Elevator cooperative
Murray House
220 MADISON AVENUE · BIN 1017187
💬 Discuss this project
1941Year Built
15Stories
D4Building Class
C5-2Zoning
211,910 sfGross Floor Area
200Units
LL97 CoveredRent Stabilized33 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: MURRAY HOUSE OWNERS CORP · 19,980 sf lot · 10.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 6 filings · 20 docs
Bulkhead1p · 1 filing · 3 docs
Penthouse1p · 1 filing · 4 docs
Floor 1516p · 2 filings · 11 docs
Floor 1417p · 3 filings · 14 docs
Floor 13
Floor 122p · 2 filings · 20 docs
Floor 111 filing · 17 docs
Floor 10
Floor 9
Floor 8
Floor 7Under Construction2p · 1 filing · 20 docs
Floor 617p · 1 filing · 15 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction21p · 3 filings · 20 docs
CellarUnder Construction15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOLSTICE RESIDENTIAL GROUP14507/08/2026
XINOS CONSTRUCTION1704/09/2026
MURRAY HOUSE OWNERS8803/22/2026
MNR GROUP103/22/2026
SOLSTICE RESIDENT GROUP203/22/2026
XIMOS CONST CORP103/22/2026
DBJ CONTRACTING103/22/2026
MUURRLY HOUSE OWNERS CORP103/22/2026
ARGO803/22/2026
HBA ASSOCIATES INC203/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COMMERCIAL CAPITAL USA203/21/2026
CODE803/21/2026
KUSHNER STUDIOS103/21/2026
JM ZONING, LLC.803/21/2026
RESOLUTION EXPEDITING603/21/2026
AE DESIGN SOLUTION403/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
JANCO BUILDING CONSULTANTS, LLC.403/21/2026
EFG CONSULTING403/21/2026
RIZZO GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GILD RENOVATION LLCGeneral Contractor1007/08/2026
LAKE CONTRACTING LLCGeneral Contractor707/08/2026
MNR GROUP INCGeneral Contractor707/08/2026
BARAMI CONSTRUCTION CORPGeneral Contractor607/08/2026
STANLEY RUTH CO LLCGeneral Contractor603/21/2026
XINOS CONSTRUCTION CORPGeneral Contractor604/09/2026
HIGHLINE CONSTRUCTION GRGeneral Contractor507/08/2026
INTERIORS BY AJ LTDGeneral Contractor403/21/2026
MY CONTRACTING COMPANY I*General Contractor303/21/2026
RAYMOND WILSONElectrical303/21/2026
SIGNORE & SONS PLUMBING CGeneral Contractor303/21/2026
JACOBS TELECOMMUN. INCGeneral Contractor207/08/2026
ELITE HOME INTERIORS INCGeneral Contractor203/21/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
BEK PLBG & HTG LLCPlumbing207/08/2026
DONATO PLUMBING, INCPlumbing207/08/2026
G&B PLUMBING&HEATING CORPPlumbing207/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
BROTHERS PRO CONSTRUCTIONGeneral Contractor104/11/2026
D.B.J. CONTRACTING CORPGeneral Contractor107/08/2026
BECKWITH, BRUCEElectrical103/21/2026
NEW LAND CONSTRUCTION NYGeneral Contractor107/08/2026
SF CONSTRUCTION EXPERTSGeneral Contractor107/08/2026
Z S NY IMPROVEMENT CORPGeneral Contractor107/08/2026
HI-TECH PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544304/03/2026
MACIA INSPECTION & TESTIN402112/08/2025
ZASKORSKI & ASSOCIATES AR6121209/04/2024
CRAFT ENGINEERING STUDIO2916106/18/2024
TRISTATE PLANNING ENGINEE8344206/17/2024
SPECIAL TESTING & CONSULT1688401/31/2024
MADSEN ENGINEERING5423201/17/2024
MEP INSPECTIONS, INC1102201/17/2024
MERRITT ENGINEERING CONSU460106/28/2023
SCALAR ARCHITECTURE PC4696106/28/2023
Building Lifecycle
All (300)Filed (50)Permit Issued (55)Signed Off (22)Facade (FISP) (15)Violation (54)Inspection (30)Objection (44)Special Inspection (30)
08/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/07/2026
Signed off — Alteration
Interior renovation of apartment 7B on the 7th floor. No change in use occupancy or egress.
M00960182-I1
07/15/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
07/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EUGENE BIFULCO
07/15/2026
Special inspection requirement — Fenestration air leakage
EUGENE BIFULCO
07/15/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
07/15/2026
Special inspection requirement — Fenestration areas
EUGENE BIFULCO
07/15/2026
Special inspection requirement — Final
EUGENE BIFULCO
07/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
06/24/2026
Filed — Alteration
NEW SPLIT HVAC SYSTEM & ERV UNIT ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN.
M01351996-P1
06/22/2026
Special inspection requirement — Fenestration air leakage
06/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/22/2026
Special inspection requirement — Final
EUGENE BIFULCO
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
06/22/2026
Special inspection requirement — Fenestration areas
06/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/22/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
06/22/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
06/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Permit issued — Plumbing
M01351996-S1-PL
05/08/2026
Permit issued — Mechanical Systems
M01351996-S2-MS
04/21/2026
Violation issued (ECB, closed)
Unknown
04/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/09/2026
Permit issued — General Construction
M01351996-I1-GC
04/03/2026
Filed — Alteration
NEW SPLIT HVAC SYSTEM & ERV UNIT ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN.
M01351996-S2
04/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/03/2026
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
04/02/2026
Objection resolved — Addressed
04/01/2026
Objection raised — Scope
03/25/2026
Objection raised — Zoning
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/24/2026
Objection raised — Scope
03/18/2026
Filed — Alteration
NEW SPLIT HVAC SYSTEM & ERV UNIT ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN.
M01351996-S1
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
03/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
03/16/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
03/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
03/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
03/13/2026
Filed — Alteration
NEW SPLIT HVAC SYSTEM & ERV UNIT ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN.
M01351996-I1
02/18/2026
Special inspection requirement — Final
EUGENE BIFULCO
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
02/18/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
02/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
02/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2026
Signed off — Alteration
M00682751-I1
01/28/2026
Cycle 10 facade report submitted
01/28/2026
Cycle 10 facade report signed — SAFE
01/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
01/14/2026
Cycle 10 facade inspection completed
01/09/2026
Permit issued — Plumbing
M00960182-S1-PL
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Palumbo
12/12/2025
Special inspection requirement — Final
Stephan Thimme
12/08/2025
Filed — Alteration
Interior renovation of apartment 7B on the 7th floor. No change in use occupancy or egress.
M00960182-P1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPETER MICELI PLUMBING05/08/2026
DOB NOWMechanical SystemsPermit IssuedNEW LAND CONSTRUCTION NY05/08/2026
DOB NOWGeneral ConstructionPermit IssuedBROTHERS PRO CONSTRUCTION04/09/2026
DOB NOWPlumbingPermit IssuedDONATO PLUMBING, INC01/09/2026
DOB NOWStructuralSigned-offHIGHLINE CONSTRUCTION GR10/01/2025
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR10/01/2025
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP09/03/2025
DOB NOWGeneral ConstructionPermit IssuedBARAMI CONSTRUCTION02/21/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC01/14/2025
DOB NOWPlumbingPermit IssuedDONATO PLUMBING, INC01/06/2025
DOB NOWSuspended ScaffoldPermit IssuedMNR GROUP INC12/20/2024
DOB NOWStructuralSigned-offHIGHLINE CONSTRUCTION GR11/08/2024
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR11/06/2024
DOB NOWGeneral ConstructionSigned-offSTANLEY RUTH CO LLC09/13/2024
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP08/19/2024
DOB NOWGeneral ConstructionSigned-offMNR GROUP INC07/18/2024
DOB NOWSupported ScaffoldSigned-offMNR GROUP INC07/02/2024
DOB NOWMechanical SystemsPermit IssuedGILD RENOVATION LLC05/07/2024
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP03/22/2024
DOB NOWGeneral ConstructionSigned-offZ S NY IMPROVEMENT CORP03/18/2024
DOB NOWMechanical SystemsPermit IssuedGILD RENOVATION LLC03/04/2024
DOB NOWStructuralSigned-offLAKE CONTRACTING LLC02/15/2024
DOB NOWSuspended ScaffoldPermit IssuedMNR GROUP INC01/16/2024
DOB NOWGeneral ConstructionSigned-offMNR GROUP INC08/17/2023
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP08/16/2023
DOB NOWGeneral ConstructionSigned-offINTERIORS BY AJ08/15/2023
DOB NOWGeneral ConstructionSigned-offGILD RENOVATION LLC08/03/2023
DOB NOWMechanical SystemsPermit IssuedGILD RENOVATION LLC08/03/2023
DOB NOWSupported ScaffoldSigned-offMNR GROUP INC07/31/2023
DOB NOWGeneral ConstructionPermit IssuedBARAMI CONSTRUCTION05/25/2023
DOB NOWGeneral ConstructionSigned-offSTANLEY RUTH CO LLC05/22/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC05/20/2023
DOB NOWGeneral ConstructionSigned-offMY CONTRACTING COMPANY I*05/17/2023
DOB NOWPlumbingSigned-offHI-TECH PLUMBING & HEATIN04/26/2023
DOB NOWGeneral ConstructionPermit IssuedSTANLEY RUTH CO LLC04/26/2023
DOB NOWGeneral ConstructionPermit IssuedELITE HOME INTERIORS04/26/2023
DOB NOWPlumbingSigned-offBEK PLBG & HTG LLC01/23/2023
DOB NOWGeneral ConstructionPermit IssuedBARAMI CONSTRUCTION01/20/2023
DOB NOWGeneral ConstructionSigned-offINTERIORS BY AJ01/18/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC12/10/2022
+ 60 more permits on file
2 projects · most recent 06/24/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/24/2026Permit IssuedNEW LAND CONSTRUCTION NYHeating and Air Conditioning Systems, Ventilation Systems—
04/25/2023Permit IssuedELITE HOME INTERIORS INCAir Conditioning Systems
Cooling
Friedrich WCT08A10A 8,000 BTU · Ptac ×1
WCT12A10A 11,600 BTU · Ptac ×1
3 projects · most recent 06/24/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/24/2026Permit IssuedPETER MICELI PLUMBINGWater/Sanitary
12/08/2025Permit IssuedDONATO PLUMBING, INCWater/Sanitary
10/21/2021Permit IssuedG&B PLUMBING&HEATING CORPGas, Water/Sanitary
25 projects · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026On Hold - Returned CheckSWITCH ELECT OF THE FIVEGeneral Wiring
04/22/2026Permit IssuedSWITCH ELECT OF THE FIVEGeneral Wiring
11/13/2025CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
05/02/2025CompleteECO ELECTRICAL SERVCS LLCGeneral Wiring
01/09/2025CompleteECO ELECTRICAL SERVCS LLC—
11/14/2024CompleteVILANOVA ELECL CONTS LLC—
09/03/2024CompleteVILANOVA ELECL CONTS LLC—
06/25/2024CompleteEMPIRE LIC ELECL CONTRS—
05/23/2024CompleteVILANOVA ELECL CONTS LLC—
03/13/2024CompleteDENMAR ELECTRIC CORPGeneral Wiring
03/05/2024Permit IssuedROBERT CHIMENTI3 meters, 1 new_meters
02/23/2024CompleteVILANOVA ELECL CONTS LLC—
02/22/2024CompleteVILANOVA ELECL CONTS LLC—
02/19/2024CompleteW 8 ELECTRIC CORPGeneral Wiring
01/22/2024CompleteVILANOVA ELECL CONTS LLC—
1 project · most recent 12/08/2025
Steel Masonry
FiledStatusContractorScope
12/08/2025Permit IssuedDONATO PLUMBING, INCSteel, Masonry
1 project · most recent 06/24/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
06/24/2026Permit IssuedNEW LAND CONSTRUCTION NYTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 30
DateTypeResultReport
08/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 30.
▾Special Inspection Requirements (DOB NOW) — 134
DateRequirementInspectorRole
07/15/2026Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
07/15/2026Fenestration areasEUGENE BIFULCOenergy_progress
07/15/2026Fenestration air leakageEUGENE BIFULCOenergy_progress
07/15/2026Interior lighting powerEUGENE BIFULCOenergy_progress
07/15/2026Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
07/15/2026Lighting controlsEUGENE BIFULCOenergy_progress
07/15/2026FinalEUGENE BIFULCOprogress
07/15/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
06/22/2026Interior lighting powerEUGENE BIFULCOenergy_progress
06/22/2026Fenestration areas—energy_progress
06/22/2026Tenant Protection Plan Compliance—special
06/22/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
06/22/2026FinalEUGENE BIFULCOprogress
06/22/2026Fenestration air leakage—energy_progress
06/22/2026Fenestration and door U-factor and product ratings—energy_progress
06/22/2026Lighting controlsEUGENE BIFULCOenergy_progress
04/03/2026Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
03/17/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
03/16/2026Maintenance informationEUGENE BIFULCOenergy_progress
03/16/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
03/16/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
03/16/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
02/18/2026FinalEUGENE BIFULCOprogress
02/18/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
02/18/2026Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
Latest 25 of 134.
▾Documents — 1,298 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch42
09/03/2026M00514391-I1Request digital key ↗
09/03/2026M00610569-I1Request digital key ↗
09/03/2026M00611328-P1Request digital key ↗
Showing 3 of 42 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/04/2026M00452483-I1Request digital key ↗
09/03/2026M00473991-I1Request digital key ↗
09/03/2026M00473991-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/03/2026M00473991-I1Request digital key ↗
09/03/2026M00473991-P1Request digital key ↗
08/15/2026M00473991-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna2
09/04/2026M00413857-I1Request digital key ↗
08/14/2026M00240580-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00377531-I1Request digital key ↗
08/15/2026M00377531-P1Request digital key ↗
▸Applications & Permits234
▸BISPLAN / WORK APPROVAL APPLICATION124
03/04/2024104008734Open ↗
03/01/2024104008734Open ↗
02/29/2024104008734Open ↗
Showing 3 of 124 on file for this type
▸BISWORK PERMIT APPLICATION110
10/08/2021123352914Open ↗
06/03/2021121575624Open ↗
12/09/2020140943175Open ↗
Showing 3 of 110 on file for this type
▸Seals & Professional Certifications327
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION124
03/11/2020123352914Open ↗
12/09/2019123681391Open ↗
11/29/2019123681391Open ↗
Showing 3 of 124 on file for this type
▸DOB NOWProgress Inspector Seal & Signature50
09/02/2026M00780923-P1Open ↗
09/02/2026M00780923-P1Open ↗
09/02/2026M00780923-P1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
09/05/2026M00024553-I1Open ↗
09/05/2026M00240580-I1Open ↗
09/03/2026M00377531-I1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/01/2026M00611328-P1Open ↗
09/01/2026M00473991-I1Open ↗
09/01/2026M00473991-I1Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
01/18/2019123537459Open ↗
Showing 1 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
10/27/2020140943175Open ↗
Showing 1 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
10/27/2020140943175Open ↗
Showing 1 of 4 on file for this type
▸Trade Schedules & Equipment99
▸BISSELF-CERT PLUMBING NOTICE30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE27
02/14/2020123352914Open ↗
02/22/2019123681391Open ↗
Showing 2 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING27
03/19/2019140794549Open ↗
Showing 1 of 27 on file for this type
▸BISEQUIPMENT USE PERMITS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
12/17/2021140943175Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/17/2021140943175Open ↗
▸Safety & Tenant Protection32
▸BISTenant Protection Plan and Notes25
07/12/2019123799210Open ↗
02/22/2019123681391Open ↗
02/22/2019123681391Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWTenant Protection Plan4
08/14/2026M00240580-I1Open ↗
Showing 1 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos103
▸DOB NOWDEP ACP-5: Asbestos Assessment Report44
09/03/2026M00377531-I1Open ↗
09/03/2026M00629634-I1Open ↗
09/01/2026M00544169-I1Open ↗
Showing 3 of 44 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)33
10/27/2020140943175Open ↗
07/12/2019123799210Open ↗
02/22/2019123681391Open ↗
Showing 3 of 33 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/30/2026M00890982-I1Open ↗
▸Energy Compliance102
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS53
03/11/2020123352914Open ↗
12/09/2019123681391Open ↗
11/29/2019123681391Open ↗
Showing 3 of 53 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS22
08/02/2021121575624Open ↗
09/10/2020123114691Open ↗
11/26/2019123510101Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
12/17/2021140943175Open ↗
08/02/2021121575624Open ↗
02/01/2021140943175Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/27/2020140943175Open ↗
Showing 1 of 3 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/07/2021123352914Open ↗
02/01/2021140943175Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY17
08/02/2021121575624Open ↗
02/01/2021140943175Open ↗
11/12/2020140943175Open ↗
Showing 3 of 17 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
02/28/2024104008734Open ↗
02/28/2024104008734Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS2008 CODE TR1 REQUIRED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/12/2020140943175Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs79
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST40
03/11/2024104008734Open ↗
02/07/2022123114691Open ↗
12/28/2021140943175Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
03/28/2019121240497Open ↗
03/08/2019140794549Open ↗
Showing 2 of 11 on file for this type
▸BISSUPERSEDING LETTER2
06/03/2021121575624Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL2
12/07/2021123352914Open ↗
11/12/2020140943175Open ↗
▸Cost, Insurance & Ownership93
▸BISCOST AFFIDAVIT89
03/07/2024104008734Open ↗
08/02/2021121575624Open ↗
10/27/2020140943175Open ↗
Showing 3 of 89 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
02/28/2024104008734Open ↗
12/27/2021140943175Open ↗
12/07/2021123352914Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms127
▸BISEFILING COVER SHEET44
07/12/2019123799210Open ↗
02/15/2019123681391Open ↗
Showing 2 of 44 on file for this type
▸BISADDITIONAL INFORMATION39
11/09/2023123799210Open ↗
07/29/2021121575624Open ↗
07/29/2021121575624Open ↗
Showing 3 of 39 on file for this type
▸BISBOROUGH INTAKE FORM35
10/08/2021123352914Open ↗
06/03/2021121575624Open ↗
02/14/2020123352914Open ↗
Showing 3 of 35 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
10/27/2020140943175Open ↗
Showing 1 of 9 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDHCR Document3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDHCR DOCUMENT2
05/27/2021121575624Open ↗
10/27/2020140943175Open ↗
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type