| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01362026 ↗ | 720 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 04/10/2026 | 09/24/2026 | Contractor ARISTA AIR CONDITIONING CORP | Replacement of (1) condensing unit, (1) evaporating unit, and (1) humidifier in kind. No change to use, egress, or occupancy. |
| M01173090 ↗ | 127 EAST 62 STREET MANHATTAN | Alteration | Permit Issued | 03/13/2025 | 09/23/2026 | Contractor DEAN FINE BUILDING LLC Filer ADAM MAISER | Plumbing work in connection with the interior renovation of 1-Family. No change in use, occupancy or egress with this filing. |
| M01447804 ↗ | 230 WEST 56 STREET MANHATTAN | Alteration | Permit Issued | 09/08/2026 | 09/21/2026 | Owner 1745 Broadway Owner LLC Contractor A.W. & S. CONSTRUCTION CO | OFFICE RENOVATION WORK TO INLCUDE PARTITION, CEILING AND DOOR WORK AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01351455 ↗ | 13 EAST 30 STREET MANHATTAN | Alteration | Permit Issued | 01/28/2026 | 09/08/2026 | Owner EMPIRE 30 CONDO ASSOC Contractor MASTERS RENOVATION GROUP* Filer DHD ARCHITECTURE, PC | Interior renovation to combine two adjacent condo units on the 6th, 7th floor and roof in compliance with TPPN#3/97. General Construction. N… |
| M01364446 ↗ | 460 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 04/29/2026 | 09/08/2026 | Contractor A&H EXPRESS PLBG&HTG CORP Filer RIZZO GROUP | Modifications to the existing plumbing system on the 1st floor (ODO Restaurant LL Work) as per plans. No change to use, egress or occupancy… |
| M01191314 ↗ | 145 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 03/24/2025 | 08/31/2026 | Contractor FORTE EXPRESS P & H INC | Filing herewith plumbing work for the renovation of apts 11EE & 12E at the address noted. In conjunction with GC application #'s M00191101, … |
| Person | Filings | Most recent |
|---|---|---|
| Brian Bercarich | 389 | 09/11/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| CWB ARCHITECTS | 13 | 06/02/2026 |
| CONLON ENGINEERING, LLC | 3 | 09/11/2026 |
| DHD ARCHITECTURE DESIGN PLLC | 3 | 09/11/2026 |
| POVERO and COMPANY | 3 | 07/27/2026 |
| ATOZ CONSULTING ENGINEERS, PC | 2 | 03/14/2023 |
| BRYAN M BROWN ARCHITECTS LLC | 2 | 09/25/2025 |
| DANIELLE ALBERT ARCHITECT | 2 | 12/12/2025 |
| LARA APELIAN STUDIO LLC | 2 | 07/13/2023 |
| MICHELLE HARTWELL ARCHITECT | 2 | 04/15/2025 |
| SUZUMORI ARCHITECTURE PLLC | 2 | 05/26/2026 |
| ABRAHAM BLOCH ARCHITECT | 1 | 06/19/2023 |
| ASDA ARCHITECTURE + DESIGN | 1 | 02/11/2025 |
| BARAK PLISKIN | 1 | 02/19/2026 |
| CHRISTOPHER TEETER | 1 | 12/17/2025 |
| CRAFT ENGINEERING STUDIO PLLC | 1 | 08/09/2022 |
| DENCITYWORKS ARCHITECTURE PLLC. | 1 | 12/17/2025 |
| DON M. DACUMOS | 1 | 08/06/2024 |
| ETTINGER ENGINEERING ASSOCIATES | 1 | 12/17/2025 |
| GARCIA-QUISMONDO, LUISMIGUEL RA | 1 | 01/22/2026 |
| HOWARD L ZIMMERMAN ARCH & ENG DPC | 1 | 06/26/2025 |
| IMC ARCHITECTURE DPC | 1 | 12/20/2023 |
| ISSAC & STERN ARCHITECTS, P.C | 1 | 11/14/2024 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 1 | 09/08/2026 |
| KPFF CONSULTING ENGINEERS | 1 | 09/25/2025 |
| MOBILE OFFICE ARCHITECTS, PC (MOA) | 1 | 01/06/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| WATERFIRE INC | 25 | 08/17/2026 |
| DEPENDABLE MECH CORP | 19 | 07/22/2026 |
| ULTIMATE P & H CORP | 16 | 08/06/2024 |
| A.W. & S. CONSTRUCTION CO | 14 | 09/08/2026 |
| S & J INDUSTRIAL CORP | 14 | 01/22/2026 |
| ARISTA AIR CONDITIONING C | 13 | 04/10/2026 |
| ONE MAIN CONSTRUCTION | 13 | 06/02/2026 |
| HUDSON PLMBING & MCH, LLC | 11 | 03/20/2026 |
| CARA PLUMBING GROUP INC | 10 | 06/02/2026 |
| FIOCCHI GROUP LLC | 8 | 12/12/2025 |
| WILLIAM C. GERAKARIS P&H | 8 | 01/30/2024 |
| DK CONSTRUCTION ONE, CORP | 6 | 02/23/2026 |
| EMPIRE ECS, LLC | 6 | 01/22/2026 |
| H M SPRINKLER INC | 6 | 02/27/2024 |
| OCGP.LLC | 6 | 10/23/2025 |
| P.S.I. MECHANICAL | 6 | 12/12/2025 |
| A + SPRINKLER CORP | 5 | 12/22/2025 |
| DONATO PLUMBING, INC | 5 | 07/27/2026 |
| HENRY MYERS P & H, INC | 5 | 04/07/2026 |
| A & M WARSHAW PLBG & HTG | 4 | 10/23/2025 |
| AQUEDUCT MECHANICAL CORP | 4 | 05/26/2026 |
| DEMAR PLUMBING CORP | 4 | 03/17/2026 |
| MIDNIGHT EXPRESS MECH CRP | 4 | 12/17/2025 |
| BEDROCK PLUMBING & HEATING INC | 3 | 09/08/2026 |
| FORTE EXPRESS P & H INC | 3 | 06/26/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| CBRE | 61 | 03/17/2026 |
| Two Trees Management | 16 | 06/02/2026 |
| NEW YORK UNIVERSITY | 9 | 01/03/2024 |
| STEINWAY INC | 7 | 04/24/2024 |
| EXTRA SPACE STORAGE | 6 | 03/22/2024 |
| VORNADO REALTY TRUST | 6 | 08/07/2025 |
| CUSHMAN & WAKEFIELD | 5 | 08/22/2023 |
| FIOCCHI GROUP LLC | 5 | 09/25/2025 |
| TWO TREES | 5 | 12/17/2025 |
| ALLE PROCESSING CORP | 4 | 08/17/2026 |
| Evenhar Development Corp | 4 | 02/19/2026 |
| 140 PERRY ST. CONDOMINIUM | 3 | 12/12/2025 |
| QUALITY BRANDED | 3 | 09/29/2021 |
| WEBER-FARHAT REALTY | 3 | 04/16/2025 |
| 307 KENT ASSOCIATES | 2 | 03/15/2022 |
| 45 MAIN ASSOCIATES LLC | 2 | 02/07/2020 |
| AMEX | 2 | 11/02/2023 |
| COVE PROPERTY GROUP | 2 | 08/04/2021 |
| J.W. MAYS INC | 2 | 06/19/2023 |
| LIA HOLDING INC | 2 | 03/14/2023 |
| NUVEEN REAL ESTATE | 2 | 04/28/2025 |
| THE TRUST FOR GOVERNORS ISLAND | 2 | 07/23/2026 |
| VENTURE NY PROPERTY MANAGEMENT | 2 | 06/17/2025 |
| William Gottlieb Management Co. LLC | 2 | 08/19/2022 |
| 111 Wall GC LLC | 1 | 05/26/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| RIZZO GROUP | 43 | 07/22/2026 |
| WILLIAM VITACCO ASSOCIATES | 20 | 06/02/2026 |
| OUTSOURCE CONSULTANTS, INC. | 18 | 09/08/2026 |
| DHD ARCHITECTURE, PC | 14 | 09/11/2026 |
| AGOUTI CONSTRUCTION CONSULTING | 5 | 11/14/2024 |
| METROPOLIS GROUP INC | 5 | 06/04/2025 |
| RESOLUTION EXPEDITING INC | 5 | 12/12/2025 |
| BMB BUILDING CONSULTING INC. | 4 | 01/22/2026 |
| JM ZONING, LLC. | 4 | 02/19/2026 |
| PROJECT TACTICAL SOLUTIONS | 4 | 11/21/2025 |
| CONVERSANO ASSOCIATES, INC. | 3 | 12/17/2025 |
| GILLMAN CONSULTING INC | 3 | 08/07/2025 |
| ADAM MAISER | 2 | 04/15/2025 |
| JAM CONSULTANTS, INC. | 2 | 01/07/2026 |
| NYCCODE LLC | 2 | 09/25/2025 |
| SBLM | 2 | 03/15/2022 |
| VIDARIS, INC | 2 | 05/16/2022 |
| BOHLER ENGINEERING | 1 | 06/22/2022 |
| BROOKBRIDGE CONSULTING | 1 | 04/05/2022 |
| CCA CONSTRUCTION CONSULTING ASSOCIA | 1 | 08/05/2021 |
| CHRISTOPHER TEETER,RA | 1 | 12/17/2025 |
| EA DESIGN GROUP, INC. | 1 | 07/21/2022 |
| EAST COAST EXPEDITING | 1 | 02/27/2024 |
| J. CALLAHAN CONSULTING, INC. | 1 | 06/26/2025 |
| LEWSAN CONSULTANTS | 1 | 04/07/2026 |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01362026 ↗ | 720 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 04/10/2026 | 09/24/2026 | Contractor ARISTA AIR CONDITIONING CORP | Replacement of (1) condensing unit, (1) evaporating unit, and (1) humidifier in kind. No change to use, egress, or occupancy. |
| M01173090 ↗ | 127 EAST 62 STREET MANHATTAN | Alteration | Permit Issued | 03/13/2025 | 09/23/2026 | Contractor DEAN FINE BUILDING LLC Filer ADAM MAISER | Plumbing work in connection with the interior renovation of 1-Family. No change in use, occupancy or egress with this filing. |
| M01447804 ↗ | 230 WEST 56 STREET MANHATTAN | Alteration | Permit Issued | 09/08/2026 | 09/21/2026 | Owner 1745 Broadway Owner LLC Contractor A.W. & S. CONSTRUCTION CO | OFFICE RENOVATION WORK TO INLCUDE PARTITION, CEILING AND DOOR WORK AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01351455 ↗ | 13 EAST 30 STREET MANHATTAN | Alteration | Permit Issued | 01/28/2026 | 09/08/2026 | Owner EMPIRE 30 CONDO ASSOC Contractor MASTERS RENOVATION GROUP* Filer DHD ARCHITECTURE, PC | Interior renovation to combine two adjacent condo units on the 6th, 7th floor and roof in compliance with TPPN#3/97. General Construction. N… |
| M01364446 ↗ | 460 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 04/29/2026 | 09/08/2026 | Contractor A&H EXPRESS PLBG&HTG CORP Filer RIZZO GROUP | Modifications to the existing plumbing system on the 1st floor (ODO Restaurant LL Work) as per plans. No change to use, egress or occupancy… |
| M01191314 ↗ | 145 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 03/24/2025 | 08/31/2026 | Contractor FORTE EXPRESS P & H INC | Filing herewith plumbing work for the renovation of apts 11EE & 12E at the address noted. In conjunction with GC application #'s M00191101, … |
| M01373437 ↗ | 13 RECTOR STREET MANHATTAN | Alteration | Permit Issued | 04/02/2026 | 08/10/2026 | Owner THOR EQUITIES, LLC Contractor LOCKWOOD CABINET INC | REPLACEMENT OF EXISTING MECHANICAL UNIT, ASSOCIATED DUCTWORK AND PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01429272 ↗ | 301 COMFORT ROAD MANHATTAN | Alteration | Signed-off | 07/23/2026 | 08/10/2026 | Contractor LOCKWOOD CABINET INC | SCOPE OF WORK INCLUDES THE INSTALLATION OF (1) NEW 20 TON OUTDOOR CONDENSING UNIT, REPLACEMENT OF (3) AIR HANDLING UNITS IN KIND WITH ASSOCI… |
| M01398431 ↗ | 101 WEST 78 STREET MANHATTAN | Alteration | Permit Issued | 06/24/2026 | 07/29/2026 | Contractor BENT MECHANICAL CORP Filer DHD ARCHITECTURE, PC | Plumbing work filed in conjunction with general construction in existing apartment 5B on the 5th and 6th floor. Plumbing work. No change in … |
| M01398094 ↗ | 15 WEST 81 STREET MANHATTAN | Alteration | Permit Issued | 06/09/2026 | 07/20/2026 | Contractor INS DYNAMICS INC | INTERIOR PLUMBING WORK FOR APT 10B AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. |
| M01422758 ↗ | 230 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 07/07/2026 | 07/10/2026 | Contractor WATERFIRE INC | REPLACEMENT REPLACING 2 GAS APPLIANCES ON EXISTING ROUGHING |
| M01218816 ↗ | 440 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/15/2025 | 07/02/2026 | Owner FIOCCHI GROUP LLC Contractor FIOCCHI GROUP LLC Filer NYCCODE LLC | structural work associated with the Interior renovation of the duplex apartment, associated with the convenience stair reconstruction as sho… |
| M01163271 ↗ | 277 BLEECKER STREET MANHATTAN | Alteration | Permit Issued | 01/14/2025 | 05/28/2026 | Owner ABC MANAGEMENT Contractor EMPIRE ECS, LLC | SPRINKLER WORK TO INCLUDE - MODIFICATION OF EXISTING SPRINKLER SYSTEM, INSTALL NEW SPRINKLER HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| M01365389 ↗ | 540 1 AVENUE MANHATTAN | Alteration | Permit Issued | 03/09/2026 | 05/27/2026 | Contractor BROSNA CONSTRUCTION CORPO | HEREWITH FILING FOR PLUMBING MODIFICATIONS FOR LIPTON HALL RENOVATION (APARTMENTS 18C, 18M, 19S, 20E, 20M, 20S, 21A, 21L, 21X AND 23E). NO C… |
| M01214970 ↗ | 134 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 05/29/2025 | 05/07/2026 | Contractor EMPIRE ECS, LLC | PROPOSED MECHANICAL WORK IN CONJUNCTION TO ARCH. DESIGNS. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01364450 ↗ | 460 WEST 34 STREET MANHATTAN | Alteration | Filed — no permit on record | 04/29/2026 | — | Filer RIZZO GROUP | — |
| Q01311745 ↗ | 58-80 59 STREET QUEENS | Alteration | Permit Issued | 11/06/2025 | 04/29/2026 | Owner ALLE PROCESSING CORP Contractor WATERFIRE INC | ADDITION OF NEW GAS PIPING. NO CHANGE TO USE EGRESS, OR OCCUPANCY. |
| M01303539 ↗ | 298 LAFAYETTE STREET MANHATTAN | Alteration | Permit Issued | 10/29/2025 | 04/28/2026 | Owner 111 Wall GC LLC Contractor REMI INTERIORS INC | Sprinkler modification work for tenant improvement fitout. No change in use, egress or occupancy |
| M00991306 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Permit Issued | 01/31/2024 | 04/27/2026 | Owner CBRE, INC. Contractor A + SPRINKLER CORP Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Installation of (87) new sprinkler heads and associated piping on the 28th Floor/33rd Floor … |
| B01232299 ↗ | 191 MAPLE STREET BROOKLYN | Alteration | Permit Issued | 08/15/2025 | 04/23/2026 | Contractor 2K-CONSTRUCTION CORP | STRUCTURAL MODIFICATIONS TO A ONE FAMILY HOME ON THE BAS, 1ST, 2ND, AND ROOF FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01378152 ↗ | 122 WEST 97 STREET MANHATTAN | Alteration | Permit Issued | 04/07/2026 | 04/23/2026 | Owner UWS VENTURES III, LLC Contractor HENRY MYERS P & H, INC Filer LEWSAN CONSULTANTS | INSTALLATION OF NEW GAS PIPPING AND ASSOCIATED VALVES AND APPURTENANCES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00317290 ↗ | 53 MERCER STREET MANHATTAN | Alteration | Signed-off | 07/26/2020 | 04/22/2026 | Owner Evenhar Development Corp Contractor NEW YORK STANDARD MECH CORP Filer JM ZONING, LLC. | Proposed Pluming work type filed in conjunctions with ALT-1 110296028 |
| M00776920 ↗ | 53 MERCER STREET MANHATTAN | Alteration | Signed-off | 07/28/2022 | 04/22/2026 | Owner Evenhar Development Corp Contractor NEW YORK STANDARD MECH CO Filer JM ZONING, LLC. | New SP installation filed in conjunction with ALT1 #110296028 |
| M01364444 ↗ | 460 WEST 34 STREET MANHATTAN | Alteration | Filed — no permit on record | 03/28/2026 | — | Filer RIZZO GROUP | — |
| M00385008 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 08/21/2020 | 03/27/2026 | Contractor A PLUS PLUMBING CORP | Removal of (1) existing Fire Hose Rack and Piping back to riser, Install one (1) new valve w/ tamper switch at riser on the 32nd Floor (CO)/… |
| M01356981 ↗ | 333 EAST 14 STREET MANHATTAN | Alteration | Permit Issued | 02/10/2026 | 03/25/2026 | Contractor ANY TEMP ANY TIME LLC | Proposed work to comply with ECB violation #39171514R. Replacement two ventilation fans on the roof, one Greenheck fan model GB-360-15-1-46-… |
| M01347207 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/23/2026 | 03/11/2026 | Owner CBRE, INC. Contractor A&H EXPRESS PLBG&HTG CORP Filer RIZZO GROUP | Install new plumbing fixtures: (1) WC, (1) Lavatory, (3) HWHs, (2) sinks, (3) Funnel drains, (1) drinking fountain, (1) ejector pump and ass… |
| M01347226 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/23/2026 | 03/11/2026 | Contractor DEPENDABLE MECHANICAL COR | Modifications to the existing Sprinkler System: Installation of (10) new sprinkler heads on the Cellar and (22) heads on the 1st Floor and a… |
| M01347179 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/23/2026 | 03/06/2026 | Contractor DK CONSTRUCTION ONE, CORP | Modifications to the existing HVAC System; Installation of new supplemental unit and ductwork on the Cellar & 1st Floor as per plans (Retail… |
| M01360741 ↗ | 470 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/23/2026 | 02/26/2026 | Contractor ANY TEMP ANY TIME LLC | REPLACEMENT IN KIND OF FOUR (4) EXISTING CONDENSERS AND SIX (6) EXISTING EVAPORATORS, ALL LOCATED WITHIN PENTHOUSE A. NO CHANGE TO USE, EGRE… |
| B08051896 ↗ | 314 KENT AVENUE BROOKLYN | Alteration | Permit Issued | 12/17/2022 | 01/26/2026 | Owner TWO TREES Contractor REFINERY CONSTRUCTION LLC | TENANT FIT-OUT FOR ENTIRE OFFICE FLOORS IN CONJUNCTION WITH ALT 1 321385504 |
| M01331699 ↗ | 301 COMFORT ROAD MANHATTAN | Alteration | Signed-off | 01/07/2026 | 01/12/2026 | Contractor WATERFIRE INC Filer JAM CONSULTANTS, INC. | Installation of sprinkler heads in off domestic in stairwell for Building 9 - Governors Island. |
| M01312651 ↗ | 300 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 11/14/2025 | 01/09/2026 | Owner 300 CPW APARTMENTS CORP. Contractor TC BROWNE & CO., LLC | PLUMBING MODIFICATIONS AT APT 10L, 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00842135 ↗ | 122 WAVERLY PLACE MANHATTAN | Alteration | Signed-off | 03/29/2023 | 12/18/2025 | Contractor SUPER PLUMBERS CORP Filer DHD ARCHITECTURE, PC | Interior and exterior plumbing work on the Cellar, 001,002,005, Roof and Open space. No change in use, occupancy or egress |
| M00343992 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/26/2020 | 12/04/2025 | Owner CBRE, INC. Contractor A + SPRINKLER CORP Filer RIZZO GROUP | Modifications to the Sprinkler System: Install (103) new heads on the 32nd Flr (CO)/37th Flr (Mktg) and Install (114) new sprinkler heads an… |
| M00499131 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/26/2021 | 12/04/2025 | Owner CBRE, INC. Contractor A + SPRINKLER CORP Filer RIZZO GROUP | Remove (12) existing temporary heads and loop and Install (110) new sprinkler heads and associated piping on the 27th Floor (CO)/ 32nd Floor… |
| M00604469 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/03/2021 | 12/01/2025 | Owner CBRE, INC. Contractor DEMAR PLUMBING CORP Filer RIZZO GROUP | Install NEW PL Fixtures: (2) Sinks, (1) Funnel Drain, (1) Dishwasher, (1) Chller w. Ice, (1) CM, (7) HWH and associated CW/San Piping; RELOC… |
| M00890651 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 12/01/2025 | Owner CBRE, INC. Contractor DEMAR PLUMBING CORP Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Install thirty-nine (39) new sprinkler heads and associated sprinkler piping on the 17th Flo… |
| X00987016 ↗ | 1725 WEST FARMS ROAD BRONX | Alteration | Permit Issued | 01/29/2024 | 11/05/2025 | Owner EXTRA SPACE STORAGE Contractor HENRY MYERS P & H, INC | Installation of new gas piping. No change to use, occupancy, or egress. |
| M01241710 ↗ | 37 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 07/22/2025 | 10/30/2025 | Owner Two Trees Management Contractor PRIME PLMBG & HTG OF NY | RENOVATION OF AN EXISTING OFFICE SPACE TO ACCOMMODATE NEW OFFICE LAYOUT, INCLUDING NEW PARTITIONS, PANTRY. NO CHANGE IN USE OR BULK. |
| M01250888 ↗ | 37 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 07/25/2025 | 10/29/2025 | Owner Two Trees Management Contractor PRIME PLMBG & HTG OF NY | RENOVATION OF AN EXISTING OFFICE SPACE TO ACCOMMODATE NEW OFFICE LAYOUT, INCLUDING NEW PARTITIONS, PANTRY. NO CHANGE IN USE OR BULK. |
| M00302469 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/29/2020 | 10/21/2025 | Owner CBRE, INC. Contractor BEDROCK PLBG. & HTG., INC Filer RIZZO GROUP | Removal of plumbing fixtures and cap associated piping on the 5-7th Floors (CO)/ 9-11th Floors (Marketing) as per plans. No change to use, e… |
| M00451779 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/21/2021 | 10/21/2025 | Owner CBRE, INC. Contractor SKH MECHANICAL CORP Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Installation of fifty-nine (59) new sprinkler heads and associated piping on the 28th Floor … |
| M00753854 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/07/2022 | 10/21/2025 | Contractor A&H EXPRESS PLBG&HTG CORP | Install new plumbing fixtures: (1) Water closet, (1) Lavatory, (1) Shower and associated CW/sanitary piping on the 1st Floor; (1) Hot water … |
| M00599728 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/18/2021 | 10/07/2025 | Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Installation of twenty-five (25) new temporary sprinkler heads and associated piping on the … |
| B01262887 ↗ | 20 JAY STREET BROOKLYN | Alteration | Permit Issued | 08/25/2025 | 09/30/2025 | Owner Two Trees Management Contractor ONE MAIN CONSTRUCTION | Renovation of an existing office space to accommodate new conference rooms and offices, including partitions. No change in use or bulk. |
| M00890047 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 09/22/2025 | Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR Filer RIZZO GROUP | Install (103) new sprinkler heads and associated piping on the 18th Flr (CO)/23rd Flr (Mktg) and install (117) new sprinkler heads and pipin… |
| M00221578 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/28/2019 | 09/17/2025 | Owner CBRE, INC. Contractor TRISTATE PLBG SVCS CORP Filer RIZZO GROUP | Removal of sixteen (16) temporary sprinkler heads and installation of one hundred and forty five (145) permanent sprinkler heads and associa… |
| M00939696 ↗ | 140 PERRY STREET MANHATTAN | Alteration | Signed-off | 11/14/2023 | 09/16/2025 | Contractor P.S.I. MECHANICAL | Renovation of an existing dwelling unit. Architectural work as per plans. No change of use, occupancy or egress. |
| M01264381 ↗ | 652 HUDSON STREET MANHATTAN | Alteration | Signed-off | 08/28/2025 | 09/05/2025 | Owner MAXWELL KATES Contractor FULL CAPACITY FIRE CORP Filer JAM CONSULTANTS, INC. | MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH APARTMENT RENOVATIONS AS PER PLANS FILED. |
| B01251040 ↗ | 20 JAY STREET BROOKLYN | Alteration | Permit Issued | 07/25/2025 | 09/04/2025 | Owner Two Trees Management Contractor ONE MAIN CONSTRUCTION | Installation of new (8) sinks, (3) floor drains, (1) lavatory, (1) water closet, (1) ejector pump, (1) floor sink, (2) water heaters, (1) ho… |
| B01248892 ↗ | 314 KENT AVENUE BROOKLYN | Alteration | Signed-off | 07/02/2025 | 08/05/2025 | Contractor TRISTATE FIRE SPRINK INC | SPRINKLER WORK FOR TENANT FIT-OUT - 5TH FLOOR ENTIRE |
| B01250741 ↗ | 45 MAIN STREET BROOKLYN | Alteration | Signed-off | 07/24/2025 | 08/01/2025 | Owner Two Trees Management Contractor BUILTECH ASSOCIATES | CONSTRUCTION OF NEW PARTITIONS AND NEW FINISHES AS SHOWN ON PLANS. No change to use, egress or occupancy |
| M01015349 ↗ | 118 EAST 29 STREET MANHATTAN | Alteration | Signed-off | 03/22/2024 | 07/31/2025 | Contractor P.S.I. MECHANICAL | Plumbing work filed in combination with the renovation of an existing dwelling unit. Architectural, structural, mechanical and sprinkler wor… |
| B01248961 ↗ | 314 KENT AVENUE BROOKLYN | Alteration | Signed-off | 07/02/2025 | 07/17/2025 | Owner TWO TREES Contractor PRIME PLMBG & HTG OF NY | PLUMBING WORK FOR TENANT FIT-OUT - 5TH FLOOR |
| M00710996 ↗ | 307 7 AVENUE MANHATTAN | Alteration | Signed-off | 07/21/2022 | 06/11/2025 | Owner BERNSTEIN REAL ESTATE Contractor DEEM PLUMBING INC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 14TH FLOOR (SUITE 1401) AS PER PLANS FILED HEREWITH. NO CHANGE IN US… |
| B01184868 ↗ | 314 KENT AVENUE BROOKLYN | Alteration | Signed-off | 03/07/2025 | 05/30/2025 | Owner TWO TREES Contractor TRISTATE FIRE SPRINK INC | SPRINKLER WORK FOR TENANT FIT-OUT - 8TH FLOOR ENTIRE |
| M01003037 ↗ | 140 PERRY STREET MANHATTAN | Alteration | Signed-off | 07/22/2024 | 05/27/2025 | Contractor MJE MECHANICAL LLC | Mechanical work filed in conjunction with the renovation of an existing dwelling unit. Architectural, plumbing and sprinkler work filed unde… |
| M01061323 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/24/2024 | 05/22/2025 | Owner CBRE, INC. Contractor A&H EXPRESS PLBG&HTG CORP Filer RIZZO GROUP | Installation of new plumbing fixtures: (7) Lavatories, (8) WCs, (3) UR, (1) HWH, (2) sinks, (1) refrigerator with Ice machine, (1) dishwashe… |
| M01061383 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/02/2024 | 05/22/2025 | Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Install (153) new sprinkler heads on the 16th Floor (CO)/ 21st Floor (Mktg) as per plans (Be… |
| B01176646 ↗ | 39 WASHINGTON STREET BROOKLYN | Alteration | Signed-off | 04/22/2025 | 05/20/2025 | Owner Two Trees Management Contractor ONE MAIN CONSTRUCTION | RENOVATION OF AN EX'G OFFICE SPACE TO ACCOMODATE NEW CONFERENCE ROOMS AND OFFICES, INCLUDING PARTITIONS ON THE 9TH FL NORTH WING AS SHOWN ON… |
| M01196678 ↗ | 111 GREENWICH AVENUE MANHATTAN | Alteration | Signed-off | 04/16/2025 | 05/19/2025 | Owner WEBER-FARHAT REALTY Contractor EMPIRE ECS, LLC | Installation of (1) New Outdoor condenser, (2) new evaporators on the 2nd floor. No change to use/ egress/ occupancy. |
| M01176421 ↗ | 37 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 02/26/2025 | 05/12/2025 | Owner Two Trees Management Contractor ONE MAIN CONSTRUCTION | Renovation of an existing office space to accommodate new office layout, including new partitions, restrooms, pantry. No change in use or bu… |
| B01176751 ↗ | 39 WASHINGTON STREET BROOKLYN | Alteration | Signed-off | 05/05/2025 | 05/09/2025 | Owner Two Trees Management Contractor ONE MAIN CONSTRUCTION | Plumbing work modifications on 9th floor south wing as shown on plans. |
| M01018498 ↗ | 812 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/21/2024 | 05/09/2025 | Contractor FIOCCHI GROUP LLC | MECHANICAL WORK FOR INSTALLATION OF THRU WALL AIR COOLED CONDENSING UNITS AND INDOOR AIR HANDLERS WITH ASSOCIATED DUCTS/PIPING AS PER PLANS … |
| M01200723 ↗ | 730 3 AVENUE MANHATTAN | Alteration | Signed-off | 04/28/2025 | 05/06/2025 | Owner NUVEEN REAL ESTATE Contractor TIMBIL MECHANICAL, LLC | MECHANICAL WORK RELATED TO REPLACEMENT IN KIND OF EXISTING GENERATOR, ON EXISTING FUEL PIPES, AS SHOWN ON PLANS FILED HEREWITH. WORK ON 13T… |
| M01019004 ↗ | 392 7 AVENUE MANHATTAN | Alteration | Signed-off | 03/15/2024 | 04/30/2025 | Owner VORNADO REALTY TRUST Contractor EMPIRE ECS, LLC Filer GILLMAN CONSULTING INC | Hereby filing to relocate and install sprinkler heads with related piping for restaurant fit out as shown on plans filed herewith. NO change… |
| M01039470 ↗ | 53 MERCER STREET MANHATTAN | Alteration | Signed-off | 06/07/2024 | 04/22/2025 | Owner Evenhar Development Corp Contractor QUEST BUILDERS GROUP INC Filer JM ZONING, LLC. | Plumbing work related to interior renovation of 3rd, 4th and mezzanine floor. No Change to use, egress or occupancy |
| M01205197 ↗ | 305 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 04/09/2025 | 04/16/2025 | Owner ABC REALTY Contractor ARISTA AIR CONDITIONING C | REPLACE EXISTING EVAPORATOR WITHIN APARTMENT 4AD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01012541 ↗ | 140 PERRY STREET MANHATTAN | Alteration | Signed-off | 07/22/2024 | 04/08/2025 | Contractor E.M.P. FIRE SPRINKLER LLC | Sprinkler work filed in conjunction with the renovation of an existing dwelling unit. Architectural, mechanical and plumbing work as per pla… |
| B01118544 ↗ | 20 JAY STREET BROOKLYN | Alteration | Signed-off | 10/29/2024 | 04/07/2025 | Owner Two Trees Management Contractor ONE MAIN CONSTRUCTION | Renovation of existing office space to accommodate new conference rooms and offices. No change in use. |
| M01179504 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/05/2025 | 03/13/2025 | Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Install (11) new heads on the 13th (CO)/18th (Mktg) and Relocate (10) existing heads and Ins… |
| M01045905 ↗ | 1 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 05/30/2024 | 03/11/2025 | Contractor ASCO SPRINKLER CO.,INC Filer GILLMAN CONSULTING INC | Modification to sprinkler system and related piping on 4th Floor Construction/3rd Floor Marketing Tenant Space Rest. #1 as shown on drawings… |
| M01179488 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/05/2025 | 03/10/2025 | Contractor DK CONSTRUCTION ONE, CORP | Modifications to the existing HVAC System: Relocate and redistribute ductwork on the 13-14th Floors (CO)/ 18-19th Floors (Mktg) as per plans… |
| M01165408 ↗ | 540 1 AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2025 | 03/06/2025 | Contractor HUDSON PLMBING & MCH, LLC | Herewith filing plumbing modifications for NYU Lipton Hall 18th Floor Apartment. No change in use, egress, or occupancy. |
| Q00745889 ↗ | 215-40 40 AVENUE QUEENS | Alteration | Permit Issued | 03/13/2023 | 03/05/2025 | Contractor RRP PLUMBING CORP | PLUMBING WORK IN CONJUCTION WITH RENOVATION OF 215-42 40 AVE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00735392 ↗ | 215-40 40 AVENUE QUEENS | Alteration | Permit Issued | 03/13/2023 | 03/04/2025 | Contractor RRP PLUMBING CORP | PLUMBING WORK IN CONJUCTION WITH RENOVATION OF 215-40 40 AVE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01167670 ↗ | 441 NINTH AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2025 | 02/27/2025 | Contractor R.J.C. MECHANICAL CORP Filer METROPOLIS GROUP INC | Removal and Installation of plumbing fixtures, gas fixtures and related fixture piping and gas piping, No Change to Use, Egress or occupancy… |
| M01165443 ↗ | 540 1 AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2025 | 02/26/2025 | Contractor HUDSON PLMBING & MCH, LLC | Herewith filing plumbing modifications for NYU Lipton Hall 19D, 23D, 23F, 23J, and 23L Apartments. No change in use, egress, or occupancy. |
| M01167668 ↗ | 441 NINTH AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2025 | 02/24/2025 | Contractor NICON BUILD LLC | Removal and Installation of ductwork, diffusers, fans, AC units and related mechanical piping, Installation of Commercial Kitchen Rangehood … |
| M01167682 ↗ | 441 NINTH AVENUE MANHATTAN | Alteration | Signed-off | 02/10/2025 | 02/13/2025 | Contractor MORA FIRE PROTECTION LLC Filer METROPOLIS GROUP INC | Modification of existing sprinkler system, No Change to Use, Egress or occupancy. |
| M00997636 ↗ | 50 RIVERSIDE BOULEVARD MANHATTAN | Alteration | Permit Issued | 04/11/2024 | 01/28/2025 | Contractor JOHN PETROCELLI CONSTRUCT Filer DHD ARCHITECTURE, PC | INTERIOR RENOVATION TO COMBINE TWO ADJACENT CONDO UNITS 19D & 19E ON 19TH FLOOR. THE COMBINATION WORK SHALL BE IN ACCORDANCE WITH LOCAL LAW … |
| M01155851 ↗ | 347 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 01/17/2025 | 01/27/2025 | Owner NYU LANGONE HEALTH Contractor BROSNA CONSTRUCTION CORPO | Filing for the renovation of unit 20D at the 20th floor. Work includes removal and installation of interior non load bearing partitions, doo… |
| M01061341 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/24/2024 | 01/06/2025 | Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Installation of (183) new sprinkler heads on the 7th floor (CO)/ 11th Floor (Mktg) as per pl… |
| M00975214 ↗ | 126 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 01/03/2024 | 11/13/2024 | Owner NEW YORK UNIVERSITY Contractor HIGHMARK TEC & CHILLER | Replacement of existing chiller. No change to use, egress, or occupancy. |
| M01007882 ↗ | 220 CENTRAL PARK SOUTH MANHATTAN | Alteration | Signed-off | 03/25/2024 | 10/30/2024 | Owner VORNADO REALTY TRUST Contractor FIOCCHI GROUP LLC Filer GILLMAN CONSULTING INC | Remove and construction interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. |
| M01015359 ↗ | 118 EAST 29 STREET MANHATTAN | Alteration | Signed-off | 03/25/2024 | 09/24/2024 | Contractor FIOCCHI GROUP LLC | Mechanical work filed in conjunction with the renovation of an existing dwelling unit. Architectural, sprinkler, structural and plumbing wor… |
| M01061380 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/02/2024 | 09/23/2024 | Owner CBRE, INC. Contractor A&H EXPRESS PLBG&HTG CORP Filer RIZZO GROUP | Removal of waste and vent piping and Install new fixtures: (3) dishwashers, (4) sinks, (4) funnel drains, (4) ejector pumps, (4) HWH and ass… |
| M01061400 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/02/2024 | 09/23/2024 | Contractor A&H EXPRESS PLBG&HTG CORP | Install new plumbing fixtures: (1) pantry sink, (1) funnel drain, (1) dishwasher, (1) HWH, (1) ejector pump and associated CW/sanitary pipin… |
| M00775135 ↗ | 103 GREENWICH AVENUE MANHATTAN | Alteration | Signed-off | 08/19/2022 | 08/30/2024 | Contractor ETHOS PLUMBING CORP | Additions/ modifications to existing plumbing system as per plans filed herewith . No change in use, egress or occupancy |
| M01067969 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/02/2024 | 08/28/2024 | Contractor STANDARD FIRE SUPP CORP | Modifications to the existing Sprinkler System: Relocate (38) heads, Remove (11) existing heads, Install (3) new heads and associated piping… |
| M00948472 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Signed-off | 10/18/2023 | 08/12/2024 | Contractor N-STORE SERVICES LLC | Structural work to include wall panels for retail space at 1st floor as shown on plans. |
| M01061403 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/02/2024 | 08/07/2024 | Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Relocate (5) sprinkler heads and remove (9) existing sprinkler heads and associated piping o… |
| M01061282 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/24/2024 | 07/31/2024 | Owner CBRE, INC. Contractor DK CONSTRUCTION ONE, CORP Filer RIZZO GROUP | Modifications to the existing HVAC System: Install condenser water pump with leak detector, new water cooled ac unit and associated controls… |
| M01061375 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/02/2024 | 07/31/2024 | Contractor DK CONSTRUCTION ONE, CORP | Modifications to the existing HVAC System: Install condenser water pump with leak detector, new water cooled ac unit and associated controls… |
| M01067961 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/02/2024 | 07/29/2024 | Owner CBRE, INC. Contractor A&A PLUMBING CORP Filer RIZZO GROUP | Relocate (1) sink, (1) refrigerator, (1) DW, (1) CM; Install new: (1) sink, (1) HWH, (1) ejector pump, (2) FDs, (1) domestic HW circulation … |
| B00936473 ↗ | 39 WASHINGTON STREET BROOKLYN | Alteration | Signed-off | 10/05/2023 | 07/24/2024 | Owner Two Trees Management Contractor ONE MAIN CONSTRUCTION | Modification of plumbing system at 8th floor as shown on plans |
| M00282570 ↗ | 65 WORTH STREET MANHATTAN | Alteration | Signed-off | 01/10/2020 | 07/15/2024 | Contractor ADRIAS PLUMBING CORP Filer JM ZONING, LLC. | Filing herewith to replace 2 boilers in subcellar |
| M01061399 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/02/2024 | 07/10/2024 | Owner CBRE, INC. Contractor DK CONSTRUCTION ONE, CORP Filer RIZZO GROUP | Modifications to the existing HVAC System: Install new volume dampers and associated controls on the 30th Floor (CO)/ 35th Floor (Mktg) as p… |
| M01067893 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/02/2024 | 07/09/2024 | Owner CBRE, INC. Contractor W.J. REGAN & COMPANY LLC Filer RIZZO GROUP | Modifications to the existing HVAC System: Install new ductwork and ceiling registers and associated controls and piping on the 22nd Floor (… |