← Back
Limited service hotel, often national chain
Belleclaire Hotel
2175 BROADWAY · BIN 1030866
💬 Discuss this project
1903Year Built
10Stories
H3Building Class
C4-6AZoning
121,147 sfGross Floor Area
6Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SAFE
Limited service hotel, often national chain · Owner of record: LOPHIJO REALTY CORP. · 13,575 sf lot · 8.92 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 1Under Construction4p · 3 filings · 20 docs
CellarUnder Construction6p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIUMPH HOTELS4609/13/2026
TRIUMPH HOSPITALITY GROUP307/08/2026
LOPHIJO REALTY8003/22/2026
VERMA GROUP LLC103/22/2026
SCHIMENTI CONSTRUCTION CO103/22/2026
VEMA GROUP103/22/2026
BELLECHAIRE HOTEL LLC22203/22/2026
LOPHZJO RELATY CORP103/22/2026
TO OWNER OF PREMISES103/22/2026
LOPHI JO REALTY COPR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION803/21/2026
SWA ARCHITECTURE1403/21/2026
ALL IN PERMIT CONSULTANTS203/21/2026
LOUIS STRIAR203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VEMA GROUP LLCGeneral Contractor1307/14/2026
SIGNSTAR NYCScaffold207/08/2026
ADVANCED PLBG, MECH & SPRFire Protection207/08/2026
SCHIMENTI CONSTRUCTION COGeneral Contractor207/08/2026
NATIONAL MAINTENANCEScaffold207/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
ALFONSO GIGANTEElectrical103/21/2026
BRIAN CHEBUSKEElectrical103/21/2026
PSI FIRE CORPPlumbing107/08/2026
THE RIGHT CONNECTION P&HPlumbing108/06/2026
ROBERT CHIMENTIElectrical103/21/2026
RONNIE ARCHERElectrical103/21/2026
YOUNG CHOEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AHT ENGINEERING PLLC8836209/09/2026
GEORGE E. BERGER & ASSOCI3947105/06/2026
MM ARCHITECT PC3934105/06/2026
MEP INSPECTIONS, INC1102203/09/2021
METRIC CONSULTING AND INS1803203/25/2020
CATALPA SPECIAL INSPECTIO2004109/24/2019
Building Lifecycle
All (167)Filed (19)Permit Issued (22)Signed Off (10)Facade (FISP) (12)Violation (60)Objection (14)Special Inspection (30)
09/11/2026
Permit issued — General Construction
M01418486-S1-GC
09/09/2026
Filed — Alteration
INSTALLATION OF NEW INTERIOR NON-LOAD BEARING, NON-RATED PARTITIONS WITHIN EXISTING RETAIL TENANT SPACE ON FIRST FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01418486-P1
09/09/2026
Special inspection requirement — Energy Code Compliance Inspections
ABRAHAM TAWIL
09/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ABRAHAM TAWIL
09/09/2026
Special inspection requirement — Maintenance information
ABRAHAM TAWIL
09/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
ABRAHAM TAWIL
09/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
ABRAHAM TAWIL
09/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABRAHAM TAWIL
08/05/2026
Permit issued — Plumbing
M01418486-I1-PL
07/13/2026
Permit issued — Sidewalk Shed
M01393206-I1-SH
07/10/2026
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01393206-I1
06/26/2026
Permit issued — General Construction
M01390068-I1-GC
06/23/2026
Filed — Alteration
INSTALLATION OF NEW INTERIOR NON-LOAD BEARING, NON-RATED PARTITIONS WITHIN EXISTING RETAIL TENANT SPACE ON FIRST FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01418486-I1
06/19/2026
Special inspection requirement — Energy Code Compliance Inspections
ABRAHAM TAWIL
06/19/2026
Special inspection requirement — Maintenance information
ABRAHAM TAWIL
06/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
ABRAHAM TAWIL
06/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ABRAHAM TAWIL
06/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
ABRAHAM TAWIL
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABRAHAM TAWIL
06/09/2026
Objection resolved — Addressed
05/26/2026
Objection raised — Admin
05/06/2026
Filed — Alteration
IT IS PROPOSED TO RENOVATE THE EXISTING CELLAR AND FIRST FLOOR FOR THE NEW TENANT AS SHOWN ON THE PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01390068-I1
04/27/2026
Special inspection requirement — Lighting controls
Matt Markowitz
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Matt Markowitz
04/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stuart Berger
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matt Markowitz
04/20/2026
Special inspection requirement — Final
Matt Markowitz
08/15/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00005105-I1
08/09/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00497307-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/01/2023
Signed off — Alteration
Installation of temporary skylight protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00752912-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/23/2023
Cycle 9 facade report signed — SAFE
01/05/2023
Cycle 9 facade report submitted
01/03/2023
Cycle 9 facade inspection completed
11/09/2022
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00005105-P3
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2022
Permit issued — Protection and Mechanical Methods
M00752912-I1-PM
06/29/2022
Filed — Alteration
Installation of temporary skylight protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00752912-I1
06/15/2022
Violation issued (HPD, closed)
B
06/15/2022
Violation issued (HPD, closed)
B
06/15/2022
Violation issued (HPD, closed)
A
06/15/2022
Violation issued (HPD, closed)
B
06/15/2022
Violation issued (HPD, closed)
B
06/15/2022
Violation issued (HPD, closed)
B
06/15/2022
Violation issued (HPD, closed)
B
06/15/2022
Violation issued (HPD, open)
C
06/15/2022
Violation issued (HPD, closed)
B
05/17/2022
Permit issued — Sidewalk Shed
M00005105-I1-SH
02/15/2022
Violation issued (HPD, closed)
A
12/20/2021
Signed off — Alteration
SPRINKLER WORK AS PER PLANS
M00225514-I1
11/04/2021
Permit issued — Supported Scaffold
M00497307-I1-SF
11/03/2021
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00497307-I1
10/28/2021
Permit issued — Sprinklers
M00225514-I1-EW-SP
09/15/2021
Signed off — Alteration
AMENDING PLUMBING PLAN TO SINK IN BREAK ROOM
M00216854-I1
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAHT ENGINEERING PLLC09/11/2026
DOB NOWPlumbingPermit IssuedTHE RIGHT CONNECTION P&H08/05/2026
DOB NOWSidewalk ShedPermit IssuedVEMA GROUP LLC07/13/2026
DOB NOWGeneral ConstructionPermit IssuedVEMA GROUP LLC06/26/2026
DOB NOWProtection and Mechanical MethodsSigned-offVEMA GROUP LLC06/30/2022
DOB NOWSidewalk ShedSigned-offVEMA GROUP LLC05/17/2022
DOB NOWSupported ScaffoldSigned-offVEMA GROUP LLC11/04/2021
DOB NOWSprinklersSigned-offADVANCED PLBG, MECH & SPR10/28/2021
DOB NOWSidewalk ShedSigned-offVEMA GROUP LLC05/13/2021
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC12/07/2020
DOB NOWSignSigned-offSIGNSTAR NYC11/10/2020
DOB NOWSignPermit IssuedSIGNSTAR NYC06/17/2020
DOB NOWStructuralSigned-offSCHIMENTI CONSTRUCTION CO12/26/2019
DOB NOWSprinklersSigned-offADVANCED PLBG, MECH & SPR12/24/2019
DOB NOWPlumbingSigned-offPSI FIRE CORP11/13/2019
DOB NOWMechanical SystemsSigned-offSCHIMENTI CONSTRUCTION CO10/18/2019
DOB NOWSidewalk ShedSigned-offVEMA GROUP LLC04/19/2019
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC02/11/2019
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC01/31/2019
DOB NOWSidewalk ShedSigned-offVEMA GROUP LLC11/09/2018
DOB NOWSidewalk ShedSigned-offVEMA GROUP LLC03/19/2018
DOB NOWSidewalk ShedSigned-offVEMA GROUP LLC01/17/2018
BISPLISSUEDTHE RIGHT CONNECTION P&H01/12/2026
BISOTISSUEDVEMA GROUP LLC11/25/2025
BISMHISSUEDVEMA GROUP LLC11/25/2025
BISOTISSUEDVEMA GROUP LLC11/25/2025
BISMHISSUEDVEMA GROUP LLC11/25/2025
BISOTISSUEDVEMA GROUP LLC11/25/2025
BISMHISSUEDVEMA GROUP LLC11/25/2025
BISOTISSUEDVEMA GROUP LLC11/25/2025
BISOTISSUEDVEMA GROUP LLC11/25/2025
BIS—ISSUEDVEMA GROUP LLC11/25/2025
BISEQISSUEDVEMA GROUP LLC11/25/2025
BISPLISSUEDTHE RIGHT CONNECTION P&H10/30/2025
BISPLISSUEDTHE RIGHT CONNECTION P&H01/28/2025
BISOTISSUEDVEMA GROUP LLC11/27/2024
BISOTISSUEDVEMA GROUP LLC11/27/2024
BISMHISSUEDVEMA GROUP LLC11/27/2024
BIS—ISSUEDVEMA GROUP LLC11/27/2024
BISOTISSUEDVEMA GROUP LLC11/27/2024
+ 32 more permits on file
1 project · most recent 09/09/2026
Water/Sanitary
FiledStatusContractorScope
09/09/2026Permit IssuedMAX P & H INCWater/Sanitary
11 projects · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/05/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
09/04/2024Permit IssuedV ELECTRIC NY INCGeneral Wiring
02/06/2024CompleteROBERT CHIMENTI4 meters, 1 new_meters
06/24/2021CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
06/15/2021CompleteGKF ELECL CONTRACTORS INC—
08/13/2018Permit IssuedGKF ELECL CONTRACTORS INC4 meters, 4 new_meters
08/13/2018Permit IssuedGKF ELECL CONTRACTORS INCGeneral Wiring
08/09/2018CompleteHV ELECTRIC CORPGeneral Wiring
01/16/2018CompleteGKF ELECL CONTRACTORS INC—
12/07/2017Permit IssuedANTONIO CERIELLO ELEC INC—
1 project · most recent 07/10/2026
Sidewalk Shed
FiledStatusContractorScope
07/10/2026Permit IssuedVEMA GROUP LLCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
09/09/2026Energy Code Compliance InspectionsABRAHAM TAWILprogress
09/09/2026HVAC-R and service water piping design and insulationABRAHAM TAWILenergy_progress
09/09/2026Maintenance informationABRAHAM TAWILenergy_progress
09/09/2026HVAC-R and service water heating system controlsABRAHAM TAWILenergy_progress
09/09/2026HVAC-R and service water heating equipmentABRAHAM TAWILenergy_progress
09/09/2026Fire-Resistant Penetrations and JointsABRAHAM TAWILspecial
06/19/2026Energy Code Compliance InspectionsABRAHAM TAWILprogress
06/19/2026Maintenance informationABRAHAM TAWILenergy_progress
06/19/2026HVAC-R and service water heating equipmentABRAHAM TAWILenergy_progress
06/19/2026HVAC-R and service water piping design and insulationABRAHAM TAWILenergy_progress
06/19/2026HVAC-R and service water heating system controlsABRAHAM TAWILenergy_progress
06/19/2026Fire-Resistant Penetrations and JointsABRAHAM TAWILspecial
04/27/2026Lighting controlsMatt Markowitzenergy_progress
04/27/2026Energy Code Compliance InspectionsMatt Markowitzprogress
04/27/2026Tenant Protection Plan ComplianceStuart Bergerspecial
04/27/2026Fire-Resistant Penetrations and JointsMatt Markowitzspecial
04/20/2026FinalMatt Markowitzprogress
03/10/2021Sprinkler SystemsNicolas Crosettospecial
02/19/2021Sprinkler SystemsNicolas Crosettospecial
11/02/2020FinalFRANK VILLANOprogress
04/02/2020FinalERIC BERLENTprogress
04/02/2020Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
04/02/2020Post-installed AnchorsSAMI HAJJAR P.Especial
04/02/2020MasonrySAMI HAJJAR P.Especial
04/02/2020Structural Steel - WeldingSAMI HAJJAR P.Especial
Latest 25 of 39.
▾Documents — 1,161 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch7
09/05/2026M00093779-I1Request digital key ↗
09/03/2026M00005105-I1Request digital key ↗
09/03/2026M00497307-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026M00005105-P3Request digital key ↗
09/03/2026M00005105-I1Request digital key ↗
08/15/2026M00005105-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00124522-I1Request digital key ↗
09/04/2026M00419774-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00216854-I1Request digital key ↗
09/05/2026M00216854-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/04/2026M00225514-I1Request digital key ↗
08/15/2026M00225514-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00216782-P1Request digital key ↗
08/14/2026M00216782-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00225885-I1Request digital key ↗
▸Applications & Permits299
▸BISPLAN / WORK APPROVAL APPLICATION191
02/04/2026121106962Open ↗
01/05/2026121106962Open ↗
07/24/2025122548822Open ↗
Showing 3 of 191 on file for this type
▸BISWORK PERMIT APPLICATION100
02/27/2023123061104Open ↗
02/24/2023123061104Open ↗
02/24/2023123061104Open ↗
Showing 3 of 100 on file for this type
▸DOB NOWLPC Approval/Permit8
09/14/2026M01418486-S1Open ↗
09/05/2026M00216854-I1Open ↗
09/05/2026M00216854-P1Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications173
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION90
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 90 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/14/2026M01418486-P1Open ↗
09/14/2026M01418486-S1Open ↗
09/05/2026M00216854-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026M01418486-P1Open ↗
09/06/2026M00225514-P1Open ↗
09/01/2026M01418486-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026M01418486-P1Open ↗
09/23/2026M01418486-S1Open ↗
09/23/2026M01418486-P1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment102
▸BISEQUIPMENT USE PERMITS38
10/22/2025122548822Open ↗
10/22/2025122548822Open ↗
10/22/2025122548822Open ↗
Showing 3 of 38 on file for this type
▸BISSCHEDULE B - PLUMBING23
10/24/2023110344226Open ↗
10/23/2023123061104Open ↗
10/03/2023123061104Open ↗
Showing 3 of 23 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
10/22/2025122548822Open ↗
10/22/2025122548822Open ↗
10/22/2025122548822Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER SYSTEMS2
11/07/2023123061104Open ↗
11/07/2023123061104Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection72
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist20
09/14/2026M01418486-P1Open ↗
09/14/2026M01418486-S1Open ↗
09/05/2026M00216854-I1Open ↗
Showing 3 of 20 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISTenant Protection Plan and Notes15
02/23/2026121106962Open ↗
Showing 1 of 15 on file for this type
▸DOB NOWTenant Protection Plan9
09/05/2026M00216854-I1Open ↗
09/05/2026M00216854-P1Open ↗
09/05/2026M00225885-I1Open ↗
Showing 3 of 9 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT5
11/06/2023122549368Open ↗
11/06/2023110045530Open ↗
11/06/2023102715279Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos50
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/14/2026M01418486-P1Open ↗
09/14/2026M01418486-S1Open ↗
09/05/2026M00216854-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Energy Compliance44
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
01/04/2023123582355Open ↗
12/30/2022123582355Open ↗
Showing 2 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
08/07/2025122548822Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/18/2026121106962Open ↗
02/18/2026121106962Open ↗
Showing 2 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports45
▸BISTECHNICAL REPORT: RESPONSIBILITY26
03/03/2026121106962Open ↗
10/16/2025122548822Open ↗
01/22/2025123706613Open ↗
Showing 3 of 26 on file for this type
▸BISMECHANICAL SYSTEMS4
10/16/2025122548822Open ↗
01/22/2025123706613Open ↗
11/07/2023123061104Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
10/16/2025122548822Open ↗
01/22/2025123706613Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS2
10/16/2025122548822Open ↗
10/16/2025122548822Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
10/16/2025122548822Open ↗
01/22/2025123706613Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
10/16/2025122548822Open ↗
10/16/2025122548822Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
10/16/2025122548822Open ↗
10/16/2025122548822Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs130
▸BISLANDMARKS APPROVAL28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
10/20/2025122548822Open ↗
06/28/2023120990838Open ↗
01/05/2023123582355Open ↗
Showing 3 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION22
02/23/2026121106962Open ↗
11/03/2023102715279Open ↗
11/03/2023102715279Open ↗
Showing 3 of 22 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE21
10/31/2023102715279Open ↗
10/04/2023102715279Open ↗
09/27/2023102715279Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISLANDMARKS SIGNOFF9
01/28/2025123706613Open ↗
01/07/2025120042916Open ↗
01/03/2023123582355Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER4
02/27/2023123061104Open ↗
02/24/2023123061104Open ↗
Showing 2 of 4 on file for this type
▸BISFINAL3
10/16/2025122548822Open ↗
11/17/2022110344226Open ↗
Showing 2 of 3 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership55
▸BISCOST AFFIDAVIT46
01/04/2023123582355Open ↗
12/30/2022123582355Open ↗
Showing 2 of 46 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
10/16/2025122548822Open ↗
01/22/2025123706613Open ↗
Showing 2 of 9 on file for this type
▸Filing & Intake Forms143
▸BISADDITIONAL INFORMATION59
01/14/2026121106962Open ↗
08/07/2025122548822Open ↗
12/12/2024123706613Open ↗
Showing 3 of 59 on file for this type
▸BISEFILING COVER SHEET45
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 45 on file for this type
▸BISBOROUGH INTAKE FORM34
02/27/2023123061104Open ↗
Showing 1 of 34 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWDHCR Document3
09/05/2026M00225885-I1Open ↗
09/04/2026M00225514-I1Open ↗
08/13/2026M00225514-P1Open ↗