← Back
Office only, 2-6 stories
2236 NOSTRAND AVENUE
BROOKLYN · BIN 3206429
💬 Discuss this project
1928Year Built
2Stories
O2Building Class
C8-2Zoning
38,240 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: SHAMBHALA REALTY LLC · 19,120 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof8p · 3 filings · 20 docs
Floor 218p · 4 filings · 20 docs
Floor 118p · 5 filings · 20 docs
Cellar8p · 4 filings · 20 docs
Basement1p · 1 filing · 14 docs
7 jobs · most recent 02/20/2024
General Wiring
FiledStatusContractorScope
02/20/2024CompleteC.M. RICHEY ELEC'L CONTR3 meters, 3 new_meters
02/27/2023Permit IssuedE D ELECTRICAL INCGeneral Wiring
12/13/2022Permit IssuedALL PRO ELEC. OF N.Y. INC—
12/13/2022Permit IssuedALL PRO ELEC. OF N.Y. INC—
12/13/2022Permit IssuedJAM ELECTRICAL CORP—
07/08/2022Permit IssuedJAM ELECTRICAL CORP—
06/15/2022Permit IssuedC.M. RICHEY ELEC'L CONTRGeneral Wiring
Building Lifecycle
All (135)Filed (22)Permit Issued (13)Signed Off (13)Violation (50)Inspection (7)Special Inspection (30)
10/16/2024
Signed off — Alteration
Install new mechanical systems including roof top gas fired ac units, VRF split air conditioning systems, exhaust fans, ERV's, Associated ductwork and piping as shown on drawings filed herewith.
B00745355-I1
10/15/2024
Signed off — Alteration
B00742496-I1
10/10/2024
Signed off — Alteration
Installation of piles and foundation work as shown
B00745405-I1
10/09/2024
Signed off — Alteration
Propose to construct interior partitions, ceilings and doors for new medical office as shown on drawings filed herewith.
B00742477-I1
10/08/2024
Signed off — Alteration
Propose to remove all interior partitions, ceilings, doors as shown on drawings filed herewith.
B00742455-I1
08/12/2024
Signed off — Alteration
Install new plumbing fixtures and related piping as shown on drawings filed herewith.
B00745382-I1
07/31/2024
Signed off — Alteration
Install new sprinkler heads and related piping as shown on drawings filed herewith.
B00745387-I1
09/21/2023
Filed — Alteration
Install new mechanical systems including roof top gas fired ac units, VRF split air conditioning systems, exhaust fans, ERV's, Associated ductwork and piping as shown on drawings filed herewith.
B00745355-P1
09/19/2023
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "LOGO NEW YORK CANCER & BLOOD SPECIALISTS"
B08032683-I1
09/19/2023
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "LOGO NEW YORK CANCER & BLOOD SPECIALISTS"
B08032694-I1
09/19/2023
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "MEMORIAL MEDICAL CARE, PC A PRACTICE OF MSK PHYSICIANS MEMORIAL SLOAN KETTERING CANCER CNETER NEW YORK CANCER & BLOOK SPECIALISTS"
B00816376-I1
09/19/2023
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "MEMORIAL MEDICAL CARE, PC A PRACTICE OF MSK PHYSICIANS MEMORIAL SLOAN KETTERING CANCER CENTER"
B08032679-I1
09/19/2023
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "MEMORIAL MEDICAL CARE, PC A PRACTICE OF MSK PHYSICIANS MEMORIAL SLOAN KETTERING CANCER CENTER"
B08032689-I1
09/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
09/13/2023
Special inspection requirement — Sprinkler Systems
EDWARD TOROSSIAN
09/12/2023
Filed — Alteration
Install new sprinkler heads and related piping as shown on drawings filed herewith.
B00745387-P1
08/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
JAIME MOYA
08/16/2023
Special inspection requirement — Permanent certificate
JAIME MOYA
08/16/2023
Special inspection requirement — Maintenance information
JAIME MOYA
08/16/2023
Special inspection requirement — Duct leakage testing, insulation and design
JAIME MOYA
08/16/2023
Special inspection requirement — Ventilation and air distribution system
JAIME MOYA
08/16/2023
Special inspection requirement — Shutoff dampers
JAIME MOYA
08/16/2023
Special inspection requirement — Electrical motors and elevators
JAIME MOYA
08/16/2023
Special inspection requirement — Metering
JAIME MOYA
08/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JAIME MOYA
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAIME MOYA
08/16/2023
Special inspection requirement — Heating Systems
JAIME MOYA
08/16/2023
Special inspection requirement — Mechanical Systems
JAIME MOYA
08/16/2023
Special inspection requirement — Final
JAIME MOYA
08/16/2023
Special inspection requirement — Exterior lighting power
JAIME MOYA
08/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
JAIME MOYA
01/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
01/19/2023
Special inspection requirement — Sprinkler Systems
EDWARD TOROSSIAN
01/03/2023
Filed — Alteration
Propose to construct interior partitions, ceilings and doors for new medical office as shown on drawings filed herewith.
B00742477-P1
01/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
01/03/2023
Special inspection requirement — Interior lighting power
EDWARD TOROSSIAN
01/03/2023
Special inspection requirement — Lighting controls
EDWARD TOROSSIAN
01/03/2023
Special inspection requirement — Final
EDWARD TOROSSIAN
12/07/2022
Special inspection requirement — Lighting controls
EDWARD TOROSSIAN
12/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
12/07/2022
Special inspection requirement — Final
EDWARD TOROSSIAN
12/07/2022
Special inspection requirement — Interior lighting power
EDWARD TOROSSIAN
11/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
11/28/2022
Filed — Alteration
Install new plumbing fixtures and related piping as shown on drawings filed herewith.
B00745382-P4
11/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
11/23/2022
Filed — Alteration
Install new plumbing fixtures and related piping as shown on drawings filed herewith.
B00745382-P3
11/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
11/20/2022
Permit issued — Sign
B08032679-I1-SG
11/20/2022
Permit issued — Sign
B08032694-I1-SG
11/20/2022
Permit issued — Sign
B08032689-I1-SG
11/20/2022
Permit issued — Sign
B00816376-I1-SG
11/20/2022
Permit issued — Sign
B08032683-I1-SG
11/18/2022
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "LOGO NEW YORK CANCER & BLOOD SPECIALISTS"
B08032683-I1
11/18/2022
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "LOGO NEW YORK CANCER & BLOOD SPECIALISTS"
B08032694-I1
11/18/2022
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "MEMORIAL MEDICAL CARE, PC A PRACTICE OF MSK PHYSICIANS MEMORIAL SLOAN KETTERING CANCER CNETER NEW YORK CANCER & BLOOK SPECIALISTS"
B00816376-I1
11/18/2022
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "MEMORIAL MEDICAL CARE, PC A PRACTICE OF MSK PHYSICIANS MEMORIAL SLOAN KETTERING CANCER CENTER"
B08032679-I1
11/18/2022
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "MEMORIAL MEDICAL CARE, PC A PRACTICE OF MSK PHYSICIANS MEMORIAL SLOAN KETTERING CANCER CENTER"
B08032689-I1
11/14/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/09/2022
Filed — Alteration
Install new plumbing fixtures and related piping as shown on drawings filed herewith.
B00745382-P2
11/09/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 135 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHAMBALA REALTY LLC2203/22/2026
CANAL JEAN CO103/22/2026
POPE CONTRACTING INC103/21/2026
1040 JERICHO TPKE403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOSHI CONSULTANT909/21/2023
COMBINED RESOURCES CONSULTING & DE501/03/2023
SHAABAN ENGINEERING, LLC511/18/2022
TROLYDIA ENGINEERING PLLC306/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MBE CODE ZONING3403/21/2026
KAZAM CONSULTANTS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COOK & KRUPA LLCGeneral Contractor807/08/2026
N Y SIGN ARTScaffold507/08/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
C.M. RICHEY ELEC'L CONTRElectrical103/22/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
ROBERT COVELLOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TROLYDIA TESTING & INSPEC44221409/21/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSKANSKA BUILDING INC11/20/2022
DOB NOWSignSigned-offSKANSKA BUILDING INC11/20/2022
DOB NOWSignSigned-offSKANSKA BUILDING INC11/20/2022
DOB NOWSignSigned-offSKANSKA BUILDING INC11/20/2022
DOB NOWSignSigned-offSKANSKA BUILDING INC11/20/2022
DOB NOWGeneral ConstructionSigned-offCOOK & KRUPA LLC08/08/2022
DOB NOWMechanical SystemsSigned-offCOOK & KRUPA LLC07/21/2022
DOB NOWFoundationSigned-offCOOK & KRUPA LLC07/21/2022
DOB NOWStructuralSigned-offCOOK & KRUPA LLC07/08/2022
DOB NOWGeneral ConstructionSigned-offCOOK & KRUPA LLC06/14/2022
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC06/10/2022
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO06/10/2022
DOB NOWGeneral ConstructionSigned-offCOOK & KRUPA LLC06/07/2022
BIS—ISSUEDSIGNSTAR NYC03/21/2017
BISPLISSUEDKCM PLUMBING & HEATING CO03/24/2016
BIS—ISSUEDPAUL SIGNS, INC06/09/2015
BISPLISSUEDPRIMO PLBG & HTG INC04/02/2015
BISOTISSUEDSCHIMENTI CONSTRUCTION CO04/01/2015
BISOTISSUEDSCHIMENTI CONSTRUCTION CO04/01/2015
BISMHISSUEDSCHIMENTI CONSTRUCTION CO04/01/2015
BISPLISSUEDMILLENNIUM MECH CONT INC02/23/2015
BISSPISSUEDMETFLOW FIRE CONTROL LLC01/29/2015
BISOTISSUEDPARK PREMIUM ENTERPRISES11/26/2014
BISOTISSUEDCANAL JEAN02/23/2001
BISPLRE-ISSUEDBYPASS MECHANICAL CORP01/16/2001
BISSPISSUEDPLUMBING WORKS CORP01/10/2001
BISPLISSUEDBYPASS MECHANICAL CORP12/27/2000
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIPMENT04/19/2000
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIPMENT04/19/2000
BISOTISSUEDRAIF CONSTR CORP03/16/2000
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/14/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/26/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
09/13/2023Fire-Resistant Penetrations and JointsEDWARD TOROSSIANspecial
09/13/2023Sprinkler SystemsEDWARD TOROSSIANspecial
08/16/2023HVAC-R and service water heating equipmentJAIME MOYAenergy_progress
08/16/2023Permanent certificateJAIME MOYAenergy_progress
08/16/2023Maintenance informationJAIME MOYAenergy_progress
08/16/2023Duct leakage testing, insulation and designJAIME MOYAenergy_progress
08/16/2023Ventilation and air distribution systemJAIME MOYAenergy_progress
08/16/2023Shutoff dampersJAIME MOYAenergy_progress
08/16/2023Electrical motors and elevatorsJAIME MOYAenergy_progress
08/16/2023MeteringJAIME MOYAenergy_progress
08/16/2023HVAC-R and service water piping design and insulationJAIME MOYAenergy_progress
08/16/2023Fire-Resistant Penetrations and JointsJAIME MOYAspecial
08/16/2023Heating SystemsJAIME MOYAspecial
08/16/2023Mechanical SystemsJAIME MOYAspecial
08/16/2023FinalJAIME MOYAprogress
08/16/2023Exterior lighting powerJAIME MOYAenergy_progress
08/16/2023HVAC-R and service water heating system controlsJAIME MOYAenergy_progress
01/19/2023Fire-Resistant Penetrations and JointsEDWARD TOROSSIANspecial
01/19/2023Sprinkler SystemsEDWARD TOROSSIANspecial
01/03/2023Fire-Resistant Penetrations and JointsEDWARD TOROSSIANspecial
01/03/2023Interior lighting powerEDWARD TOROSSIANenergy_progress
01/03/2023Lighting controlsEDWARD TOROSSIANenergy_progress
01/03/2023FinalEDWARD TOROSSIANprogress
12/07/2022Lighting controlsEDWARD TOROSSIANenergy_progress
12/07/2022Fire-Resistant Penetrations and JointsEDWARD TOROSSIANspecial
Latest 25 of 45.
▾Documents — 217 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/29/2026B00742455-I1Request digital key ↗
08/29/2026B00742455-P1Request digital key ↗
08/29/2026B00742477-P1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION14
03/28/2017321474515Open ↗
12/23/2015321101188Open ↗
08/31/2015321205511Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION11
03/28/2017321474515Open ↗
04/06/2016321086613Open ↗
06/10/2015321140136Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications98
▸DOB NOWProgress Inspector Seal & Signature28
09/30/2026B08032683-I1Open ↗
09/02/2026B00816376-I1Open ↗
09/01/2026B00742477-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/29/2026B00742455-I1Open ↗
08/29/2026B00742455-P1Open ↗
08/29/2026B00745405-I1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
05/02/2017321474515Open ↗
03/28/2017321474515Open ↗
01/24/2017321086613Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
03/28/2017321474515Open ↗
12/23/2015321101188Open ↗
12/23/2015321101188Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B00742477-I1Open ↗
09/01/2026B00745355-P1Open ↗
09/01/2026B00745355-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
03/28/2017321474515Open ↗
08/31/2015321205511Open ↗
06/10/2015321140136Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/03/2009320003615Open ↗
▸BISProfessional and Owner Certification (POC3)1
04/02/2015321101188Open ↗
▸Trade Schedules & Equipment12
▸BISSELF-CERT PLUMBING NOTICE5
08/13/2015321086613Open ↗
08/13/2015321086613Open ↗
08/04/2015321101188Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
12/23/2015321101188Open ↗
04/28/2015301085279Open ↗
04/02/2015301085279Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/23/2015321101188Open ↗
▸BISEQUIPMENT USE PERMITS1
12/23/2015321101188Open ↗
▸BISSCHEDULE B - PLUMBING1
04/03/2009320003615Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
08/31/2015321205511Open ↗
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/29/2026B00742455-I1Open ↗
08/29/2026B00742455-P1Open ↗
08/29/2026B00745405-I1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/28/2017321474515Open ↗
06/30/2015321101188Open ↗
04/02/2015321101188Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/03/2009320003615Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
12/23/2015321101188Open ↗
06/23/2015321101188Open ↗
06/11/2015321101188Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026B00745355-I1Open ↗
08/13/2026B00742477-I1Open ↗
08/13/2026B00742496-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/23/2015321101188Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00745355-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
08/29/2026B00745405-S1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS3
06/10/2015321140136Open ↗
02/20/2015321086613Open ↗
04/03/2009320003615Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/02/2017321474515Open ↗
12/23/2015321101188Open ↗
07/08/2015321140136Open ↗
▸BISSUPERSEDING LETTER1
12/02/2014301050341Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
05/02/2017321474515Open ↗
03/28/2017321474515Open ↗
07/08/2015321140136Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET6
03/27/2017321474515Open ↗
08/31/2015321205511Open ↗
06/10/2015321140136Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
06/30/2015321101188Open ↗
06/29/2015321101188Open ↗