← Back
Two stories - detached, small or mid-size
218-03 HORACE HARDING EXPWY
QUEENS · Bayside · BIN 4160897
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R2AZoning
1,350 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,556 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEPARTMENT OF ENVIRONMENTAL PROTECTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAPHAEL FORONDA ARCHITECT501/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AQUATECH PLUMBING & HEATINGGeneral Contractor307/08/2026
J C MECHANICAL CORPGeneral Contractor203/21/2026
LION HEART ELECTRIC CORPElectrical103/22/2026
FK CONSTRUCTION INCGeneral Contractor104/09/2026
AQUATECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRANK J. QUATELA, ARCHITE1632301/20/2026
Building Lifecycle
All (69)Filed (5)Permit Issued (5)Signed Off (3)Violation (1)Inspection (5)Objection (20)Special Inspection (30)
04/13/2026
Signed off — Alteration CO
PROPOSED NEW 18'-0" (INCLUDING SPLAYS) CURB CUT IN CONJUNCTION WITH DOB NOW APPLICATION Q01035859.
Q01035859-I1
03/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/17/2026
Signed off — Alteration CO
PROPOSED NEW 18'-0" (INCLUDING SPLAYS) CURB CUT IN CONJUNCTION WITH DOB NOW APPLICATION Q01035859.
Q01035859-S1
03/09/2026
Special inspection requirement — Ventilation and air distribution system
FRANK QUATELA
03/09/2026
Special inspection requirement — Insulation placement and R values
FRANK QUATELA
03/09/2026
Special inspection requirement — Permanent certificate
FRANK QUATELA
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
03/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANK QUATELA
03/09/2026
Special inspection requirement — Mechanical Systems
FRANK QUATELA
03/09/2026
Special inspection requirement — Structural Wood Frame
RAPHAEL FORONDA
03/09/2026
Special inspection requirement — Final
RAPHAEL FORONDA
03/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
RAPHAEL FORONDA
03/09/2026
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
03/09/2026
Special inspection requirement — Fenestration air leakage
FRANK QUATELA
03/09/2026
Special inspection requirement — Air barrier - visual inspection
FRANK QUATELA
03/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK QUATELA
03/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
FRANK QUATELA
03/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK QUATELA
03/09/2026
Special inspection requirement — Electric vehicle service equipment requirements
FRANK QUATELA
03/09/2026
Special inspection requirement — Interior lighting power
FRANK QUATELA
03/09/2026
Special inspection requirement — Fenestration areas
FRANK QUATELA
03/09/2026
Special inspection requirement — Maintenance information
FRANK QUATELA
03/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
FRANK QUATELA
03/06/2026
Objection resolved — Addressed
03/05/2026
Signed off — Alteration CO
PROPOSED NEW 18'-0" (INCLUDING SPLAYS) CURB CUT IN CONJUNCTION WITH DOB NOW APPLICATION Q01035859.
Q01035859-S2
03/05/2026
Objection resolved — Addressed
03/03/2026
Objection raised — Zoning
03/03/2026
Objection raised — Scope
02/26/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/20/2026
Filed — Alteration CO
PROPOSED NEW 18'-0" (INCLUDING SPLAYS) CURB CUT IN CONJUNCTION WITH DOB NOW APPLICATION Q01035859.
Q01035859-P2
01/20/2026
Filed — Alteration CO
PROPOSED NEW 18'-0" (INCLUDING SPLAYS) CURB CUT IN CONJUNCTION WITH DOB NOW APPLICATION Q01035859.
Q01035859-P1
12/29/2025
Special inspection requirement — Maintenance information
FRANK QUATELA
12/29/2025
Special inspection requirement — Mechanical Systems
FRANK QUATELA
12/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANK QUATELA
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
12/29/2025
Special inspection requirement — Final
RAPHAEL FORONDA
12/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
RAPHAEL FORONDA
12/29/2025
Special inspection requirement — Structural Wood Frame
RAPHAEL FORONDA
12/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK QUATELA
12/29/2025
Special inspection requirement — Air barrier - visual inspection
FRANK QUATELA
12/29/2025
Special inspection requirement — Fenestration air leakage
FRANK QUATELA
11/12/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/01/2025
Permit issued — Curb Cut
Q01035859-S2-CC
09/05/2025
Permit issued — Structural
Q01035859-I1-MS
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/21/2025
Violation issued (ECB, closed)
Unknown
06/30/2025
Permit issued — General Construction
Q01035859-I1-ST
06/18/2025
Permit issued — Plumbing
Q01035859-S1-PL
06/17/2025
Permit issued — Mechanical Systems
Q01035859-I1-GC
02/19/2025
Objection resolved — Addressed
02/19/2025
Objection resolved — Addressed
02/19/2025
Objection resolved — Addressed
02/12/2025
Objection raised — Admin
01/24/2025
Filed — Alteration CO
PROPOSED NEW 18'-0" (INCLUDING SPLAYS) CURB CUT IN CONJUNCTION WITH DOB NOW APPLICATION Q01035859.
Q01035859-S2
06/26/2024
Objection resolved — Addressed
06/24/2024
Objection raised — Zoning
06/12/2024
Objection resolved — Addressed
06/11/2024
Objection raised — Scope
06/11/2024
Objection raised — Zoning
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offFK CONSTRUCTION INC10/01/2025
DOB NOWStructuralSigned-offJ C MECHANICAL09/05/2025
DOB NOWGeneral ConstructionSigned-offAQUATECH PLUMBING HEATI06/30/2025
DOB NOWPlumbingSigned-offAQUATECH PLBG & HTG LLC06/18/2025
DOB NOWMechanical SystemsPermit IssuedAQUATECH PLUMBING HEATI06/17/2025
BISOTISSUEDS VICARI & SONS04/12/2006
1 project · most recent 01/20/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/20/2026Signed-offFK CONSTRUCTION INCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-4D30NL 30,000 BTU · Condensing Unit ×2
1 project · most recent 01/20/2026
Water/Sanitary
FiledStatusContractorScope
01/20/2026Signed-offAQUATECH PLBG & HTG LLCWater/Sanitary
2 projects · most recent 08/19/2025
General Wiring
FiledStatusContractorScope
08/19/2025CompleteCOBRA ELECTRICAL NYC LLCGeneral Wiring
09/02/2022CompleteLION HEART ELECTRIC CORPGeneral Wiring
1 project · most recent 01/20/2026
Wood
FiledStatusContractorScope
01/20/2026Signed-offFK CONSTRUCTION INCWood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/26/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
11/12/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
10/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
03/09/2026Ventilation and air distribution systemFRANK QUATELAenergy_progress
03/09/2026Insulation placement and R valuesFRANK QUATELAenergy_progress
03/09/2026Permanent certificateFRANK QUATELAenergy_progress
03/09/2026Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
03/09/2026Structural Stability – Alterations of existing buildingsFRANK QUATELAspecial
03/09/2026Mechanical SystemsFRANK QUATELAspecial
03/09/2026Structural Wood FrameRAPHAEL FORONDAprogress
03/09/2026FinalRAPHAEL FORONDAprogress
03/09/2026Fire-Resistance Rated ConstructionRAPHAEL FORONDAprogress
03/09/2026Energy Code Compliance InspectionsFRANK QUATELAprogress
03/09/2026Fenestration air leakageFRANK QUATELAenergy_progress
03/09/2026Air barrier - visual inspectionFRANK QUATELAenergy_progress
03/09/2026Fenestration and door U-factor and product ratingsFRANK QUATELAenergy_progress
03/09/2026HVAC-R and service water heating system controlsFRANK QUATELAenergy_progress
03/09/2026HVAC-R and service water piping design and insulationFRANK QUATELAenergy_progress
03/09/2026Electric vehicle service equipment requirementsFRANK QUATELAenergy_progress
03/09/2026Interior lighting powerFRANK QUATELAenergy_progress
03/09/2026Fenestration areasFRANK QUATELAenergy_progress
03/09/2026Maintenance informationFRANK QUATELAenergy_progress
03/09/2026HVAC-R and service water heating equipmentFRANK QUATELAenergy_progress
12/29/2025Maintenance informationFRANK QUATELAenergy_progress
12/29/2025Mechanical SystemsFRANK QUATELAspecial
12/29/2025Structural Stability – Alterations of existing buildingsFRANK QUATELAspecial
12/29/2025Energy Code Compliance InspectionsFRANK QUATELAprogress
12/29/2025FinalRAPHAEL FORONDAprogress
Latest 25 of 43.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01035859-P1Request digital key ↗
08/21/2026Q01035859-S2Request digital key ↗
08/21/2026Q01035859-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01035859-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature14
09/27/2026Q01035859-P2Open ↗
09/27/2026Q01035859-P2Open ↗
09/27/2026Q01035859-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01035859-S2Open ↗
08/21/2026Q01035859-S1Open ↗
08/21/2026Q01035859-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026Q01035859-P2Open ↗
09/18/2026Q01035859-I1Open ↗
08/23/2026Q01035859-S1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01035859-I1Open ↗
08/13/2026Q01035859-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q01035859-S2Open ↗
08/21/2026Q01035859-S1Open ↗
08/21/2026Q01035859-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01035859-I1Open ↗
08/21/2026Q01035859-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01035859-I1Open ↗