← Back
BuildNYC
Office with commercial, 7-19 stories
Cambria Hotel
224 WEST 47TH STREET · Name © OpenStreetMap contributors · BIN 1024743
💬 Discuss this project
1923Year Built
10Stories
O6Building Class
C6-7TZoning
33,659 sfGross Floor Area
23Units
LL97 Covered8 Active Violations 2 unresolved · 6 paperwork only 6 likely answered 10 old, status unconfirmed ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 226 Realty L.L.C. C/O · 3,300 sf lot · 10.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsCambria Hotels & Suites7 filings
RoofEmergency generator work2p · 3 filings · 3 docs
CellarGk West 47th LLCUnder Construction2 filings
Site & exteriorGk West 47th LLC5 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GK West 47th7208/29/2026
226 Realty5803/22/2026
JMW Builders307/08/2026
226 West 47th St103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants303/21/2026
AE Design Solution1603/21/2026
Gene Kaufman Architect803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold3607/08/2026
Omnibuild ConstructionGeneral Contractor1307/08/2026
HF Group Plumbing & SpnklerFire Protection1207/08/2026
M & A ProjectsScaffold203/21/2026
Vanquish GroupScaffold203/21/2026
Service Sign Erectors CoSign hanger207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Trolydia Testing & Inspec4422804/09/2026
McHenery Testing Lab9181103/05/2025
KZ Engineering4665208/20/2024
Geodesign627210/03/2022
WSP USA1848210/03/2022
Building Lifecycle
All (217)Filed (23)Permit Issued (49)Signed Off (11)Facade (FISP) (16)Violation (60)Inspection (6)Objection (28)Special Inspection (24)
09/25/2026
Violation issued (ECB, open)
Construction
08/27/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/16/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01152906-I1
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00781092-I1
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00707980-I1
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00707979-I1
05/28/2026
Signed off — Alteration
M00706853-I1
05/27/2026
Signed off — Alteration
HEREBY FILING FOR A TEMPORARY STANDPIPE ALARM SYSTEM AS PER LOCAL LAW 63&64 OF 2009 FOR EXISTING 11 STORY BUILDING DURING CONSTRUCTION. THIS APPLICATION IS FILED IN CONJUCTION WITH ALT1# 122106318
M00608534-I1
05/27/2026
Signed off — Alteration
HEREBY FILING FOR INSTALLATION OF NEW SPRINKLER/STANDPIPE SYSTEM. FILED IN CONJUNCTION WITH ALT1 #122106318
M00350105-I1
05/27/2026
Signed off — Alteration
M01132538-I1
05/27/2026
Signed off — Alteration
M01135834-I1
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAIME MOYA
04/21/2026
Special inspection requirement — Standpipe Systems
JAIME MOYA
04/21/2026
Special inspection requirement — Sprinkler Systems
JAIME MOYA
04/09/2026
Filed — Alteration
HEREBY FILING FOR INSTALLATION OF NEW SPRINKLER/STANDPIPE SYSTEM. FILED IN CONJUNCTION WITH ALT1 #122106318
M00350105-P2
04/09/2026
Permit issued — Mechanical Systems
M01132538-I1-MS
03/11/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/06/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/04/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2025
Permit issued — Standpipe
M00350105-I1-EW-SP
10/30/2025
Cycle 9 facade report signed — SAFE
10/15/2025
Signed off — Alteration
M00614803-I1
10/08/2025
Permit issued — Sign
M01110304-I1-SG
10/08/2025
Objection resolved — Addressed
10/01/2025
Objection raised — Admin
09/29/2025
Filed — Alteration
HEREBY FILING FOR INSTALLATION OF NEW SPRINKLER/STANDPIPE SYSTEM. FILED IN CONJUNCTION WITH ALT1 #122106318
M00350105-P1
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAIME MOYA
09/29/2025
Special inspection requirement — Standpipe Systems
JAIME MOYA
09/29/2025
Special inspection requirement — Sprinkler Systems
JAIME MOYA
09/08/2025
Cycle 9 facade report submitted
09/02/2025
Cycle 9 facade inspection completed
07/28/2025
Permit issued — General Construction
M00581212-I1-GC
07/01/2025
Signed off — Alteration
M01038212-I1
05/09/2025
Permit issued — Suspended Scaffold
M01038212-I1-SC
04/08/2025
Permit issued — Mechanical Systems
M01132538-I1-MS
04/07/2025
Permit issued — Standpipe
M00608534-I1-EW-SD
04/04/2025
Permit issued — Boiler Equipment
M01135834-I1-BE
03/27/2025
Permit issued — Sidewalk Shed
M00707979-I1-SH
03/13/2025
Permit issued — Protection and Mechanical Methods
M00707980-I1-PM
03/07/2025
Permit issued — Construction Fence
M00706853-I1-FN
03/07/2025
Permit issued — Sprinklers
M00350105-I1-EW-SD
03/07/2025
Permit issued — Suspended Scaffold
M01190668-I1-SC
03/05/2025
Filed — Alteration
Installation of one man bucket for facade repair.
M01190668-I1
03/05/2025
Special inspection requirement — Post-installed Anchors
TREVOR O. FLOWERS
12/12/2024
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01152906-I1
12/12/2024
Permit issued — Supported Scaffold
M01152906-I1-SF
11/13/2024
Filed — Alteration
M01132538-I1
11/07/2024
Filed — Alteration
M01135834-I1
11/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD TOROSSIAN
11/04/2024
Permit issued — Supported Scaffold
M08041720-I1-SF
10/31/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
EDWARD TOROSSIAN
10/03/2024
Cycle 9 facade report submitted
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2024
Permit issued — Sign
M01110304-I1-SG
09/13/2024
Filed — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
M01110304-I1
09/13/2024
Cycle 9 facade report signed — UNSAFE
08/26/2024
Permit issued — Suspended Scaffold
M01038212-P1-SC
Latest 60 of 217 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offOmnibuild Construction04/09/2026
DOB NOWSprinklersSigned-offHF Group Plumbing & Spnkler10/31/2025
DOB NOWSignPermit IssuedService Sign Erectors Co10/08/2025
DOB NOWGeneral ConstructionPermit IssuedOmnibuild Construction07/28/2025
DOB NOWSuspended ScaffoldSigned-offM & A Projects05/09/2025
DOB NOWMechanical SystemsSigned-offOmnibuild Construction04/08/2025
DOB NOWStandpipeSigned-offHF Group Plumbing & Spnkler04/07/2025
DOB NOWBoiler EquipmentSigned-offAmerican Boiler & Welding04/04/2025
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems03/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems03/13/2025
DOB NOWConstruction FenceSigned-offCore Scaffold Systems03/07/2025
DOB NOWStandpipeSigned-offHF Group Plumbing & Spnkler03/07/2025
DOB NOWSuspended ScaffoldPermit IssuedRegal Construction Group03/07/2025
DOB NOWSupported ScaffoldSigned-offM & A Projects12/12/2024
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems11/04/2024
DOB NOWSignPermit IssuedService Sign Erectors Co09/17/2024
DOB NOWSuspended ScaffoldPermit IssuedM & A Projects08/26/2024
DOB NOWSprinklersSigned-offHF Group Plumbing & Spnkler08/19/2024
DOB NOWGeneral ConstructionPermit IssuedOmnibuild Construction08/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/24/2024
DOB NOWSprinklersSigned-offHF Group Plumbing & Spnkler07/22/2024
DOB NOWSprinklersSigned-offHF Group Plumbing & Spnkler07/01/2024
DOB NOWStructuralSigned-offOmnibuild Construction06/27/2024
DOB NOWSuspended ScaffoldSigned-offM & A Projects05/01/2024
DOB NOWStandpipeSigned-offHF Group Plumbing & Spnkler04/08/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems03/28/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems03/19/2024
DOB NOWConstruction FenceSigned-offCore Scaffold Systems03/15/2024
DOB NOWStandpipeSigned-offHF Group Plumbing & Spnkler03/07/2024
DOB NOWStandpipeSigned-offHF Group Plumbing & Spnkler03/07/2024
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems11/13/2023
DOB NOWGeneral ConstructionPermit IssuedOmnibuild Construction08/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/31/2023
DOB NOWStructuralSigned-offOmnibuild Construction07/07/2023
DOB NOWSprinklersSigned-offHF Group Plumbing & Spnkler06/28/2023
DOB NOWFoundationPermit IssuedOmnibuild Construction06/08/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems04/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems03/29/2023
DOB NOWConstruction FenceSigned-offCore Scaffold Systems03/24/2023
DOB NOWStandpipeSigned-offHF Group Plumbing & Spnkler03/09/2023
+ 59 more permits on file
1 project · most recent 04/09/2026
FiledStatusContractorScope
04/09/2026Signed-offHF Group Plumbing & Spnkler608 heads, 1 outlets
1 project · most recent 04/09/2026
FiledStatusContractorScope
04/09/2026———
7 projects · most recent 03/05/2025
General Wiring
FiledStatusContractorScope
03/05/2025Permit IssuedJam Electrical—
01/12/2024Permit IssuedSigma ElectricGeneral Wiring
10/09/2023Permit IssuedSigma Electric1 meters, 1 new_meters
04/11/2023Permit IssuedSigma ElectricGeneral Wiring
07/05/2022CompleteSolas Electrical—
04/03/2022CompleteV. Vass Electric—
01/04/2022Permit IssuedRight Away Electric—
1 project · most recent 12/12/2024
Scaffold
FiledStatusContractorScope
12/12/2024Signed-offM & A ProjectsScaffold
1 project · most recent 03/05/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/05/2025Permit IssuedRegal Construction GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/11/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/04/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/14/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/21/2026Fire-Resistant Penetrations and JointsJAIME MOYAspecial
04/21/2026Standpipe SystemsJAIME MOYAspecial
04/21/2026Sprinkler SystemsJAIME MOYAspecial
09/29/2025Fire-Resistant Penetrations and JointsJAIME MOYAspecial
09/29/2025Standpipe SystemsJAIME MOYAspecial
09/29/2025Sprinkler SystemsJAIME MOYAspecial
03/05/2025Post-installed AnchorsTREVOR O. FLOWERSspecial
11/07/2024Fire-Resistant Penetrations and JointsEDWARD TOROSSIANspecial
10/31/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsEDWARD TOROSSIANspecial
08/26/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/26/2024Post-installed AnchorsKarol Zdancewiczspecial
08/20/2024Post-installed AnchorsKarol Zdancewiczspecial
08/20/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
05/18/2022Structural Stability – Alterations of existing buildingsEDWARD TOROSSIANspecial
10/19/2021MasonryEDWARD TOROSSIANspecial
10/19/2021Post-installed AnchorsEDWARD TOROSSIANspecial
10/19/2021Sprayed fire-resistant materialsEDWARD TOROSSIANspecial
10/19/2021Structural Steel - DetailsEDWARD TOROSSIANspecial
10/19/2021Structural Steel - WeldingEDWARD TOROSSIANspecial
10/19/2021Subgrade InspectionsEDWARD TOROSSIANspecial
10/19/2021Wall Panels, Curtain Walls, and VeneersEDWARD TOROSSIANspecial
10/19/2021FinalEDWARD TOROSSIANprogress
10/19/2021Concrete - Cast-In-PlaceSILVIAN MARCUSspecial
10/08/2021Standpipe SystemsJAIME MOYAspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Cambria Hotels & SuitesHotel / Lodging—
Project M00350105 Alteration · LOC Issued · 03/17/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 376 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch20
09/03/2026M00581212-I1Request digital key ↗
09/03/2026M00608534-I1Request digital key ↗
09/02/2026M00706853-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/21/2026M00350105-I1Request digital key ↗
08/21/2026M00350105-P1Request digital key ↗
08/21/2026M00350105-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/21/2026M00350105-I1Request digital key ↗
08/21/2026M00350105-P1Request digital key ↗
08/21/2026M00350105-P2Request digital key ↗
▸Applications & Permits91
▸BISPLAN / WORK APPROVAL APPLICATION66
01/29/2026122106318Open ↗
12/18/2025122140717Open ↗
11/25/2025122106318Open ↗
Showing 3 of 66 on file for this type
▸BISWORK PERMIT APPLICATION23
12/10/2025141028787Open ↗
12/02/2025141028787Open ↗
12/21/2023122106318Open ↗
Showing 3 of 23 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/08/2025122106318Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM3
07/13/2021122106318Open ↗
11/24/2020122106318Open ↗
08/16/2016122106318Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/24/2020122106318Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/24/2020122106318Open ↗
▸BISZONING RESOLUTION DETERMINATION1
05/08/2020122106318Open ↗
▸Seals & Professional Certifications65
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/03/2026M00581212-I1Open ↗
09/02/2026M00706853-I1Open ↗
09/02/2026M00707979-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026M01135834-I1Open ↗
09/23/2026M01135834-I1Open ↗
09/01/2026M00350105-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
04/07/2017140403695Open ↗
11/07/2016122745048Open ↗
11/07/2016122745048Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/22/2025141028787Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/22/2025141028787Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/22/2025141028787Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00614803-I1Open ↗
08/28/2026M01110304-I1Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING9
11/25/2025122106318Open ↗
11/18/2025122106318Open ↗
05/01/2025122106318Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/07/2016122745048Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/13/2021122106318Open ↗
▸BISSITE SAFETY PLAN: BEST APPROVAL REQUIRED1
11/23/2021122106318Open ↗
▸BISTenant Protection Plan and Notes1
11/07/2016122745048Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/25/2026M01135834-I1Open ↗
08/25/2026M01132538-I1Open ↗
08/13/2026M00614803-I1Open ↗
▸BISASBESTOS: EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
05/24/2024122106318Open ↗
05/24/2024122106318Open ↗
11/08/2021122106318Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/15/2016122745048Open ↗
Showing 1 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
11/24/2025122668595Open ↗
11/24/2025122140691Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/29/2025122668595Open ↗
10/29/2025122140691Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERIOR LIGHTING POWER1
12/10/2025141028787Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/22/2025141028787Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY9
11/24/2025122106318Open ↗
10/29/2025122668595Open ↗
10/29/2025122140691Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
11/20/2025122106318Open ↗
11/20/2025122106318Open ↗
11/07/2016122745048Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
08/31/2023122106318Open ↗
11/07/2016122745048Open ↗
▸BISMASONRY1
11/24/2025122668595Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/07/2025122106318Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/07/2016122745048Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
11/07/2016122745048Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M00766060-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026M00766060-I1Open ↗
▸Approvals, Objections & Sign-offs40
▸BISSCHEDULE A - OCCUPANCY / USE15
11/20/2025122106318Open ↗
11/12/2025122106318Open ↗
06/06/2025122106318Open ↗
Showing 3 of 15 on file for this type
▸BISSHED LETTER9
08/19/2021140403819Open ↗
08/19/2021140403819Open ↗
08/21/2020140403819Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/15/2025122106318Open ↗
08/19/2021140403819Open ↗
08/23/2019140403819Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
12/17/2025122668595Open ↗
03/20/2023140403819Open ↗
04/07/2017140403695Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFINAL3
12/10/2025141028787Open ↗
11/24/2025122668595Open ↗
11/24/2025122140691Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT14
07/18/2020122140691Open ↗
07/18/2020122140691Open ↗
03/11/2020122106318Open ↗
Showing 3 of 14 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
10/27/2021122106318Open ↗
10/21/2021122106318Open ↗
12/07/2016122745048Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
11/10/2025122140691Open ↗
11/10/2025122668595Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
11/07/2016122745048Open ↗
▸Filing & Intake Forms38
▸BISADDITIONAL INFORMATION19
02/04/2026122106318Open ↗
12/08/2025122106318Open ↗
10/22/2025122106318Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET12
06/15/2016122745048Open ↗
06/15/2016122745048Open ↗
Showing 2 of 12 on file for this type
▸BISBOROUGH INTAKE FORM4
08/19/2021140403819Open ↗
08/21/2020140403819Open ↗
01/22/2019122106318Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/22/2025141028787Open ↗
Showing 1 of 3 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
03/20/2023140403819Open ↗
08/21/2020140403819Open ↗
08/21/2020140403819Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026M01190668-I1Open ↗
08/13/2026M01038212-P1Open ↗
08/13/2026M01038212-I1Open ↗
▸DOB NOWCalculations3
08/13/2026M01038212-P1Open ↗
08/13/2026M01190668-I1Open ↗
08/13/2026M01038212-I1Open ↗
▸BISSupporting Document: Fee Exempt2
11/07/2016122745048Open ↗
11/07/2016122745048Open ↗
▸DOB NOWStructural Peer Review Report2
08/13/2026M00766060-I1Open ↗
08/13/2026M00614803-I1Open ↗
▸BISPLOT DIAGRAM1
11/24/2020122106318Open ↗