Office with commercial, 7-19 stories
224 WEST 35TH STREET
MANHATTAN · BIN 1014414
💬 Discuss this project
1924Year Built
17Stories
O6Building Class
M1-9A/R12Zoning
143,448 sfGross Floor Area
34Units
LL97 Covered0 Active Violations 2 old, status unconfirmed ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: Profile Enterprises 2 · 9,875 sf lot · 14.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsSprinkler head modification and addition in public hallways1 filing
RoofGetir UsUnder Construction2p · 3 filings · 20 docs
Floor 12HVAC unit work on multiple floors1p · 2 filings · 6 docs
Floor 11HVAC unit work on multiple floors2 filings · 6 docs
Floor 10
Floor 9
Floor 8
Floor 7Unit 7003p · 4 filings · 20 docs
Floor 6
Floor 5
Floor 4Stairway and shaft vent dampers installation1p · 1 filing · 10 docs
Floor 3HVAC unit work on multiple floors2p · 2 filings · 6 docs
Floor 2Legalize and remove illegal plumbing fixtures, 2nd floor4 filings · 14 docs
Floor 1Getir Us5p · 3 filings · 17 docs
MezzanineGetir Us5p · 3 filings · 20 docs
CellarFuel oil storage tank removalUnder Construction2 filings · 7 docs
Site & exteriorPROFILE ENTERPRISES II LLC c/o GATSBY ENTERPRISES, LLCUnder Construction4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Profile Enterprises6603/22/2026
Gatsby Enterprises1603/21/2026
Enterprises 2603/21/2026
24 Bake203/21/2026
TM Plating203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf201/22/2026
Gad Ashoori PE512/03/2025
Ronald Krigsman P.E.P.C109/18/2025
Paul Perdek, Prof. Engineering109/15/2025
LCW Engineering306/03/2025
KN3 Engineering205/20/2025
Saghari Architectural Services112/19/2024
Nta Design Group101/17/2024
Yan Engineering104/10/2023
Paknia Engineering203/30/2023
NY Building Associates303/04/2023
Abeja Engineering210/28/2021
Design Group in H&K101/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Group in H K203/21/2026
AE Design Solution603/21/2026
Site Safety BSD303/21/2026
Paknia Engineering & Architecture403/21/2026
JD Design Associates203/21/2026
Kma Designs403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & J BuildGeneral Contractor407/08/2026
J & G Construction ServicesScaffold307/04/2026
Manhattan Concretespecialty_contractor303/21/2026
Island Breeze Mechanical SRVSGeneral Contractor303/21/2026
High Quality ConstructionGeneral Contractor203/21/2026
DK BuildersGeneral Contractor204/09/2026
BT's Plumbing and HeatingPlumbing207/08/2026
DK BuildersScaffold209/01/2026
AJC Plumbing & HeatingPlumbing107/08/2026
Plumbing Plumbing & PlumbingPlumbing107/08/2026
Village P & H NYFire Protection107/08/2026
Arb ElectricElectrical103/21/2026
Wasoff Plumbing & Utility CoPlumbing107/08/2026
L J Electrical ServiceElectrical103/22/2026
Elemco Testing Co Inc DbaElectrical103/21/2026
Level Solar Inc Dba LevelElectrical103/21/2026
Torres IvanElectrical103/21/2026
Interior Building ServiceGeneral Contractor107/08/2026
Pepaj ConstructionGeneral Contractor107/08/2026
JD ArchScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LCW Engineering1103206/03/2025
Leo Y Lee Associates2481205/20/2025
NY Restoration Technology6187112/19/2024
CL Engineering6781310/31/2023
Paknia Engineering1462203/30/2023
NKM Engineering6244203/04/2023
Abeja Engineering7269110/28/2021
Design Group in H&K1363101/13/2020
Building Lifecycle
All (179)Filed (25)Permit Issued (25)Signed Off (6)Facade (FISP) (12)Violation (60)Inspection (13)Objection (8)Special Inspection (30)
09/29/2026
Permit issued — Boiler Equipment
M01233492-I1-BE
08/31/2026
Permit issued — Supported Scaffold
M01284293-I1-SF
07/02/2026
Permit issued — Sidewalk Shed
M01178201-I1-SH
04/08/2026
Permit issued — Sidewalk Shed
M01178201-I1-SH
04/07/2026
Permit issued — Suspended Scaffold
M01182268-I1-SC
04/07/2026
Permit issued — Structural
M01128202-I1-GC-CX
01/22/2026
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCC
M01178201-P1
01/07/2026
Objection raised — Scope
01/07/2026
Objection raised — Scope
01/07/2026
Objection raised — Scope
01/07/2026
Objection raised — Scope
12/20/2025
Violation issued (ECB, closed)
Construction
12/03/2025
Filed — Alteration
M01303936-I1
12/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/22/2025
Special inspection requirement — Duct leakage testing, insulation and design
10/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/16/2025
Special inspection requirement — Mechanical Systems
10/16/2025
Special inspection requirement — Final
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/30/2025
Permit issued — Boiler Equipment
M01233492-I1-BE
09/18/2025
Filed — Alteration
REMOVAL OF FUEL OIL STORAGE TANK AND ASSOCIATED PIPING .
M01233492-I1
09/17/2025
Permit issued — Supported Scaffold
M01284293-I1-SF
09/15/2025
Filed — Alteration
M01284293-I1
09/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/13/2025
Permit issued — Plumbing
M01231043-S1-PL
06/06/2025
Permit issued — General Construction
M01231043-I1-GC
06/04/2025
Permit issued — Mechanical Systems
M01231043-S2-MS
06/03/2025
Filed — Alteration
Subsequent filing for pluming installation in a bagel shop. No change to the use, egress or occupancy.
M01231043-S1
06/03/2025
Filed — Alteration
Subsequent filing for pluming installation in a bagel shop. No change to the use, egress or occupancy.
M01231043-S2
06/03/2025
Filed — Alteration
Subsequent filing for pluming installation in a bagel shop. No change to the use, egress or occupancy.
M01231043-I1
05/28/2025
Filed — Alteration
M01221751-I1
05/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
luis wong
05/23/2025
Special inspection requirement — Lighting controls
luis wong
05/23/2025
Special inspection requirement — Interior lighting power
luis wong
05/23/2025
Special inspection requirement — Energy Code Compliance Inspections
luis wong
05/23/2025
Special inspection requirement — Final
luis wong
05/23/2025
Special inspection requirement — Mechanical Systems
luis wong
05/23/2025
Special inspection requirement — Final
luis wong
05/20/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01182268-P1
04/21/2025
Permit issued — General Construction
M01128202-I1-GC-CX
03/04/2025
Permit issued — Suspended Scaffold
M01182268-I1-SC
02/26/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01182268-I1
02/19/2025
Permit issued — Sidewalk Shed
M01178201-I1-SH
02/18/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCC
M01178201-I1
12/31/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/19/2024
Filed — Alteration
M01128202-I1
11/13/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2024
Special inspection requirement — Masonry
Hamidreza Saghari
10/18/2024
Special inspection requirement — Air barrier - visual inspection
Hamidreza Saghari
10/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hamidreza Saghari
10/16/2024
Special inspection requirement — Final
Hamidreza Saghari
07/25/2024
Signed off — Alteration
M00989248-I1
06/03/2024
Violation issued (ECB, closed)
Elevators
02/12/2024
Permit issued — General Construction
M00989248-I1-GC
01/22/2024
Signed off — Alteration
REPLACE EXISTING TOILET FIXTURES IN SAME LOCATION. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
M00909519-S2
01/19/2024
Signed off — Alteration
REPLACE EXISTING TOILET FIXTURES IN SAME LOCATION. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
M00909519-I1
01/19/2024
Permit issued — General Construction
M00838006-I1-GC
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedDMT Plumbing & Heating09/29/2026
DOB NOWSupported ScaffoldPermit IssuedDK Builders08/31/2026
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services07/02/2026
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services04/08/2026
DOB NOWSuspended ScaffoldPermit IssuedRK Contracting04/07/2026
DOB NOWStructuralPermit IssuedDK Builders04/07/2026
DOB NOWBoiler EquipmentPermit IssuedDMT Plumbing & Heating09/30/2025
DOB NOWSupported ScaffoldPermit IssuedDK Builders09/17/2025
DOB NOWPlumbingSigned-offPlumbing Plumbing & Plumbing06/13/2025
DOB NOWGeneral ConstructionPermit IssuedM & J Build06/06/2025
DOB NOWMechanical SystemsPermit IssuedM & J Build06/04/2025
DOB NOWGeneral ConstructionPermit IssuedDK Builders04/21/2025
DOB NOWSuspended ScaffoldPermit IssuedRK Contracting03/04/2025
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services02/19/2025
DOB NOWGeneral ConstructionSigned-offInterior Building Service02/12/2024
DOB NOWGeneral ConstructionPermit IssuedHigh Quality Construction01/19/2024
DOB NOWPlumbingPermit IssuedWasoff Plumbing & Utility Co01/18/2024
DOB NOWPlumbingSigned-offBT's Plumbing and Heating01/05/2024
DOB NOWPlumbingSigned-offBT's Plumbing and Heating09/25/2023
DOB NOWGeneral ConstructionSigned-offPepaj Construction09/11/2023
DOB NOWSprinklersSigned-offVillage P & H NY02/13/2023
DOB NOWPlumbingSigned-offAJC Plumbing & Heating11/05/2021
DOB NOWGeneral ConstructionPermit IssuedManhattan Concrete11/04/2021
DOB NOWMechanical SystemsSigned-offIsland Breeze Mechanical SRVS01/30/2020
DOB NOWConstruction FencePermit IssuedJD Arch10/09/2018
BISPLISSUEDSenid PL & Heating11/05/2021
BISPLISSUEDSenid PL & Heating11/10/2020
BISOTISSUEDAntis Contracting06/10/2020
BISOTISSUEDAntis Contracting03/16/2020
BISMHISSUEDAdvance Mechanical02/14/2020
BISSPISSUEDWNW & Sons Plumbing & Heating01/16/2020
BISPLISSUEDSenid PL & Heating11/13/2019
BISOTISSUEDMarcos General Contractor06/24/2019
BISOTISSUEDPepaj Construction04/01/2019
BISOTISSUEDPepaj Construction02/15/2019
BISPLISSUEDSo Plumbing & Heating01/07/2019
BISFPISSUEDMetflow Fire Control11/07/2018
BISOTISSUEDJD Arch10/05/2018
BISPLISSUEDSenid PL & Heating09/13/2018
BISPLISSUEDHenry Myers P & H04/24/2018
+ 35 more permits on file
1 project · most recent 06/03/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2025Permit IssuedM & J BuildVentilation Systems
Ventilation
Canarm 212 1,808 CFM · Kitchen Exhaust ×4
Captiveaire USBI24DD-RM-S 4,800 CFM · Kitchen Exhaust ×4
2 projects · most recent 06/03/2025
Water/Sanitary Gas
FiledStatusContractorScope
06/03/2025Signed-offPlumbing Plumbing & PlumbingWater/Sanitary
10/28/2021Signed-offAJC Plumbing & HeatingGas, Water/Sanitary
6 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedFirst Star ElectricGeneral Wiring
02/19/2025Permit IssuedRichard Neu—
02/24/2024Permit IssuedEric & NG ElectricalGeneral Wiring
12/04/2023Permit IssuedL J Electrical ServiceGeneral Wiring
02/10/2023Permit IssuedOmd Electrical5 meters, 1 new_meters
06/12/2019Permit IssuedL J Electrical ServiceGeneral Wiring
1 project · most recent 01/22/2026
Sidewalk Shed
FiledStatusContractorScope
01/22/2026Permit IssuedJ & G Construction ServicesSidewalk Shed
1 project · most recent 05/20/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
05/20/2025Permit IssuedDK BuildersSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/31/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/10/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
10/22/2025HVAC-R and service water heating system controls—energy_progress
10/22/2025Duct leakage testing, insulation and design—energy_progress
10/22/2025HVAC-R and service water piping design and insulation—energy_progress
10/22/2025HVAC-R and service water heating equipment—energy_progress
10/22/2025Fire-Resistant Penetrations and Joints—special
10/16/2025Mechanical Systems—special
10/16/2025Final—progress
05/23/2025Fire-Resistant Penetrations and Jointsluis wongspecial
05/23/2025Lighting controlsluis wongenergy_progress
05/23/2025Interior lighting powerluis wongenergy_progress
05/23/2025Energy Code Compliance Inspectionsluis wongprogress
05/23/2025Finalluis wongprogress
05/23/2025Mechanical Systemsluis wongspecial
05/23/2025Finalluis wongprogress
10/18/2024MasonryHamidreza Sagharispecial
10/18/2024Air barrier - visual inspectionHamidreza Sagharienergy_progress
10/17/2024Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
10/16/2024FinalHamidreza Saghariprogress
01/11/2024FinalNicholas Tjartjalisprogress
07/25/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/25/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/25/2023FinalCHRISTIAN LOZADAprogress
04/04/2023Sprinkler SystemsEdouard Pakniaspecial
04/04/2023Post-installed AnchorsEdouard Pakniaspecial
03/27/2023Sprinkler SystemsEdouard Pakniaspecial
Latest 25 of 36.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Getir UsOfficeFloor 1, Mezzanine
Project M00617597 Alteration · Permit Entire · 10/28/2021
Project M00617592 Alteration · Permit Entire · 10/27/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 694 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch26
09/06/2026M00079232-I1Request digital key ↗
09/03/2026M00617592-P1Request digital key ↗
09/03/2026M00617592-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00293188-I1Request digital key ↗
▸Applications & Permits154
▸BISPLAN / WORK APPROVAL APPLICATION84
07/21/2022122049746Open ↗
07/12/2022122049746Open ↗
03/25/2020123688385Open ↗
Showing 3 of 84 on file for this type
▸BISWORK PERMIT APPLICATION70
03/14/2020140891211Open ↗
02/19/2020123369942Open ↗
01/16/2020123688385Open ↗
Showing 3 of 70 on file for this type
▸Seals & Professional Certifications160
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
03/02/2020123688385Open ↗
01/03/2020123517337Open ↗
12/26/2019123517337Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/05/2026M00293188-I1Open ↗
09/03/2026M00617592-I1Open ↗
09/03/2026M00617597-I1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT22
03/14/2020140891211Open ↗
07/01/2019123688385Open ↗
06/17/2019123835813Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
09/06/2019123835813Open ↗
07/01/2019123688385Open ↗
06/17/2019123835813Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026M00909519-I1Open ↗
09/01/2026M00989248-I1Open ↗
09/01/2026M00617592-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/18/2026M00909519-S1Open ↗
09/23/2026M00909519-I1Open ↗
09/02/2026M00617597-P1Open ↗
Showing 3 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
03/14/2020140891211Open ↗
08/15/2017140674198Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
03/14/2020140891211Open ↗
08/15/2017140674198Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment54
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE27
07/01/2019123688385Open ↗
06/17/2019123835813Open ↗
04/04/2019123517337Open ↗
Showing 3 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING12
07/12/2022122049746Open ↗
Showing 1 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
11/22/2019123835813Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
11/22/2019123835813Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
04/22/2019123495789Open ↗
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes7
07/01/2019123688385Open ↗
06/17/2019123835813Open ↗
09/20/2018123517337Open ↗
Showing 3 of 7 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist3
09/05/2026M00293188-I1Open ↗
08/15/2026M00733214-I1Open ↗
08/13/2026M00733214-P1Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of No Harassment1
08/13/2026M01231043-I1Open ↗
▸Environmental & Asbestos50
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/05/2026M00293188-I1Open ↗
09/03/2026M00617592-I1Open ↗
09/03/2026M00617597-I1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
03/14/2020140891211Open ↗
07/22/2019123688385Open ↗
09/20/2018123517337Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/17/2019123835813Open ↗
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
10/18/2019123835813Open ↗
10/18/2019123835813Open ↗
06/17/2019123835813Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
11/03/2022122049746Open ↗
03/14/2020140891211Open ↗
08/15/2017140674198Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/23/2019123517337Open ↗
10/18/2019123835813Open ↗
02/08/2018140674198Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
03/14/2020140891211Open ↗
08/15/2017140674198Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/03/2022122049746Open ↗
08/21/2020123369942Open ↗
▸BISNYCECC ANALYSIS2
03/14/2020140891211Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
08/21/2020123369942Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY8
11/03/2022122049746Open ↗
03/14/2020140891211Open ↗
08/15/2017140674198Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
11/04/2022122049746Open ↗
07/02/2020123688385Open ↗
12/23/2019123517337Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL9
03/14/2020140891211Open ↗
10/05/2018123517337Open ↗
09/17/2018123547723Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
07/22/2019123688385Open ↗
06/17/2019123835813Open ↗
02/08/2018140674198Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER5
02/19/2019123547723Open ↗
05/22/2018104738697Open ↗
08/28/2017104738697Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTransit Authority Approval2
08/13/2026M01128202-I1Open ↗
08/13/2026M00079232-I1Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership45
▸BISCOST AFFIDAVIT44
07/02/2020123688385Open ↗
03/14/2020140891211Open ↗
12/23/2019123517337Open ↗
Showing 3 of 44 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/03/2022122049746Open ↗
▸Filing & Intake Forms77
▸BISADDITIONAL INFORMATION29
07/21/2022122049746Open ↗
09/27/2019123835813Open ↗
02/21/2019123517337Open ↗
Showing 3 of 29 on file for this type
▸BISEFILING COVER SHEET28
07/01/2019123688385Open ↗
06/17/2019123835813Open ↗
06/17/2019123835813Open ↗
Showing 3 of 28 on file for this type
▸BISBOROUGH INTAKE FORM13
03/25/2020123688385Open ↗
03/24/2020123688385Open ↗
01/03/2020123517337Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
03/14/2020140891211Open ↗
08/15/2017140674198Open ↗
Showing 2 of 7 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWCalculations2
08/13/2026M01182268-P1Open ↗
08/13/2026M01182268-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01182268-I1Open ↗
08/13/2026M01182268-P1Open ↗
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01128202-I1Open ↗