← Back
Elevator cooperative
212 EAST 48 STREET
MANHATTAN · East Midtown-Turtle Bay · BIN 1037995
💬 Discuss this project
1924Year Built
9Stories
D4Building Class
R8BZoning
51,576 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized3 Open Violations 1 unresolved · 2 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 48TH ST OWNERS CORP · 8,440 sf lot · 6.11 FAR built · Flood zone X
Locations of Work
MechanicalEquipmentGeneral
Floor 71 filing · 9 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior6p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
212 EAST 48TH STREET OWNERS1503/21/2026
212 E 48 ST OWNERS1203/21/2026
48TH STREET OWNERS1003/22/2026
KINGS GROUP NY CORP503/22/2026
E 48TH ST OWNERS203/21/2026
48 OWNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYED ENGINEERING, P.C.107/09/2021
ANDREW KATZ ENGINEERS102/04/2020
BAILEYS ENGINEERING PC105/22/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANZALONE ARCHITECTURE203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor303/21/2026
HAMILTON AIR COMPANY, INC.General Contractor203/21/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor203/21/2026
BLH ELECT'L CONTRS. INC.Electrical103/22/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
R.J.ELECTRICAL CONTRACTORElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KATZ ARCHITECTURE1371102/04/2020
Building Lifecycle
All (77)Filed (3)Permit Issued (3)Signed Off (2)Facade (FISP) (12)Violation (52)Special Inspection (5)
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
08/30/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00550191-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/08/2023
Cycle 9 facade report submitted
04/21/2023
Cycle 9 facade report signed — SAFE
04/18/2023
Cycle 9 facade inspection completed
02/15/2022
Violation issued (HPD, closed)
A
07/09/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00550191-I1
07/09/2021
Permit issued — Sidewalk Shed
M00550191-I1-SH
05/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/13/2021
Violation issued (ECB, open)
Construction
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
02/13/2021
Violation issued (ECB, open)
Construction
08/04/2020
Signed off — Alteration
M00284851-I1
05/07/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/26/2020
Permit issued — Mechanical Systems
M00284851-I1-MS
02/04/2020
Filed — Alteration
M00284851-I1
12/19/2019
Special inspection requirement — Mechanical Systems
David Katz
12/19/2019
Special inspection requirement — Final
David Katz
12/19/2019
Special inspection requirement — Maintenance information
David Katz
12/19/2019
Special inspection requirement — HVAC and service water heating equipment
David Katz
12/19/2019
Special inspection requirement — HVAC and service water heating system controls
David Katz
11/20/2019
Cycle 8 facade report signed — SWARMP
10/25/2019
Violation issued (HPD, closed)
I
10/02/2019
Cycle 8 facade inspection completed
04/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/13/2019
Cycle 8 facade report submitted
10/03/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/13/2018
Violation issued (ECB, closed)
Cranes and Derricks
07/13/2018
Violation issued (ECB, closed)
Construction
07/13/2018
Violation issued (ECB, closed)
Construction
07/13/2018
Violation issued (ECB, closed)
Construction
07/13/2018
Violation issued (ECB, closed)
Construction
07/13/2018
Violation issued (ECB, closed)
Construction
07/13/2018
Violation issued (ECB, closed)
Construction
05/23/2018
Permit issued — Sidewalk Shed
M00044633-I1-SH
05/22/2018
Filed — Alteration
M00044633-I1
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/07/2016
Violation issued (FDNY_NOV, closed)
03/26/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/10/2015
Violation issued (ECB, closed)
Local Law
01/22/2015
Cycle 7 facade report submitted
01/02/2015
Cycle 7 facade report signed — SWARMP
12/21/2014
Cycle 7 facade inspection completed
03/18/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/18/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/12/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/21/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/21/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP07/09/2021
DOB NOWMechanical SystemsSigned-offHAMILTON AIR COMPANY, INC.02/26/2020
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL05/23/2018
BISOTISSUEDJUNO CONTRACTING CORP03/24/2022
BISOTISSUEDJUNO CONTRACTING CORP06/23/2021
BISBLISSUEDCC CONTROLLED PLBG CO INC07/09/2020
BISOTISSUEDHAMILTON AIR COMPANY, INC.02/24/2020
BISOTISSUEDK BAILEY INTERIOR INC09/20/2019
BISOTISSUEDWORLDKOR CONSTRUCTION CORP06/27/2019
BISPLISSUEDPEAK PLUMBING SOLUTIONS LLC06/19/2019
BISOTISSUEDK BAILEY INTERIOR INC06/12/2019
BISOTISSUEDWORLDKOR CONSTRUCTION CORP06/04/2019
BISPLISSUEDG.BASSOLINO PLUMBING LTD02/19/2019
BISOTISSUEDG.BASSOLINO PLUMBING LTD02/19/2019
BISOTISSUEDC C CONTROLLED COMBUSTION10/31/2018
BISOTISSUEDVEMA-P LLC03/19/2018
BISMHISSUEDLEIB DESIGNS LLC10/07/2015
BISOTISSUEDDBD SERVICES, INC08/18/2014
BISPLRE-ISSUEDS.K. PIPING & HEATING COR05/07/2014
BISOTISSUEDNICKOS CONSTR OF NY CORP04/29/2014
BISOTISSUEDVEMA ENTERPRISES INC06/04/2013
BISOTISSUEDCURTIS ROBERTS CONTRACTIN02/25/2013
BISPLISSUEDFIVE STAR P AND H CO, INC10/11/2011
BIS—ISSUEDMETAMORPHOSIS CONSTR CORP10/07/2011
BISPLISSUEDGANIC PLUMBING & HTG INC06/05/2009
BISOTISSUEDBAYSIDE CONTRACTING INC10/22/2007
BISOTISSUEDRCD RESTORATIONS INC09/18/2007
BISOTISSUEDA & F CONSTRUCTION OF NY INC06/12/2007
BISPLISSUEDACCURATE MECHANICAL INC10/24/2005
BISOTISSUEDEMPIRE WOODWORK CORP02/15/2005
BISOTISSUEDWACHTEL MECHANICAL SERVICES INC04/16/2002
BISOTISSUEDJACK HENRY CONSTR LTD12/07/2001
BISOTISSUEDUPGRADE CONTR. CO. INC09/21/2000
BISPLISSUEDM.O.D.PLUMBING & HEATING CORP.11/24/1997
BISOTISSUEDMETAMORPHOSIS CONSTR CORP11/12/1997
BISOTISSUEDM&W WATERPROOFING BLDG MAINTENCE05/20/1996
18 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedG-ELECTRIC INCGeneral Wiring
08/03/2026Permit IssuedG-ELECTRIC INCGeneral Wiring
08/03/2026Permit IssuedG-ELECTRIC INCGeneral Wiring
08/03/2026Permit IssuedG-ELECTRIC INCGeneral Wiring
08/03/2026Permit IssuedG-ELECTRIC INCGeneral Wiring
08/03/2026Permit IssuedG-ELECTRIC INCGeneral Wiring
06/09/2026Permit IssuedCENTURY ELECTRIC LLCGeneral Wiring
05/14/2026Permit IssuedCENTURY ELECTRIC LLCGeneral Wiring
12/26/2025CompleteW 8 ELECTRIC CORP—
10/30/2023Permit IssuedLINA ELECTRIC, CORPGeneral Wiring
05/24/2022CompleteDNR ELECTRIC INCORPORATE—
03/10/2022Permit IssuedHIGH QUALITY ELECTRIC OF—
11/25/2019CompleteTRINCITY ELECTRIC, INCGeneral Wiring
06/18/2019Permit IssuedR.J.ELECTRICAL CONTRACTORGeneral Wiring
08/02/2018Permit IssuedBLH ELECT'L CONTRS. INC.1 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/19/2019Mechanical SystemsDavid Katzspecial
12/19/2019FinalDavid Katzprogress
12/19/2019Maintenance informationDavid Katzenergy_progress
12/19/2019HVAC and service water heating equipment David Katzenergy_progress
12/19/2019HVAC and service water heating system controls David Katzenergy_progress
▾Documents — 330 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/06/2026M00044633-I1Request digital key ↗
09/03/2026M00550191-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00284851-I1Request digital key ↗
▸Applications & Permits68
▸BISPLAN / WORK APPROVAL APPLICATION39
09/27/2024122076948Open ↗
07/11/2024122076948Open ↗
11/16/2023120613620Open ↗
Showing 3 of 39 on file for this type
▸BISWORK PERMIT APPLICATION25
06/23/2021140959988Open ↗
02/26/2020123679527Open ↗
09/23/2019123705927Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
01/03/2024120613620Open ↗
08/29/2023120613620Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
09/16/2024120613620Open ↗
▸Seals & Professional Certifications53
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
02/19/2020123679527Open ↗
12/31/2019123676762Open ↗
12/23/2019123679527Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
03/18/2019123705927Open ↗
02/15/2019123676762Open ↗
10/31/2018123493077Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
03/18/2019123705927Open ↗
02/15/2019123676762Open ↗
10/31/2018123493077Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/23/2026M00284851-I1Open ↗
08/23/2026M00284851-I1Open ↗
08/23/2026M00284851-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/06/2026M00044633-I1Open ↗
08/13/2026M00284851-I1Open ↗
08/13/2026M00550191-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/08/2018140745601Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/08/2018140745601Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/21/2020140959988Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M00284851-I1Open ↗
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
02/18/2020123705927Open ↗
02/14/2020123705927Open ↗
10/08/2019123705927Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/31/2018123493077Open ↗
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes4
12/23/2019123679527Open ↗
05/21/2019123722301Open ↗
03/18/2019123705927Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
11/25/2020140959988Open ↗
02/19/2020123679527Open ↗
12/23/2019123679527Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/19/2021140959988Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/23/2021140959988Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00284851-I1Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
12/24/2020140959988Open ↗
12/23/2019123679527Open ↗
05/21/2019123722301Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/31/2018123493077Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00284851-I1Open ↗
▸Energy Compliance37
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
12/31/2019123676762Open ↗
12/23/2019123679527Open ↗
06/04/2019123722301Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
04/27/2021123679527Open ↗
04/27/2021123679527Open ↗
12/28/2020123722301Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
04/28/2023140959988Open ↗
04/27/2021123679527Open ↗
12/28/2020123722301Open ↗
Showing 3 of 8 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
10/04/2024122076948Open ↗
04/28/2023140959988Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
03/08/2018140745601Open ↗
Showing 1 of 2 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
08/21/2020123493077Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/28/2023140959988Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/07/2024122076948Open ↗
▸BISLIGHTING IN DWELLING UNITS1
10/04/2024122076948Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY11
04/27/2021123679527Open ↗
04/27/2021123679527Open ↗
04/27/2021123679527Open ↗
Showing 3 of 11 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
04/28/2023140959988Open ↗
▸BISMASONRY1
04/28/2023140959988Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
10/10/2024122076948Open ↗
05/02/2023140959988Open ↗
04/27/2021123679527Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL2
10/04/2024122076948Open ↗
04/28/2023140959988Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/21/2020123493077Open ↗
12/31/2019123676762Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT31
04/28/2023140959988Open ↗
04/27/2021123679527Open ↗
12/29/2020123722301Open ↗
Showing 3 of 31 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/08/2024122076948Open ↗
▸Filing & Intake Forms39
▸BISADDITIONAL INFORMATION15
01/03/2024120613620Open ↗
08/29/2023120613620Open ↗
02/24/2021140959988Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET13
12/23/2019123679527Open ↗
05/21/2019123722301Open ↗
03/18/2019123705927Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM9
02/14/2020123705927Open ↗
12/31/2019123676762Open ↗
10/08/2019123705927Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/08/2018140745601Open ↗
Showing 1 of 2 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/21/2020123493077Open ↗