Office with commercial, 7-19 stories
2226 3 AVENUE
MANHATTAN · BIN 1091722
💬 Discuss this project
2022Year Built
10Stories
O6Building Class
C4-6Zoning
133,426 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Office with commercial, 7-19 stories · Owner of record: EIK HARLEM ASSOCIATES, LLC · 18,973 sf lot · 7.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof7p · 7 filings · 20 docs
Bulkhead5p · 4 filings · 20 docs
Floor 106p · 5 filings · 20 docs
Floor 97p · 5 filings · 20 docs
Floor 85p · 5 filings · 20 docs
Floor 76p · 5 filings · 20 docs
Floor 68p · 6 filings · 20 docs
Floor 58p · 6 filings · 20 docs
Floor 46p · 4 filings · 20 docs
Floor 36p · 6 filings · 20 docs
Floor 28p · 7 filings · 20 docs
Floor 12p · 3 filings · 20 docs
Cellar7p · 7 filings · 20 docs
1 job · most recent 10/17/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/17/2023Permit IssuedCREATIVE PLUMBING INGas, Storm, Water/Sanitary
6 jobs · most recent 07/18/2022
General Wiring
FiledStatusContractorScope
07/18/2022Permit IssuedANTHONY G FERRY INCGeneral Wiring
07/18/2022CompleteJAM ELECTRICAL CORP—
04/08/2022CompleteANTHONY G FERRY INCGeneral Wiring
02/16/2022CompleteTOP SHELF ELECTRIC CORP—
05/12/2021CompleteBDS ELECTRIC CORP.—
11/01/2019Permit IssuedT.M.T ELECTRIC INCGeneral Wiring
Building Lifecycle
All (246)Filed (52)Permit Issued (40)Signed Off (21)Violation (11)Inspection (12)Objection (80)Special Inspection (30)
02/28/2025
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
05/20/2024
Signed off — Alteration
M00449450-I1
04/11/2024
Permit issued — Plumbing
M00449630-I1-PL
03/29/2024
Signed off — Alteration
INSTALL (2) 330 GALLON FUEL OIL STORAGE TO SERVE THE EMERGENCY GENERATORS AS PER PLANS FILED. FILED IN CONJUNCTION WITH NB #121209156. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00714106-S1
03/29/2024
Signed off — Alteration
BOILER WORK AS PER PLANS FILED. FILED IN CONJUNCTION WITH NB#121209156.
M00712103-I1
03/08/2024
Violation issued (ECB, closed)
Construction
11/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
11/09/2023
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
11/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
11/09/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JOHN MCMONAGLE
11/09/2023
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
11/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
11/09/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
11/02/2023
Objection resolved — Addressed
10/27/2023
Objection raised — Scope
10/25/2023
Signed off — Alteration
INSTALLATINO AND USE OF TEMPORARY WORKING PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00711815-I1
10/17/2023
Filed — Alteration
Plumbing work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with #NB 121209156.
M00449630-P4
10/02/2023
Signed off — Alteration
Install foundation as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #121209156.
M00449332-I1
10/02/2023
Signed off — Alteration
Structural work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #121209156.
M00449247-I1
09/13/2023
Signed off — Alteration
M00703124-I1
09/13/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF / OVERHEAD PROTECTION AS PER DRAWINGS AT ADJACENT PROPERTIES DURING NB CONST, FILED SEP. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00687106-I1
09/13/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SHED INSTALLED ON ROADWAY. DOT PERMITS BY OTHERS.
M00682316-I1
09/13/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00702796-I1
09/13/2023
Signed off — Alteration
INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS DURING NB CONST FILED SEP. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE INSTALLED ON RDWY. DOT PERMITS BY OTHERS.
M00589985-I1
08/14/2023
Signed off — Alteration
INSTALL (2) 330 GALLON FUEL OIL STORAGE TO SERVE THE EMERGENCY GENERATORS AS PER PLANS FILED. FILED IN CONJUNCTION WITH NB #121209156. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00714106-I1
08/14/2023
Signed off — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# 121209156.
M00461842-I1
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/25/2023
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
07/25/2023
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
07/20/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/19/2023
Filed — Alteration
M00449450-P5
07/18/2023
Permit issued — Boiler Equipment
M00714106-S1-BE
07/13/2023
Filed — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# 121209156.
M00461842-P5
07/13/2023
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/13/2023
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
07/10/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JOHN MCMONAGLE
07/06/2023
Signed off — Alteration
Install standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB#121209156.
M00530529-I1
07/06/2023
Special inspection requirement — Permanent certificate
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — Final
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — Smoke Control Systems Testing
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — Chimneys and vents
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
07/06/2023
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
06/29/2023
Filed — Alteration
INSTALL (2) 330 GALLON FUEL OIL STORAGE TO SERVE THE EMERGENCY GENERATORS AS PER PLANS FILED. FILED IN CONJUNCTION WITH NB #121209156. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00714106-S1
06/29/2023
Filed — Alteration
INSTALL (2) 330 GALLON FUEL OIL STORAGE TO SERVE THE EMERGENCY GENERATORS AS PER PLANS FILED. FILED IN CONJUNCTION WITH NB #121209156. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00714106-P2
06/28/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JOHN MCMONAGLE
06/28/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JOHN MCMONAGLE
06/22/2023
Signed off — Alteration
INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.
M00723175-I1
06/19/2023
Objection resolved — Addressed
06/16/2023
Objection raised — Other
06/12/2023
Filed — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# 121209156.
M00461842-P4
06/08/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/07/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
Latest 60 of 246 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP2807/08/2026
MOORE GROUP807/08/2026
EIK HARLEM ASSOCIATES, LLC103/22/2026
RINALDI GROUP1003/22/2026
GROUP OF NY THE RENALDI103/22/2026
CELTIC SERVICES NYC203/21/2026
KHEDOURI ASSOCIATES403/21/2026
KHEDOURI ASSOCS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.5603/21/2026
AE DESIGN SOLUTION203/21/2026
LOMBARDO BUILDING CONSULTANTS403/21/2026
A1 EXPEDITING SERVICE2403/21/2026
CELTIC SERVICES NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE SCAFFOLDING GROUPGeneral Contractor2907/08/2026
THE RINALDI GROUP OF NYGeneral Contractor1407/08/2026
CREATIVE PLUMBING INGeneral Contractor803/22/2026
METFLOW FIRE CONTROL LLCFire Protection607/08/2026
CREATIVE PLUMBING INPlumbing307/08/2026
MOORE GROUP CORPORATIONGeneral Contractor307/08/2026
SULLIVAN GROUP DESIGNGeneral Contractor203/22/2026
ARK BUILDERS CORPGeneral Contractor203/21/2026
CHAMP PLUMBING & HTG CORPPlumbing107/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8433110/17/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAB PLUMBING INC04/11/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP07/18/2023
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/15/2023
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/12/2023
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP05/12/2023
DOB NOWMechanical SystemsSigned-offTHE RINALDI GROUP OF NY05/09/2023
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP05/03/2023
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/03/2023
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP03/01/2023
DOB NOWPlumbingPermit IssuedAB PLUMBING INC02/23/2023
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP02/13/2023
DOB NOWBoiler EquipmentSigned-offCHAMP PLUMBING & HTG CORP12/22/2022
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP12/22/2022
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC11/03/2022
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC11/03/2022
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC08/08/2022
DOB NOWSupported ScaffoldSigned-offARK BUILDERS CORP07/28/2022
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP07/15/2022
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP07/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offMOORE GROUP CORPORATION07/12/2022
DOB NOWStructuralSigned-offTHE RINALDI GROUP OF NY07/12/2022
DOB NOWPlumbingPermit IssuedAB PLUMBING INC06/24/2022
DOB NOWMechanical SystemsSigned-offTHE RINALDI GROUP OF NY06/08/2022
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP05/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offMOORE GROUP CORPORATION04/29/2022
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP03/15/2022
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP03/15/2022
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC11/17/2021
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC11/17/2021
DOB NOWPlumbingPermit IssuedL&J PLG & HTG CO OF NY IN11/08/2021
DOB NOWSupport of ExcavationSigned-offTHE RINALDI GROUP OF NY10/07/2021
DOB NOWEarth WorkPermit IssuedTHE RINALDI GROUP OF NY09/27/2021
DOB NOWFoundationSigned-offTHE RINALDI GROUP OF NY09/22/2021
DOB NOWStructuralSigned-offTHE RINALDI GROUP OF NY09/20/2021
DOB NOWMechanical SystemsSigned-offTHE RINALDI GROUP OF NY09/15/2021
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP09/10/2021
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC09/01/2021
DOB NOWCurb CutPermit IssuedTHE RINALDI GROUP OF NY08/05/2021
+ 24 more permits on file
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
02/28/2025Pass-Final Fence Non-Directive 14PassView ↗
07/20/2023Pass-Final Boiler Equipment InspectionPassView ↗
06/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
06/07/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
06/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/07/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/03/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/06/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/06/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/05/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 138
DateRequirementInspectorRole
11/09/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
11/09/2023HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
11/09/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJOHN MCMONAGLEspecial
11/09/2023Maintenance informationJOHN MCMONAGLEenergy_progress
11/09/2023HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
11/09/2023Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
11/09/2023HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
07/25/2023Sprinkler SystemsJOHN MCMONAGLEspecial
07/25/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/25/2023Standpipe SystemsJOHN MCMONAGLEspecial
07/13/2023Sprinkler SystemsJOHN MCMONAGLEspecial
07/13/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/13/2023Standpipe SystemsJOHN MCMONAGLEspecial
07/10/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJOHN MCMONAGLEspecial
07/06/2023Heating SystemsJOHN MCMONAGLEspecial
07/06/2023Permanent certificateJOHN MCMONAGLEenergy_progress
07/06/2023Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
07/06/2023Shutoff dampersJOHN MCMONAGLEenergy_progress
07/06/2023HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
07/06/2023Maintenance informationJOHN MCMONAGLEenergy_progress
07/06/2023HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
07/06/2023HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
07/06/2023FinalJOHN MCMONAGLEprogress
07/06/2023Smoke Control Systems TestingJOHN MCMONAGLEspecial
07/06/2023Mechanical SystemsJOHN MCMONAGLEspecial
Latest 25 of 138.
▾Documents — 519 on file (BIS + DOB NOW)
▸Plans & Drawings59
▸DOB NOWPlans/Sketch28
09/04/2026M00476837-I1Request digital key ↗
09/04/2026M00482900-I1Request digital key ↗
09/03/2026M00518876-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Standpipe6
08/31/2026M00461842-P5Request digital key ↗
08/31/2026M00461842-P1Request digital key ↗
08/31/2026M00461842-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
08/31/2026M00449450-P3Request digital key ↗
08/31/2026M00449450-P5Request digital key ↗
08/31/2026M00449450-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
08/31/2026M00461842-P5Request digital key ↗
08/31/2026M00461842-P1Request digital key ↗
08/31/2026M00461842-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/29/2026M00449630-P2Request digital key ↗
08/29/2026M00449630-P1Request digital key ↗
08/29/2026M00449630-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Foundation2
09/03/2026M00449332-P1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Support of Excavation2
09/03/2026M00448549-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/03/2026M00449247-P1Request digital key ↗
09/03/2026M00449247-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/04/2026M00471266-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00476837-I1Request digital key ↗
▸Applications & Permits57
▸BISPLAN / WORK APPROVAL APPLICATION38
02/13/2024122442945Open ↗
09/28/2023100060292Open ↗
06/28/2023121209156Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION17
12/07/2022121209156Open ↗
09/20/2022121209156Open ↗
04/25/2022121209156Open ↗
Showing 3 of 17 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
01/20/2021140996411Open ↗
▸DOB NOWHPD - Permit Notice1
09/04/2026M00476837-I1Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/17/2021121209156Open ↗
▸BISZONING DIAGRAM1
08/26/2021121209156Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/17/2021121209156Open ↗
▸Seals & Professional Certifications211
▸DOB NOWProgress Inspector Seal & Signature68
09/23/2026M00712103-I1Open ↗
09/23/2026M00712103-I1Open ↗
09/23/2026M00712103-I1Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature64
09/23/2026M00712103-I1Open ↗
09/23/2026M00714106-I1Open ↗
09/23/2026M00714106-S1Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature52
09/04/2026M00471266-I1Open ↗
09/04/2026M00476837-I1Open ↗
09/03/2026M00449332-P1Open ↗
Showing 3 of 52 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
09/16/2021121209156Open ↗
09/16/2021121209156Open ↗
09/16/2021121209156Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
09/14/2015122509507Open ↗
07/13/2015122442945Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/14/2015122509507Open ↗
07/13/2015122442945Open ↗
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/19/2021140996411Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/20/2021140996411Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/13/2015122442945Open ↗
11/24/2014122200910Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/01/2023121209156Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
08/26/2021121209156Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/15/2015122442945Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
08/26/2021121209156Open ↗
08/19/2021140996411Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/21/2021121209156Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/19/2021140996411Open ↗
▸BISSTREET TREE SIGNOFF1
02/27/2024121209156Open ↗
▸Environmental & Asbestos38
▸DOB NOWOER: Notice to Proceed18
09/02/2026M00714106-S1Open ↗
09/02/2026M00714106-I1Open ↗
08/29/2026M00449630-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
09/02/2026M00714106-I1Open ↗
09/02/2026M00714106-S1Open ↗
Showing 2 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
02/27/2024140996411Open ↗
08/11/2023121209156Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
06/01/2021140996411Open ↗
05/17/2021121209156Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/13/2015122442945Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/04/2026M00476837-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/16/2021121209156Open ↗
09/14/2015122509507Open ↗
07/13/2015122442945Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/22/2021121209156Open ↗
08/18/2021121209156Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/14/2023121209156Open ↗
▸BISFENESTRATION AREAS1
07/14/2023121209156Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/14/2023121209156Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/07/2023121209156Open ↗
▸BISLIGHTING CONTROLS1
07/05/2023121209156Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/01/2023121209156Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX19
06/09/2022121209156Open ↗
03/18/2022121209156Open ↗
03/16/2022121209156Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY7
05/20/2022121209156Open ↗
11/22/2021121209156Open ↗
11/22/2021121209156Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/07/2023121209156Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/07/2023121209156Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
07/14/2023121209156Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/16/2021121209156Open ↗
▸DOB NOWHydrant Flow Test Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs26
▸BISSCHEDULE A - OCCUPANCY / USE14
06/28/2023121209156Open ↗
06/20/2023121209156Open ↗
04/26/2023121209156Open ↗
Showing 3 of 14 on file for this type
▸BISSUPERSEDING LETTER7
12/07/2022121209156Open ↗
04/25/2022121209156Open ↗
03/30/2022121209156Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFOUNDATION PLAN APPROVAL1
08/26/2021121209156Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT6
09/14/2015122509507Open ↗
07/13/2015122442945Open ↗
Showing 2 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
10/06/2021121209156Open ↗
09/27/2021121209156Open ↗
09/16/2021121209156Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION10
06/30/2023121209156Open ↗
05/18/2023121209156Open ↗
08/29/2022121209156Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM6
04/25/2022121209156Open ↗
04/20/2022121209156Open ↗
03/30/2022121209156Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
09/14/2015122509507Open ↗
07/13/2015122442945Open ↗
11/24/2014122200910Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/19/2021140996411Open ↗
▸Other Documents18
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
05/20/2022121209156Open ↗
05/20/2022121209156Open ↗
08/26/2021121209156Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/01/2021140996411Open ↗
▸BISVESTIBULES1
07/05/2023121209156Open ↗
▸BISMAINTENANCE INFORMATION1
08/01/2023121209156Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
08/01/2023121209156Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/23/2023121209156Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/19/2021140996411Open ↗
▸BISPLOT DIAGRAM1
05/17/2021121209156Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
04/28/2023121209156Open ↗
▸BISAIR BARRIER CONTINUITY PLAN1
07/05/2023121209156Open ↗