← Back
Converted dwellings or rooming house
220 EAST 32 STREET
MANHATTAN · Murray Hill-Kips Bay · BIN 1020068
💬 Discuss this project
1910Year Built
3Stories
C5Building Class
R7BZoning
3,940 sfGross Floor Area
6Units
Rent Stabilized12 Open Violations ▸
Converted dwellings or rooming house · Owner of record: 220 EAST 32ND STREET LLC · 1,852 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
Architecture
Basement4p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MR1307/08/2026
A D GENERAL CONTRACTORS604/09/2026
220 EAST 32ND STREET LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING203/21/2026
GREEN STUDIO203/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & D GENERAL CONTR INCGeneral Contractor404/09/2026
ROYAL HVAC SYSTEMS INCGeneral Contractor303/21/2026
CORTLANDT CONTRACTING CORPGeneral Contractor107/08/2026
M C M PLBG & HTG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC4949103/04/2022
Building Lifecycle
All (51)Filed (5)Permit Issued (5)Signed Off (3)Violation (31)Inspection (4)Special Inspection (3)
08/15/2025
Permit issued — Sidewalk Shed
M01271902-I1-SH
08/15/2025
Permit issued — Sidewalk Shed
M01271902-I1-SF
08/14/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01271902-I1
11/22/2024
Violation issued (HPD, closed)
I
11/15/2023
Violation issued (HPD, closed)
I
06/13/2023
Violation issued (HPD, closed)
C
06/13/2023
Violation issued (HPD, closed)
C
06/13/2023
Violation issued (HPD, closed)
C
06/13/2023
Violation issued (HPD, closed)
C
06/13/2023
Violation issued (HPD, closed)
C
11/23/2022
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM ON BASEMENT AND 1ST FLOOR AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00691256-I1
10/03/2022
Signed off — Alteration
PLUMBING WORK ON BASEMENT APARTMENT #1 AND 1ST FLOOR APARTMENT#2 AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00546652-I1
10/03/2022
Signed off — Alteration
M00545576-I1
09/14/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/06/2022
Filed — Alteration
PLUMBING WORK ON BASEMENT APARTMENT #1 AND 1ST FLOOR APARTMENT#2 AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00546652-P1
08/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2022
Permit issued — Mechanical Systems
M00691256-I1-MS
03/04/2022
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM ON BASEMENT AND 1ST FLOOR AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00691256-I1
02/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/28/2021
Permit issued — Plumbing
M00546652-I1-PL
10/18/2021
Permit issued — General Construction
M00545576-I1-GC
07/19/2021
Filed — Alteration
M00545576-I1
07/18/2021
Filed — Alteration
PLUMBING WORK ON BASEMENT APARTMENT #1 AND 1ST FLOOR APARTMENT#2 AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00546652-I1
06/23/2021
Special inspection requirement — Final
MARY CHANDRAHASAN
06/23/2021
Special inspection requirement — Lighting in dwelling units
MARY CHANDRAHASAN
06/23/2021
Special inspection requirement — Lighting controls
MARY CHANDRAHASAN
10/25/2016
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (HPD, closed)
I
02/02/2015
Violation issued (HPD, closed)
I
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/22/1979
Violation issued (HPD, open)
A
05/22/1979
Violation issued (HPD, open)
A
05/22/1979
Violation issued (HPD, open)
A
05/22/1979
Violation issued (HPD, open)
B
05/22/1979
Violation issued (HPD, open)
B
05/22/1979
Violation issued (HPD, open)
B
05/22/1979
Violation issued (HPD, open)
A
05/22/1979
Violation issued (HPD, open)
B
05/22/1979
Violation issued (HPD, open)
B
05/22/1979
Violation issued (HPD, open)
B
05/22/1979
Violation issued (HPD, open)
A
04/20/1979
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedA & D GENERAL CONTR INC08/15/2025
DOB NOWSidewalk ShedPermit IssuedA & D GENERAL CONTR INC08/15/2025
DOB NOWMechanical SystemsSigned-offROYAL HVAC SYSTEMS INC03/18/2022
DOB NOWPlumbingSigned-offM C M PLBG & HTG, INC10/28/2021
DOB NOWGeneral ConstructionSigned-offCORTLANDT CONTRACTING COR10/18/2021
2 projects · most recent 08/22/2025
General Wiring
FiledStatusContractorScope
08/22/2025Permit IssuedRICHARD NEU—
09/16/2022CompleteAMR ELEC'L CONTRG CORPGeneral Wiring
1 project · most recent 08/14/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/14/2025Permit IssuedA & D GENERAL CONTR INCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/23/2021FinalMARY CHANDRAHASANprogress
06/23/2021Lighting in dwelling unitsMARY CHANDRAHASANenergy_progress
06/23/2021Lighting controlsMARY CHANDRAHASANenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00546652-I1Request digital key ↗
09/03/2026M00546652-P1Request digital key ↗
09/03/2026M00545576-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00545576-I1Open ↗
08/13/2026M01271902-I1Open ↗
08/13/2026M00546652-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026M00545576-I1Open ↗
08/27/2026M00545576-I1Open ↗
08/27/2026M00545576-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00545576-I1Open ↗
08/13/2026M00546652-P1Open ↗
08/13/2026M00546652-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00545576-I1Open ↗
08/13/2026M00691256-I1Open ↗