← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2224 CROPSEY AVENUE
BROOKLYN · BIN 3429031
💬 Discuss this project
2023Year Built
11Stories
D1Building Class
R6Zoning
808,372 sfGross Floor Area
97Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Cropsey Airs Fee Holder · 7,813 sf lot · 103.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFire protection system installation7 filings
RoofRoof protection installation1p · 1 filing
Floor 2Temporary contractor shed/field office1p · 1 filing
Floor 1Cropsey Airs LLC1p · 2 filings
CellarCropsey Airs LLC1p · 2 filings
Site & exteriorCropsey Airs LLC6 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Xolle Dmeo103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/21/2021$396K—SHORE TOWERS QZB LLC → CROPSEY AIRS FEE HOLDER LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning5003/21/2026
AE Design Solution1403/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Developers & ManagementGeneral Contractor2007/08/2026
Core Scaffold SystemsScaffold1607/08/2026
NY Developers & ManagementScaffold1307/08/2026
Tristate Fire SprinklersFire Protection507/08/2026
Kutnicki Bernstein ArchitectsGeneral Contractor403/22/2026
S&E Bridge & ScaffoldScaffold203/21/2026
Prime Piping & HeatingPlumbing207/08/2026
Tristate Fire SprinklerGeneral Contractor103/21/2026
Contact ElectricGeneral Contractor103/22/2026
Safety Fire SprinklerFire Protection107/08/2026
Fried MayerGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 Inspections14711402/03/2025
G. Blinn Consulting2894112/06/2023
Mueser Rutledge Consulting977303/06/2023
WSP USA1848403/06/2023
Ancora Engineering6818502/02/2023
Building Lifecycle
10/01/2026
Elevator Category 1 inspection report filed
01/21/2026
§ 27-2005, 2007 ADM code remove the illegal fastening consisting of unacceptable electromagnetic locking device install door at south at public…
HPD violation · open
01/21/2026
§ 27-2005 ADM code provide security in the event of a power outage by means of an acceptable latchset at doors at south at public hall stairs
HPD violation · closed
01/13/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 2nd…
HPD violation · closed
01/13/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEIL I NG IN THE BATHROOM LOCATED AT APT 2H,…
HPD violation · open
189 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offNY Developers & Management12/18/2024
DOB NOWSprinklersSigned-offTristate Fire Sprinkler11/27/2024
DOB NOWStandpipeSigned-offTristate Fire Sprinkler11/27/2024
DOB NOWMechanical SystemsSigned-offNY Developers & Management10/31/2024
DOB NOWStructuralSigned-offNY Developers & Management10/16/2024
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems08/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/09/2024
DOB NOWStandpipeSigned-offTristate Fire Sprinkler06/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/12/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems06/07/2024
DOB NOWPlumbingSigned-offPrime Piping & Heating03/14/2024
DOB NOWProtection and Mechanical MethodsSigned-offNY Developers & Management02/20/2024
DOB NOWSuspended ScaffoldSigned-offS&E Bridge & Scaffold01/22/2024
DOB NOWConstruction FenceSigned-offNY Developers & Management12/14/2023
DOB NOWStandpipeSigned-offTristate Fire Sprinkler11/30/2023
DOB NOWMechanical SystemsSigned-offNY Developers & Management08/14/2023
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems08/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/12/2023
DOB NOWStructuralSigned-offNY Developers & Management06/28/2023
DOB NOWStandpipeSigned-offTristate Fire Sprinkler06/20/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/16/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems06/15/2023
DOB NOWStructuralSigned-offNY Developers & Management06/13/2023
DOB NOWStandpipeSigned-offSafety Fire Sprinkler05/25/2023
DOB NOWFoundationSigned-offNY Developers & Management05/18/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating03/10/2023
DOB NOWConstruction FenceSigned-offNY Developers & Management12/13/2022
DOB NOWSupport of ExcavationSigned-offNY Developers & Management12/08/2022
DOB NOWFoundationSigned-offNY Developers & Management12/06/2022
DOB NOWSupport of ExcavationSigned-offNY Developers & Management09/22/2022
DOB NOWFoundationSigned-offNY Developers & Management09/20/2022
DOB NOWSupport of ExcavationSigned-offNY Developers & Management06/03/2022
DOB NOWFoundationSigned-offNY Developers & Management06/01/2022
DOB NOWConstruction FenceSigned-offNY Developers & Management12/17/2021
DOB NOWFoundationSigned-offNY Developers & Management12/09/2021
DOB NOWConstruction FenceSigned-offNY Developers & Management06/03/2019
DOB NOWConstruction FenceSigned-offNY Developers & Management05/31/2019
BIS—ISSUEDNY Developers & Management10/29/2024
BIS—ISSUEDNY Developers & Management09/12/2024
BIS—ISSUEDNY Developers & Management11/28/2023
+ 2 more permits on file
5 projects · most recent 05/15/2025
General Wiring
FiledStatusContractorScope
05/15/2025CompletePower Direct Electric—
01/06/2025CompleteContact ElectricGeneral Wiring
06/21/2023CompleteSolas Electrical—
06/14/2023CompleteSolas Electrical—
01/19/2022CompleteContact Electric—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/30/2024Pass-Final SD - More than 10 Requested FloorsPassView ↗
12/30/2024Pass-Final SP - More than 10 Requested FloorsPassView ↗
12/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/19/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/13/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
11/09/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/02/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
06/08/2023Pass-Final PL - UndergroundPassView ↗
05/09/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
12/19/2024Standpipe SystemsJACOB HAASspecial
12/19/2024Sprinkler SystemsJACOB HAASspecial
11/22/2024Sprinkler SystemsJACOB HAASspecial
11/22/2024Standpipe SystemsJACOB HAASspecial
06/06/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJACOB HAASspecial
06/06/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesJACOB HAASspecial
03/08/2023Post-installed AnchorsJACOB HAASspecial
03/08/2023Footing and FoundationJEFFREY SMILOWprogress
03/08/2023FinalJEFFREY SMILOWprogress
03/08/2023MasonryJACOB HAASspecial
03/08/2023Concrete - Cast-In-PlaceJEFFREY SMILOWspecial
03/08/2023Fire-Resistant Penetrations and JointsJACOB HAASspecial
03/08/2023Subgrade InspectionsSITOTAW FANTAYEspecial
03/08/2023Subsurface Conditions – Fill Placement & In-Place DensitySITOTAW FANTAYEspecial
03/07/2023FinalJACOB HAASprogress
03/07/2023Post-installed AnchorsJACOB HAASspecial
03/07/2023MasonryJACOB HAASspecial
03/07/2023Concrete - Cast-In-PlaceJEFFREY SMILOWspecial
03/07/2023Fire-Resistant Penetrations and JointsJACOB HAASspecial
03/07/2023Structural Steel - DetailsJEFFREY SMILOWspecial
02/08/2023Concrete - Cast-In-PlaceGregory Moormannspecial
02/08/2023Structural Stability – Alterations of existing buildingsGregory Moormannspecial
02/08/2023Excavations - Sheeting, Shoring, and BracingGregory Moormannspecial
02/08/2023UnderpinningGregory Moormannspecial
01/27/2023Concrete - Cast-In-Place—special
Latest 25 of 78.
275 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account