← Back
BuildNYC
Predominantly retail with other uses
22 LITTLE WEST 12 STREET
MANHATTAN · West Village · BIN 1080264
💬 Discuss this project
1908Year Built
6Stories
K4Building Class
M1-5Zoning
64,683 sfGross Floor Area
6Units
LL97 Covered0 Active Violations
Predominantly retail with other uses · Owner of record: 22 Little West 12th Street Partners · 13,260 sf lot · 4.88 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInfinity Real Estate2p · 1 filing · 8 docs
Floor 7Infinity Real Estate2p · 1 filing · 8 docs
Floor 6
Floor 5Goldwell56p · 1 filing · 20 docs
Floor 4Oribe, Goldwell42p · 2 filings · 20 docs
Floor 3
Floor 2
Floor 11p · 7 filings · 16 docs
Cellar2p · 8 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
22 Little West 12 Street10903/21/2026
Infinity Real Estate3807/08/2026
LW 12th Street Holding2003/21/2026
L.w.holding103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A-Squared201/21/2025
Ola Consulting Engineers901/03/2025
Kevin A. Davignon209/11/2024
Colombo Architectural Studio109/25/2023
Cthree Architecture + Design901/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Haque Associates2603/21/2026
Cthree Architecture + Design1203/21/2026
Professional Design Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dolphin Construction ManagementGeneral Contractor1607/08/2026
Asco Sprinkler CoFire Protection307/08/2026
Asco SprinklerPlumbing203/22/2026
Foos Fire NYPlumbing203/22/2026
Prime Piping & HeatingPlumbing107/08/2026
Breffni Mechanicalspecialty_contractor107/08/2026
Limongelli ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Skyline Engineering267901/03/2025
Jose A Santos PE3292109/25/2023
Building Lifecycle
All (139)Filed (24)Permit Issued (13)Signed Off (9)Violation (48)Inspection (9)Objection (12)Special Inspection (24)
01/29/2026
Signed off — Alteration CO
RENOVATION OF EXIST. OFFICE SPACE AT 5TH FL, INCLUDING MODIFICATIONS OF PARTITIONS & FINISHES TO CREATE NEW MEETING ROOMS, PANTRY/BREAK ROOM & STORAGE CLOSETS FOR STAFF/EMPLOYEES. REVISED LAYOUT WILL CHANGE THE OCCUPANT LOAD & RESULT IN AN AMENDED C OF O.
M00934322-I1
04/29/2025
Signed off — Alteration
M00972620-I1
04/24/2025
Permit issued — Suspended Scaffold
M00972620-I1-SC
02/19/2025
Signed off — Alteration
MODIFICATION OF THE EXISTING SPRINKLER SYSTEMS, ASSOCIATED WITH THE RENOVATION OF THE EXISTING INTERIOR SPACE AT 4TH FLOOR.
M01045680-I1
01/23/2025
Signed off — Alteration
MODIFICATION OF THE EXISTING SPRINKLER SYSTEMS, ASSOCIATED WITH THE RENOVATION OF THE EXISTING INTERIOR SPACE AT 4TH FLOOR.
M01045680-S2
01/23/2025
Signed off — Alteration
MODIFICATION OF THE EXISTING SPRINKLER SYSTEMS, ASSOCIATED WITH THE RENOVATION OF THE EXISTING INTERIOR SPACE AT 4TH FLOOR.
M01045680-S1
01/22/2025
Special inspection requirement — Final
Matthew Wavro
01/21/2025
Filed — Alteration
MODIFICATION OF THE EXISTING SPRINKLER SYSTEMS, ASSOCIATED WITH THE RENOVATION OF THE EXISTING INTERIOR SPACE AT 4TH FLOOR.
M01045680-P1
01/13/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
01/08/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
01/06/2025
Special inspection requirement — Final
Matthew Wavro
01/06/2025
Special inspection requirement — Mechanical Systems
Matthew Wavro
01/03/2025
Filed — Alteration
MODIFICATION OF THE EXISTING SPRINKLER SYSTEMS, ASSOCIATED WITH THE RENOVATION OF THE EXISTING INTERIOR SPACE AT 4TH FLOOR.
M01045680-P2
01/03/2025
Filed — Alteration
MODIFICATION OF THE EXISTING SPRINKLER SYSTEMS, ASSOCIATED WITH THE RENOVATION OF THE EXISTING INTERIOR SPACE AT 4TH FLOOR.
M01045680-P3
10/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
10/29/2024
Special inspection requirement — Sprinkler Systems
Matthew Wavro
10/29/2024
Special inspection requirement — Final
Matthew Wavro
10/29/2024
Special inspection requirement — Mechanical Systems
Matthew Wavro
10/29/2024
Special inspection requirement — Final
Matthew Wavro
10/10/2024
Permit issued — Sprinklers
M01045680-S2-EW-SP
09/30/2024
Signed off — Alteration CO
RENOVATION OF EXIST. OFFICE SPACE AT 5TH FL, INCLUDING MODIFICATIONS OF PARTITIONS & FINISHES TO CREATE NEW MEETING ROOMS, PANTRY/BREAK ROOM & STORAGE CLOSETS FOR STAFF/EMPLOYEES. REVISED LAYOUT WILL CHANGE THE OCCUPANT LOAD & RESULT IN AN AMENDED C OF O.
M00934322-S1
09/30/2024
Signed off — Alteration CO
RENOVATION OF EXIST. OFFICE SPACE AT 5TH FL, INCLUDING MODIFICATIONS OF PARTITIONS & FINISHES TO CREATE NEW MEETING ROOMS, PANTRY/BREAK ROOM & STORAGE CLOSETS FOR STAFF/EMPLOYEES. REVISED LAYOUT WILL CHANGE THE OCCUPANT LOAD & RESULT IN AN AMENDED C OF O.
M00934322-S2
09/30/2024
Signed off — Alteration CO
RENOVATION OF EXIST. OFFICE SPACE AT 5TH FL, INCLUDING MODIFICATIONS OF PARTITIONS & FINISHES TO CREATE NEW MEETING ROOMS, PANTRY/BREAK ROOM & STORAGE CLOSETS FOR STAFF/EMPLOYEES. REVISED LAYOUT WILL CHANGE THE OCCUPANT LOAD & RESULT IN AN AMENDED C OF O.
M00934322-S3
09/11/2024
Filed — Alteration CO
RENOVATION OF EXIST. OFFICE SPACE AT 5TH FL, INCLUDING MODIFICATIONS OF PARTITIONS & FINISHES TO CREATE NEW MEETING ROOMS, PANTRY/BREAK ROOM & STORAGE CLOSETS FOR STAFF/EMPLOYEES. REVISED LAYOUT WILL CHANGE THE OCCUPANT LOAD & RESULT IN AN AMENDED C OF O.
M00934322-P4
09/06/2024
Filed — Alteration CO
RENOVATION OF EXIST. OFFICE SPACE AT 5TH FL, INCLUDING MODIFICATIONS OF PARTITIONS & FINISHES TO CREATE NEW MEETING ROOMS, PANTRY/BREAK ROOM & STORAGE CLOSETS FOR STAFF/EMPLOYEES. REVISED LAYOUT WILL CHANGE THE OCCUPANT LOAD & RESULT IN AN AMENDED C OF O.
M00934322-P5
09/06/2024
Filed — Alteration CO
RENOVATION OF EXIST. OFFICE SPACE AT 5TH FL, INCLUDING MODIFICATIONS OF PARTITIONS & FINISHES TO CREATE NEW MEETING ROOMS, PANTRY/BREAK ROOM & STORAGE CLOSETS FOR STAFF/EMPLOYEES. REVISED LAYOUT WILL CHANGE THE OCCUPANT LOAD & RESULT IN AN AMENDED C OF O.
M00934322-P6
09/06/2024
Special inspection requirement — Sprinkler Systems
Matthew Wavro
09/06/2024
Special inspection requirement — Mechanical Systems
Matthew Wavro
09/06/2024
Special inspection requirement — Final
Matthew Wavro
09/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
08/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/29/2024
Special inspection requirement — Sprinkler Systems
Matthew Wavro
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
07/23/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/17/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/15/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/09/2024
Permit issued — Mechanical Systems
M01045680-S1-MS
07/09/2024
Permit issued — General Construction
M01045680-I1-GC
06/18/2024
Filed — Alteration
MODIFICATION OF THE EXISTING SPRINKLER SYSTEMS, ASSOCIATED WITH THE RENOVATION OF THE EXISTING INTERIOR SPACE AT 4TH FLOOR.
M01045680-I1
06/18/2024
Filed — Alteration
MODIFICATION OF THE EXISTING SPRINKLER SYSTEMS, ASSOCIATED WITH THE RENOVATION OF THE EXISTING INTERIOR SPACE AT 4TH FLOOR.
M01045680-S2
06/18/2024
Filed — Alteration
MODIFICATION OF THE EXISTING SPRINKLER SYSTEMS, ASSOCIATED WITH THE RENOVATION OF THE EXISTING INTERIOR SPACE AT 4TH FLOOR.
M01045680-S1
05/03/2024
Permit issued — Sprinklers
M00934322-S2-EW-SP
04/08/2024
Permit issued — Mechanical Systems
M00934322-S3-MS
04/08/2024
Permit issued — General Construction
M00934322-I1-GC
03/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/09/2024
Permit issued — Plumbing
M00934322-S1-PL
01/03/2024
Permit issued — Sprinklers
M00934322-S2-EW-SP
12/28/2023
Permit issued — General Construction
M00934322-I1-GC
12/27/2023
Permit issued — Mechanical Systems
M00934322-S3-MS
12/18/2023
Signed off — Alteration
Installation of split system heat pump HVAC unit to supply existing office at seventh floor. No change in use, egress or occupancy.
M00917289-I1
12/13/2023
Permit issued — Suspended Scaffold
M00972620-I1-SC
12/08/2023
Filed — Alteration
M00972620-I1
12/08/2023
Objection resolved — Addressed
12/08/2023
Objection resolved — Addressed
11/30/2023
Objection raised — Scope
11/29/2023
Objection raised — Scope
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offBig Apple Renovation & RE04/24/2025
DOB NOWSprinklersSigned-offAsco Sprinkler Co10/10/2024
DOB NOWMechanical SystemsSigned-offDolphin Construction Management07/09/2024
DOB NOWGeneral ConstructionSigned-offDolphin Construction Management07/09/2024
DOB NOWSprinklersSigned-offAsco Sprinkler Co05/03/2024
DOB NOWMechanical SystemsSigned-offDolphin Construction Management04/08/2024
DOB NOWGeneral ConstructionPermit IssuedDolphin Construction Management04/08/2024
DOB NOWPlumbingSigned-offPrime Piping & Heating01/09/2024
DOB NOWSprinklersSigned-offAsco Sprinkler Co01/03/2024
DOB NOWGeneral ConstructionPermit IssuedDolphin Construction Management12/28/2023
DOB NOWMechanical SystemsSigned-offDolphin Construction Management12/27/2023
DOB NOWSuspended ScaffoldSigned-offBig Apple Renovation & RE12/13/2023
DOB NOWMechanical SystemsSigned-offBreffni Mechanical09/26/2023
BIS—ISSUEDTalisen Construction09/17/2018
BISPLISSUEDWilliam C. Gerakaris P&H08/20/2018
BISMHISSUEDTalisen Construction07/27/2018
BISOTISSUEDTalisen Construction07/27/2018
BISSPISSUEDA & F Fire Protection Co11/09/2017
BISPLISSUEDBedrock Plumbing & Heating11/02/2017
BISOTISSUEDMichilli10/13/2017
BISEQRE-ISSUEDMichilli10/13/2017
BISMHRE-ISSUEDMichilli10/13/2017
BIS—ISSUEDDelidakis Construction Co09/27/2017
BISSPISSUEDCase Plumbing03/24/2017
BISPLISSUEDCrown Plumbing10/05/2016
BIS—ISSUEDDelidakis Construction Co07/13/2016
BISPLISSUEDWilliam C. Gerakaris P&H01/27/2016
BISSPISSUEDDynamic Plumbing & Sprinkler01/15/2016
BISSPISSUEDFive Star P & H Co12/09/2015
BISSPISSUEDNyco Plumbing & Heating10/05/2015
BISPLISSUEDCrown Plumbing09/02/2015
BISOTISSUEDGlen Way07/23/2015
BISOTISSUEDGlen Way07/07/2015
BISOTISSUEDTalisen Construction05/08/2014
BISMHISSUEDTalisen Construction05/08/2014
BISSPISSUEDNyco Plumbing & Heating04/24/2014
BISPLISSUEDZara Plumbing04/16/2014
BISPLISSUEDWilliam C. Gerakaris P&H03/18/2014
BISOTISSUEDTalisen Construction03/14/2014
BISMHISSUEDTalisen Construction03/14/2014
+ 23 more permits on file
1 project · most recent 09/11/2024
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/11/2024Signed-offDolphin Construction ManagementAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Task TSHW60 2,000 CFM ×1
TSHW90 3,000 CFM ×1
60ASHWX62-DD-2RE-HEAT 2,000 CFM ×1
90ASHWX62-DD-2RE-HEAT 3,000 CFM ×1
Ventilation
Greenheck S-A90 75 CFM · Exhaust Fan ×4
Ducts & Piping
N/A NA 1 BTU · Ductwork ×2
1 project · most recent 09/11/2024
Sprinkler System
FiledStatusContractorScope
09/11/2024Signed-offAsco Sprinkler CompanySprinkler System
1 project · most recent 09/11/2024
Water/Sanitary
FiledStatusContractorScope
09/11/2024Signed-offPrime Piping & HeatingWater/Sanitary
6 projects · most recent 07/16/2024
General Wiring HVAC Wiring
FiledStatusContractorScope
07/16/2024CompleteAllstate Electrical ContGeneral Wiring
12/29/2023CompleteAllstate Electrical ContGeneral Wiring
11/27/2023CompleteDesuze ElectricHVAC Wiring
03/23/2021CompleteP&H Electric D/B/A Mage Electric—
11/02/2018CompleteLimongelli ElectricGeneral Wiring
01/09/2018CompleteInter Connection ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
01/22/2025FinalMatthew Wavroprogress
01/08/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
01/08/2025Sprinkler SystemsMatthew Wavrospecial
01/06/2025FinalMatthew Wavroprogress
01/06/2025Mechanical SystemsMatthew Wavrospecial
10/29/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
10/29/2024Sprinkler SystemsMatthew Wavrospecial
10/29/2024FinalMatthew Wavroprogress
10/29/2024Mechanical SystemsMatthew Wavrospecial
10/29/2024FinalMatthew Wavroprogress
09/06/2024Sprinkler SystemsMatthew Wavrospecial
09/06/2024Mechanical SystemsMatthew Wavrospecial
09/06/2024FinalMatthew Wavroprogress
09/06/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
08/29/2024Sprinkler SystemsMatthew Wavrospecial
08/29/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
11/13/2023Fire-Resistant Penetrations and JointsMatthew Wavrospecial
08/10/2023FinalYahaira Volquez Colomboprogress
08/10/2023Mechanical SystemsJose Santosspecial
08/10/2023HVAC-R and service water heating system controlsJose Santosenergy_progress
08/10/2023Maintenance informationJose Santosenergy_progress
08/10/2023HVAC-R and service water heating equipmentJose Santosenergy_progress
08/10/2023HVAC-R and service water piping design and insulationJose Santosenergy_progress
08/10/2023Energy Code Compliance InspectionsJose Santosprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
OribeOfficeFloor 4
Project M01045680 Alteration · LOC Issued · 06/18/2024
GoldwellOfficeFloors 4, 5
Project M00934322 Alteration CO · LOC Issued · 11/03/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,146 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch15
08/29/2026M00917289-I1Request digital key ↗
08/28/2026M00972620-I1Request digital key ↗
08/26/2026M00934322-P5Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly9
09/05/2026M00161351-I1Request digital key ↗
09/05/2026M00196853-I1Request digital key ↗
09/03/2026M00610413-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits215
▸BISPLAN / WORK APPROVAL APPLICATION113
11/02/2022140986912Open ↗
11/01/2022140986912Open ↗
05/02/2022140986912Open ↗
Showing 3 of 113 on file for this type
▸BISWORK PERMIT APPLICATION85
11/29/2018122749972Open ↗
10/15/2018122749981Open ↗
10/09/2018122749981Open ↗
Showing 3 of 85 on file for this type
▸DOB NOWLPC Approval/Permit10
08/13/2026M00934322-S3Open ↗
08/13/2026M00934322-S1Open ↗
08/13/2026M00934322-P4Open ↗
Showing 3 of 10 on file for this type
▸BISPLACE OF ASSEMBLY5
11/15/2018123238282Open ↗
06/06/2018123238282Open ↗
Showing 2 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
11/16/2018122749981Open ↗
Showing 1 of 2 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications257
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION177
10/16/2020123238282Open ↗
06/25/2019122749972Open ↗
06/05/2019122749972Open ↗
Showing 3 of 177 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/05/2026M00196853-I1Open ↗
09/03/2026M00610413-I1Open ↗
09/03/2026M00629297-I1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
10/13/2017123293435Open ↗
10/13/2017123293435Open ↗
10/13/2017123293435Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026M00934322-S1Open ↗
09/01/2026M01045680-P2Open ↗
08/31/2026M00917289-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
10/13/2017123293435Open ↗
10/13/2017123293435Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026M01045680-I1Open ↗
08/31/2026M00917289-I1Open ↗
08/31/2026M00917289-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
12/10/2020140986912Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/10/2020140986912Open ↗
▸Trade Schedules & Equipment131
▸BISSELF-CERT PLUMBING NOTICE43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISSCHEDULE B - PLUMBING21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
03/26/2019122749972Open ↗
03/14/2019122749972Open ↗
09/12/2018122749981Open ↗
Showing 3 of 18 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA16
08/05/2019123589688Open ↗
Showing 1 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS16
11/28/2018120856617Open ↗
Showing 1 of 16 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST4
09/14/2018122749981Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWStreet Tree Checklist2
08/13/2026M00934322-P4Open ↗
08/13/2026M00934322-I1Open ↗
▸Environmental & Asbestos57
▸BISASBESTOS: CERTIFICATION (DEP ACP5)31
12/11/2018123589688Open ↗
08/16/2018122749981Open ↗
07/06/2018122749972Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/25/2026M01045680-P2Open ↗
08/25/2026M01045680-P1Open ↗
08/25/2026M01045680-S2Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
06/05/2019122749972Open ↗
05/30/2019122749972Open ↗
05/30/2019122749981Open ↗
Showing 3 of 23 on file for this type
▸BISTR8: Energy Code Progress Inspections8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
04/02/2018123293435Open ↗
03/20/2018123293435Open ↗
Showing 2 of 6 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC EXEMPTION1
12/10/2020140986912Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/23/2023140986912Open ↗
01/22/2023140986912Open ↗
12/10/2020140986912Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs146
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST75
10/16/2020123238282Open ↗
08/28/2019122749981Open ↗
08/22/2019122749981Open ↗
Showing 3 of 75 on file for this type
▸BISLANDMARKS APPROVAL25
08/28/2019122749981Open ↗
08/19/2019123589688Open ↗
07/06/2018122749972Open ↗
Showing 3 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
07/06/2018122749972Open ↗
04/27/2017122749927Open ↗
Showing 2 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
08/16/2018122749981Open ↗
Showing 1 of 8 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLANDMARKS SIGNOFF1
03/20/2018123293435Open ↗
▸Cost, Insurance & Ownership99
▸BISCOST AFFIDAVIT90
12/10/2020140986912Open ↗
08/22/2019122749981Open ↗
08/19/2019123589688Open ↗
Showing 3 of 90 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEPT OF FINANCE VERIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms113
▸BISEFILING COVER SHEET56
12/16/2020140986912Open ↗
12/11/2018123589688Open ↗
08/16/2018122749981Open ↗
Showing 3 of 56 on file for this type
▸BISADDITIONAL INFORMATION32
01/22/2023140986912Open ↗
09/09/2022140986912Open ↗
04/26/2022140986912Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM19
12/16/2020140986912Open ↗
10/16/2020123238282Open ↗
08/28/2019122749981Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
12/10/2020140986912Open ↗
Showing 1 of 6 on file for this type
▸Other Documents24
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION11
02/10/2022140986912Open ↗
Showing 1 of 11 on file for this type
▸BISPLOT DIAGRAM4
08/16/2018122749981Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026M00934322-I1Open ↗
08/13/2026M01045680-I1Open ↗
08/13/2026M01045680-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification2
08/13/2026M00934322-I1Open ↗
08/13/2026M00934322-P4Open ↗
▸BISLAA - Supporting Documentation1
04/06/2018120816493Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00972620-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00972620-I1Open ↗