← Back
Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
QUEENS · BIN 4467307
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
Architecture
Floor 11p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CNS INSPECTION SERVICES LLC206/03/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMERSON BROTHERS LLCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818206/03/2024
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (4)
08/27/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATIONS, REPLACE DOORS & WINDOWS AND REPLACE EXISTING DECKS
Q00978315-I1
06/03/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS, REPLACE DOORS & WINDOWS AND REPLACE EXISTING DECKS
Q00978315-P1
06/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
06/03/2024
Special inspection requirement — Final
MOHAMMAD AHEAD
05/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
05/29/2024
Special inspection requirement — Final
MOHAMMAD AHEAD
02/01/2024
Permit issued — General Construction
Q00978315-I1-GC
01/22/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS, REPLACE DOORS & WINDOWS AND REPLACE EXISTING DECKS
Q00978315-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEMERSON BROTHERS LLC02/01/2024
1 project · most recent 12/23/2024
General Wiring
FiledStatusContractorScope
12/23/2024CompletePAPPAS & FODERA ELECT'LGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/03/2024Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
06/03/2024FinalMOHAMMAD AHEADprogress
05/29/2024Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
05/29/2024FinalMOHAMMAD AHEADprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00978315-P1Request digital key ↗
08/23/2026Q00978315-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00978315-I1Open ↗
08/23/2026Q00978315-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026Q00978315-I1Open ↗
08/29/2026Q00978315-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026Q00978315-I1Open ↗
08/29/2026Q00978315-P1Open ↗