← Back
Two family converted from one family
215-40 40 AVENUE
QUEENS · Bayside · BIN 4443857
💬 Discuss this project
1930Year Built
2.75Stories
B3Building Class
R3XZoning
3,458 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: 215 40-42 40 LLC · 6,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction36p · 8 filings · 20 docs
Floor 2Under Construction33p · 8 filings · 20 docs
Floor 1Under Construction33p · 8 filings · 20 docs
CellarUnder Construction45p · 10 filings · 20 docs
Site & exteriorUnder Construction7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
215 40-42 40 LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/30/2021$1.8M—EAST 198TH LLC → 215 40-42 40 LLC$506/sf building
08/04/2021$1.2M—Private party → EAST 198TH LLC$347/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROJECT TACTICAL SOLUTIONS2203/21/2026
JD DESIGN ASSOCIATES INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JD ARCH LLCGeneral Contractor2207/08/2026
RRP PLUMBING CORPPlumbing607/08/2026
HI-RITE ELECTRIC CORPElectrical203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROJECT TACTICAL SOLUTION58591402/27/2026
Building Lifecycle
All (94)Filed (23)Permit Issued (22)Signed Off (8)Violation (1)Inspection (10)Special Inspection (30)
05/05/2026
Signed off — Alteration
Q00735390-I1
05/05/2026
Signed off — Alteration
STRUCTURAL ALTERATION TO INCLUDE FRAMING OF NEW CONVENIENCE STAIR AND REMOVE OF EXISTING CHIMNEY.
Q00745887-I1
04/20/2026
Signed off — Alteration
RENOVATION TO INCLUDE INSTALL AND DEMO OF NON-LOAD BEARING PARTITIONS AND DOORS AND EXTERIOR WORK. WORK TO INCLUDE REMOVAL OF CHIMNEY, CELLAR SLAB, TEMP REMOVAL OF ENTRY STAIR, FLOORING, CEILING, AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00735388-I1
04/20/2026
Signed off — Alteration
RENOVATION TO INCLUDE INSTALL AND DEMO OF NON-LOAD BEARING PARTITIONS AND DOORS AND EXTERIOR WORK. WORK TO INCLUDE REMOVAL OF CHIMNEY, CELLAR SLAB, TEMP REMOVAL OF ENTRY STAIR, FLOORING, CEILING, AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00744283-I1
03/31/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/16/2026
Signed off — Alteration
MECHANICAL WORK IN CONJUCTION WITH RENOVATION OF 215-42 40 AVE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00745888-I1
03/16/2026
Signed off — Alteration
MECHANICAL WORK IN CONJUCTION WITH RENOVATION OF 215-40 40 AVE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00735391-I1
03/13/2026
Signed off — Alteration
MODIFICATION OF EXISTING FOUNDATION TO INCREASE HEADROOM IN CELLAR.
Q00735389-I1
03/13/2026
Signed off — Alteration
Q00745885-I1
03/02/2026
Special inspection requirement — Footing and Foundation
Max Lee
03/02/2026
Special inspection requirement — Concrete - Cast-In-Place
Max Lee
03/02/2026
Special inspection requirement — Footing and Foundation
Max Lee
03/02/2026
Special inspection requirement — Underpinning
Max Lee
03/02/2026
Special inspection requirement — Final
Max Lee
03/02/2026
Special inspection requirement — Concrete - Cast-In-Place
Max Lee
03/02/2026
Special inspection requirement — Underpinning
Max Lee
03/02/2026
Special inspection requirement — Final
Max Lee
02/27/2026
Filed — Alteration
Q00745885-P1
02/27/2026
Filed — Alteration
MODIFICATION OF EXISTING FOUNDATION TO INCREASE HEADROOM IN CELLAR.
Q00735389-P1
02/13/2026
Special inspection requirement — Footing and Foundation
Max Lee
02/13/2026
Special inspection requirement — Underpinning
Max Lee
02/13/2026
Special inspection requirement — Concrete - Cast-In-Place
Max Lee
02/13/2026
Special inspection requirement — Final
Max Lee
01/20/2026
Special inspection requirement — Lighting in dwelling units
LEILA COLBERT
01/20/2026
Special inspection requirement — Interior lighting power
LEILA COLBERT
01/20/2026
Special inspection requirement — Lighting in dwelling units
LEILA COLBERT
01/20/2026
Special inspection requirement — Final
LEILA COLBERT
01/20/2026
Special inspection requirement — Interior lighting power
LEILA COLBERT
01/20/2026
Special inspection requirement — Insulation placement and R values
LEILA COLBERT
01/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Max Lee
01/20/2026
Special inspection requirement — Final
LEILA COLBERT
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
LEILA COLBERT
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
LEILA COLBERT
01/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Max Lee
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
01/20/2026
Special inspection requirement — Insulation placement and R values
LEILA COLBERT
01/16/2026
Filed — Alteration
RENOVATION TO INCLUDE INSTALL AND DEMO OF NON-LOAD BEARING PARTITIONS AND DOORS AND EXTERIOR WORK. WORK TO INCLUDE REMOVAL OF CHIMNEY, CELLAR SLAB, TEMP REMOVAL OF ENTRY STAIR, FLOORING, CEILING, AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00735388-P2
01/16/2026
Filed — Alteration
RENOVATION TO INCLUDE INSTALL AND DEMO OF NON-LOAD BEARING PARTITIONS AND DOORS AND EXTERIOR WORK. WORK TO INCLUDE REMOVAL OF CHIMNEY, CELLAR SLAB, TEMP REMOVAL OF ENTRY STAIR, FLOORING, CEILING, AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00744283-P2
12/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2025
Filed — Alteration
PLUMBING WORK IN CONJUCTION WITH RENOVATION OF 215-40 40 AVE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00735392-P3
11/21/2025
Filed — Alteration
PLUMBING WORK IN CONJUCTION WITH RENOVATION OF 215-42 40 AVE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00745889-P3
10/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Filed — Alteration
PLUMBING WORK IN CONJUCTION WITH RENOVATION OF 215-42 40 AVE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00745889-P2
10/02/2025
Filed — Alteration
PLUMBING WORK IN CONJUCTION WITH RENOVATION OF 215-40 40 AVE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00735392-P2
08/08/2025
Special inspection requirement — Energy Code Compliance Inspections
LEILA COLBERT
08/08/2025
Special inspection requirement — Final
LEILA COLBERT
08/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Max Lee
08/08/2025
Special inspection requirement — Lighting in dwelling units
LEILA COLBERT
07/09/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
07/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/31/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
03/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/05/2025
Permit issued — Plumbing
Q00745889-I1-PL
03/04/2025
Permit issued — Plumbing
Q00735392-I1-PL
12/04/2024
Violation issued (HPD, closed)
I
10/09/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/01/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/25/2024
Permit issued — General Construction
Q00735388-I1-GC
09/25/2024
Permit issued — General Construction
Q00744283-I1-GC
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP03/05/2025
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP03/04/2025
DOB NOWGeneral ConstructionSigned-offJD ARCH LLC09/25/2024
DOB NOWGeneral ConstructionSigned-offJD ARCH LLC09/25/2024
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP03/20/2024
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP03/20/2024
DOB NOWFoundationSigned-offJD ARCH LLC01/25/2024
DOB NOWFoundationSigned-offJD ARCH LLC01/25/2024
DOB NOWConstruction FencePermit IssuedJD ARCH LLC01/11/2024
DOB NOWGeneral ConstructionSigned-offJD ARCH LLC09/25/2023
DOB NOWGeneral ConstructionSigned-offJD ARCH LLC09/11/2023
DOB NOWMechanical SystemsSigned-offJD ARCH LLC03/21/2023
DOB NOWMechanical SystemsSigned-offJD ARCH LLC03/21/2023
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP03/20/2023
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP03/20/2023
DOB NOWStructuralSigned-offJD ARCH LLC11/25/2022
DOB NOWStructuralSigned-offJD ARCH LLC11/25/2022
DOB NOWFoundationSigned-offJD ARCH LLC09/28/2022
DOB NOWFoundationSigned-offJD ARCH LLC09/27/2022
DOB NOWGeneral ConstructionSigned-offJD ARCH LLC09/26/2022
DOB NOWGeneral ConstructionSigned-offJD ARCH LLC09/26/2022
DOB NOWConstruction FencePermit IssuedJD ARCH LLC08/25/2022
2 projects · most recent 11/21/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/21/2025Permit IssuedRRP PLUMBING CORPGas, Water/Sanitary
11/21/2025Permit IssuedRRP PLUMBING CORPGas, Water/Sanitary
2 projects · most recent 06/13/2024
General Wiring
FiledStatusContractorScope
06/13/2024CompleteHI-RITE ELECTRIC CORPGeneral Wiring
06/11/2024CompleteHI-RITE ELECTRIC CORPGeneral Wiring
1 project · most recent 08/24/2022
Fence
FiledStatusContractorScope
08/24/2022Permit IssuedJD ARCH LLCFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/31/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
12/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/09/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/31/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/09/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
03/02/2026Concrete - Cast-In-PlaceMax Leespecial
03/02/2026UnderpinningMax Leespecial
03/02/2026Concrete - Cast-In-PlaceMax Leespecial
03/02/2026FinalMax Leeprogress
03/02/2026Footing and FoundationMax Leeprogress
03/02/2026Footing and FoundationMax Leeprogress
03/02/2026FinalMax Leeprogress
03/02/2026UnderpinningMax Leespecial
02/13/2026FinalMax Leeprogress
02/13/2026Footing and FoundationMax Leeprogress
02/13/2026Concrete - Cast-In-PlaceMax Leespecial
02/13/2026UnderpinningMax Leespecial
01/20/2026FinalLEILA COLBERTprogress
01/20/2026Fire-Resistant Penetrations and JointsMax Leespecial
01/20/2026Structural Stability – Alterations of existing buildingsMax Leespecial
01/20/2026Interior lighting powerLEILA COLBERTenergy_progress
01/20/2026Lighting in dwelling unitsLEILA COLBERTenergy_progress
01/20/2026Interior lighting powerLEILA COLBERTenergy_progress
01/20/2026Insulation placement and R valuesLEILA COLBERTenergy_progress
01/20/2026Structural Stability – Alterations of existing buildingsMax Leespecial
01/20/2026Fire-Resistant Penetrations and JointsMax Leespecial
01/20/2026Energy Code Compliance InspectionsLEILA COLBERTprogress
01/20/2026FinalLEILA COLBERTprogress
01/20/2026Insulation placement and R valuesLEILA COLBERTenergy_progress
01/20/2026Lighting in dwelling unitsLEILA COLBERTenergy_progress
Latest 25 of 74.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/25/2026Q00796427-I1Request digital key ↗
08/25/2026Q00735389-P1Request digital key ↗
08/25/2026Q00735389-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸Seals & Professional Certifications62
▸DOB NOWProgress Inspector Seal & Signature26
09/02/2026Q00735388-I1Open ↗
09/02/2026Q00735388-I1Open ↗
09/02/2026Q00735388-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/25/2026Q00796427-I1Open ↗
08/25/2026Q00735389-P1Open ↗
08/25/2026Q00735389-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026Q00735388-I1Open ↗
09/01/2026Q00745888-I1Open ↗
08/31/2026Q00744283-P1Open ↗
Showing 3 of 13 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
08/25/2026Q00735389-I1Open ↗
08/25/2026Q00735390-I1Open ↗
08/24/2026Q00745889-I1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/17/2026Q00744283-I1Open ↗
08/17/2026Q00735388-I1Open ↗