
01/11/2024
Objection resolved — Addressed
01/11/2024
Objection raised — Structural
01/11/2024
Objection raised — Mechanical
01/11/2024
Objection raised — Scope
01/11/2024
Objection resolved — Addressed
01/10/2024
Objection raised — Scope
01/10/2024
Objection raised — Fire_Protection
01/10/2024
Objection raised — Accessibility
01/10/2024
Objection raised — Fire_Protection
01/10/2024
Objection resolved — Addressed
01/09/2024
Permit issued — Plumbing
B00940344-I1-PL
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSTEEL CONSTRUCTION LLC11/05/2025
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP11/03/2025
DOB NOWGeneral ConstructionPermit IssuedTISHMAN INTERIORS CORP11/03/2025
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP01/09/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/16/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC10/11/2024
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP09/10/2024
DOB NOWGeneral ConstructionPermit IssuedTISHMAN INTERIORS CORP09/10/2024
DOB NOWStructuralSigned-offTISHMAN INTERIORS CORP09/10/2024
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE05/10/2024
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP03/26/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP02/02/2024
DOB NOWPlumbingSigned-offEKG PLUMBING & HEATING LL01/09/2024
DOB NOWStructuralSigned-offTISHMAN INTERIORS CORP12/15/2023
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP10/27/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/16/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC10/12/2023
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP09/26/2023
DOB NOWGeneral ConstructionPermit IssuedTISHMAN INTERIORS CORP09/22/2023
DOB NOWStructuralSigned-offTISHMAN INTERIORS CORP09/11/2023
DOB NOWSignSigned-offSIGNSTAR NYC04/13/2022
DOB NOWSidewalk ShedPermit IssuedKING HOIST & SCAFFOLDING11/27/2019
DOB NOWSupported ScaffoldPermit IssuedKING HOIST & SCAFFOLDING11/27/2019
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP10/15/2019
DOB NOWSupported ScaffoldPermit IssuedKING HOIST & SCAFFOLDING09/16/2019
DOB NOWSidewalk ShedPermit IssuedKING HOIST & SCAFFOLDING09/13/2019
BISOTISSUEDON-TRAC CONSTRUCTION ASSO08/10/2020
BISOTISSUEDTISHMAN CONSTRUCTION CORP10/18/2019
BISOTISSUEDTISHMAN INTERIORS CORP09/23/2019
BISMHISSUEDTISHMAN INTERIORS CORP09/23/2019
BISSPISSUEDPACE PLUMBING CORP06/07/2019
BISPLISSUEDPACE PLUMBING CORP06/06/2019
BISBLISSUEDMASTER TECH PLUMBING LLC12/04/2018
BISOTISSUEDTISHMAN INTERIORS CORP09/19/2018
BISOTISSUEDTISHMAN INTERIORS CORP09/19/2018
BISOTISSUEDTISHMAN CONSTRUCTION CORP09/19/2018
BISOTISSUEDTISHMAN INTERIORS CORP09/19/2018
BISMHISSUEDTISHMAN INTERIORS CORP09/19/2018
BISMHISSUEDTISHMAN CONSTRUCTION CORP09/19/2018
BISSPISSUEDPACE PLUMBING CORP07/12/2018
+ 36 more permits on file
1 project · most recent 12/07/2023
Water/Sanitary
FiledStatusContractorScope
12/07/2023Signed-offEKG PLUMBING & HEATING LLWater/Sanitary
9 projects · most recent 09/18/2026
General Wiring
FiledStatusContractorScope
09/18/2026Permit IssuedFREEDOM ELECTRIC & DATAGeneral Wiring
11/05/2025Permit IssuedRICHARD NEU—
01/30/2024CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
09/25/2023Permit IssuedJAMES F. VOLPE ELEC'LGeneral Wiring
09/07/2023CompleteTOP SHELF ELECTRIC CORP—
08/26/2021CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
02/11/2020CompletePINTO & TEGER ELEC. CORP.General Wiring
10/09/2018CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
02/14/2018Permit IssuedJAMES F. VOLPE ELEC'LGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
10/23/2023Energy Code Compliance InspectionsEUGENE BIFULCOprogress
09/27/2023Post-installed AnchorsEUGENE BIFULCOspecial
09/27/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
09/21/2023Energy Code Compliance InspectionsEUGENE BIFULCOprogress
09/21/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
09/21/2023Maintenance informationEUGENE BIFULCOenergy_progress
09/21/2023HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
09/21/2023HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
09/21/2023HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
09/18/2023Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
08/30/2023Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
08/22/2023FinalEUGENE BIFULCOprogress
08/22/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/22/2023FinalEUGENE BIFULCOprogress
08/22/2023Energy Code Compliance InspectionsEUGENE BIFULCOprogress
08/22/2023Mechanical SystemsEUGENE BIFULCOspecial
08/16/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/16/2023Post-installed AnchorsEUGENE BIFULCOspecial
08/16/2023Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
08/16/2023Structural Steel - WeldingEUGENE BIFULCOspecial
08/16/2023MasonryEUGENE BIFULCOspecial
08/16/2023Structural Steel - DetailsEUGENE BIFULCOspecial
08/16/2023FinalEUGENE BIFULCOprogress
08/16/2023Energy Code Compliance InspectionsEUGENE BIFULCOprogress
08/16/2023FinalEUGENE BIFULCOprogress
Latest 25 of 32.
▾Documents — 418 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
08/30/2026B00713400-I1Request digital key ↗
08/26/2026B00920619-I1Request digital key ↗
08/26/2026B00920534-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00227634-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00212258-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00227641-I1Request digital key ↗
▸Applications & Permits88
▸BISPLAN / WORK APPROVAL APPLICATION43
08/06/2020340750422Open ↗
04/03/2020321480848Open ↗
02/18/2020340494995Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION39
08/10/2020340750422Open ↗
10/21/2019321996024Open ↗
10/04/2019321791664Open ↗
Showing 3 of 39 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION6
10/08/2019321791664Open ↗
09/25/2019321480866Open ↗
09/25/2019321480857Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications97
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
04/10/2020321996024Open ↗
04/10/2020321996024Open ↗
04/01/2020340494995Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/26/2026B00888921-I1Open ↗
08/26/2026B00944279-P1Open ↗
08/26/2026B00944279-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B00923388-I1Open ↗
08/28/2026B00923341-I1Open ↗
08/28/2026B00923341-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B00888921-I1Open ↗
09/11/2026B00940344-I1Open ↗
09/01/2026B00923388-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
07/12/2017321618727Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/03/2018340649150Open ↗
07/12/2017321618727Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/03/2018340649150Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/03/2018340649150Open ↗
Showing 1 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/06/2020340750422Open ↗
05/18/2017340494995Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment19
▸BISSCHEDULE B - PLUMBING7
02/18/2020340494995Open ↗
12/03/2018340649150Open ↗
07/30/2018340494995Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
08/03/2020321480848Open ↗
07/19/2020321480857Open ↗
05/27/2020321480866Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/29/2018321485273Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/03/2018340649150Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/04/2019321791664Open ↗
▸Environmental & Asbestos29
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
08/06/2020340750422Open ↗
09/26/2019321996024Open ↗
09/21/2018321791664Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026B00888921-I1Open ↗
08/26/2026B00940323-I1Open ↗
08/26/2026B00940344-I1Open ↗
Showing 3 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
08/03/2020321480848Open ↗
07/22/2020321480857Open ↗
05/28/2020321480866Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
12/03/2018340649150Open ↗
07/24/2017321484540Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026B00923388-I1Open ↗
08/13/2026B00923341-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
04/10/2020321996024Open ↗
04/10/2020321996024Open ↗
10/15/2019321996024Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
12/08/2020340750422Open ↗
08/31/2020321484540Open ↗
05/07/2020321485273Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/06/2020340750422Open ↗
05/07/2020321485273Open ↗
▸BISNYCECC ANALYSIS1
12/03/2018340649150Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/08/2020340750422Open ↗
12/08/2020340750422Open ↗
08/31/2020321484540Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWHydrant Flow Test Letter2
08/26/2026B00940323-I1Open ↗
08/15/2026B00940323-P1Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
07/25/2017340494995Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
07/11/2018321618727Open ↗
▸BISHYDRO FLOW TEST LETTER1
08/08/2017340494995Open ↗
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
12/08/2020340750422Open ↗
12/02/2020321485273Open ↗
11/20/2020340494995Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/26/2026B00944279-P1Open ↗
08/26/2026B00944279-I1Open ↗
08/13/2026B01313047-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
09/25/2019321485273Open ↗
09/19/2019321484540Open ↗
09/18/2019321485273Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership38
▸BISCOST AFFIDAVIT37
12/08/2020340750422Open ↗
08/31/2020321484540Open ↗
08/06/2020340750422Open ↗
Showing 3 of 37 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/20/2020340494995Open ↗
▸Filing & Intake Forms47
▸BISEFILING COVER SHEET24
09/26/2019321996024Open ↗
06/28/2018321791664Open ↗
06/28/2018321791664Open ↗
Showing 3 of 24 on file for this type
▸BISADDITIONAL INFORMATION13
03/04/2020340494995Open ↗
12/27/2019321485273Open ↗
12/26/2019321485273Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM6
04/10/2020321996024Open ↗
04/03/2020321480848Open ↗
03/01/2019321555027Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/06/2020340750422Open ↗
12/03/2018340649150Open ↗
05/18/2017340494995Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWHydraulic Calculations2
08/26/2026B00940323-I1Open ↗
08/13/2026B00940323-P1Open ↗
▸BISUnknown1
02/19/2019321484540Open ↗