← Back
Legitimate theatre, sole use
7 Theater Group
222 WEST 45 STREET · Midtown-Times Square · BIN 1080842
💬 Discuss this project
1913Year Built
5Stories
J4Building Class
C6-5Zoning
60,232 sfGross Floor Area
2Units
LL97 Covered2 Open Violations ▸
Legitimate theatre, sole use · Owner of record: SHUBERT AND BOOTH THEATRE, LLC · 25,305 sf lot · 2.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof6p · 4 filings · 20 docs
Floor 21p · 1 filing · 5 docs
Floor 11p · 1 filing · 2 docs
Basement1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRATT CONSTRUCTION2607/08/2026
INTERSYSTEM INSTALLATION CORP607/08/2026
SHUBERT BOOTH THEATRE LLC203/22/2026
SHUBER103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEM INSTALLATIONGeneral Contractor2507/08/2026
SOHO CONTRACTING CORPGeneral Contractor707/08/2026
PRATT CONSTRUCTION & RESTGeneral Contractor507/08/2026
THE SHUBERT ORGANIZATIONGeneral Contractor307/08/2026
TRISTATE MAINTENANCE & SEGeneral Contractor303/21/2026
PEREIRA, WESLLEYElectrical103/21/2026
RALPH NUZZOLOElectrical103/21/2026
SHORT, HENRYElectrical103/21/2026
VAN VASSELLElectrical103/21/2026
AIR STREAM AIR CONDITIONINGGeneral Contractor107/08/2026
GOING SIGN & SERVICING COGeneral Contractor107/08/2026
TRISTRUX LLCGeneral Contractor104/09/2026
BALATON CONSULTING LLCScaffold107/08/2026
ALPHONSE, MICHAELElectrical103/21/2026
GOING SIGN SVCNGScaffold107/08/2026
HEMSING, ROBERTElectrical103/21/2026
HOWARD WEISSElectrical103/21/2026
JOHN O'KANEElectrical103/21/2026
O'KANE JOHNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974207/19/2023
GEORGE J. XERAKIAS, PE1658103/30/2023
SAG ENGINEERING & CONSULT608311/18/2022
CHOI ENGINEERING PLLC2264105/18/2021
Building Lifecycle
All (98)Filed (21)Permit Issued (29)Signed Off (15)Violation (17)Objection (6)Special Inspection (10)
10/30/2025
Signed off — Alteration
M01206738-I1
09/19/2025
Permit issued — Antenna
M01206738-I1-AN
09/02/2025
Filed — Alteration
M01206738-I1
06/14/2024
Signed off — Alteration
M00466504-I1
12/01/2023
Signed off — Alteration
ERECT, MAINTAIN & DISMANTLE OF SIDEWALK SHED FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH.
M00840765-I1
12/01/2023
Signed off — Alteration
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00840867-I1
09/26/2023
Permit issued — General Construction
M00466504-I1-GC
08/22/2023
Signed off — Alteration
M00844563-I1
07/19/2023
Filed — Alteration
M00844563-I1
07/19/2023
Permit issued — Mechanical Systems
M00844563-I1-MS
07/12/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLAN
M00173590-I1
05/30/2023
Signed off — Alteration
M08042330-I1
05/30/2023
Signed off — Alteration
ERECT (3) LED SIGNS ON EXISTING MARQUEE WITH CHANGEABLE COPY ACCESSORY TO THEATRE USE
M08042365-I1
04/11/2023
Permit issued — Supported Scaffold
M00840867-I1-SF
04/06/2023
Signed off — Alteration
INSTALLATION OF SPLIT SYSTEM ON THE ROOF AND 2ND FLOOR WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M08012868-I1
03/30/2023
Filed — Alteration
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00840867-I1
03/29/2023
Permit issued — Sidewalk Shed
M00840765-I1-SH
03/28/2023
Filed — Alteration
ERECT, MAINTAIN & DISMANTLE OF SIDEWALK SHED FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH.
M00840765-I1
03/08/2023
Special inspection requirement — Post-installed Anchors
George Xerakias
01/18/2023
Signed off — Alteration
ERECT STRUCTURE SUPPORTING TWO VIDEO SIGNS
M08012897-I1
12/22/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLAN
M00173597-I1
12/16/2022
Signed off — Alteration
Installation of a temporarily shoring per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00543893-I1
12/16/2022
Signed off — Alteration
M00646588-I1
12/09/2022
Permit issued — Structural
M08042330-I1-ST
12/05/2022
Signed off — Alteration
ERECT (2) LED ACCESSORY BUSINESS PRODUCTION SIGNS ON STRUCTURE FOR THE SHUBERT THEATRE WITH CHANGEABLE COPY
M08012916-I1
11/30/2022
Permit issued — Mechanical Systems
M08012868-I1-MS
11/25/2022
Permit issued — Sign
M08042365-I1-SG
11/18/2022
Filed — Alteration
M08042330-I1
11/18/2022
Filed — Alteration
ERECT (3) LED SIGNS ON EXISTING MARQUEE WITH CHANGEABLE COPY ACCESSORY TO THEATRE USE
M08042365-I1
11/18/2022
Filed — Alteration
INSTALLATION OF SPLIT SYSTEM ON THE ROOF AND 2ND FLOOR WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M08012868-I1
10/25/2022
Permit issued — Sign
M08012916-I1-SG
10/14/2022
Permit issued — Structural
M08012897-I1-GC-CX
10/07/2022
Filed — Alteration
ERECT STRUCTURE SUPPORTING TWO VIDEO SIGNS
M08012897-I1
10/07/2022
Filed — Alteration
ERECT (2) LED ACCESSORY BUSINESS PRODUCTION SIGNS ON STRUCTURE FOR THE SHUBERT THEATRE WITH CHANGEABLE COPY
M08012916-I1
09/29/2022
Special inspection requirement — Structural Steel - Details
Chester Kowalski
09/29/2022
Special inspection requirement — Structural Steel - Welding
Chester Kowalski
09/29/2022
Special inspection requirement — Final
William Gorlin
09/29/2022
Special inspection requirement — Post-installed Anchors
Chester Kowalski
09/29/2022
Special inspection requirement — Final
William Gorlin
09/27/2022
Permit issued — Sidewalk Shed
M00173590-I1-SH
09/27/2022
Permit issued — Supported Scaffold
M00173597-I1-SF
09/26/2022
Permit issued — Protection and Mechanical Methods
M00646588-I1-PM
09/26/2022
Permit issued — Protection and Mechanical Methods
M00543893-I1-PM
09/21/2022
Permit issued — General Construction
M00466504-I1-GC
07/19/2022
Permit issued — Sidewalk Shed
M00173590-I1-SH
07/07/2022
Permit issued — Protection and Mechanical Methods
M00543893-I1-PM
02/11/2022
Permit issued — Supported Scaffold
M00173597-I1-SF
12/20/2021
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLAN
M00173590-P2
12/14/2021
Permit issued — Protection and Mechanical Methods
M00646588-I1-PM
12/13/2021
Filed — Alteration
M00646588-I1
10/13/2021
Permit issued — General Construction
M00466504-I1-GC
09/29/2021
Signed off — Alteration
Herewith in filing packaged unit air conditioning system. No change to use, egress occupancy.
M00523066-I1
09/14/2021
Permit issued — Sidewalk Shed
M00173590-I1-SH
09/10/2021
Filed — No Work
M00576907-I1
08/02/2021
Permit issued — Protection and Mechanical Methods
M00543893-I1-PM
06/23/2021
Permit issued — Protection and Mechanical Methods
M00543893-I1-PM
06/22/2021
Filed — Alteration
Installation of a temporarily shoring per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00543893-I1
06/21/2021
Filed — Alteration
M00466504-I1
06/19/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLAN
M00173597-P1
05/20/2021
Permit issued — Mechanical Systems
M00523066-I1-MS
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offTRISTRUX LLC09/19/2025
DOB NOWGeneral ConstructionSigned-offSOHO CONTRACTING CORP09/26/2023
DOB NOWMechanical SystemsSigned-offTHE SHUBERT ORGANIZATION07/19/2023
DOB NOWSupported ScaffoldSigned-offSOHO CONTRACTING CORP04/11/2023
DOB NOWSidewalk ShedSigned-offSOHO CONTRACTING CORP03/29/2023
DOB NOWStructuralSigned-offGOING SIGN SERVICING12/09/2022
DOB NOWMechanical SystemsSigned-offAIR STREAM AIR CONDITIONI11/30/2022
DOB NOWSignSigned-offPOLSINELLI, HENRY11/25/2022
DOB NOWSignPermit IssuedNORTH SHORE NEON SIGN CO10/25/2022
DOB NOWStructuralSigned-offTHE SHUBERT ORGANIZATION10/14/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/27/2022
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEM INSTALLATION09/26/2022
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEM INSTALLATION09/26/2022
DOB NOWGeneral ConstructionSigned-offSOHO CONTRACTING CORP09/21/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/19/2022
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEM INSTALLATION07/07/2022
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION02/11/2022
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEM INSTALLATION12/14/2021
DOB NOWGeneral ConstructionSigned-offSOHO CONTRACTING CORP10/13/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/14/2021
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEM INSTALLATION08/02/2021
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEM INSTALLATION06/23/2021
DOB NOWMechanical SystemsSigned-offTRISTATE MAINTENANCE & SE05/20/2021
DOB NOWSupported ScaffoldSigned-offPRATT CONSTRUCTION & RES*01/11/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/16/2020
DOB NOWSupported ScaffoldSigned-offPRATT CONSTRUCTION & RES*01/02/2020
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION06/03/2019
DOB NOWSupported ScaffoldSigned-offPRATT CONSTRUCTION & RES*06/03/2019
BISOTISSUEDSHOW MOTION INC10/30/2018
BISOTISSUEDTHE SHUBERT ORGANIZATION07/18/2018
BISOTISSUEDTHE SHUBERT ORGANIZATION07/06/2018
BISOTISSUEDTELCOM ENGINEERING GP INC10/18/2017
BISOTISSUEDSHOW MOTION INC03/27/2017
BISOTISSUEDTHE SHUBERT ORGANIZATION12/22/2016
BISSDISSUEDASHLAR MECHANICAL CORP03/02/2016
BISOTISSUEDKOENIG IRON WORKS INC02/19/2016
BISMHISSUEDKOENIG IRON WORKS INC02/19/2016
BISOTISSUEDTELCOM ENGINEERING GP INC09/03/2015
BISOTISSUEDTELCOM ENGINEERING GP INC02/25/2015
+ 37 more permits on file
11 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026Permit IssuedR. NUZZOLO ELECTRIC INC—
05/11/2026CompleteR. NUZZOLO ELECTRIC INC—
03/15/2024CompleteR. NUZZOLO ELECTRIC INC—
12/06/2022CompleteH. & L. ELECTRIC INCGeneral Wiring
10/28/2022CompleteH. & L. ELECTRIC INCGeneral Wiring
10/26/2022CompleteR. NUZZOLO ELECTRIC INC—
09/23/2022CompleteH. & L. ELECTRIC INCGeneral Wiring
04/10/2022CompleteR. NUZZOLO ELECTRIC INC—
10/08/2019CompleteSTEVEN FARKAS—
05/29/2019CompleteSTEVEN FARKAS—
10/12/2018CompleteERBACH ELEC'L CONTRG LLC—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/08/2023Post-installed AnchorsGeorge Xerakiasspecial
09/29/2022Structural Steel - DetailsChester Kowalskispecial
09/29/2022Structural Steel - WeldingChester Kowalskispecial
09/29/2022FinalWilliam Gorlinprogress
09/29/2022Post-installed AnchorsChester Kowalskispecial
09/29/2022FinalWilliam Gorlinprogress
05/17/2021Mechanical SystemsEugene Choispecial
05/17/2021FinalEugene Choiprogress
02/05/2021MasonryChester Kowalskispecial
02/05/2021FinalRICHARD LEFEVERprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Shubert TheatreOther—
Project M08012916 Alteration · LOC Issued · 10/07/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 404 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch12
09/03/2026M00523066-I1Request digital key ↗
09/03/2026M00543893-I1Request digital key ↗
09/03/2026M00646588-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
09/05/2026M00180304-I1Request digital key ↗
09/03/2026M00576907-I1Request digital key ↗
08/15/2026M00127476-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00173590-I1Request digital key ↗
09/05/2026M00173590-P1Request digital key ↗
09/05/2026M00173590-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/03/2026M00173597-I1Request digital key ↗
08/15/2026M00173597-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00466504-I1Request digital key ↗
▸Applications & Permits70
▸BISPLAN / WORK APPROVAL APPLICATION30
04/06/2022123533649Open ↗
10/30/2018123533649Open ↗
07/09/2018123377167Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION30
10/30/2018123533649Open ↗
07/19/2018123580375Open ↗
07/06/2018123377167Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWLPC Approval/Permit9
08/13/2026M01206738-I1Open ↗
08/13/2026M00523066-I1Open ↗
08/13/2026M08012897-I1Open ↗
Showing 3 of 9 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/24/2017121496434Open ↗
▸Seals & Professional Certifications119
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION50
10/30/2018123533649Open ↗
09/26/2018123039461Open ↗
07/27/2018123580375Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00127476-I1Open ↗
09/05/2026M00173590-I1Open ↗
09/05/2026M00173590-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
10/30/2018123533649Open ↗
07/09/2018123377167Open ↗
06/26/2018123580375Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
03/08/2013121537024Open ↗
12/10/2012121428419Open ↗
11/21/2012121439568Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
10/30/2018123533649Open ↗
07/09/2018123377167Open ↗
06/26/2018123580375Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026M00466504-I1Open ↗
08/28/2026M00523066-I1Open ↗
08/23/2026M08012897-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026M08012916-I1Open ↗
08/29/2026M00466504-I1Open ↗
08/28/2026M00523066-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment17
▸BISEQUIPMENT USE PERMITS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
04/11/2013121439568Open ↗
04/11/2013121402231Open ↗
12/13/2012121439568Open ↗
▸BISSCHEDULE B - PLUMBING2
11/21/2012121439568Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
12/17/2014121968479Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/08/2014121998106Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/27/2012120685570Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
09/05/2026M00173590-P2Open ↗
08/13/2026M00173597-P1Open ↗
▸Environmental & Asbestos33
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
10/30/2018123533649Open ↗
06/26/2018123580375Open ↗
03/29/2017123039461Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00173597-I1Open ↗
09/01/2026M08012868-I1Open ↗
08/29/2026M00844563-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/05/2016122636549Open ↗
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
05/08/2014121998106Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
07/27/2018123580375Open ↗
06/26/2018123580375Open ↗
04/19/2018121707448Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/27/2018123580375Open ↗
04/19/2018121707448Open ↗
12/27/2012120685570Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
10/30/2018123533649Open ↗
02/05/2016122636549Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M08012868-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/24/2022123533649Open ↗
01/20/2022121801381Open ↗
01/12/2022121801381Open ↗
▸Approvals, Objections & Sign-offs57
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
04/06/2022123533649Open ↗
09/26/2018123039461Open ↗
07/27/2018123580375Open ↗
Showing 3 of 23 on file for this type
▸BISLANDMARKS APPROVAL19
09/26/2018123039461Open ↗
07/27/2018123580375Open ↗
07/09/2018123377167Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
07/24/2013121707448Open ↗
03/08/2013121537024Open ↗
12/10/2012121428419Open ↗
Showing 3 of 13 on file for this type
▸BISFINAL1
04/05/2022123533649Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
12/27/2012120685570Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT41
10/30/2018123533649Open ↗
09/26/2018123039461Open ↗
07/27/2018123580375Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/24/2022123533649Open ↗
▸Filing & Intake Forms24
▸BISEFILING COVER SHEET19
10/30/2018123533649Open ↗
07/09/2018123377167Open ↗
06/26/2018123580375Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM4
09/26/2018123039461Open ↗
07/27/2018123580375Open ↗
07/13/2018123377167Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
12/19/2014121707448Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type