← Back
Office only, 2-6 stories
222-15 NORTHERN BOULEVARD
QUEENS · BIN 4312903
💬 Discuss this project
1989Year Built
4Stories
O2Building Class
R6BZoning
59,337 sfGross Floor Area
2Units
LL97 Covered6 Open Violations 4 unresolved · 2 paperwork only ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: MINDEL ASSOCIATES LLC · 20,964 sf lot · 2.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof4p · 3 filings · 19 docs
Floor 44p · 2 filings · 20 docs
Floor 33p · 2 filings · 6 docs
Floor 2
Floor 11p · 1 filing · 4 docs
Cellar8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MINDEL ASSOCIATES9309/13/2026
OWNER OF PREMISES103/22/2026
NINDEL ASSOCIATES103/22/2026
NEW CINGULAR WIRELESS PCS, LLC203/21/2026
MANDEL ASSOCIATES503/21/2026
MODERNAGE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES203/21/2026
CCM CONSULTING GROUP, INC.203/21/2026
C PLUS DESIGN GROUP803/21/2026
Z.S. ENGINEERING, D.P.C.103/21/2026
Z S ENGINEERING DPC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A&G HOME IMPROVEMENT CONSGeneral Contractor507/08/2026
CORNERSTONE CONSTRUCTIONGeneral Contractor307/08/2026
ICOR SOLUTIONS INCGeneral Contractor303/21/2026
JACOBS TELECOMMUN. INCGeneral Contractor303/21/2026
ED FERRY MECHANICAL CORPPlumbing307/08/2026
SYSTEMATIC CONTROL CORPGeneral Contractor203/21/2026
DONG SAN CONSTRUCTION INCGeneral Contractor203/21/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor107/08/2026
AVON PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNY ENGINEERING P.C3304605/04/2026
JKM ARCHITECTURE P.C.8906211/22/2024
ARNOLD MONTAG ARCHITECT,4599312/15/2022
SIDERIS KEFALAS ENGINEERS3434103/15/2022
TRIANGLE INSPECTION & TES7495212/19/2019
ZS ENGINEERING PC919108/15/2019
Building Lifecycle
All (172)Filed (21)Permit Issued (14)Signed Off (7)Violation (60)Inspection (10)Objection (30)Special Inspection (30)
08/04/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/23/2026
Signed off — Alteration
INSTALL/REMOVE NEW NON-LOAD BEARING PARTITIONS ON THE PARTIAL 3RD FLOOR PER PLAN INDICATED. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01253899-I1
07/23/2026
Signed off — Alteration
MODIFY EXISTING SPRINKLER SYSTEM BASED ON NEW LAYOUT ON THE PARTIAL CELLAR FLOOR-#LLA SUBSEQUENT WITH A2 JOB DOB NOW#Q01200498. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q01200498-I1
05/29/2026
Permit issued — General Construction
Q01392312-I1-GC
05/04/2026
Filed — Alteration
Q01392312-I1
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/03/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/13/2025
Permit issued — General Construction
Q01253899-I1-GC
08/04/2025
Objection resolved — Addressed
07/30/2025
Objection raised — Scope
07/10/2025
Filed — Alteration
INSTALL/REMOVE NEW NON-LOAD BEARING PARTITIONS ON THE PARTIAL 3RD FLOOR PER PLAN INDICATED. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01253899-I1
07/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
07/08/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/03/2025
Permit issued — General Construction
Q01200498-I1-GC
06/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
05/15/2025
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEM BASED ON NEW LAYOUT ON THE PARTIAL CELLAR FLOOR-#LLA SUBSEQUENT WITH A2 JOB DOB NOW#Q01200498. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q01200498-P1
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
04/24/2025
Objection resolved — Addressed
04/23/2025
Objection raised — Cost
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/21/2025
Objection raised — Fire_Protection
04/21/2025
Objection raised — Cost
04/10/2025
Signed off — Alteration
RENOVATION OF EXISTING DENTAL OFFICE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01123410-S1
04/08/2025
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEM BASED ON NEW LAYOUT ON THE PARTIAL CELLAR FLOOR-#LLA SUBSEQUENT WITH A2 JOB DOB NOW#Q01200498. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q01200498-S1
04/03/2025
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEM BASED ON NEW LAYOUT ON THE PARTIAL CELLAR FLOOR-#LLA SUBSEQUENT WITH A2 JOB DOB NOW#Q01200498. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q01200498-I1
03/12/2025
Signed off — Alteration
RENOVATION OF EXISTING DENTAL OFFICE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01123410-I1
03/11/2025
Signed off — Alteration
Q01136865-I1
03/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/07/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2024
Filed — Alteration
RENOVATION OF EXISTING DENTAL OFFICE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01123410-P2
11/22/2024
Filed — Alteration
RENOVATION OF EXISTING DENTAL OFFICE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01123410-P1
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Min
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Min
11/20/2024
Permit issued — General Construction
Q01136865-I1-GC
11/05/2024
Filed — Alteration
Q01136865-I1
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
11/01/2024
Signed off — Alteration
HEREWITH FILING FOR INSTALLATION OF MECHANICAL SYSTEM AND EQUIPMENT FOR MEDICAL OFFICE SUITE 4-NORTH. CONDENSING UNIT TO BE MOUNTED ON EXISTING STEEL DUNNAGE PREVIOUSLY FILED AND APPROVED UNDER ALT 1325/85.
Q00685838-I1
10/22/2024
Permit issued — Plumbing
Q01123410-S1-PL
10/16/2024
Permit issued — General Construction
Q01123410-I1-GC
10/13/2024
Filed — Alteration
RENOVATION OF EXISTING DENTAL OFFICE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01123410-S1
10/13/2024
Filed — Alteration
RENOVATION OF EXISTING DENTAL OFFICE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01123410-I1
10/01/2024
Violation issued (ECB, closed)
Construction
07/24/2024
Permit issued — Mechanical Systems
Q00685838-I1-MS
05/23/2024
Violation issued (FDNY_NOV, closed)
04/01/2024
Objection resolved — Addressed
04/01/2024
Objection resolved — Addressed
04/01/2024
Objection resolved — Addressed
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2024
Objection raised — Other
02/02/2024
Objection raised — Other
02/02/2024
Objection raised — Other
02/01/2024
Signed off — Alteration
Q00340404-I1
01/31/2024
Filed — Alteration
AT&T / Replacement of existing telecommunications antennas with replacement/installation of RRH units on roof. Retrofit of cabinets in the existing room in cellar. All work in compliance with TPPN 5/98. No change too occupancy, use, or egress.
Q00019764-P1
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offA&G HOME IMPROVEMENT CONS05/29/2026
DOB NOWGeneral ConstructionSigned-offA&G HOME IMPROVEMENT CONS08/13/2025
DOB NOWGeneral ConstructionSigned-offA&G HOME IMPROVEMENT CONS06/03/2025
DOB NOWGeneral ConstructionSigned-offICOR SOLUTIONS INC11/20/2024
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC10/22/2024
DOB NOWGeneral ConstructionSigned-offDONG SAN CONSTRUCTION10/16/2024
DOB NOWMechanical SystemsSigned-offSYSTEMATIC CONTROL CORP07/24/2024
DOB NOWPlumbingSigned-offED FERRY MECHANICAL CORP05/23/2022
DOB NOWGeneral ConstructionPermit IssuedCORNERSTONE CONSTRUCTION04/20/2022
DOB NOWGeneral ConstructionPermit IssuedCORNERSTONE CONSTRUCTION04/11/2022
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP10/28/2020
DOB NOWSprinklersSigned-offED FERRY MECHANICAL CORP01/13/2020
DOB NOWPlumbingSigned-offED FERRY MECHANICAL CORP01/13/2020
DOB NOWAntennaPermit IssuedARMENTUM DIGITAL INFRASTR08/27/2019
BISOTISSUEDGREEN HYBRID ENERGY SOLU*02/06/2020
BISSPISSUEDUNLIMITED PLG SOLUTIONS07/03/2019
BISOTISSUEDJA-TO BLDG CONTRACTORS IN05/13/2019
BIS—ISSUEDSTEEL TNE CONSTRUCTION05/18/2018
BISPLISSUEDAURA PLUMBING INC09/12/2017
BISOTISSUEDODYSSIA GLOBAL COMM. CORP08/03/2017
BISMHISSUEDODYSSIA GLOBAL COMM. CORP07/20/2017
BISSPISSUEDUNLIMITED PLG SOLUTIONS06/13/2016
BISOTISSUEDJ-TECH CONSTRUCTION CORP04/18/2016
BISPLISSUEDED FERRY MECHANICAL CORP04/15/2016
BISOTISSUEDJ-TECH CONSTRUCTION CORP01/07/2016
BISOTISSUEDSYSTEMATIC CONTROL CORP11/24/2015
BISMHISSUEDEMPIRE TELECOM USA,LLC09/23/2015
BISOTISSUEDSTEPHEN LYDON01/23/2015
BISPLISSUEDED FERRY MECHANICAL CORP12/08/2014
BISOTISSUEDSTEPHEN LYDON12/05/2014
BISSPISSUEDUNLIMITED PLG SOLUTIONS10/23/2014
BISOTISSUEDSTEPHEN LYDON08/18/2014
BIS—ISSUEDMINDEL ASSOCIATES LLC06/02/2014
BISOTISSUEDSTEPHEN LYDON03/03/2014
BISPLISSUEDED FERRY MECHANICAL CORP01/27/2014
BISOTISSUEDSTEPHEN LYDON01/17/2014
BISSPISSUEDUNLIMITED PLG SOLUTIONS11/20/2013
BISOTISSUEDFRIENDLY CONSTRUCTION CO02/15/2012
BISOTISSUEDPREFERRED BUILDERS INC03/15/2011
BIS—ISSUEDNATIONAL MAINTENCE INC07/16/2007
+ 21 more permits on file
2 projects · most recent 05/15/2025
Sprinkler System
FiledStatusContractorScope
05/15/2025——Sprinkler System
08/15/2019——Sprinkler System
1 project · most recent 12/15/2022
Water/Sanitary
FiledStatusContractorScope
12/15/2022Signed-offED FERRY MECHANICAL CORPWater/Sanitary
4 projects · most recent 07/16/2026
General Wiring
FiledStatusContractorScope
07/16/2026CompleteS. J. ELECTRIC INC.General Wiring
10/22/2024CompleteASKO ELEC CONST & MAIN INGeneral Wiring
04/26/2022CompleteS. J. ELECTRIC INC.General Wiring
06/05/2019Permit IssuedCAT DEL-V ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/04/2026Pass-Final General Construction Non-Directive 14PassView ↗
10/03/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/08/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/07/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/25/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
04/24/2026Fire-Resistant Penetrations and JointsYUE ZHOUspecial
07/10/2025Fire-Resistant Penetrations and JointsYUE ZHOUspecial
06/02/2025Fire-Resistant Penetrations and JointsYUE ZHOUspecial
05/14/2025Fire-Resistant Penetrations and JointsYUE ZHOUspecial
11/22/2024Fire-Resistant Penetrations and JointsJohn Minspecial
11/21/2024Fire-Resistant Penetrations and JointsJohn Minspecial
11/04/2024Fire-Resistant Penetrations and JointsYUE ZHOUspecial
12/21/2022Interior lighting powerArnold Montagenergy_progress
12/21/2022Lighting controlsArnold Montagenergy_progress
12/21/2022Fire-Resistant Penetrations and JointsArnold Montagspecial
12/21/2022Energy Code Compliance InspectionsArnold Montagprogress
12/21/2022Fire-Resistance Rated ConstructionArnold Montagprogress
06/27/2022Lighting controlsArnold Montagenergy_progress
06/27/2022Fire-Resistant Penetrations and JointsArnold Montagspecial
06/27/2022Energy Code Compliance InspectionsArnold Montagprogress
06/27/2022Fire-Resistance Rated ConstructionArnold Montagprogress
06/27/2022Interior lighting powerArnold Montagenergy_progress
03/23/2022Energy Code Compliance InspectionsArnold Montagprogress
03/23/2022Fire-Resistant Penetrations and JointsArnold Montagspecial
03/15/2022Maintenance informationChris Siderisenergy_progress
03/15/2022HVAC-R and service water piping design and insulationChris Siderisenergy_progress
03/15/2022HVAC-R and service water heating equipmentChris Siderisenergy_progress
03/15/2022HVAC-R and service water heating system controlsChris Siderisenergy_progress
02/23/2022Mechanical SystemsChris Siderisspecial
02/23/2022FinalChris Siderisprogress
Latest 25 of 30.
▾Documents — 515 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch15
08/25/2026Q00686002-S1Request digital key ↗
08/25/2026Q00686002-P1Request digital key ↗
08/25/2026Q00686002-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Antenna3
08/28/2026Q00340404-I1Request digital key ↗
08/15/2026Q00019764-P1Request digital key ↗
08/14/2026Q00019764-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/28/2026Q00185838-I1Request digital key ↗
08/28/2026Q00258916-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00258916-I1Request digital key ↗
08/28/2026Q00283953-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026Q00261433-I1Request digital key ↗
▸Applications & Permits85
▸BISPLAN / WORK APPROVAL APPLICATION53
04/14/2022420563731Open ↗
04/14/2022421095834Open ↗
04/14/2022421887890Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION26
02/24/2020421095834Open ↗
12/27/2019421891527Open ↗
07/24/2019421887890Open ↗
Showing 3 of 26 on file for this type
▸BISPLACE OF ASSEMBLY4
07/16/2019421313402Open ↗
03/30/2019421313402Open ↗
07/19/2016421272893Open ↗
Showing 3 of 4 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/28/2021421943366Open ↗
▸Seals & Professional Certifications120
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION58
02/13/2020421095834Open ↗
02/03/2020421095834Open ↗
12/30/2019421095834Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/28/2026Q00019764-P1Open ↗
08/28/2026Q00019764-I1Open ↗
08/28/2026Q00258916-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/26/2026Q01136865-I1Open ↗
09/01/2026Q00685838-I1Open ↗
09/01/2026Q01392312-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q00685838-I1Open ↗
09/01/2026Q00685838-I1Open ↗
08/31/2026Q00686002-S1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
05/04/2019421887890Open ↗
05/04/2019421887890Open ↗
Showing 2 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
01/19/2017421229780Open ↗
Showing 1 of 8 on file for this type
▸Trade Schedules & Equipment24
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
05/04/2019421887890Open ↗
04/18/2017421467861Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
09/15/2017421341159Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection12
▸BISSTREET TREE CHECKLIST10
12/30/2019421095834Open ↗
11/08/2019421891527Open ↗
05/04/2019421887890Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan2
08/15/2026Q00019764-P1Open ↗
08/14/2026Q00019764-I1Open ↗
▸Environmental & Asbestos39
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
08/28/2026Q00258916-I1Open ↗
08/28/2026Q00283953-I1Open ↗
08/28/2026Q00340404-I1Open ↗
Showing 3 of 20 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
12/30/2019421095834Open ↗
11/08/2019421891527Open ↗
05/04/2019421887890Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance48
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
02/13/2020421095834Open ↗
02/03/2020421095834Open ↗
12/27/2019421891527Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
03/14/2018421467861Open ↗
01/31/2018421467852Open ↗
02/16/2017421229780Open ↗
Showing 3 of 11 on file for this type
▸BISSOLAR TAX ABATEMENT APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEMERGENCY LIGHTING(IF NOT IN COMPLIANCE WITH MEMO 2/18/81)1
07/16/2019421313402Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSOLAR TAX ABATEMENT APPLICATION (PTA4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00685838-I1Open ↗
▸Inspections & Test Reports3
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION3
07/16/2019421313402Open ↗
06/14/2019420563731Open ↗
03/30/2019420563731Open ↗
▸Approvals, Objections & Sign-offs70
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST35
10/21/2020420563731Open ↗
09/10/2020420563731Open ↗
06/18/2020420563731Open ↗
Showing 3 of 35 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
04/14/2022420563731Open ↗
02/10/2020420563731Open ↗
01/16/2020420563731Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
11/27/2019420563731Open ↗
05/03/2019420563731Open ↗
05/02/2019420563731Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
04/18/2017421467852Open ↗
Showing 1 of 8 on file for this type
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAG TERMINATION LETTER1
12/03/2021421943366Open ↗
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT35
12/30/2019421095834Open ↗
12/20/2019421891527Open ↗
11/08/2019421891527Open ↗
Showing 3 of 35 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms50
▸BISEFILING COVER SHEET19
08/17/2021421943366Open ↗
12/30/2019421095834Open ↗
11/08/2019421891527Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION18
09/28/2021421943366Open ↗
06/15/2020420563731Open ↗
06/15/2020420563731Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM11
08/17/2021421943366Open ↗
10/03/2019420563731Open ↗
05/08/2019420563731Open ↗
Showing 3 of 11 on file for this type
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00019764-I1Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/16/2019421313402Open ↗
▸BISTCO FEE DUE1
06/18/2020420563731Open ↗