← Back
Cape Cod
221-26 108 AVENUE
QUEENS · Queens Village · BIN 4241461
💬 Discuss this project
1945Year Built
1.5Stories
A0Building Class
R2Zoning
1,099 sfGross Floor Area
1Units
4 Open Violations 2 unresolved · 2 paperwork only ▸FDNY Report ↗
Cape Cod · 4,000 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 14p · 1 filing · 11 docs
Cellar7p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TURNIER ENGINEERING PC307/27/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENET PLBG AND HTG CORPPlumbing207/08/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TURNIER ENGINEERING PC6900106/02/2020
Building Lifecycle
All (29)Filed (3)Permit Issued (2)Signed Off (1)Violation (18)Inspection (4)Special Inspection (1)
10/21/2021
Signed off — Alteration
Provide new gas riser diagram. Cap and remove gas line for stove in cellar. Test gas line to all legal appliances (hot water heater, gas dryer & cooking stove). Cooking stove is located on the 1st floor. Boiler is fuel by OIL.
Q00351418-S1
10/05/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/28/2021
Violation issued (ECB, closed)
Construction
08/03/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/27/2021
Filed — Alteration
Provide new gas riser diagram. Cap and remove gas line for stove in cellar. Test gas line to all legal appliances (hot water heater, gas dryer & cooking stove). Cooking stove is located on the 1st floor. Boiler is fuel by OIL.
Q00351418-P1
07/26/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/20/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/13/2021
Permit issued — Plumbing
Q00351418-S1-PL
03/26/2021
Filed — Alteration
Provide new gas riser diagram. Cap and remove gas line for stove in cellar. Test gas line to all legal appliances (hot water heater, gas dryer & cooking stove). Cooking stove is located on the 1st floor. Boiler is fuel by OIL.
Q00351418-S1
08/09/2020
Permit issued — Plumbing
Q00351418-I1-PL
06/02/2020
Filed — Alteration
Provide new gas riser diagram. Cap and remove gas line for stove in cellar. Test gas line to all legal appliances (hot water heater, gas dryer & cooking stove). Cooking stove is located on the 1st floor. Boiler is fuel by OIL.
Q00351418-I1
05/22/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE TURNIER
01/25/2020
Violation issued (ECB, closed)
Construction
11/30/2019
Violation issued (ECB, closed)
Construction
10/02/2019
Violation issued (ECB, closed)
Construction
08/13/2019
Violation issued (ECB, closed)
Construction
05/22/2019
Violation issued (ECB, closed)
Construction
03/01/2019
Violation issued (ECB, closed)
Construction
12/31/2018
Violation issued (ECB, closed)
Construction
12/12/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2018
Violation issued (ECB, closed)
Construction
09/17/2018
Violation issued (ECB, closed)
Construction
05/22/2001
Violation issued (ECB, closed)
Quality of Life
05/22/2001
Violation issued (ECB, closed)
Quality of Life
05/22/2001
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
04/11/2001
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
04/11/2001
Violation issued (ECB, open)
Zoning
04/11/2001
Violation issued (ECB, closed)
Construction
04/24/2000
Violation issued (ECB, open)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGENET PLBG AND HTG CORP07/13/2021
DOB NOWPlumbingPermit IssuedGENET PLBG AND HTG CORP08/09/2020
BISOTISSUEDSUNPOWER CORPORATION, SYS07/10/2023
BISOTISSUEDGENET PLUMBING AND HEATING08/18/2020
1 project · most recent 07/27/2021
Gas
FiledStatusContractorScope
07/27/2021Signed-offGENET PLBG AND HTG CORPGas
2 projects · most recent 02/06/2024
FiledStatusContractorScope
02/06/2024CompleteBERGER QUALITY ELEC'L CON1 meters, 1 new_meters
07/14/2023CompleteBERGER QUALITY ELEC'L CON—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/05/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/26/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
05/22/2020Fire-Resistant Penetrations and JointsEUGENE TURNIERspecial
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/27/2026Q00351418-S1Request digital key ↗
08/27/2026Q00351418-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/27/2026Q00351418-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
08/01/2023440789951Open ↗
06/29/2023440789951Open ↗
05/12/2020421763773Open ↗
▸BISWORK PERMIT APPLICATION2
07/10/2023440789951Open ↗
08/18/2020421763773Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00351418-P1Open ↗
08/27/2026Q00351418-S1Open ↗
08/27/2026Q00351418-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/29/2023440789951Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/29/2023440789951Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/12/2020421763773Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/05/2026Q00351418-I1Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
05/19/2020421763773Open ↗
05/12/2020421763773Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
05/19/2020421763773Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
07/03/2023440789951Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00351418-I1Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/29/2023440789951Open ↗
05/19/2020421763773Open ↗
05/12/2020421763773Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00351418-P1Open ↗
08/27/2026Q00351418-S1Open ↗
08/27/2026Q00351418-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/29/2023440789951Open ↗
10/28/2021421763773Open ↗
08/12/2020421763773Open ↗
Showing 3 of 6 on file for this type
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
06/29/2023440789951Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
02/26/2024440789951Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/26/2024440789951Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/26/2024440789951Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/12/2020421763773Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/29/2023440789951Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/26/2024440789951Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/28/2021421763773Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/29/2023440789951Open ↗
10/28/2021421763773Open ↗
08/12/2020421763773Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/26/2024440789951Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/03/2023440789951Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/26/2024440789951Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/05/2024440789951Open ↗
10/28/2021421763773Open ↗
▸BISFINAL1
02/26/2024440789951Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
03/05/2024440789951Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
06/29/2023440789951Open ↗
10/28/2021421763773Open ↗
05/19/2020421763773Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/26/2024440789951Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
08/03/2023440789951Open ↗
06/02/2020421763773Open ↗
▸BISEFILING COVER SHEET1
08/10/2020421763773Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/29/2023440789951Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
03/05/2024440789951Open ↗