Roof3p · 2 filings · 8 docs
ArchitectureGeneralStructural
Issued Permit Scope
Supported Scaffold
Modification to HVAC ductwork are related piping on 55th floor construction/65th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Penthouse2p · 1 filing · 3 docs
MechanicalStructural
Issued Permit Scope
Supported Scaffold
Use of temporary scaffold as per application filed herewith.
On file for this project
3 documents
Floor 743p · 2 filings · 20 docs
Fire ProtectionPlumbing
Installation of new plumbing fixtures and related piping on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents · 2 drawing sheets
Installation of new sprinkler heads on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Floor 73
Floor 72
Floor 711p · 1 filing · 2 docs
Plumbing
Hereby filing to remove, replace, and install plumbing fixtures with related piping for apartment renovation on construction floor61/marketing floor 71 as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
2 documents · 1 drawing sheet
Floor 70
Floor 697p · 2 filings · 20 docs
MechanicalPlumbing
Modification to HVAC ductwork and related piping on 59th Fl. construction/69th Fl. marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents · 5 drawing sheets
Modification to plumbing fixtures and related piping on 59th Fl.construction/69th Fl. marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Floor 68
Floor 67Under Construction12p · 3 filings · 8 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Modification to HVAC ductwork and related piping on marketing floors PH76, PH77/Construction floors 66 & 67 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Modification to plumbing fixtures and related piping on on marketing floors PH76, PH77/Construction floors 66 & 67 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
2 documents
Modification to sprinkler system and related piping on marketing floors PH76, PH77/Construction floors 66 & 67 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Floor 66Under Construction12p · 3 filings · 8 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Modification to HVAC ductwork and related piping on marketing floors PH76, PH77/Construction floors 66 & 67 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Modification to plumbing fixtures and related piping on on marketing floors PH76, PH77/Construction floors 66 & 67 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
2 documents
Modification to sprinkler system and related piping on marketing floors PH76, PH77/Construction floors 66 & 67 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Floor 65Under Construction2p · 2 filings · 11 docs
MechanicalPlumbing
Issued Permit Scope
Plumbing
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
INSTALLATION OF NEEDLE BEAM SCAFFOLDING AS PER DRAWINGS. NEEDLE BEAM SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Floor 64Under Construction57p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Installation of new plumbing fixtures and related piping on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modification to existing HVAC system on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
35 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 63Under Construction52p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Installation of new plumbing fixtures and related piping on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents
Modification to existing HVAC system on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
35 documents
Installation of new sprinkler heads on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents
Floor 629p · 2 filings · 7 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers
Relocate sprinkler heads and related piping on construction floor 62/marketing floor 72 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents
Art ceiling lighting throughout; replace doors with ballistic doors on 62nd Floor Construction/72nd Floor Marketing as shown on drawings filed. No change in use, egress or occupancy.
On file for this project
3 documents
Floor 616p · 3 filings · 10 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
Hereby filing to remove, replace, and install plumbing fixtures with related piping for apartment renovation on construction floor61/marketing floor 71 as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
2 documents
Hereby filing to construct interior partitions, ceilings and door for apt renovation on construction floor 61/marketing floor 71 as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
2 documents
INSTALLATION OF NEEDLE BEAM SCAFFOLDING AS PER DRAWINGS. NEEDLE BEAM SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Floor 60
Floor 5928p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Modification to sprinkler system and related piping on 59th Fl. construction/69th Fl. marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
17 documents · 2 drawing sheets
Modification to HVAC ductwork and related piping on 59th Fl. construction/69th Fl. marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents
Modification to plumbing fixtures and related piping on 59th Fl.construction/69th Fl. marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 5839p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Modification to plumbing fixtures and related piping on 58th floor construction/68th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modification to HVAC ductwork and related piping on 58th floor construction/68th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents · 2 drawing sheets
Modification to sprinkler system and related piping on 58th floor construction/68th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Floor 5719p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Install plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
4 documents
Modification to fan coil units and relocate chilled water and condensate drain piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 5621p · 3 filings · 12 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Installation of new plumbing fixture and related piping for marketing floor 66/construction floor 56 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Modification to HVAC ductwork and related piping for marketing floor 66/construction floor 56 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Modification to sprinkler system and associated piping for marketing floor 66/construction floor 56 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Floor 552p · 2 filings · 10 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Modification to sprinkler system as show on drawings filed herewith on 55th floor construction/65th floor marketing as show on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents
Modification to HVAC ductwork are related piping on 55th floor construction/65th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Floor 546p · 1 filing · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Remove and construction interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.
On file for this project
16 documents
Floor 531p · 1 filing · 3 docs
Architecture
Remove and install plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 529p · 2 filings · 5 docs
ArchitectureDMFire ProtectionGeneral
Issued Permit Scope
General Construction · Sprinklers
Modification to sprinkler system and related piping on 52nd Floor Construction/62nd Floor Marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
2 documents
Apartment renovation on construction floor 52/marketing floor 62 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 5 drawing sheets
Floor 51
Floor 502p · 1 filing · 6 docs
Structural
INSTALLATION OF NEEDLE BEAM SCAFFOLDING AS PER DRAWINGS. NEEDLE BEAM SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents · 2 drawing sheets
Floor 491p · 1 filing · 3 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 481p · 1 filing · 3 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 47Under Construction6p · 3 filings · 14 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Sprinklers · Supported Scaffold
Removing existing walls to rebuild with sound dampened walls as shown on drawings. No change in use, egress or occupancy.
On file for this project
5 documents
Modification to sprinkler heads and related piping for construction floors 46 & 47/marketing floors 56 & 57 as shown on drawings filed herewith. No change in use,egress or occupancy.
On file for this project
6 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 4641p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Supported Scaffold
Modification to sprinkler heads and related piping for construction floors 46 & 47/marketing floors 56 & 57 as shown on drawings filed herewith. No change in use,egress or occupancy.
On file for this project
6 documents
Interior non bearing partition alteration to existing apartment as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
19 documents
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 451p · 1 filing · 3 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 441p · 1 filing · 3 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 431p · 1 filing · 3 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 421p · 1 filing · 3 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 411p · 1 filing · 3 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 401p · 1 filing · 3 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 391p · 1 filing · 3 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 38
Floor 3718p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Replace and relocate sprinkler heads as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents
Modification to existing HVAC system as shown on drawings filed herewith. No change use, egress or occupancy.
On file for this project
19 documents
Floor 36
Floor 35
Floor 341p · 1 filing · 10 docs
Mechanical
Modification to existing mechanical system on 24th floor construction/34th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Floor 33
Floor 32
Floor 312p · 1 filing · 2 docs
ArchitectureDM
Renovation to existing apartment as shown drawings filed herewith. No change in use, egress or occupancy.
On file for this project
2 documents · 2 drawing sheets
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 2419p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Modification to plumbing fixtures and related piping on 24th floor construction/34th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents
Modification to existing mechanical system on 24th floor construction/34th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents
Modification to sprinkler system on 24th floor construction/34th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
9 documents
Floor 23
Floor 22
Floor 211 filing · 2 docs
Architecture
Issued Permit Scope
General Construction
Renovation to existing apartment as shown drawings filed herewith. No change in use, egress or occupancy.
On file for this project
2 documents
Floor 20
Floor 19
Floor 182p · 1 filing · 6 docs
Structural
INSTALLATION OF NEEDLE BEAM SCAFFOLDING AS PER DRAWINGS. NEEDLE BEAM SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents · 2 drawing sheets
Floor 17Under Construction59p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of interior partition wall and millwork as shown on drawings. No change in use, egress or occupancy.
On file for this project
2 documents · 2 drawing sheets
Install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Modify sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1646p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Modify sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents
Modification to existing HVAC system as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents
Floor 1547p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Modify sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Modification to existing HVAC system as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents
Floor 1445p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents
Modify sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents
Modification to existing HVAC system as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents
Floor 1314p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Installation of new sprinkler heads and temporary core sprinkler protection and related piping (14th & 15th Floor marketing) as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents
Installation of new plumbing fixtures and related piping (14th & 15th Floor marketing) as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Modification to existing HVAC system (14th & 15th floor marketing) as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
24 documents
Floor 1214p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Installation of new sprinkler heads and temporary core sprinkler protection and related piping (14th & 15th Floor marketing) as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents
Installation of new plumbing fixtures and related piping (14th & 15th Floor marketing) as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Modification to existing HVAC system (14th & 15th floor marketing) as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
24 documents
Floor 11Under Construction32p · 5 filings · 12 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modification/additions to plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
1 document · 2 drawing sheets
Remove and construct interior partitions, doors and ceilings as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 5 filings on this floor.
Floor 10Under Construction33p · 5 filings · 12 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modification/additions to plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
1 document · 2 drawing sheets
Remove and construct interior partitions, doors and ceilings as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 9Under Construction33p · 6 filings · 15 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modification/additions to plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
1 document · 2 drawing sheets
Modification to HVAC ductwork and related piping on marketing floors PH76, PH77/Construction floors 66 & 67 as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 869p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to HVAC ductwork and related piping on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 5 drawing sheets
Construction of new non load bearing partitions and ceiling, new finishes on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents
Modification to plumbing fixtures and related piping on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 770p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Supported Scaffold
Modification to HVAC ductwork and related piping on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 4 drawing sheets
Construction of new non load bearing partitions and ceiling, new finishes on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents
Modification to plumbing fixtures and related piping on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 62p · 4 filings · 8 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing · Sprinklers · Supported Scaffold
Relocating 4 existing sprinkler heads.
On file for this project
3 documents
Modification to plumbing fixtures and related piping on 6th floor construction/7th floor marketing as shown on drawing filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Project M25427141Permit Issued · 09/25/2020
Relocating 4 existing sprinkler heads.
Latest 3 of 4 filings on this floor.
Floor 51p · 1 filing · 2 docs
Mechanical
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 48p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Supported Scaffold
Remove and construction interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.
On file for this project
16 documents · 1 drawing sheet
New wall and fire rated door at service corridor as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Modification to sprinkler heads and modification to existing plumbing piping for 3rd floor construction/4th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 38p · 3 filings · 20 docs
DMFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Modification to existing HVAC system as shown on drawings filed herewith. No change use, egress or occupancy.
On file for this project
19 documents · 1 drawing sheet
Modification to sprinkler heads and modification to existing plumbing piping for 3rd floor construction/4th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents
Modification to HVAC ductwork and related piping for construction 3rd floor construction/4th floor marketing as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents
Floor 24p · 2 filings · 4 docs
ArchitectureGeneral
Issued Permit Scope
General Construction
Temporary tent accessory to the amenity dining room. Removed at the end of the programing. No changes to existing structures, use or egress.
On file for this project
2 documents
No filed description on record for this project.
On file for this project
2 documents
Floor 13p · 2 filings · 4 docs
ArchitectureMechanical
Issued Permit Scope
Supported Scaffold
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Sub-Cellar1p · 1 filing · 4 docs
Architecture
Modification to sprinkler system as show on drawings filed herewith on 55th floor construction/65th floor marketing as show on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Site & exterior11p · 4 filings · 17 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF NEEDLE BEAM SCAFFOLDING AS PER DRAWINGS. NEEDLE BEAM SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents · 12 drawing sheets
Latest 3 of 4 filings on this floor.
Filed — no permit issued72p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
General construction work associated with the renovation of an existing apartment. There is no change proposed to use, egress, or occupancy.
On file for this project
6 documents · 9 drawing sheets
Plumbing work associated with the renovation of an existing apartment. There is no change proposed to use, egress, or occupancy.
On file for this project
6 documents · 11 drawing sheets
Sprinkler work associated with the renovation of an existing apartment. There is no change proposed to use, egress, or occupancy.
On file for this project
2 documents · 9 drawing sheets
Latest 3 of 10 filings on this floor.