← Back
Condo, residential unit in elevator building
220 Central Park South
220 CENTRAL PARK SOUTH · BIN 1090184
💬 Discuss this project
2015Year Built
70Stories
R4Building Class
C5-1Zoning
396,613 sfGross Floor Area
117Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: No Report Filed
Condo, residential unit in elevator building · 27,604 sf lot · 14.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 6 docs
Floor 744p · 3 filings · 20 docs
Floor 73
Floor 72
Floor 711p · 1 filing · 2 docs
Floor 70
Floor 698p · 3 filings · 20 docs
Floor 68
Floor 67Under Construction12p · 3 filings · 8 docs
Floor 66Under Construction13p · 4 filings · 10 docs
Floor 65Under Construction2p · 2 filings · 11 docs
Floor 64Under Construction35p · 4 filings · 20 docs
Floor 63Under Construction30p · 2 filings · 20 docs
Floor 62
Floor 611p · 1 filing · 6 docs
Floor 60
Floor 593p · 2 filings · 20 docs
Floor 584p · 3 filings · 20 docs
Floor 572p · 1 filing · 8 docs
Floor 56
Floor 559p · 4 filings · 11 docs
Floor 543p · 3 filings · 9 docs
Floor 531p · 1 filing · 3 docs
Floor 528p · 2 filings · 5 docs
Floor 51
Floor 502p · 1 filing · 6 docs
Floor 49
Floor 48
Floor 47Under Construction4p · 1 filing · 5 docs
Floor 462p · 2 filings · 20 docs
Floor 45
Floor 442p · 1 filing · 6 docs
Floor 431p · 1 filing · 2 docs
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 345p · 3 filings · 18 docs
Floor 33
Floor 32
Floor 312p · 1 filing · 2 docs
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 182p · 1 filing · 6 docs
Floor 17Under Construction14p · 3 filings · 20 docs
Floor 161p · 1 filing · 14 docs
Floor 152p · 2 filings · 20 docs
Floor 14
Floor 131p · 1 filing · 7 docs
Floor 121p · 1 filing · 7 docs
Floor 11Under Construction34p · 6 filings · 19 docs
Floor 10Under Construction33p · 5 filings · 12 docs
Floor 9Under Construction33p · 6 filings · 15 docs
Floor 87p · 3 filings · 20 docs
Floor 77p · 3 filings · 20 docs
Floor 61p · 2 filings · 3 docs
Floor 5
Floor 45p · 4 filings · 20 docs
Floor 31p · 1 filing · 19 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 6 docs
Sub-Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VORNADO REALTY TRUST30809/18/2026
SASA1 LLC103/22/2026
220 CPS INTERNATIONAL LLC103/22/2026
KORHANS403/21/2026
VNO 225 WEST 58TH STREET LLC22103/21/2026
MADAVE PROPERTIES SPE2703/21/2026
ENCLOS303/21/2026
DEL-SAVIO CONSTRUCTION203/21/2026
VNO 225 W58TH ST803/21/2026
240 CENTRAL PARK SO403/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GILLMAN CONSULTING22603/21/2026
NYCCODE1003/21/2026
A1 EXPEDITING SERVICE1803/21/2026
EUROCELT EXPEDITING, INC203/21/2026
RMBA LLC603/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
HOWARD I SHAPIRO ASSOCIATES203/21/2026
JMG CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAEL AUTOMATIC SPR.CO INCFire Protection3708/14/2026
SILVERLINING INTERIORSGeneral Contractor3307/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor2407/08/2026
FIOCCHI GROUP LLCGeneral Contractor2207/08/2026
FORTE EXPRESS P & H INCPlumbing1707/08/2026
DONATO PLUMBING, INCPlumbing907/08/2026
WATERFIRE INCPlumbing807/08/2026
LICO CONTRACTING INCGeneral Contractor807/08/2026
HIGHLINE CONSTRUCTION GRGeneral Contractor707/08/2026
POLAR MECHANICAL CORPGeneral Contractor707/08/2026
PLANT CONSTRUCTION LLCGeneral Contractor607/08/2026
SDC LLCGeneral Contractor607/08/2026
SILVER RAIL ASSOC INCGeneral Contractor507/08/2026
YORK SCAFFOLD EQUIPMENT CORP.General Contractor507/08/2026
K.I.M.CO. REFRIGERATIONGeneral Contractor507/08/2026
ORBIT PLBG & HTG INCPlumbing407/08/2026
ORBIT SPRINKLER CORPFire Protection307/08/2026
KG SPRINKLER CORPFire Protection307/08/2026
NEW MILLENNIUM P & H CORPPlumbing307/08/2026
S. DONADIC INCGeneral Contractor307/08/2026
ANTHONY FIGUCCIOElectrical203/21/2026
ECO ELECTRICAL SERVCS LLCElectrical203/22/2026
STAMFORD TENT & EQUIP COGeneral Contractor203/21/2026
THE I. GRACE COMPANY COMMGeneral Contractor203/21/2026
ANCHOR PLUMBING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ERIC SHEFFIELD ARCHITECT2195104/22/2026
CES ENGINEERING LLC12773604/16/2026
DOMANI INSPECTION SERVICE8431004/01/2026
ABS ENGINEERING, PLLC4835411/21/2025
DELTA TESTING LABS687409/30/2024
B2 ENGINEERING D.P.C.5433903/25/2024
C.M. TESTING LABORATORY,1352302/22/2024
CATALPA SPECIAL INSPECTIO2004210/24/2023
METRIC CONSULTING AND INS1803610/19/2023
CNS INSPECTION SERVICES7566709/15/2023
Building Lifecycle
All (300)Filed (49)Permit Issued (78)Signed Off (37)Violation (13)Inspection (51)Objection (42)Special Inspection (30)
09/17/2026
Permit issued — General Construction
M01396697-I1-GC
09/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2026
Permit issued — Sprinklers
M00868550-I1-EW-SP
07/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/27/2026
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
07/27/2026
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
07/24/2026
Objection resolved — Resolved
07/24/2026
Objection resolved — Resolved
07/24/2026
Objection resolved — Resolved
07/21/2026
Objection raised — Other
07/21/2026
Objection raised — Other
07/21/2026
Objection raised — Scope
07/16/2026
Signed off — Alteration
Installation of new plumbing fixtures and related piping on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
M00292085-I1
06/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/18/2026
Filed — Alteration
Removal of interior partition wall and millwork as shown on drawings. No change in use, egress or occupancy.
M01396697-I1
06/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/18/2026
Signed off — Alteration
Modification to plumbing fixtures and related piping on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
M00540340-I1
05/18/2026
Permit issued — General Construction
M01390558-I1-GC
04/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2026
Filed — Alteration
M01390558-I1
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sheffield
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sheffield
04/21/2026
Special inspection requirement — Final
Eric Sheffield
04/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/16/2026
Filed — Alteration
Installation of new plumbing fixtures and related piping on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
M00292085-P5
04/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/01/2026
Filed — Alteration
Modification to plumbing fixtures and related piping on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
M00540340-P2
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Delbert Smith
03/30/2026
Signed off — Alteration
Modification to sprinkler system and related piping on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
M00540296-I1
03/23/2026
Permit issued — Plumbing
M00292085-I1-PL
03/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
03/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2026
Permit issued — Plumbing
M00868545-I1-PL
01/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/18/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/16/2025
Objection raised — Cost
12/16/2025
Objection raised — Fire_Protection
12/15/2025
Permit issued — Structural
M00868538-I1-ST
12/15/2025
Permit issued — Mechanical Systems
M00434443-I1-MS
12/15/2025
Permit issued — General Construction
M00868534-I1-GC
12/15/2025
Permit issued — Mechanical Systems
M00868543-I1-MS
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/10/2025
Objection raised — Structural
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedREBOSIO CONSTRUCTION SVC09/17/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC08/13/2026
DOB NOWGeneral ConstructionPermit IssuedCOPPERWOOD SPECIALTIES IN05/18/2026
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/23/2026
DOB NOWPlumbingPermit IssuedFORTE EXPRESS P & H INC01/23/2026
DOB NOWGeneral ConstructionPermit IssuedSILVERLINING INTERIORS12/15/2025
DOB NOWStructuralPermit IssuedSILVERLINING INTERIORS12/15/2025
DOB NOWMechanical SystemsPermit IssuedSILVERLINING INTERIORS12/15/2025
DOB NOWMechanical SystemsPermit IssuedSILVERLINING INTERIORS12/15/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC10/02/2025
DOB NOWMechanical SystemsPermit IssuedHIGHLINE CONSTRUCTION GR10/01/2025
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR09/30/2025
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR09/30/2025
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC02/06/2025
DOB NOWPlumbingPermit IssuedFORTE EXPRESS P & H INC01/24/2025
DOB NOWMechanical SystemsPermit IssuedSILVERLINING INTERIORS12/19/2024
DOB NOWMechanical SystemsPermit IssuedSILVERLINING INTERIORS12/19/2024
DOB NOWGeneral ConstructionPermit IssuedSILVERLINING INTERIORS12/19/2024
DOB NOWStructuralPermit IssuedSILVERLINING INTERIORS12/19/2024
DOB NOWMechanical SystemsPermit IssuedHIGHLINE CONSTRUCTION GR11/01/2024
DOB NOWPlumbingSigned-offFORTE EXPRESS P & H INC10/30/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC10/21/2024
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR10/02/2024
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR10/02/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC09/30/2024
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC07/16/2024
DOB NOWSprinklersPermit IssuedH M SPRINKLER INC06/13/2024
DOB NOWMechanical SystemsSigned-offFIOCCHI GROUP LLC04/30/2024
DOB NOWGeneral ConstructionSigned-offFIOCCHI GROUP LLC04/16/2024
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC03/04/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC02/23/2024
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC02/01/2024
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC01/25/2024
DOB NOWPlumbingPermit IssuedFORTE EXPRESS P & H INC01/22/2024
DOB NOWMechanical SystemsPermit IssuedSILVERLINING INTERIORS12/28/2023
DOB NOWGeneral ConstructionSigned-offSILVERLINING INTERIORS12/28/2023
DOB NOWGeneral ConstructionPermit IssuedSILVERLINING INTERIORS12/27/2023
DOB NOWMechanical SystemsPermit IssuedSILVERLINING INTERIORS12/27/2023
DOB NOWStructuralPermit IssuedSILVERLINING INTERIORS12/27/2023
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC11/03/2023
+ 60 more permits on file
1 project · most recent 10/20/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/20/2022Permit IssuedHIGHLINE CONSTRUCTION GRAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
First Company 8VMB-3HW 17,600 BTU · Fan Coil Indoor ×6
12VMB-3HW 21,600 BTU · Fan Coil Indoor ×3
8PHBCX-41 26,000 BTU · Fan Coil Indoor ×2
12PHBCX-41 27,200 BTU · Fan Coil Indoor ×1
20MVB-4HW 51,600 BTU · Fan Coil Indoor ×1
4PHBCX-41 14,300 BTU · Fan Coil Indoor ×1
Multiaqua MHQWW-24-H-1 23,669 BTU · Fan Coil Indoor ×2
Heating
First Company 8VMB-3HW 31,300 BTU · Fan Coil Indoor ×6
12VMB-3HW 50,600 BTU · Fan Coil Indoor ×3
8PHBCX-41 23,200 BTU · Fan Coil Indoor ×2
12PHBCX-41 30,000 BTU · Fan Coil Indoor ×1
20MVB-4HW 113,600 BTU · Fan Coil Indoor ×1
4PHBCX-41 14,900 BTU · Fan Coil Indoor ×1
Ventilation
5 projects · most recent 11/21/2025
FiledStatusContractorScope
11/21/2025——50 heads
10/19/2023Permit IssuedRAEL AUTOMATIC SPR.CO INC68 heads
10/20/2022Permit IssuedKG SPRINKLER CORP100 heads
01/08/2021Permit IssuedRAEL AUTOMATIC SPR.CO INC78 heads
09/24/2020Permit IssuedRAEL AUTOMATIC SPR.CO INC4 heads
9 projects · most recent 04/16/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/16/2026Signed-offDONATO PLUMBING, INCGas, Water/Sanitary
04/01/2026Signed-offDONATO PLUMBING, INCGas, Water/Sanitary
11/21/2025———
11/21/2025——Gas, Water/Sanitary
10/19/2023Permit IssuedFORTE EXPRESS P & H INCGas, Water/Sanitary
10/19/2023———
06/22/2023Signed-offDONATO PLUMBING, INCWater/Sanitary
05/12/2022——Water/Sanitary
10/05/2021——Gas
25 projects · most recent 06/16/2026
General Wiring Lighting
FiledStatusContractorScope
06/16/2026CompleteKJK ELECTRIC INCGeneral Wiring
12/03/2025CompleteECO ELECTRICAL SERVCS LLCGeneral Wiring, Lighting
12/02/2025CompleteAPOLLO ELECTRIC NYG, INC—
05/07/2025CompleteECO ELECTRICAL SERVCS LLCLighting
04/16/2025CompleteTWINTECH ELECTRIC INC—
02/18/2025CompleteAPOLLO ELECTRIC INC.General Wiring
09/12/2024CompleteAPOLLO ELECTRIC INC.General Wiring
09/10/2024CompleteSUPREME ELECTRIC CORPGeneral Wiring
08/05/2024CompleteWARREN OSTROFF ELEC., INCGeneral Wiring
12/21/2023Permit IssuedAPOLLO ELECTRIC NYG, INC—
09/29/2023CompleteAPOLLO ELECTRIC INC.—
04/06/2023CompleteAPOLLO ELECTRIC USA, INCGeneral Wiring
11/03/2022Permit IssuedECO ELECTRICAL SERVCS LLCLighting
08/10/2022CompleteWARREN OSTROFF ELEC., INC—
08/08/2022CompleteZIP ELECTRIC INCGeneral Wiring
1 project · most recent 10/24/2023
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
10/24/2023Permit IssuedSILVERLINING INTERIORSTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 56
DateTypeResultReport
09/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/27/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
07/27/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
06/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
Latest 25 of 56.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/21/2026FinalEric Sheffieldprogress
04/21/2026Fire-Resistance Rated ConstructionEric Sheffieldprogress
04/21/2026Fire-Resistant Penetrations and JointsEric Sheffieldspecial
03/31/2026Fire-Resistant Penetrations and JointsDelbert Smithspecial
03/20/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/05/2025Fire-Resistant Penetrations and JointsAlex Schwartzspecial
11/05/2025Post-installed AnchorsAlex Schwartzspecial
11/05/2025Maintenance informationAlex Schwartzenergy_progress
11/05/2025Duct leakage testing, insulation and designAlex Schwartzenergy_progress
11/05/2025Energy Code Compliance InspectionsAlex Schwartzprogress
11/05/2025Post-installed AnchorsAlex Schwartzspecial
11/05/2025Energy Code Compliance InspectionsAlex Schwartzprogress
11/05/2025HVAC-R and service water piping design and insulationAlex Schwartzenergy_progress
11/05/2025Fire-Resistant Penetrations and JointsAlex Schwartzspecial
11/05/2025Post-installed AnchorsAlex Schwartzspecial
11/05/2025Fire-Resistance Rated Construction—progress
11/05/2025Lighting in dwelling unitsAlex Schwartzenergy_progress
11/05/2025Lighting controlsAlex Schwartzenergy_progress
11/05/2025Interior lighting powerAlex Schwartzenergy_progress
10/29/2025Final—progress
10/29/2025FinalAlex Schwartzprogress
10/29/2025Mechanical SystemsAlex Schwartzspecial
04/03/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/03/2025FinalJOHN MCMONAGLEprogress
04/03/2025Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
Latest 25 of 150.
▾Documents — 2,851 on file (BIS + DOB NOW)
▸Plans & Drawings140
▸DOB NOWPlans/Sketch59
09/06/2026M00011036-I1Request digital key ↗
09/06/2026M00037566-I1Request digital key ↗
09/06/2026M00043401-I1Request digital key ↗
Showing 3 of 59 on file for this type
▸DOB NOWPlans/Sketch - Plumbing27
09/05/2026M00310574-I1Request digital key ↗
09/05/2026M00335801-I1Request digital key ↗
09/05/2026M00272441-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler24
09/05/2026M00240882-I1Request digital key ↗
09/05/2026M00269212-P2Request digital key ↗
09/05/2026M00269212-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems19
09/05/2026M00310590-I1Request digital key ↗
09/05/2026M00335771-I1Request digital key ↗
09/05/2026M00272635-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold7
09/05/2026M00126243-I1Request digital key ↗
09/05/2026M00094294-I1Request digital key ↗
09/05/2026M00136397-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00452246-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00459043-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00292538-I1Request digital key ↗
▸Applications & Permits577
▸BISPLAN / WORK APPROVAL APPLICATION364
08/27/2025123734414Open ↗
08/11/2025123734414Open ↗
04/07/2025123734414Open ↗
Showing 3 of 364 on file for this type
▸BISWORK PERMIT APPLICATION213
04/20/2022140993227Open ↗
04/20/2022140993227Open ↗
02/03/2022140449717Open ↗
Showing 3 of 213 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZoning Diagram (ZD1)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications703
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION219
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 219 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature139
09/06/2026M00043401-I1Open ↗
09/05/2026M00129786-I1Open ↗
09/05/2026M00126243-I1Open ↗
Showing 3 of 139 on file for this type
▸DOB NOWProgress Inspector Seal & Signature123
09/27/2026M00043401-I1Open ↗
09/18/2026M00370990-I1Open ↗
09/18/2026M00370990-I1Open ↗
Showing 3 of 123 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature87
09/23/2026M00335801-I1Open ↗
09/23/2026M00335801-I1Open ↗
09/23/2026M00335801-I1Open ↗
Showing 3 of 87 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISAPPLICANT OWNER SIGNATURE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Trade Schedules & Equipment107
▸BISSCHEDULE B - PLUMBING52
07/19/2022140449717Open ↗
01/27/2022123734423Open ↗
01/26/2022123734414Open ↗
Showing 3 of 52 on file for this type
▸BISSELF-CERT PLUMBING NOTICE39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSTANDPIPE SYSTEMS2
01/18/2023121922330Open ↗
01/18/2023140172934Open ↗
▸Safety & Tenant Protection86
▸DOB NOWTenant Protection Plan54
09/05/2026M00335771-I1Open ↗
09/05/2026M00272414-I1Open ↗
09/05/2026M00272414-P1Open ↗
Showing 3 of 54 on file for this type
▸BISTenant Protection Plan and Notes27
02/09/2022123734423Open ↗
Showing 1 of 27 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Environmental & Asbestos14
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance138
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS64
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 64 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY22
07/30/2021123734414Open ↗
Showing 1 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)11
10/27/2025123855738Open ↗
04/11/2024123748962Open ↗
07/13/2023123784011Open ↗
Showing 3 of 11 on file for this type
▸BISLIGHTING IN DWELLING UNITS10
10/27/2025123855738Open ↗
04/11/2024123748962Open ↗
07/13/2023123784011Open ↗
Showing 3 of 10 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS7
10/27/2025123855738Open ↗
04/11/2024123748962Open ↗
07/13/2023123784011Open ↗
Showing 3 of 7 on file for this type
▸BISLIGHTING CONTROLS5
04/11/2024123748962Open ↗
07/13/2023123784011Open ↗
12/09/2022140941051Open ↗
Showing 3 of 5 on file for this type
▸BISINTERIOR LIGHTING POWER5
10/27/2025123855738Open ↗
04/11/2024123748962Open ↗
07/13/2023123784011Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports143
▸BISTECHNICAL REPORT: RESPONSIBILITY99
10/27/2025123734414Open ↗
08/11/2025123734414Open ↗
04/03/2025123734414Open ↗
Showing 3 of 99 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)6
10/27/2025123855738Open ↗
04/11/2024123748962Open ↗
07/13/2023123784011Open ↗
Showing 3 of 6 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPOST-INSTALLED ANCHORS4
10/27/2025123855738Open ↗
08/01/2023123784011Open ↗
06/23/2022123855765Open ↗
Showing 3 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHYDRO FLOW TEST LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Approvals, Objections & Sign-offs208
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST99
12/23/2024103564457Open ↗
12/11/2024102229303Open ↗
12/11/2024101471195Open ↗
Showing 3 of 99 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION45
04/20/2022140993227Open ↗
Showing 1 of 45 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE19
03/14/2024121184592Open ↗
03/08/2024121184592Open ↗
05/23/2023121184592Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSUPERSEDING LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISFINAL11
02/28/2024123748962Open ↗
07/13/2023123784011Open ↗
01/18/2023140540074Open ↗
Showing 3 of 11 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION11
08/13/2021123734414Open ↗
Showing 1 of 11 on file for this type
▸Cost, Insurance & Ownership88
▸BISCOST AFFIDAVIT55
03/28/2022140927479Open ↗
03/25/2022140927479Open ↗
03/11/2022140927479Open ↗
Showing 3 of 55 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW313
04/09/2024123748962Open ↗
10/12/2023140172934Open ↗
07/13/2023123784011Open ↗
Showing 3 of 13 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE9
04/04/2022121184592Open ↗
Showing 1 of 9 on file for this type
▸Filing & Intake Forms528
▸BISADDITIONAL INFORMATION332
10/30/2025123734414Open ↗
10/30/2025123734414Open ↗
10/30/2024123855738Open ↗
Showing 3 of 332 on file for this type
▸BISBOROUGH INTAKE FORM92
02/03/2022140449717Open ↗
Showing 1 of 92 on file for this type
▸BISEFILING COVER SHEET61
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 61 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents43
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION31
08/05/2021140705066Open ↗
Showing 1 of 31 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type