← Back
BuildNYC
City residence, one family
213 EAST 48TH STREET
MANHATTAN · BIN 1038002
💬 Discuss this project
1899Year Built
3Stories
A4Building Class
R8BZoning
6,120 sfGross Floor Area
1Units
Rent Stabilized0 Active Violations
City residence, one family · Owner of record: Bamboo Garden II · 3,339 sf lot · 1.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 16 docs
Floor 61 filing · 16 docs
Floor 51 filing · 16 docs
Floor 41 filing · 16 docs
Floor 319p · 2 filings · 20 docs
Floor 218p · 2 filings · 20 docs
Floor 117p · 2 filings · 20 docs
Cellar1 filing · 16 docs
Basement1p · 1 filing · 20 docs
Sub-Basement17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bamboo Garden3707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/15/2017$5.0M—Private party → BAMBOO GARDEN II LLC$817/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mehdi Ghazi, P.E.601/02/2026
Z&T Engineering405/11/2023
Lu Ning Architecture311/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lu Ning Architecture803/21/2026
Mei Architect1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Primrose ServiceGeneral Contractor707/08/2026
Borowide Elect'l ContractorsElectrical203/21/2026
Wasoff Plumbing & UtilityPlumbing207/08/2026
Drumsilla PlumbingPlumbing109/04/2013
Everest ScaffoldingGeneral Contractor211/21/2014
Modern Concepts RenovationGeneral Contractor308/15/2013
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mehdi Ghazi, P.E.7129601/02/2026
Building Lifecycle
05/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
M01009756-S1-PL
04/23/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
M01009756-I1-GC
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
01/02/2026
Filed — Alteration
INSTALLATION PLUMBING WORK AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01009756-P3
66 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWasoff Plumbing & Utility04/25/2025
DOB NOWGeneral ConstructionPermit IssuedPrimrose Service04/23/2025
DOB NOWStructuralPermit IssuedPrimrose Service10/09/2024
DOB NOWPlumbingPermit IssuedWasoff Plumbing & Utility04/03/2024
DOB NOWGeneral ConstructionPermit IssuedPrimrose Service03/21/2024
BISEQISSUEDEverest Scaffolding11/21/2014
BISEQISSUEDEverest Scaffolding11/21/2014
BISPLISSUEDDrumsilla Plumbing09/04/2013
BISMHISSUEDModern Concept Renovation08/15/2013
BISMHISSUEDModern Concept Renovation08/15/2013
BISMHISSUEDModern Concept Renovation06/25/2013
1 project · most recent 05/11/2023
Heating and Air Conditioning Systems
FiledStatusContractorScope
05/11/2023——Heating and Air Conditioning Systems
2 projects · most recent 01/02/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
01/02/2026Permit IssuedWasoff Plumbing & UtilityGas, Water/Sanitary
05/11/2023——Storm, Water/Sanitary
1 project · most recent 05/30/2024
General Wiring
FiledStatusContractorScope
05/30/2024Permit IssuedKJK ElectricGeneral Wiring
2 projects · most recent 01/02/2026
Wood Concrete
FiledStatusContractorScope
01/02/2026Permit IssuedWasoff Plumbing & UtilityWood
05/11/2023——Concrete, Wood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
01/05/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
12/19/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
10/04/2024FinalMEHDI GHAZIprogress
10/04/2024Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
09/03/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
09/03/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
05/09/2023Concrete - Cast-In-Place—special
05/09/2023Concrete - Cast-In-Place—special
05/09/2023Subgrade Inspections—special
05/09/2023Structural Stability – Alterations of existing buildings—special
03/29/2023Structural Stability – Alterations of existing buildings—special
03/29/2023Construction Operations Influencing Adjacent Structures—special
02/10/2023Construction Operations Influencing Adjacent Structures—special
02/10/2023Final—progress
02/10/2023Structural Stability – Alterations of existing buildings—special
01/10/2023Structural Steel - Details—special
01/10/2023Structural Steel - Welding—special
01/10/2023Construction Operations Influencing Adjacent Structures—special
01/10/2023Excavations - Sheeting, Shoring, and Bracing—special
12/13/2022HVAC-R and service water heating equipment—energy_progress
12/13/2022Maintenance information—energy_progress
12/13/2022HVAC-R and service water heating system controls—energy_progress
10/07/2022Energy Code Compliance Inspections—progress
10/07/2022Fire-Resistant Penetrations and Joints—special
10/07/2022HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 52.
70 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account