| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01302319 ↗ | 65 8 AVENUE MANHATTAN | Alteration | Permit Issued | 11/21/2025 | 08/25/2026 | Design MM ARCHITECT PC Owner 245 REALTY LLC Contractor NEW WHITEHALL APARTMENTS | It is proposed to remove kitchen hood, ducts on 1FL, exhaust fan, split AC unit on lower roof and unit inside former pizza store as per ECB … |
| Q01424047 ↗ | 153-90 ROCKAWAY BOULEVARD QUEENS | Alteration | Filed — no permit on record | 08/04/2026 | — | Design GEORGE E. BERGER & ASSOC. Owner ALLIAH MANAGEMENT LLC | — |
| M01418151 ↗ | 140 5 AVENUE MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 08/03/2026 | Contractor DORMASA CONSTRUCTION INC | RENOVATION OF EXISTING RETAIL STORE ON THE 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M01390068 ↗ | 2175 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/06/2026 | 06/26/2026 | Design MM ARCHITECT PC Owner TRIUMPH HOTELS LLC Contractor VEMA GROUP LLC | IT IS PROPOSED TO RENOVATE THE EXISTING CELLAR AND FIRST FLOOR FOR THE NEW TENANT AS SHOWN ON THE PLANS. NO CHANGE TO USE, EGRESS OR OCCUPA… |
| B00983298 ↗ | 1424 HERKIMER STREET BROOKLYN | Alteration | Signed-off | 01/18/2024 | 07/18/2025 | Design MOTTOLA RINI ENGINEERS Contractor OLYMPIAN FUEL OIL CORP | provide new 300 gallon rooftop fuel storage tank w/ containment for hand fill as indicated on plans & per BB 2011-001 for buildings construc… |
| B00983288 ↗ | 1424 HERKIMER STREET BROOKLYN | Alteration | Signed-off | 01/18/2024 | 01/27/2025 | Design MOTTOLA RINI ENGINEERS Contractor MLA CONSTRUCTION INC | IT IS PROPOSED TO FILE WORK FOR NEW GENERATOR AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FUEL STORAGE… |
| Name | Projects together | Most recent |
|---|---|---|
| GEORGE E. BERGER & ASSOC. | 7 | 08/04/2026 |
| MM ARCHITECT PC | 3 | 05/06/2026 |
| MOTTOLA RINI ENGINEERS | 2 | 01/18/2024 |
| BASIC GROUPS CORP | 1 | 07/24/2020 |
| CTHREE ARCHITECTURE + DESIGN, PC | 1 | 07/23/2026 |
| JAMI L. STUTZ ARCHITECT | 1 | 06/21/2023 |
| STARK CONSULTING, LLC | 1 | 07/23/2026 |
| SW ENGINEERING COMPANY | 1 | 12/08/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| LIBERTY ONE CONSTRUCTION | 3 | 06/16/2023 |
| MLA CONSTRUCTION INC | 2 | 02/20/2024 |
| ALL DIMENSION HOME IMPROV | 1 | 06/21/2023 |
| COPPER MECHANICAL INC | 1 | 07/24/2020 |
| DONE RIGHT KITCHEN EXHAUS | 1 | 12/08/2023 |
| DORMASA CONSTRUCTION INC | 1 | 07/23/2026 |
| G.A.M.C.N.Y. LLC | 1 | 03/11/2024 |
| JACK PICCINI, INC | 1 | 01/18/2024 |
| JODOM MECHANICAL, INC | 1 | 10/12/2022 |
| MANHATTAN CONSTRUCTION & | 1 | 01/03/2022 |
| NEW WHITEHALL APARTMENTS | 1 | 11/21/2025 |
| OLYMPIAN FUEL OIL CORP | 1 | 01/18/2024 |
| VEMA GROUP LLC | 1 | 05/06/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| LIBERTY ONE CONSTRUCTION, LLC | 4 | 06/16/2023 |
| TRIUMPH HOTELS LLC | 2 | 05/06/2026 |
| 245 REALTY LLC | 1 | 11/21/2025 |
| ALLIAH MANAGEMENT LLC | 1 | 08/04/2026 |
| GILMAN MANAGEMENT CORPORATION | 1 | 07/24/2020 |
| THE JANE HOTEL | 1 | 01/03/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| GEORGE E. BERGER & ASS. LLC | 11 | 08/04/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 12/08/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01302319 ↗ | 65 8 AVENUE MANHATTAN | Alteration | Permit Issued | 11/21/2025 | 08/25/2026 | Design MM ARCHITECT PC Owner 245 REALTY LLC Contractor NEW WHITEHALL APARTMENTS | It is proposed to remove kitchen hood, ducts on 1FL, exhaust fan, split AC unit on lower roof and unit inside former pizza store as per ECB … |
| Q01424047 ↗ | 153-90 ROCKAWAY BOULEVARD QUEENS | Alteration | Filed — no permit on record | 08/04/2026 | — | Design GEORGE E. BERGER & ASSOC. Owner ALLIAH MANAGEMENT LLC | — |
| M01418151 ↗ | 140 5 AVENUE MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 08/03/2026 | Contractor DORMASA CONSTRUCTION INC | RENOVATION OF EXISTING RETAIL STORE ON THE 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| M01390068 ↗ | 2175 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/06/2026 | 06/26/2026 | Design MM ARCHITECT PC Owner TRIUMPH HOTELS LLC Contractor VEMA GROUP LLC | IT IS PROPOSED TO RENOVATE THE EXISTING CELLAR AND FIRST FLOOR FOR THE NEW TENANT AS SHOWN ON THE PLANS. NO CHANGE TO USE, EGRESS OR OCCUPA… |
| B00983298 ↗ | 1424 HERKIMER STREET BROOKLYN | Alteration | Signed-off | 01/18/2024 | 07/18/2025 | Design MOTTOLA RINI ENGINEERS Contractor OLYMPIAN FUEL OIL CORP | provide new 300 gallon rooftop fuel storage tank w/ containment for hand fill as indicated on plans & per BB 2011-001 for buildings construc… |
| B00983288 ↗ | 1424 HERKIMER STREET BROOKLYN | Alteration | Signed-off | 01/18/2024 | 01/27/2025 | Design MOTTOLA RINI ENGINEERS Contractor MLA CONSTRUCTION INC | IT IS PROPOSED TO FILE WORK FOR NEW GENERATOR AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FUEL STORAGE… |
| M00845382 ↗ | 1084 2 AVENUE MANHATTAN | Alteration | Signed-off | 06/21/2023 | 08/27/2024 | Design JAMI L. STUTZ ARCHITECT Contractor ALL DIMENSION HOME IMPROV | Minor demolition and erection of non-bearing partitions. Construction of a ventless fireplace. |
| M00928973 ↗ | 219 WEST 46 STREET MANHATTAN | Alteration | Permit Issued | 12/08/2023 | 05/23/2024 | Design SW ENGINEERING COMPANY Owner TRIUMPH HOTELS Contractor DONE RIGHT KITCHEN EXHAUS | ALTERATION OF EXISTING COMMERCIAL KITCHEN EXHAUST.NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X01011028 ↗ | 190 WILLOW AVENUE BRONX | Alteration | Signed-off | 03/11/2024 | 04/16/2024 | Design GEORGE E. BERGER & ASSOC. Contractor GAMCNY | IT IS PROPSED TO REPLACE SPILT AIR CONDITIONING UNIT THAT SUPPLIES THE ELEVATOR MOTOR/HOIST ROOM AT UPPER ROOF LEVEL AS SHOW ON PLAN. NO CHN… |
| B01008322 ↗ | 1424 HERKIMER STREET BROOKLYN | Alteration | Signed-off | 02/20/2024 | 02/28/2024 | Design GEORGE E. BERGER & ASSOC. Contractor MLA CONSTRUCTION INC | IT IS PROPOSED TO INSTALL NEW INTERIOR PARTITIONS AND DOORS AT THE CELLAR AS SHOWN ON PLANS. PATCH, PAINT AND REPAIR AS NECESSARY. NO CHAN… |
| B00880949 ↗ | 3154 EMMONS AVENUE BROOKLYN | Alteration | Signed-off | 06/16/2023 | 07/08/2023 | Design GEORGE E. BERGER & ASSOC. Owner LIBERTY ONE CONSTRUCTION Contractor LIBERTY ONE CONSTRUCTION | IT IS PROPOSED TO REMOVE LOOSE AND DAMAGED PAINT, PLASTER AND FINISHES; PATCH, PAINT & REPAIR ALL WALLS AND CEILING; RETILE EXISITNG BATHROO… |
| X08014726 ↗ | 1387 GRAND CONCOURSE BRONX | Alteration | Signed-off | 10/12/2022 | 11/09/2022 | Design GEORGE E. BERGER & ASSOC. Contractor JODOM MECHANICAL, INC | IT IS PROPOSED TO INSTALL NEW BATHROOM AND KITCHEN FIXTURES AND PLUMBING AT BASEMENT LEVEL (APT.4) IN CONJUNCTION WITH GENERAL CONSTRUCTION … |
| X08014557 ↗ | 1387 GRAND CONCOURSE BRONX | Alteration | Signed-off | 10/12/2022 | 10/15/2022 | Design GEORGE E. BERGER & ASSOC. Contractor LIBERTY ONE CONSTRUCTION | IT IS PROPOSED THE GENERAL CONSTRUCTION FOR INTTERIOR RENOVATION AND RESTORE EXISTING APARTMENT AT BASEMENT LEVEL IN CONJUNCTION WITH PLUMBI… |
| M00398980 ↗ | 3 WEST 8 STREET MANHATTAN | Alteration | Signed-off | 10/09/2020 | 08/26/2021 | Design MM ARCHITECT PC Owner THE JANE HOTEL Contractor MANHATTAN CONSTRUCTION & | it is proposed to complete direct replacement of existing HVAC. |
| Q00516493 ↗ | 202-24 HOLLIS AVE QUEENS | Alteration | Signed-off | 06/02/2021 | 06/17/2021 | Design GEORGE E. BERGER & ASSOC. Contractor LIBERTY ONE CONSTRUCTION | IT IS PROPOSED TO MAKE A MINOR INTERIOR RENOVATION TO A FIRE DAMAGED APARTMENT#4A ON FIRST FLOOR AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPA… |
| M00369334 ↗ | 255 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 07/24/2020 | 09/16/2020 | Design BASIC GROUPS CORP Owner GILMAN MANAGEMENT Contractor COPPER MECHANICAL INC | Cap, remove, and install new plumbing fixtures in cellar and first floor as shown on plans. Application is filed in conjunction with ALT 2 #… |
| Building | Filings | Most Recent |
|---|---|---|
| 153-90 ROCKAWAY BOULEVARD ↗ | 1 | 08/04/2026 |
| 140 5 AVENUE ↗ | 1 | 07/23/2026 |
| 2175 BROADWAY ↗ | 1 | 05/06/2026 |
| 65 8 AVENUE ↗ | 2 | 11/21/2025 |
| 190 WILLOW AVENUE ↗ | 1 | 03/11/2024 |
| 1424 HERKIMER STREET ↗ | 3 | 02/20/2024 |
| 219 WEST 46 STREET ↗ | 2 | 12/08/2023 |
| 1084 2 AVENUE ↗ | 1 | 06/21/2023 |
| 3154 EMMONS AVENUE ↗ | 1 | 06/16/2023 |
| 1387 GRAND CONCOURSE ↗ | 3 | 11/08/2022 |
| 3 WEST 8 STREET ↗ | 2 | 01/03/2022 |
| 202-24 HOLLIS AVE ↗ | 1 | 06/02/2021 |
| 255 LAFAYETTE STREET ↗ | 1 | 07/24/2020 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/06/2026 | Tenant Protection Plan Compliance | 140 5 AVENUE | Stuart Berger | special |
| 06/29/2026 | HVAC-R and service water heating system controls | 153-90 ROCKAWAY BOULEVARD | Stuart Berger | energy_progress |
| 06/29/2026 | HVAC-R and service water heating equipment | 153-90 ROCKAWAY BOULEVARD | Stuart Berger | energy_progress |
| 06/29/2026 | Final | 153-90 ROCKAWAY BOULEVARD | Stuart Berger | progress |
| 06/29/2026 | Energy Code Compliance Inspections | 153-90 ROCKAWAY BOULEVARD | Stuart Berger | progress |
| 06/29/2026 | Mechanical Systems | 153-90 ROCKAWAY BOULEVARD | Stuart Berger | special |
| 06/17/2026 | Final | 140 5 AVENUE | Salvatore Croce | progress |
| 06/17/2026 | Lighting controls | 140 5 AVENUE | Salvatore Croce | energy_progress |
| 06/17/2026 | Interior lighting power | 140 5 AVENUE | Salvatore Croce | energy_progress |
| 04/27/2026 | Fire-Resistant Penetrations and Joints | 2175 BROADWAY | Matt Markowitz | special |
| 04/27/2026 | Tenant Protection Plan Compliance | 2175 BROADWAY | Stuart Berger | special |
| 04/27/2026 | Energy Code Compliance Inspections | 2175 BROADWAY | Matt Markowitz | progress |
| 04/27/2026 | Lighting controls | 2175 BROADWAY | Matt Markowitz | energy_progress |
| 04/20/2026 | Final | 2175 BROADWAY | Matt Markowitz | progress |
| 11/21/2025 | Tenant Protection Plan Compliance | 65 8 AVENUE | Stuart Berger | special |
| 10/21/2025 | Fire-Resistance Rated Construction | 65 8 AVENUE | Matt Markowitz | progress |
| 10/21/2025 | Fire-Resistant Penetrations and Joints | 65 8 AVENUE | Matt Markowitz | special |
| 10/14/2025 | Final | 65 8 AVENUE | Matt Markowitz | progress |
| 03/06/2024 | HVAC-R and service water heating equipment | 190 WILLOW AVENUE | Stuart Berger | energy_progress |
| 03/06/2024 | HVAC-R and service water piping design and insulation | 190 WILLOW AVENUE | Stuart Berger | energy_progress |
| 12/28/2023 | Chimneys and vents | 1424 HERKIMER STREET | Anthony Rini, III | special |
| 12/28/2023 | Emergency and Standby Power Systems (Generator) | 1424 HERKIMER STREET | ALEKSANDR LEVIN | special |
| 12/28/2023 | Tenant Protection Plan Compliance | 1424 HERKIMER STREET | Stuart Berger | special |
| 12/28/2023 | Mechanical Systems | 1424 HERKIMER STREET | Anthony Rini, III | special |
| 12/28/2023 | Final | 1424 HERKIMER STREET | Anthony Rini, III | progress |
| 11/09/2023 | Tenant Protection Plan Compliance | 219 WEST 46 STREET | Stuart Berger | special |
| 09/05/2023 | Maintenance information | 219 WEST 46 STREET | EDWARD SIMONIELLO | energy_progress |
| 09/05/2023 | HVAC-R and service water heating system controls | 219 WEST 46 STREET | EDWARD SIMONIELLO | energy_progress |
| 09/05/2023 | Electrical motors and elevators | 219 WEST 46 STREET | EDWARD SIMONIELLO | energy_progress |
| 09/05/2023 | HVAC-R and service water heating equipment | 219 WEST 46 STREET | EDWARD SIMONIELLO | energy_progress |
| 09/05/2023 | Final | 219 WEST 46 STREET | EDWARD SIMONIELLO | progress |
| 09/05/2023 | Energy Code Compliance Inspections | 219 WEST 46 STREET | EDWARD SIMONIELLO | progress |
| 09/05/2023 | Mechanical Systems | 219 WEST 46 STREET | EDWARD SIMONIELLO | special |
| 06/07/2023 | Tenant Protection Plan Compliance | 3154 EMMONS AVENUE | Stuart Berger | special |
| 05/25/2023 | Final | 3154 EMMONS AVENUE | Stuart Berger | progress |
| 11/09/2022 | Interior lighting power | 1387 GRAND CONCOURSE | Stuart Berger | energy_progress |
| 11/09/2022 | Energy Code Compliance Inspections | 1387 GRAND CONCOURSE | Stuart Berger | progress |
| 11/09/2022 | Final | 1387 GRAND CONCOURSE | Stuart Berger | progress |
| 11/09/2022 | Fire-Resistance Rated Construction | 1387 GRAND CONCOURSE | Stuart Berger | progress |
| 11/09/2022 | Fire-Resistant Penetrations and Joints | 1387 GRAND CONCOURSE | Stuart Berger | special |
| 11/07/2022 | Energy Code Compliance Inspections | 1387 GRAND CONCOURSE | Stuart Berger | progress |
| 11/07/2022 | Fire-Resistant Penetrations and Joints | 1387 GRAND CONCOURSE | Stuart Berger | special |
| 11/07/2022 | Interior lighting power | 1387 GRAND CONCOURSE | Stuart Berger | energy_progress |
| 11/07/2022 | Fire-Resistance Rated Construction | 1387 GRAND CONCOURSE | Stuart Berger | progress |
| 11/07/2022 | Final | 1387 GRAND CONCOURSE | Stuart Berger | progress |
| 01/03/2022 | Maintenance information | 3 WEST 8 STREET | Matt Markowitz | energy_progress |
| 01/03/2022 | Final | 3 WEST 8 STREET | Matt Markowitz | progress |
| 01/03/2022 | Mechanical Systems | 3 WEST 8 STREET | Stuart Berger | special |
| 12/20/2021 | Final | 3 WEST 8 STREET | Matt Markowitz | progress |
| 12/20/2021 | Mechanical Systems | 3 WEST 8 STREET | Stuart Berger | special |