| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01362734 ↗ | 52 VANDERBILT AVENUE MANHATTAN | Alteration | Permit Issued | 03/13/2026 | 09/28/2026 | Design DPM ARCHITECTURE, P.C. Owner BRAUSE REALTY INC. Filer RETHY ASSOCIATES, INC. | Modifications to Existing Sprinkler System on Part of 16th Floor |
| X01219259 ↗ | 350 GRAND CONCOURSE BRONX | New Building | Permit Issued | 09/19/2025 | 09/17/2026 | Design EP ENGINEERING LLC Owner 34-20 JUNCTION DM LLC Filer JM ZONING, LLC. | Structural work for new building |
| Q00528155 ↗ | 94-18 JUNCTION BOULEVARD | New Building | Permit Issued | 06/04/2021 | 08/14/2026 | Design DAGHER ENGINEERING PLLC Owner 34-20 JUNCTION DM LLC Filer CORE CONSULTANTS NYC | The Mechanical scope is in conjunction with New Building JOB NO# Q00528155-I1 |
| Q01288646 ↗ | 94-18 JUNCTION BOULEVARD | Alteration | Signed-off | 09/29/2025 | 06/10/2026 | Design EC BUILDING CONSULTANTS. INC Owner BOGOPA SERVICE CORP. | Proposed plumbing work on cellar and first floor for Supermarket. No change to occupancy use or egress. |
| X01288557 | 350 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 12/19/2025 | 05/19/2026 | Design MRCE Owner 34-20 JUNCTION DM LLC Filer JM ZONING, LLC. | Soil remediation work as per plans filed. No change in use egress or occupancy. |
| Q00953991 ↗ | 34-20 JUNCTION BOULEVARD QUEENS | Alteration | Signed-off | 10/30/2023 | 04/17/2026 | Design PAUL PERDEK, PROF. ENG. PLLC Owner 34-20 JUNCTION DM LLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| KZ ENGINEERING, P.C | 15 | 03/04/2026 |
| WSP | 9 | 09/08/2026 |
| H & O ENGINEERING, DPC | 6 | 01/02/2024 |
| VENTROP ENGINEERING CONSULTING GROU | 6 | 09/08/2026 |
| LANGAN ENGINEERING | 5 | 07/16/2025 |
| SBLM ARCHITECTS, PC | 5 | 05/07/2024 |
| FISCHER MAKOOI ARCHITECTS PLLC | 4 | 06/18/2026 |
| MRCE | 4 | 06/15/2026 |
| PHILIP HABIB & ASSOCIATES | 4 | 02/03/2020 |
| TITAN ENGINEERS PC | 4 | 06/18/2026 |
| FNA ENGINEERING SERVICES PC | 3 | 06/18/2026 |
| GGA STUDIOS, DPC | 3 | 09/13/2024 |
| MARIN ARCHITECTS, P.C. | 3 | 03/03/2026 |
| SOUTH BAY ENGINEERING PLLC | 3 | 03/05/2019 |
| AKRF, INC. | 2 | 07/28/2026 |
| ANCORA ENGINEERING, PLLC | 2 | 09/08/2026 |
| DESIMONE CONSULTING ENGINEERS | 2 | 07/16/2025 |
| ETTINGER ENGINEERING ASSOCIATES | 2 | 06/23/2025 |
| GACE DPC | 2 | 07/28/2026 |
| GEA CONSULTING ENGINEERS | 2 | 05/07/2024 |
| MCNAMARA SALVIA | 2 | 12/21/2022 |
| RAND ENGINEERING & ARCHITECTURE | 2 | 11/22/2019 |
| SILMAN | 2 | 11/08/2022 |
| SJC ENGINEERING PC | 2 | 12/19/2022 |
| SRL ASSOCIATES | 2 | 12/03/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| ON STAR MANAGEMENT LLC | 5 | 04/16/2026 |
| CAPITAL CONCRETE NY INC | 3 | 09/08/2026 |
| MPI PLUMBING CORP | 3 | 09/08/2026 |
| SAFETY FIRE SPRINKLER COR | 3 | 07/28/2026 |
| TRISTATE FIRE SPRINK INC | 3 | 09/08/2026 |
| BEST MECHANICAL SVCS INC | 2 | 06/18/2026 |
| 1 ARBOR LLC | 1 | 02/09/2026 |
| 5 K CONSTRUCTION RESOURCE | 1 | 03/13/2026 |
| A & E PLUMBING CORP | 1 | 02/09/2026 |
| BNK COOLING & HEATING COR | 1 | 09/08/2026 |
| CMA PLUMBING & HEATING IN | 1 | 03/13/2026 |
| CREATIVE PLUMBING IN | 1 | 05/07/2024 |
| I DO PLUMBING & HTG INC | 1 | 05/01/2026 |
| LINE VENTURE GROUP LLC | 1 | 05/01/2026 |
| LTM CONSTRUCTION LLC | 1 | 12/01/2023 |
| MOREAIR MECHANICAL SERVIC | 1 | 03/13/2026 |
| P.H. WORKS INC | 1 | 07/28/2026 |
| RIG KINGLAND SERVICES INC | 1 | 09/08/2026 |
| THE FRANKLIN CO CONT INC | 1 | 09/08/2026 |
| TITAN INDUSTRIAL SVC CORP | 1 | 02/05/2024 |
| TOP QUALITY BUILDERS INC | 1 | 05/13/2026 |
| TURNER CONSTRUCTION COMPA | 1 | 07/28/2026 |
| XOLLE DEMO LLC | 1 | 04/08/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| 34-20 JUNCTION DM LLC | 6 | 07/28/2026 |
| SILVERSTEIN PROPERTIES INC. | 6 | 07/16/2025 |
| YS BUILDERS NY INC | 6 | 12/08/2021 |
| 19 ROCKWELL PLACE LLC | 4 | 09/08/2026 |
| NNRC PROPERTIES LLC | 4 | 04/16/2026 |
| RANCO CAPITAL LLC | 3 | 06/25/2019 |
| RB REALTY CAPITAL LLC | 3 | 12/07/2021 |
| 88TH AVENUE OWNER LLC | 2 | 04/07/2022 |
| ALBA SERVICES INC | 1 | 04/25/2019 |
| BOGOPA SERVICE CORP | 1 | 05/01/2026 |
| BRAUSE REALTY INC. | 1 | 03/13/2026 |
| CARTHAGE 124TH LP | 1 | 04/16/2019 |
| CLARKSON LEFFERTS GARDENS LLC | 1 | 12/10/2021 |
| SAFON OWNER LLC | 1 | 03/30/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| JM ZONING, LLC. | 15 | 09/08/2026 |
| SPEEDY EXPEDITING INC | 8 | 09/08/2026 |
| SYNERGY BUILDING CONSULTANTS | 8 | 03/04/2026 |
| WILLIAM VITACCO ASSOCIATES | 6 | 05/07/2024 |
| MARIN ARCHITECTS, P.C. | 4 | 10/27/2023 |
| DOMANI CONSULTING | 2 | 06/14/2024 |
| EXPEDITING PLUS INC. | 2 | 03/27/2019 |
| AE DESIGN SOLUTION INC. | 1 | 02/05/2024 |
| AVALON DESIGNS INC | 1 | 05/13/2026 |
| BAC Developers Group | 1 | 06/18/2026 |
| BDP EXPEDITERS | 1 | 04/16/2019 |
| CANAS SOLUTIONS INC | 1 | 06/23/2025 |
| CORE CONSULTANTS NYC | 1 | 07/28/2026 |
| EC BUILDING CONSULTANTS, INC. | 1 | 05/01/2026 |
| EXPEDITING 4 U | 1 | 06/25/2019 |
| HAIDER ENGINEERING, P.E. | 1 | 04/08/2024 |
| KD DESIGNS | 1 | 04/25/2019 |
| RETHY ASSOCIATES, INC. | 1 | 03/13/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01362734 ↗ | 52 VANDERBILT AVENUE MANHATTAN | Alteration | Permit Issued | 03/13/2026 | 09/28/2026 | Design DPM ARCHITECTURE, P.C. Owner BRAUSE REALTY INC. Filer RETHY ASSOCIATES, INC. | Modifications to Existing Sprinkler System on Part of 16th Floor |
| X01219259 ↗ | 350 GRAND CONCOURSE BRONX | New Building | Permit Issued | 09/19/2025 | 09/17/2026 | Design EP ENGINEERING LLC Owner 34-20 JUNCTION DM LLC Filer JM ZONING, LLC. | Structural work for new building |
| Q00528155 ↗ | 94-18 JUNCTION BOULEVARD | New Building | Permit Issued | 06/04/2021 | 08/14/2026 | Design DAGHER ENGINEERING PLLC Owner 34-20 JUNCTION DM LLC Filer CORE CONSULTANTS NYC | The Mechanical scope is in conjunction with New Building JOB NO# Q00528155-I1 |
| Q01288646 ↗ | 94-18 JUNCTION BOULEVARD | Alteration | Signed-off | 09/29/2025 | 06/10/2026 | Design EC BUILDING CONSULTANTS. INC Owner BOGOPA SERVICE CORP. | Proposed plumbing work on cellar and first floor for Supermarket. No change to occupancy use or egress. |
| X01288557 | 350 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 12/19/2025 | 05/19/2026 | Design MRCE Owner 34-20 JUNCTION DM LLC Filer JM ZONING, LLC. | Soil remediation work as per plans filed. No change in use egress or occupancy. |
| Q00953991 ↗ | 34-20 JUNCTION BOULEVARD QUEENS | Alteration | Signed-off | 10/30/2023 | 04/17/2026 | Design PAUL PERDEK, PROF. ENG. PLLC Owner 34-20 JUNCTION DM LLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00655003 ↗ | 19 ROCKWELL PLACE BROOKLYN | New Building | Permit Issued | 02/02/2022 | 04/02/2026 | Owner 19 ROCKWELL PLACE LLC Filer JM ZONING, LLC. | Superstructure drawings filed in conjunction with NB |
| Q00736094 ↗ | 92-11 147 PLACE QUEENS | Alteration | Permit Issued | 05/18/2022 | 03/23/2026 | Design ADROIT ENGINEERING PLLC Filer AVALON DESIGNS INC | Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| M00578593 ↗ | BROADWAY MANHATTAN | New Building | Permit Issued | 09/08/2021 | 03/09/2026 | Design NEW YORK ENGINEERS LLC Filer JM ZONING, LLC. | Structural work as per plans filed. Filed in conjunction with DOB Now NB M00578593. |
| Q01341445 ↗ | 94-18 JUNCTION BOULEVARD | Alteration | Signed-off | 01/06/2026 | 03/06/2026 | — | THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A LEASING OFFICE INCLUDING MODEL APARTMENTS PURSUANT TO SECTION AC 28-11 AND BUILDI… |
| X01353214 ↗ | 350 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 03/04/2026 | 03/05/2026 | Design KZ ENGINEERING, P.C Owner 34-20 JUNCTION DM LLC | Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| 122745100BIS | 255 WEST 34 STREET MANHATTAN | — | ISSUED | 08/21/2017 | 03/03/2026 | — | EQ, PL |
| B01206925 ↗ | 19 ROCKWELL PLACE BROOKLYN | Alteration | Signed-off | 06/25/2025 | 09/16/2025 | Design KZ ENGINEERING, P.C Owner 19 ROCKWELL PLACE LLC | This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildin… |
| M00686955 ↗ | FREDERICK DOUGLASS BOULEVARD MANHATTAN | New Building | Permit Issued | 02/28/2022 | 08/05/2025 | Filer BAC Developers Group | SOE herewith filed in conjunction with NB job number M00686955-I1 |
| M00680461 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 02/21/2022 | 06/23/2025 | Filer HAIDER ENGINEERING, P.E. | ALTERATION TYPE 3: CONSTRUCTION FENCE - FENCE TO BE ERECTED AROUND THE PERIMETER OF 170 WEST 225TH STREET FOR FOUNDATION (Job #X00680369), S… |
| X00649028 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 01/24/2022 | 06/16/2025 | Design MARIN ARCHITECTS, P.C. Filer CANAS SOLUTIONS INC | INSTALLATION OF NEW CURB CUT. |
| B00876026 ↗ | 19 ROCKWELL PLACE BROOKLYN | Alteration | Signed-off | 05/31/2023 | 06/10/2025 | Design KZ ENGINEERING, P.C Owner 19 ROCKWELL PLACE LLC | Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| B01059974 ↗ | 19 ROCKWELL PLACE BROOKLYN | Alteration | Signed-off | 06/14/2024 | 06/10/2025 | Design GGA STUDIOS, DPC Owner 19 ROCKWELL PLACE LLC Filer DOMANI CONSULTING | INSTALLATION OF TEMP CONSTRUCTION OFFICES AS SHOW PER PLAN IN ACCORDANCE WITH BC 3303.6 |
| M00730865 ↗ | FREDERICK DOUGLASS BOULEVARD MANHATTAN | Alteration | Signed-off | 05/18/2022 | 05/29/2025 | Design KZ ENGINEERING, P.C | Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| Q01030133 ↗ | 34-20 JUNCTION BOULEVARD QUEENS | Alteration | Signed-off | 05/13/2024 | 05/20/2025 | Design KZ ENGINEERING, P.C Owner 34-20 JUNCTION DM LLC | Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg… |
| X00686021 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 03/01/2022 | 05/08/2025 | Design TITAN ENGINEERS PC Filer MARIN ARCHITECTS, P.C. | structural in conjunction with a nb |
| Q00682956 ↗ | 44-01 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 03/24/2022 | 03/11/2025 | Design LANGAN ENGINEERING Filer JM ZONING, LLC. | Install 30 ft. curb cut as per plans filed to provide access to residential parking garage as per plans filed. No change touse, egress or oc… |
| Q00682989 ↗ | 44-01 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 03/24/2022 | 03/11/2025 | Design LANGAN ENGINEERING | INSTALLATION OF CURB CUT FILED IN CONJUNCTION WITH NB#Q00599457-I1 |
| Q00683021 ↗ | 44-01 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 03/24/2022 | 03/11/2025 | Design LANGAN ENGINEERING Filer JM ZONING, LLC. | Install 23ft. curb cut as per plans filed to provide access to residential parking garage as per plans filed. No change to use, egress or oc… |
| Q00683037 ↗ | 44-01 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 03/24/2022 | 03/11/2025 | Design LANGAN ENGINEERING Filer JM ZONING, LLC. | Install 12ft. curb cut as per plans filed to provide access to residential parking garage as per plans filed. No change to use, egress or oc… |
| Q00599457 ↗ | 44-01 NORTHERN BOULEVARD QUEENS | New Building | Permit Issued | 10/19/2021 | 02/07/2025 | Design HILL WEST ARCHITECTS Filer JM ZONING, LLC. | Structural work as per plans filed. |
| B00680820 ↗ | 77 KOSCIUSZKO STREET BROOKLYN | New Building | Permit Issued | 02/15/2022 | 01/30/2025 | Design S. WIEDER ARCHITECT P.C. Owner NNRC PROPERTIES LLC Filer SPEEDY EXPEDITING INC | Temporary Standpipe work for proposed 13 story building as per plans filed. |
| B00637703 ↗ | 2224 CROPSEY AVENUE BROOKLYN | Alteration | Signed-off | 11/29/2021 | 12/18/2024 | Design KZ ENGINEERING, P.C Filer JM ZONING, LLC. | INSTALL CONSTRUCTION FENCE AS PER PLANS FILED |
| B00133081 ↗ | 2266 CROPSEY AVENUE BROOKLYN | Alteration | Signed-off | 09/25/2019 | 12/04/2024 | Design PHILIP HABIB & ASSOCIATES | CONSTRUCTING A CURB CUT IN CONJUNCTION WITH NB #32184756 |
| X00633905 ↗ | 170 WEST 225 STREET MANHATTAN | New Building | Permit Issued | 12/01/2021 | 12/04/2024 | Design MARIN ARCHITECTS, P.C. | APPLICATION IS HEREBY FILED FOR ERECTION OF 7 STORY MIXED USE BUILDING. |
| 321180155BIS | 600 DEKALB AVENUE BROOKLYN | — | RE-ISSUED | 12/16/2015 | 11/08/2024 | — | EQ, PL |
| B00503572 ↗ | 2224 CROPSEY AVENUE BROOKLYN | Alteration | Signed-off | 05/12/2021 | 10/31/2024 | Filer JM ZONING, LLC. | Mechanical work as per plans filed herewith. Filed in conjunction with New Building application # |
| 321600362BIS | 2224 CROPSEY AVENUE BROOKLYN | — | ISSUED | 07/31/2023 | 10/29/2024 | — | — |
| M01062582 ↗ | 160 WEST 225 STREET MANHATTAN | Alteration | Permit Issued | 06/25/2024 | 10/17/2024 | Modification of the exisiting boiler flue as a result of construction of new building next door X00633905 | |
| B00503794 ↗ | 2224 CROPSEY AVENUE BROOKLYN | Alteration | Signed-off | 07/01/2021 | 10/16/2024 | Design WSP Filer JM ZONING, LLC. | Amending Structural scope of work as per plans filed. Filed in conjunction with New Building application #321600362. |
| Q00735734 ↗ | 44-01 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 05/12/2022 | 09/18/2024 | Design KZ ENGINEERING, P.C | Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| Q01107554 ↗ | 44-01 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 09/13/2024 | 09/17/2024 | Design GGA STUDIOS, DPC | TEMPORARY USE PERMIT APPLICATION FOR LEASING OFFICE AND MODEL APARTMENT PURSUANT TO 28-111 AND BUILDING BULLETIN 2010-002 OPTION B. APPLICAT… |
| M01102681 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 09/09/2024 | 09/15/2024 | Design MARIN ARCHITECTS, P.C. | INSTALLATION OF TEMPORARY CONSTRUCTION OFFICES |
| X00657299 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 02/01/2022 | 09/13/2024 | Filer CANAS SOLUTIONS INC | APPLICATION IS HEREBY FILED FOR APPROVAL OF INSTALLATION OF MECHANICAL SYSTEMS. |
| Q00910279 ↗ | 44-01 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 08/01/2023 | 07/23/2024 | Design GGA STUDIOS, DPC Filer DOMANI CONSULTING | TEMPORARY CONSTRUCTION OFFICE IN CONJUCTIONS WITH NB # 321595449 NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00705270 ↗ | 77 KOSCIUSZKO STREET BROOKLYN | Alteration | Permit Issued | 04/01/2022 | 06/13/2024 | Design WSP | Limited foundation work as per plans filed herewith. Filed in conjunction with NB# B00680820. |
| B00705276 ↗ | 77 KOSCIUSZKO STREET BROOKLYN | Alteration | Signed-off | 03/31/2022 | 06/13/2024 | Design MRCE Owner NNRC PROPERTIES LLC Filer SPEEDY EXPEDITING INC | Limited support of excavation work as per plans filed herewith. Filed in conjunction with NB# B00680820. |
| B00705274 ↗ | 600 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 04/01/2022 | 06/11/2024 | Design WSP Owner NNRC PROPERTIES LLC Filer SPEEDY EXPEDITING INC | Limited foundation work as per plans filed herewith. Filed in conjunction with NB# 321180155. |
| B00705277 ↗ | 77 KOSCIUSZKO STREET BROOKLYN | Alteration | Signed-off | 03/31/2022 | 06/11/2024 | Design MRCE Owner NNRC PROPERTIES LLC Filer SPEEDY EXPEDITING INC | Limited support of excavation work as per plans filed herewith. Filed in conjunction with NB# 321180155. |
| 321384756BIS | 2266 CROPSEY AVENUE BROOKLYN | — | ISSUED | 01/08/2020 | 04/02/2024 | — | PL |
| B00192193 ↗ | 2266 CROPSEY AVENUE BROOKLYN | Alteration | Signed-off | 09/16/2019 | 03/18/2024 | Design KZ ENGINEERING, P.C | Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| 140602122BIS | 255 WEST 34 STREET MANHATTAN | — | ISSUED | 09/29/2017 | 03/05/2024 | — | EQ |
| B00980592 ↗ | 2224 CROPSEY AVENUE BROOKLYN | Alteration | Signed-off | 01/02/2024 | 02/20/2024 | Design H & O ENGINEERING, DPC Filer JM ZONING, LLC. | temporary contractor shed/shanty. |
| 420664169BIS | 98-36 QUEENS BOULEVARD QUEENS | — | ISSUED | 04/03/2019 | 11/20/2023 | — | PL |
| B00198867 ↗ | 2266 CROPSEY AVENUE BROOKLYN | Alteration | Signed-off | 07/25/2019 | 11/14/2023 | INSTALLATION OF EMERGENCY GENERATOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. FILED IN CONJUNCTION WITH NB #321384756 AND FUEL STORAGE #B00242… | |
| X00680369 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 03/01/2022 | 10/20/2023 | Design TITAN ENGINEERS PC Filer MARIN ARCHITECTS, P.C. | Filed herewith foundation application in conjunction with NB#X00633905 |
| X00732116 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 05/10/2022 | 10/17/2023 | Design FNA ENGINEERING SERVICES PC Filer MARIN ARCHITECTS, P.C. | FO in conjunction with NB X00633905 |
| X00677493 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 03/17/2022 | 09/06/2023 | Design FNA ENGINEERING SERVICES PC Filer MARIN ARCHITECTS, P.C. | SOE in conjunction with NB X00633905 underpinning filed underapplication X00732116-I1 |
| Q00127495 ↗ | 98-36 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 02/06/2019 | 08/23/2023 | Design SLCE ARCHITECTS Owner RB REALTY CAPITAL LLC | Application filed for temporary construction fence in conjunction with NB. |
| Q00127575 ↗ | 98-36 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 02/22/2019 | 08/23/2023 | Design PHILIP HABIB & ASSOCIATES Owner RB REALTY CAPITAL LLC | Installation of curb cut in conjunction with NB |
| Q00127566 ↗ | 98-36 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 02/22/2019 | 08/22/2023 | Design PHILIP HABIB & ASSOCIATES Owner RB REALTY CAPITAL LLC | Installation of curb cut in conjunction with NB |
| B00637210 ↗ | 218 CLARKSON AVENUE BROOKLYN | Alteration | Signed-off | 12/03/2021 | 08/21/2023 | Design SRL ASSOCIATES | Installation of temporary construction fence/plywood enclosure per plan submitted. Work shall comply with 2014 building codes chapter 33. No… |
| 321596484BIS | 218 CLARKSON AVENUE BROOKLYN | — | ISSUED | 12/16/2021 | 07/20/2023 | — | — |
| B00521837 ↗ | 2224 CROPSEY AVENUE BROOKLYN | Alteration | Signed-off | 05/25/2021 | 05/18/2023 | Design WSP Filer JM ZONING, LLC. | PROVIDE SUPPORT OF EXCAVATION WORK AS PER PLANS FILED. |
| B00286884 ↗ | 218 CLARKSON AVENUE BROOKLYN | Alteration | Signed-off | 12/26/2019 | 04/25/2023 | Respectfully requesting to amend the mechanical scope of work filed under application # B00286884 to reflect design changes in association w… | |
| X00355747 ↗ | GRAND CONCOURSE BRONX | Alteration | Signed-off | 06/19/2020 | 03/10/2023 | Design KZ ENGINEERING, P.C Owner YS BUILDERS NY INC | Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, e… |
| X00366038 ↗ | GRAND CONCOURSE BRONX | Alteration | Signed-off | 07/02/2020 | 03/10/2023 | Design KZ ENGINEERING, P.C Owner YS BUILDERS NY INC | Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| B00495800 ↗ | 124 9 STREET BROOKLYN | Alteration CO | Permit Issued | 04/09/2021 | 02/02/2023 | Design SBLM ARCHITECTS, PC | Filing for a change of use from mercantile and office to an auto dealership with accessory storage on the 1st Floor. Work includes removal a… |
| Q00623665 ↗ | 152-13 88 AVENUE QUEENS | Alteration | Permit Issued | 11/10/2021 | 12/09/2022 | Design A PLUS DESIGN INC | Install new construction fence in conjunction with NB application#420666862 |
| 220696860BIS | GRAND CONCOURSE BRONX | — | ISSUED | 12/14/2020 | 11/23/2022 | — | PL |
| 220696851BIS | GRAND CONCOURSE BRONX | — | ISSUED | 12/14/2020 | 11/22/2022 | — | PL |
| X00185756 ↗ | GRAND CONCOURSE BRONX | Alteration | Signed-off | 07/03/2019 | 11/20/2022 | Owner YS BUILDERS NY INC Filer SPEEDY EXPEDITING INC | INSTALLATION OF NEW CURB CUT IN CONJUNCTION WITH NB # 220696860. |
| X00185786 ↗ | GRAND CONCOURSE BRONX | Alteration | Signed-off | 07/03/2019 | 11/18/2022 | Owner YS BUILDERS NY INC Filer SPEEDY EXPEDITING INC | INSTALLATION OF NEW CURB CUT IN CONJUNCTION WITH NB #220696851. |
| B00620904 ↗ | 37 9 STREET BROOKLYN | Alteration CO | Permit Issued | 11/01/2021 | 10/24/2022 | Design SBLM ARCHITECTS, PC | Filing for the removal of plumbing fixtures & modifications of sprinkler at the 1st floor. No change to use, egress, or occupancy. |
| 321597795BIS | 963 ATLANTIC AVENUE BROOKLYN | — | ISSUED | 04/15/2021 | 10/07/2022 | — | — |
| B00625032 ↗ | 37 9 STREET BROOKLYN | Alteration | Signed-off | 11/08/2021 | 10/04/2022 | Design SULLIVAN GROUP DESIGN LLC | Installation of curb cut in conjunction with Alt-CO #B00620904. No change to use, egress, or occupancy. |
| 420666862BIS | 152-13 88 AVENUE QUEENS | — | ISSUED | 12/15/2021 | 10/04/2022 | — | — |
| B00242222 ↗ | 160 CLARKSON AVENUE BROOKLYN | Alteration | Signed-off | 02/03/2020 | 09/29/2022 | Design PHILIP HABIB & ASSOCIATES | PROVIDED CURB CUT FOR PROPOSED NEW BUILDING AS PER PLANS FILED IN CONJUNCTION TO NB #321594422. |
| 340736671BIS | 963 ATLANTIC AVENUE BROOKLYN | — | ISSUED | 09/15/2022 | 09/15/2022 | — | OT |
| B00226433 ↗ | 963 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 10/24/2019 | 08/18/2022 | Filer JM ZONING, LLC. | Structural Work as per filed plans. |
| B00586515 ↗ | 124 9 STREET BROOKLYN | Alteration | Signed-off | 09/21/2021 | 08/17/2022 | Design GEA CONSULTING ENGINEERS | Filing for the removal of duct work, grilles, dampers, hangers, and supports from the 1st floor. No change to use, egress, or occupancy. |
| B00650117 ↗ | 37 9 STREET BROOKLYN | Alteration | Signed-off | 02/02/2022 | 08/16/2022 | Design SILMAN | Installation of temporary wood construction fence. No change to use, egress, or occupancy. |
| B00650149 ↗ | 37 9 STREET BROOKLYN | Alteration | Signed-off | 01/03/2022 | 08/11/2022 | Design SBLM ARCHITECTS, PC | Filing for renovation of the 1st floor space. Work includes new interior non load bearing partitions, removing existing interior vault, infi… |
| B00227462 ↗ | 963 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 10/16/2019 | 08/01/2022 | Design SJC ENGINEERING PC Filer JM ZONING, LLC. | Installation of Mechanical System filed in conjunction with NB #321597795 |
| B00246316 ↗ | 963 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 11/22/2019 | 07/21/2022 | Herewith filed a 12'-0 Curb Cut located along Atlantic Avenue | |
| B00104297 ↗ | 600 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 12/24/2018 | 06/21/2022 | Design SOUTH BAY ENGINEERING PLLC | INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE FOR DEMOLITION AND NB WORK |
| B00343622 ↗ | 218 CLARKSON AVENUE BROOKLYN | Alteration | Signed-off | 05/05/2020 | 05/13/2022 | Design DEROSIER ENGINEERING, LLC | Install 17 ft. curb cut to provide access to parking garage as per plans filed. No change to use, egress or occupancy. Filed in conjunction … |
| B00286805 ↗ | 218 CLARKSON AVENUE BROOKLYN | Alteration | Signed-off | 12/30/2019 | 04/26/2022 | Design MCNAMARA SALVIA | Structural work as per plans filed. Filed in conjunction with New Building #321596484. |
| 340713179BIS | 2266 CROPSEY AVENUE BROOKLYN | — | ISSUED | 01/15/2020 | 03/24/2022 | — | OT |
| B00304513 ↗ | 963 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 02/03/2020 | 03/22/2022 | Design KZ ENGINEERING, P.C Filer JM ZONING, LLC. | Install temporary construction fence as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB#321597795 |
| B00203622 ↗ | 160 CLARKSON AVENUE BROOKLYN | Alteration | Signed-off | 10/07/2019 | 03/16/2022 | PROVIDED MECHANICAL WORK FOR PROPOSED NEW BUILDING AS PER PLANS FILED IN CONJUNCTION WITH NB #321594422. | |
| B00269240 ↗ | 160 CLARKSON AVENUE BROOKLYN | Alteration | Signed-off | 02/11/2020 | 03/16/2022 | Design KZ ENGINEERING, P.C | Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, eg… |
| 321594422BIS | 160 CLARKSON AVENUE BROOKLYN | — | ISSUED | 06/10/2020 | 03/16/2022 | — | — |
| 123690522BIS | 90 JOHN STREET MANHATTAN | — | ISSUED | 01/27/2020 | 03/02/2022 | — | OT |
| Q00326594 ↗ | 152-13 88 AVENUE QUEENS | Alteration | Permit Issued | 03/26/2020 | 02/28/2022 | Design SJC ENGINEERING PC Owner 88TH AVENUE OWNER LLC Filer JM ZONING, LLC. | Mechanical work as per plans filed |
| Q00326736 ↗ | 152-13 88 AVENUE QUEENS | Alteration | Permit Issued | 03/18/2020 | 02/25/2022 | Design WSP Owner 88TH AVENUE OWNER LLC Filer JM ZONING, LLC. | Structural work as per plans filed. |
| 340828830BIS | 262 9 STREET BROOKLYN | — | ISSUED | 02/18/2022 | 02/18/2022 | — | OT |
| 121186821BIS | 4951 CHAMBERS STREET MANHATTAN | — | ISSUED | 06/08/2016 | 02/03/2022 | — | PL |
| B00495826 ↗ | 124 9 STREET BROOKLYN | Alteration | Signed-off | 09/21/2021 | 12/17/2021 | Design SILMAN | Filing for partition openings, new concrete ramps, new concrete infills. No change to use, egress, or occupancy. |
| B00495820 ↗ | 124 9 STREET BROOKLYN | Alteration | Signed-off | 09/17/2021 | 12/16/2021 | Design SBLM ARCHITECTS, PC | Filing for interior renovation on the 1st floor. Work includes removal and installation of interior non load bearing partitions, doors, fini… |
| M00187300 ↗ | 517 WEST 29 STREET MANHATTAN | Alteration | Signed-off | 09/04/2019 | 12/15/2021 | Filer JM ZONING, LLC. | HEREWITH FILING FOR CURB CUT IN CONJUNCTION WITH NB APP 123440080 |
| 122906506BIS | 545 WEST 37 STREET MANHATTAN | — | ISSUED | 12/01/2021 | 12/15/2021 | — | EQ |
| 123893885BIS | 90 JOHN STREET MANHATTAN | — | ISSUED | 06/21/2019 | 11/19/2021 | — | MH, PL, SP |
| 123893974BIS | 90 JOHN STREET MANHATTAN | — | ISSUED | 01/27/2020 | 11/19/2021 | — | OT |
| M00513002 ↗ | 4951 CHAMBERS STREET MANHATTAN | Alteration | Signed-off | 07/21/2021 | 09/30/2021 | Design WSP | Filed herewith sidewalk vault repair as per plans filed. Filed in conjunction with Alt I #121186821. No change in occupancy, use or egress. |