← Back
BuildNYC
Predominantly retail with other uses
217 EAST 49TH STREET
MANHATTAN · BIN 1038244
💬 Discuss this project
1900Year Built
3Stories
K4Building Class
R8BZoning
4,200 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 217 E. 49th Street · 1,443 sf lot · 2.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRidgeview Property Group17p · 5 filings · 20 docs
Floor 3Ridgeview Property Group28p · 5 filings · 20 docs
Floor 2Ridgeview Property Group25p · 5 filings · 20 docs
Floor 1Ridgeview Property Group25p · 5 filings · 20 docs
CellarRidgeview Property Group29p · 6 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation12p · 4 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
217 49th Street4007/08/2026
121 West 7203/21/2026
127 E 49 ST203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/26/2021$3.2M—217 EAST 49TH LLC → 217 E. 49TH STREET, LLC$774/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rohan Development1909/26/2025
MSM Engineering Services202/24/2025
Mohammad Ahead, PE107/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOB Expediting1103/21/2026
VRD Development1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spartan Demolition Cospecialty_contractor1607/08/2026
Spartan Demolition CoScaffold607/08/2026
A & M Warshaw Plumbing & HeatingPlumbing507/08/2026
MNK Enterprises NYScaffold407/08/2026
Park Contracting GroupScaffold207/08/2026
Brandl ElectricElectrical103/22/2026
All Empire Building ConScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rohan Engineering2600709/26/2025
Building Lifecycle
All (124)Filed (22)Permit Issued (23)Signed Off (7)Violation (31)Inspection (9)Objection (2)Special Inspection (30)
07/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01113090-I1
05/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/25/2026
Signed off — Alteration
Proposed interior renovation the the plumbing work of 3 story commercial building. no change in use , egress or occupancy
M00526551-I1
02/25/2026
Signed off — Alteration
Proposed interior renovation of three - story commercial building. no change is use , occupancy and a new certificate of occupancy is not required
M00580444-I1
12/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2025
Permit issued — General Construction
M00860201-I1-GC
11/06/2025
Permit issued — Mechanical Systems
M00580451-I1-MS
10/08/2025
Signed off — Alteration
M00527930-I1
10/08/2025
Signed off — Alteration
Propose boiler work in conjunction with alteration NO M00580444 no change in use, egress or occupancy
M01190921-I1
10/06/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/26/2025
Filed — Alteration
Proposed interior renovation of three - story commercial building. no change is use , occupancy and a new certificate of occupancy is not required
M00580444-P2
09/26/2025
Special inspection requirement — Interior lighting power
BRIAN ROHAN
09/26/2025
Special inspection requirement — Electrical motors and elevators
BRIAN ROHAN
09/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN ROHAN
09/26/2025
Special inspection requirement — Fenestration areas
BRIAN ROHAN
09/26/2025
Special inspection requirement — Vestibules
BRIAN ROHAN
09/26/2025
Special inspection requirement — Maintenance information
BRIAN ROHAN
09/26/2025
Special inspection requirement — Fenestration air leakage
BRIAN ROHAN
09/26/2025
Special inspection requirement — Structural Steel - Details
BRIAN ROHAN
09/26/2025
Special inspection requirement — Insulation placement and R values
BRIAN ROHAN
09/26/2025
Special inspection requirement — Final
BRIAN ROHAN
09/26/2025
Special inspection requirement — Lighting controls
BRIAN ROHAN
09/26/2025
Special inspection requirement — Air barrier - visual inspection
BRIAN ROHAN
09/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ROHAN
09/26/2025
Special inspection requirement — Permanent certificate
BRIAN ROHAN
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ROHAN
09/26/2025
Special inspection requirement — Wood – Seismic Resistance
BRIAN ROHAN
09/26/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
BRIAN ROHAN
09/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ROHAN
09/26/2025
Special inspection requirement — Structural Wood Frame
BRIAN ROHAN
09/26/2025
Special inspection requirement — Structural Cold-Formed Steel
BRIAN ROHAN
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ROHAN
09/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ROHAN
09/24/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01185082-I1
09/15/2025
Violation issued (ECB, closed)
Construction
08/13/2025
Objection resolved — Addressed
08/12/2025
Objection raised — Accessibility
07/30/2025
Filed — Alteration CO
Alteration 1 filing to update the occupant calculation load of each floor.
M00860201-P1
07/16/2025
Permit issued — Sidewalk Shed
M01113090-I1-SH
07/14/2025
Permit issued — Supported Scaffold
M01185082-I1-SF
06/04/2025
Permit issued — Plumbing
M00526551-I1-PL
06/03/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ROHAN
06/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ROHAN
06/02/2025
Filed — Alteration
Proposed interior renovation the the plumbing work of 3 story commercial building. no change in use , egress or occupancy
M00526551-P4
05/13/2025
Filed — Alteration
Propose boiler work in conjunction with alteration NO M00580444 no change in use, egress or occupancy
M01190921-P3
05/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ROHAN
05/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ROHAN
05/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ROHAN
05/09/2025
Filed — Alteration
Propose boiler work in conjunction with alteration NO M00580444 no change in use, egress or occupancy
M01190921-P2
05/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ROHAN
05/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ROHAN
05/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ROHAN
05/05/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/24/2025
Permit issued — Boiler Equipment
M01190921-I1-BE
03/11/2025
Filed — Alteration
Propose boiler work in conjunction with alteration NO M00580444 no change in use, egress or occupancy
M01190921-P1
03/06/2025
Filed — Alteration
Propose boiler work in conjunction with alteration NO M00580444 no change in use, egress or occupancy
M01190921-I1
02/24/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01185082-I1
02/24/2025
Permit issued — Supported Scaffold
M01185082-I1-SF
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSpartan Demolition Co11/13/2025
DOB NOWMechanical SystemsPermit IssuedSpartan Demolition Co11/06/2025
DOB NOWSidewalk ShedSigned-offPark Contracting Group07/16/2025
DOB NOWSupported ScaffoldSigned-offPark Contracting Group07/14/2025
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating06/04/2025
DOB NOWBoiler EquipmentSigned-offA & M Warshaw Plumbing & Heating03/24/2025
DOB NOWSupported ScaffoldSigned-offMNK Enterprises NY02/24/2025
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY09/20/2024
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating05/24/2024
DOB NOWGeneral ConstructionSigned-offSpartan Demolition Co02/09/2024
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating06/21/2023
DOB NOWGeneral ConstructionSigned-offSpartan Demolition Co06/07/2023
DOB NOWSidewalk ShedPermit IssuedAll Empire Building Con07/11/2022
DOB NOWGeneral ConstructionSigned-offSpartan Demolition Co06/27/2022
DOB NOWConstruction FenceSigned-offSpartan Demolition Co06/27/2022
DOB NOWStructuralSigned-offSpartan Demolition Co06/01/2022
DOB NOWConstruction FenceSigned-offSpartan Demolition Co06/01/2022
DOB NOWGeneral ConstructionSigned-offSpartan Demolition Co02/18/2022
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating01/19/2022
DOB NOWConstruction FenceSigned-offSpartan Demolition Co01/07/2022
DOB NOWGeneral ConstructionSigned-offSpartan Demolition Co12/29/2021
DOB NOWGeneral ConstructionSigned-offSpartan Demolition Co10/04/2021
DOB NOWGeneral ConstructionSigned-offSpartan Demolition Co08/10/2021
BISMHISSUEDCool Breeze Air Con04/26/2007
BISEQISSUEDSpring Scaffolding03/29/2001
BISOTISSUEDStar Awnings03/17/2000
BISFPISSUEDLund Fire Products Co07/21/1999
BISPLISSUEDNew York Standard Mechanical05/24/1999
BISOTISSUEDA&D Alloca & Son04/27/1999
1 project · most recent 07/03/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/03/2024Permit IssuedSpartan Demolition CoAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Rheem RWMV06A3621 57,598 BTU · Fan Coil Indoor ×1
RWMV10A3621 57,598 BTU · Fan Coil Indoor ×1
RWMV10A6024 69,936 BTU · Fan Coil Indoor ×1
Heating
Mitsubishi Electric NTXWPH06A112A 10,700 BTU ×1
9 projects · most recent 02/11/2026
General Wiring
FiledStatusContractorScope
02/11/2026CompleteBrandl ElectricGeneral Wiring
11/17/2025CompleteBrandl Electric—
11/17/2025CompleteBrandl Electric—
09/15/2025CompleteBrandl ElectricGeneral Wiring
09/12/2025CompleteBrandl ElectricGeneral Wiring
09/18/2024CompleteRichard Neu—
07/07/2022CompleteRichard Neu—
05/19/2022CompleteBrandl ElectricGeneral Wiring
08/11/2021CompleteFirst Star ElectricGeneral Wiring
2 projects · most recent 09/18/2024
Sidewalk Shed
FiledStatusContractorScope
09/18/2024Signed-offPark Contracting GroupSidewalk Shed
07/07/2022Permit IssuedAll Empire Building ConSidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/06/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/05/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/30/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2021Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
09/26/2025Structural Stability – Alterations of existing buildingsBRIAN ROHANspecial
09/26/2025Structural Steel - DetailsBRIAN ROHANspecial
09/26/2025Structural Cold-Formed SteelBRIAN ROHANspecial
09/26/2025Structural Wood FrameBRIAN ROHANprogress
09/26/2025Energy Code Compliance InspectionsBRIAN ROHANprogress
09/26/2025Fire-Resistance Rated ConstructionBRIAN ROHANprogress
09/26/2025FinalBRIAN ROHANprogress
09/26/2025Insulation placement and R valuesBRIAN ROHANenergy_progress
09/26/2025Fenestration air leakageBRIAN ROHANenergy_progress
09/26/2025Interior lighting powerBRIAN ROHANenergy_progress
09/26/2025Electrical motors and elevatorsBRIAN ROHANenergy_progress
09/26/2025Fenestration and door U-factor and product ratingsBRIAN ROHANenergy_progress
09/26/2025VestibulesBRIAN ROHANenergy_progress
09/26/2025Air barrier - visual inspectionBRIAN ROHANenergy_progress
09/26/2025Lighting controlsBRIAN ROHANenergy_progress
09/26/2025Fenestration areasBRIAN ROHANenergy_progress
09/26/2025Maintenance informationBRIAN ROHANenergy_progress
09/26/2025Permanent certificateBRIAN ROHANenergy_progress
09/26/2025HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
09/26/2025Wood – Seismic ResistanceBRIAN ROHANspecial
09/26/2025Fire-Resistant Penetrations and JointsBRIAN ROHANspecial
09/26/2025Exterior Insulation and Finish Systems (EIFS)BRIAN ROHANspecial
06/03/2025HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
06/03/2025Energy Code Compliance InspectionsBRIAN ROHANprogress
05/13/2025HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
Latest 25 of 81.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
09/03/2026M00526550-P1Request digital key ↗
09/03/2026M00526550-I1Request digital key ↗
09/03/2026M00527930-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION6
09/25/2023102256372Open ↗
09/25/2023102650221Open ↗
09/25/2023102047321Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026M00860201-I1Open ↗
08/13/2026M00860201-P1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/03/2026M00527930-I1Open ↗
09/03/2026M00580444-P1Open ↗
09/03/2026M00580444-P2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
10/09/2026M01190921-P1Open ↗
09/06/2026M00580444-P1Open ↗
09/06/2026M00580444-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/06/2026M00580444-P1Open ↗
09/06/2026M00580444-P1Open ↗
09/02/2026M00526550-P1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/22/2026M00860201-P1Open ↗
08/22/2026M00860201-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00580444-I1Open ↗
08/27/2026M00526551-I1Open ↗
08/27/2026M00580451-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00580444-I1Open ↗
08/13/2026M00580451-I1Open ↗
08/13/2026M00526551-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/12/2022123914345Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/22/2026M00860201-I1Open ↗
08/22/2026M00860201-P1Open ↗