← Back
BuildNYC
Elevator apt, fireproof without stores
2120 HUGHES AVENUE
BRONX · BIN 2114116
💬 Discuss this project
1995Year Built
6Stories
D3Building Class
R7-1Zoning
59,645 sfGross Floor Area
63Units
LL97 CoveredRent Stabilized38 Active Violations ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: 2120 Hughes · 17,172 sf lot · 3.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Unit 2A, Unit 2B2p · 1 filing · 10 docs
Floor 1
CellarBoiler replacement and registration3p · 2 filings · 11 docs
Site & exteriorLocust Cove Management17p · 3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2120 Hughes103/22/2026
JMG Properties103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/26/2021$8.2M—Private party → 2120 HUGHES LLC$138/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AP Professional Engineering109/13/2023
Mohammad Ahead, PE107/15/2023
CL Engineering211/22/2022
Gregory V. Perotto, P.E204/15/2021
MCRB Service112/13/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Perotto Group403/21/2026
Studio Huashi403/21/2026
HH Building Consulting & Architectu203/21/2026
Sandeep Kaur103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystem S&SScaffold903/21/2026
Pat Sementa P & H CoPlumbing207/08/2026
Apex Group NYGeneral Contractor203/21/2026
Jko USA ManagementGeneral Contractor107/08/2026
Apex Group NYScaffold107/08/2026
High Quality Electric ofElectrical103/21/2026
PipestylistsPlumbing107/08/2026
Star Electrical ContractorsElectrical103/21/2026
E & M Electrical NYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM Engineering Services8449112/14/2023
Norman C. Lok818107/15/2023
KL Innovative Design7225211/22/2022
Gregory V. Perotto, P.E947204/15/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/04/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 7J, 7th…
HPD violation · open
09/04/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 7J, 7th STORY, 1st…
HPD violation · open
09/04/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM…
HPD violation · open
09/04/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE FOYER LOCATED AT…
HPD violation · open
284 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offApex Group NY03/15/2024
DOB NOWGeneral ConstructionSigned-offApex Group NY12/08/2023
DOB NOWSidewalk ShedSigned-offApex Group NY09/14/2023
DOB NOWPlumbingSigned-offT & T Plumbing03/04/2023
DOB NOWGeneral ConstructionSigned-offJko USA Management11/22/2022
DOB NOWPlumbingSigned-offPat Sementa P & H Co05/31/2021
DOB NOWBoiler EquipmentSigned-offPat Sementa P & H Co05/31/2021
DOB NOWSidewalk ShedSigned-offIntersystem S&S08/01/2018
DOB NOWSidewalk ShedSigned-offIntersystem S&S05/10/2018
DOB NOWSidewalk ShedSigned-offIntersystem S&S12/14/2017
BISOTISSUEDJanbar05/24/2018
BISOTISSUEDJanbar10/19/2017
BISOTISSUEDJanbar08/22/2017
BIS—ISSUEDMacquesten General Contracting01/19/1996
BISPLISSUEDD & M Plumbing & Heating01/18/1995
BISEQISSUEDMacquesten General Contracting01/11/1995
BIS—ISSUEDMacquesten General Contracting01/11/1995
BIS—ISSUEDMacquesten General Contracting09/29/1994
BISEQISSUEDMacquesten General Contracting09/29/1994
1 project · most recent 04/15/2021
Gas
FiledStatusContractorScope
04/15/2021Signed-offPat Sementa P & H CoGas
3 projects · most recent 09/13/2023
General Wiring
FiledStatusContractorScope
09/13/2023CompleteHigh Quality Electric of—
03/06/2023CompleteE & M Electrical NYGeneral Wiring
12/14/2017CompleteSteven Farkas—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/11/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/06/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/28/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/14/2024Post-installed AnchorsMOHAMED MAHMOUDspecial
05/17/2023MasonryNORMAN LOKspecial
05/17/2023FinalMOHAMMAD AHEADprogress
05/17/2023Tenant Protection Plan ComplianceNORMAN LOKspecial
11/22/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
10/31/2022FinalCHRISTIAN LOZADAprogress
10/31/2022Fire-Resistance Rated ConstructionHO YIN LAWprogress
10/31/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
03/26/2021Heating SystemsGregory Perottospecial
03/26/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
03/26/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
03/26/2021Maintenance informationGregory Perottoenergy_progress
03/26/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
62 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account