Residential, converted (23 apartments per DOB filing)
225 25TH STREET
BROOKLYN · BIN 3009588
💬 Discuss this project
1931Year Built
3Stories
N2Building Class
M1-1DZoning
57,224 sfGross Floor Area
23Units
LL97 Covered0 Active Violations
Residential, converted (23 apartments per DOB filing) · Owner of record: 25th Street Owner · 29,048 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofEmergency generator installation94p · 7 filings · 20 docs
BulkheadEmergency generator and sprinkler system1p · 1 filing · 2 docs
Floor 3Emergency generator installation92p · 6 filings · 20 docs
Floor 2Emergency generator installation88p · 6 filings · 20 docs
Floor 1Curb cut installation94p · 9 filings · 20 docs
CellarEmergency generator installation87p · 6 filings · 20 docs
Site & exteriorEmergency generator installation64p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Virta Realty203/21/2026
25th Street Owner103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/01/2024$16.4M—ROYAL INDUSTRIES INTERNATIONAL, INC. → 25TH STREET OWNER LLC$286/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Core Consultants NYC803/21/2026
Select Type403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Liberty One ConstructionGeneral Contractor1007/08/2026
MNK EnterprisesScaffold303/21/2026
P.H. WorksPlumbing207/08/2026
Liberty One ConstructionScaffold204/09/2026
F.S. WorksFire Protection207/08/2026
Solas ElectricalElectrical103/22/2026
MNK Enterprises NYScaffold104/09/2026
U&Z ConstructionScaffold104/09/2026
GWT EnterprisesScaffold104/09/2026
Alef Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Miltiadis Leptourgos, PE5081803/02/2026
Building Lifecycle
All (165)Filed (25)Permit Issued (18)Signed Off (11)Violation (42)Inspection (11)Objection (28)Special Inspection (30)
07/06/2026
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES FROM CELLAR TO 3RD FLOOR AS PER PLANS. MODIFY EXISTING PLUMBING SYSTEM & LAYOUT. OBTAIN PL PERMIT. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE JOB # B01027795, ALT CO (GC) BY JONATHAN IMANI, RA (IMC ARCHITECTURE).
B01078209-I1
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
03/27/2026
Special inspection requirement — Lighting controls
Miltiadis Leptourgos
03/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Miltiadis Leptourgos
03/27/2026
Special inspection requirement — Permanent certificate
Miltiadis Leptourgos
03/27/2026
Special inspection requirement — Interior lighting power
Miltiadis Leptourgos
03/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
03/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Miltiadis Leptourgos
03/27/2026
Special inspection requirement — Exterior lighting power
Miltiadis Leptourgos
03/25/2026
Objection resolved — Addressed
03/24/2026
Objection raised — Other
03/02/2026
Filed — Alteration CO
APPLICATION FILED TO CONVERT EXISTING MANUFACTURING BUILDING INTO A TRANSIENT LODGING HOUSE WITH SLEEPING ACCOMMODATIONS, AND OFFICES AS SHOWN ON PLANS
B01027795-P4
01/29/2026
Signed off — Alteration
INSTALL NEW MECHANICAL SYSTEM (HVAC) THROUGHOUT THE BUILDING AS PER ATTACHED PLANS. OBTAIN MS PERMIT. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE JOB # B01027795-I1 Alteration CO (OT/GC) BY JONATHAN IMANI, RA. (IMC ARCHITECTURE) NO CHANGE IN USE
B01078279-I1
01/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — Mechanical Systems
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — Final
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — Maintenance information
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — Ventilation and air distribution system
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — Shutoff dampers
Miltiadis Leptourgos
01/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Miltiadis Leptourgos
01/19/2026
Filed — Alteration
INSTALL NEW MECHANICAL SYSTEM (HVAC) THROUGHOUT THE BUILDING AS PER ATTACHED PLANS. OBTAIN MS PERMIT. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE JOB # B01027795-I1 Alteration CO (OT/GC) BY JONATHAN IMANI, RA. (IMC ARCHITECTURE) NO CHANGE IN USE
B01078279-P1
12/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Miltiadis Leptourgos
12/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Miltiadis Leptourgos
12/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
12/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Miltiadis Leptourgos
12/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
12/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Miltiadis Leptourgos
12/24/2025
Special inspection requirement — Mechanical Systems
Miltiadis Leptourgos
12/24/2025
Special inspection requirement — Final
Miltiadis Leptourgos
12/24/2025
Special inspection requirement — Duct leakage testing, insulation and design
Miltiadis Leptourgos
12/24/2025
Special inspection requirement — Maintenance information
Miltiadis Leptourgos
11/21/2025
Signed off — Alteration
B01078288-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF 12FT CURB CUT SUPERSEEDING PERMIT FILED UNDER #300770672.
B01279040-I1
11/10/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/30/2025
Permit issued — Curb Cut
B01279040-I1-CC
10/21/2025
Objection resolved — Addressed
10/03/2025
Permit issued — Plumbing
B01078209-I1-PL
10/01/2025
Objection resolved — Addressed
10/01/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Other
09/26/2025
Objection raised — Admin
09/17/2025
Objection resolved — Addressed
09/16/2025
Objection raised — Scope
09/16/2025
Objection raised — Scope
09/10/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES FROM CELLAR TO 3RD FLOOR AS PER PLANS. MODIFY EXISTING PLUMBING SYSTEM & LAYOUT. OBTAIN PL PERMIT. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE JOB # B01027795, ALT CO (GC) BY JONATHAN IMANI, RA (IMC ARCHITECTURE).
B01078209-P5
09/02/2025
Filed — Alteration CO
APPLICATION FILED TO CONVERT EXISTING MANUFACTURING BUILDING INTO A TRANSIENT LODGING HOUSE WITH SLEEPING ACCOMMODATIONS, AND OFFICES AS SHOWN ON PLANS
B01027795-P3
08/29/2025
Filed — Alteration
PROPOSED INSTALLATION OF 12FT CURB CUT SUPERSEEDING PERMIT FILED UNDER #300770672.
B01279040-I1
08/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2025
Objection raised — Other
07/31/2025
Objection resolved — Addressed
07/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/23/2025
Signed off — Alteration
CONSTRUCTION FENCE IN CONJUCTION WITH ALT-CO # B01027795-i1
B01034186-I1
07/23/2025
Signed off — Alteration
MODIFY EXISTING SPRINKLER SYSTEM FROM CELLAR TO 3RD FLOOR TO PROVIDE SPRINKLER/STANDPIPE SYSTEM, AS PER ATTACHED PLANS. OBTAIN SP AND SD PERMITS. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE JOB B01027795-I1 Alteration CO (OT/GC) BY
B01078278-I1
07/16/2025
Filed — No Work
B01064465-P1
Latest 60 of 165 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offLiberty One Construction10/30/2025
DOB NOWPlumbingSigned-offP.H. Works10/03/2025
DOB NOWMechanical SystemsSigned-offLiberty One Construction05/21/2025
DOB NOWMechanical SystemsSigned-offLiberty One Construction05/20/2025
DOB NOWGeneral ConstructionPermit IssuedLiberty One Construction05/09/2025
DOB NOWStructuralSigned-offLiberty One Construction04/17/2025
DOB NOWGeneral ConstructionSigned-offLiberty One Construction04/17/2025
DOB NOWConstruction FenceSigned-offLiberty One Construction04/17/2025
DOB NOWSupported ScaffoldSigned-offU&Z Construction02/21/2025
DOB NOWStandpipeSigned-offF.S. Works10/21/2024
DOB NOWSprinklersSigned-offF.S. Works10/21/2024
DOB NOWStructuralSigned-offLiberty One Construction10/07/2024
DOB NOWPlumbingSigned-offP.H. Works10/03/2024
DOB NOWSidewalk ShedSigned-offGWT Enterprises05/31/2024
DOB NOWConstruction FenceSigned-offLiberty One Construction04/15/2024
DOB NOWStructuralSigned-offLiberty One Construction04/05/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY11/20/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises11/21/2022
BISOTISSUED770 Electric09/05/2012
BISMHISSUEDPalone Brothers Air06/10/2009
BISOTISSUEDCertified Contracting04/04/2003
BISSPISSUEDExpert Fire Sprinkler04/24/2000
BIS—ISSUEDRam Builders03/31/1999
BISEQISSUEDRam Builders03/31/1999
BISBLISSUEDWasoff Plumbing & Utility Co02/17/1994
BISPLISSUEDWasoff Plumbing & Utility Co02/17/1994
1 project · most recent 09/10/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/10/2025Signed-offP.H. WorksGas, Storm, Water/Sanitary
7 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026CompleteHigh Quality Electric of NYC—
06/17/2026Permit IssuedDynamic Electrical ContractorsGeneral Wiring
12/30/2025Permit IssuedEnercharge Electric ContGeneral Wiring
01/09/2025Permit IssuedDynamic Electrical ContractorsGeneral Wiring
06/08/2024Permit IssuedSolas Electrical—
03/19/2024CompleteCurrent Mechs Electric ContsGeneral Wiring
11/21/2022Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/10/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/08/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
03/27/2026Permanent certificateMiltiadis Leptourgosenergy_progress
03/27/2026Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
03/27/2026Exterior Insulation and Finish Systems (EIFS)Miltiadis Leptourgosspecial
03/27/2026Fire-Resistance Rated ConstructionMiltiadis Leptourgosprogress
03/27/2026Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
03/27/2026Interior lighting powerMiltiadis Leptourgosenergy_progress
03/27/2026Exterior lighting powerMiltiadis Leptourgosenergy_progress
03/27/2026Lighting controlsMiltiadis Leptourgosenergy_progress
01/29/2026HVAC-R and service water piping design and insulationMiltiadis Leptourgosenergy_progress
01/29/2026Maintenance informationMiltiadis Leptourgosenergy_progress
01/29/2026Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
01/29/2026Mechanical SystemsMiltiadis Leptourgosspecial
01/29/2026FinalMiltiadis Leptourgosprogress
01/29/2026Fire-Resistance Rated ConstructionMiltiadis Leptourgosprogress
01/29/2026Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
01/29/2026HVAC-R and service water heating system controlsMiltiadis Leptourgosenergy_progress
01/29/2026Shutoff dampersMiltiadis Leptourgosenergy_progress
01/29/2026HVAC-R and service water heating equipmentMiltiadis Leptourgosenergy_progress
01/29/2026Ventilation and air distribution systemMiltiadis Leptourgosenergy_progress
01/29/2026Duct leakage testing, insulation and designMiltiadis Leptourgosenergy_progress
12/24/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
12/24/2025HVAC-R and service water heating system controlsMiltiadis Leptourgosenergy_progress
12/24/2025HVAC-R and service water heating equipmentMiltiadis Leptourgosenergy_progress
12/24/2025HVAC-R and service water piping design and insulationMiltiadis Leptourgosenergy_progress
12/24/2025Maintenance informationMiltiadis Leptourgosenergy_progress
Latest 25 of 100.
▾Documents — 171 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch21
08/28/2026B08043107-I1Request digital key ↗
08/25/2026B01026132-I1Request digital key ↗
08/25/2026B01026132-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/24/2026B01064465-I1Request digital key ↗
08/24/2026B01064465-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
11/18/2025300770672Open ↗
10/23/2024301521538Open ↗
08/27/2012320376142Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
09/06/2012320376142Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)5
08/15/2026B01027795-P1Open ↗
08/14/2026B01027795-P4Open ↗
08/14/2026B01027795-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B01027795-I1Open ↗
▸Seals & Professional Certifications95
▸DOB NOWProgress Inspector Seal & Signature44
10/08/2026B01078279-I1Open ↗
10/08/2026B01078279-I1Open ↗
09/12/2026B01064465-P1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
10/08/2026B01078279-I1Open ↗
09/01/2026B01078278-I1Open ↗
08/30/2026B01026132-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/25/2026B01026132-P1Open ↗
08/25/2026B01026132-I1Open ↗
08/25/2026B01058957-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/14/2009320030676Open ↗
06/09/2009320030676Open ↗
03/11/2013320376142Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/09/2009320030676Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/09/2009320030676Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/14/2010320030676Open ↗
▸BISEQUIPMENT USE PERMITS1
06/14/2010320030676Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
08/15/2026B01027795-P3Open ↗
08/15/2026B01027795-P1Open ↗
08/14/2026B01027795-P4Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
06/09/2009320030676Open ↗
▸DOB NOWStreet Trees Site Plan1
08/14/2026B01027795-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/14/2026B01027795-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026B01027795-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/24/2026B01078285-I1Open ↗
08/24/2026B01078279-I1Open ↗
08/24/2026B01078288-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026B01026132-I1Open ↗
08/25/2026B01026132-P1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/09/2009320030676Open ↗
▸Energy Compliance7
▸DOB NOWPreliminary Commissioning Report Certification3
08/24/2026B01078209-I1Open ↗
08/13/2026B01078279-I1Open ↗
08/13/2026B01078209-I1Open ↗
▸BISEN2 - As Built Energy Analysis1
03/11/2013320376142Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/28/2012320376142Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION (PTA4)1
02/20/2013320376142Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/11/2013320376142Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/25/2010320030676Open ↗
07/14/2009320030676Open ↗
03/11/2013320376142Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/11/2013320376142Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/11/2013320376142Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/09/2009320030676Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/11/2013320376142Open ↗
07/14/2009320030676Open ↗
06/09/2009320030676Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification5
08/15/2026B01027795-P3Open ↗
08/15/2026B01027795-P1Open ↗
08/14/2026B01027795-P4Open ↗
Showing 3 of 5 on file for this type
▸BISTax Abatement Miscellaneous1
03/11/2013320376142Open ↗
▸DOB NOWFinal Survey1
08/14/2026B01027795-I1Open ↗