← Back
Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
QUEENS · BIN 4466756
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralPlumbing
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.1907/08/2026
SAND BAR CONTRACTORS203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC109/05/2024
CMC DESIGN ARCHITECT, P.C.407/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
AC BUILDING CONSULTANTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAND-BAR CONTRACTORS INCGeneral Contractor307/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
JOSEPH O'GRADY P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272109/05/2024
CMC DESIGN ARCHITECT, P.C2984307/05/2023
FP VILLANO CONSULTING ENG8575109/21/2021
Building Lifecycle
All (78)Filed (5)Permit Issued (4)Signed Off (3)Violation (2)Inspection (6)Objection (28)Special Inspection (30)
01/22/2025
Signed off — Alteration
Q01106065-I1
09/09/2024
Permit issued — Solar
Q01106065-I1-SL
09/05/2024
Filed — Alteration
Q01106065-I1
09/05/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
09/04/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
09/04/2024
Special inspection requirement — Final
Walid Abdulla
09/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/01/2024
Signed off — New Building
New 2 story, 1 family dwelling.
Q00545971-S2
01/16/2024
Signed off — New Building
New 2 story, 1 family dwelling.
Q00545971-S1
12/06/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/13/2023
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Gary Lenhart
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
07/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
Gary Lenhart
07/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Gary Lenhart
07/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Gary Lenhart
07/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Gary Lenhart
07/13/2023
Special inspection requirement — Sprinkler Systems
Gary Lenhart
07/05/2023
Filed — New Building
New 2 story, 1 family dwelling.
Q00545971-P1
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
06/29/2023
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Gary Lenhart
06/29/2023
Special inspection requirement — Sprinkler Systems
Gary Lenhart
06/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Gary Lenhart
06/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
Gary Lenhart
06/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Gary Lenhart
06/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
Gary Lenhart
06/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/02/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
03/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/29/2022
Permit issued — Plumbing
Q00545971-S2-PL
11/25/2022
Violation issued (ECB, closed)
Construction
11/25/2022
Violation issued (ECB, closed)
Construction
11/17/2022
Permit issued — Foundation
Q00545971-I1-GC-CX
09/28/2022
Permit issued — Construction Fence
Q00545971-S1-FN
02/19/2022
Filed — New Building
New 2 story, 1 family dwelling.
Q00545971-S2
02/19/2022
Filed — New Building
New 2 story, 1 family dwelling.
Q00545971-S1
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
10/19/2021
Objection resolved — Addressed
09/29/2021
Objection raised — Scope
09/29/2021
Objection raised — Other
09/29/2021
Objection raised — Zoning
09/27/2021
Objection raised — Energy
09/27/2021
Objection raised — Energy
09/27/2021
Objection raised — Energy
09/27/2021
Objection raised — Energy
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC09/09/2024
DOB NOWPlumbingSigned-offJOSEPH O'GRADY P & H INC12/29/2022
DOB NOWFoundationPermit IssuedSAND-BAR CONTRACTORS INC11/17/2022
DOB NOWConstruction FenceSigned-offSAND-BAR CONTRACTORS INC09/28/2022
BIS—ISSUEDMALBRO CONST SERVICES INC10/11/2022
1 job · most recent 07/05/2023
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
07/05/2023Signed-offJOSEPH O'GRADY P & H INCGas, Plumbing-Sprinkler, Water/Sanitary
2 jobs · most recent 09/05/2024
General Wiring
FiledStatusContractorScope
09/05/2024CompleteSUNRUN SOLAR ELECTL CORP—
01/25/2023CompleteG.E.O. ELECTRIC CORPGeneral Wiring
1 job · most recent 07/05/2023
FiledStatusContractorScope
07/05/2023Signed-offJOSEPH O'GRADY P & H INC1 scope_items
1 job · most recent 07/05/2023
Fence
FiledStatusContractorScope
07/05/2023Signed-offJOSEPH O'GRADY P & H INCFence
1 job · most recent 07/05/2023
Earthwork
FiledStatusContractorScope
07/05/2023Signed-offJOSEPH O'GRADY P & H INCEarthwork
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/02/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
09/05/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
09/04/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
09/04/2024FinalWalid Abdullaprogress
09/04/2024Energy Code Compliance InspectionsWalid Abdullaprogress
09/04/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/04/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/13/2023On-Site Private Sewage Disposal Systems InstallationGary Lenhartspecial
07/13/2023Fire-Resistant Penetrations and JointsGary Lenhartspecial
07/13/2023HVAC-R and service water heating system controlsGary Lenhartenergy_progress
07/13/2023HVAC-R and service water piping design and insulationGary Lenhartenergy_progress
07/13/2023HVAC-R and service water heating equipmentGary Lenhartenergy_progress
07/13/2023Energy Code Compliance InspectionsGary Lenhartprogress
07/13/2023Sprinkler SystemsGary Lenhartspecial
06/29/2023Fire-Resistant Penetrations and JointsGary Lenhartspecial
06/29/2023On-Site Private Sewage Disposal Systems InstallationGary Lenhartspecial
06/29/2023Sprinkler SystemsGary Lenhartspecial
06/29/2023Energy Code Compliance InspectionsGary Lenhartprogress
06/29/2023HVAC-R and service water heating equipmentGary Lenhartenergy_progress
06/29/2023HVAC-R and service water piping design and insulationGary Lenhartenergy_progress
06/29/2023HVAC-R and service water heating system controlsGary Lenhartenergy_progress
09/21/2021Fenestration areasGary Lenhartenergy_progress
09/21/2021Insulation placement and R valuesGary Lenhartenergy_progress
09/21/2021Air barrier - visual inspectionGary Lenhartenergy_progress
09/21/2021HVAC-R and service water piping design and insulationGary Lenhartenergy_progress
09/21/2021Concrete - Cast-In-PlaceGary Lenhartspecial
Latest 25 of 43.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00545971-P1Request digital key ↗
08/26/2026Q00545971-S2Request digital key ↗
08/26/2026Q00545971-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/14/2022421766592Open ↗
▸BISWORK PERMIT APPLICATION1
12/02/2022421766592Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00545971-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00545971-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026Q01106065-I1Open ↗
09/02/2026Q01106065-I1Open ↗
09/02/2026Q01106065-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026Q01106065-I1Open ↗
09/02/2026Q01106065-I1Open ↗
09/02/2026Q01106065-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026Q00545971-P1Open ↗
08/26/2026Q00545971-S2Open ↗
08/26/2026Q00545971-S1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/02/2022421766592Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
12/02/2022421766592Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/02/2022421766592Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00545971-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00545971-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00545971-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION6
12/02/2022421766592Open ↗
12/02/2022421766592Open ↗
12/02/2022421766592Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01106065-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
12/02/2022421766592Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
12/02/2022421766592Open ↗
11/14/2022421766592Open ↗
▸BISADDITIONAL INFORMATION1
12/02/2022421766592Open ↗
▸BISEFILING COVER SHEET1
11/14/2022421766592Open ↗
▸Other Documents4
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
08/13/2026Q00545971-I1Open ↗
08/13/2026Q00545971-S2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00545971-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00545971-I1Open ↗