← Back
Elevator cooperative
225 AVENUE T
BROOKLYN · BIN 3190283
💬 Discuss this project
1960Year Built
8Stories
D4Building Class
R5BZoning
113,368 sfGross Floor Area
125Units
LL97 CoveredRent Stabilized41 Open Violations 35 unresolved · 6 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: HIGHLAWN TERRACE INC · 38,763 sf lot · 2.92 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 5 filings · 20 docs
Floor 8Under Construction12p · 1 filing · 20 docs
Floor 7Under Construction12p · 1 filing · 20 docs
Floor 6Under Construction12p · 1 filing · 20 docs
Floor 5Under Construction12p · 1 filing · 20 docs
Floor 4Under Construction12p · 1 filing · 20 docs
Floor 3Under Construction12p · 1 filing · 20 docs
Floor 2Under Construction12p · 1 filing · 20 docs
Floor 1
Cellar4p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METRO MANAGEMENT DEVELOPMENT1209/13/2026
PLATINUM SERVICES NY807/08/2026
STRUCTURAL PRESERV SYSTEM203/22/2026
METRO MANAGEMENT DEV103/22/2026
MARVIN GOLD MANAGEMENT303/22/2026
HIGHTOWN TERRACE INC ANO103/22/2026
XINOS CONSTRUCTION303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAWLESS & MANGIONE403/04/2026
ASHRAF CORP209/02/2024
SOCOTEC, INC.108/09/2024
BAZINI ENGINEERING, P.C.303/10/2022
NEW AGE ENGINEERING PLLC101/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BG & ASSOCIATES803/21/2026
PLATINUM SERVICES NY403/21/2026
SMEP DESIGN & CONSULTATION LLC403/21/2026
RIGGINING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURAL PRESERV SYSTEMGeneral Contractor409/30/2026
PLATINUM SERVICES NY LLCGeneral Contractor207/08/2026
CROCITTO, JR., WILLIAMElectrical103/21/2026
MAGALLANES, ROBERTOElectrical103/21/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor107/08/2026
CAM ENERGY HTG&MECH CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688503/04/2026
SOCOTEC ENGINEERING4983408/12/2024
NEW AGE ENGINEERING PLLC7746101/21/2022
Building Lifecycle
All (138)Filed (15)Permit Issued (14)Signed Off (5)Facade (FISP) (15)Violation (60)Inspection (3)Objection (3)Special Inspection (23)
09/29/2026
Permit issued — General Construction
B01027309-I1-GC
04/06/2026
Cycle 10 facade report signed — SAFE
03/23/2026
Permit issued — Suspended Scaffold
B01370647-I1-SC
03/18/2026
Filed — Alteration
Facade Inspection
B01370647-I1
03/13/2026
Signed off — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Tomasz Kozub
B01065159-I1
03/06/2026
Cycle 10 facade inspection completed
03/04/2026
Filed — Alteration
FILING FOR FACADE REPAIRS, BALCONY REPAIRS, BRICK REPLACEMENT, POINTING, SILL REPLACEMENT, SHELF ANGLE REPLACEMENT, INTERIOR REPAIRS/UPGRADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01027309-P4
02/23/2026
Cycle 10 facade report submitted
11/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/05/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
11/05/2025
Special inspection requirement — Final
ANTHONY ORLANDO
11/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
11/05/2025
Special inspection requirement — Air barrier - visual inspection
ANTHONY ORLANDO
11/05/2025
Special inspection requirement — Insulation placement and R values
ANTHONY ORLANDO
11/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY ORLANDO
10/17/2025
Filed — Alteration
FILING FOR FACADE REPAIRS, BALCONY REPAIRS, BRICK REPLACEMENT, POINTING, SILL REPLACEMENT, SHELF ANGLE REPLACEMENT, INTERIOR REPAIRS/UPGRADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01027309-P2
10/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY ORLANDO
10/15/2025
Special inspection requirement — Final
ANTHONY ORLANDO
10/15/2025
Special inspection requirement — Insulation placement and R values
ANTHONY ORLANDO
10/15/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
10/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
10/15/2025
Special inspection requirement — Air barrier - visual inspection
ANTHONY ORLANDO
09/29/2025
Permit issued — General Construction
B01027309-I1-GC
09/23/2025
Signed off — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Tomasz Kozub
B01084792-I1
07/07/2025
Permit issued — Sidewalk Shed
B01067732-I1-SH
07/02/2025
Permit issued — Suspended Scaffold
B01065159-I1-SC
07/02/2025
Permit issued — Suspended Scaffold
B01084792-I1-SC
04/23/2025
Violation issued (ECB, closed)
Unknown
04/23/2025
Violation issued (ECB, open)
Unknown
03/20/2025
Cycle 9 facade report signed — SWARMP
02/10/2025
Cycle 9 facade report submitted
01/28/2025
Cycle 9 facade inspection completed
10/02/2024
Permit issued — General Construction
B01027309-I1-GC
09/25/2024
Filed — Alteration
FILING FOR FACADE REPAIRS, BALCONY REPAIRS, BRICK REPLACEMENT, POINTING, SILL REPLACEMENT, SHELF ANGLE REPLACEMENT, INTERIOR REPAIRS/UPGRADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01027309-P1
09/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
09/11/2024
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
09/11/2024
Special inspection requirement — Insulation placement and R values
ANTHONY ORLANDO
09/11/2024
Special inspection requirement — Air barrier - visual inspection
ANTHONY ORLANDO
09/11/2024
Special inspection requirement — Final
ANTHONY ORLANDO
09/02/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01067732-P1
08/23/2024
Permit issued — Suspended Scaffold
B01084792-I1-SC
08/21/2024
Permit issued — Suspended Scaffold
B01065159-P1-SC
08/21/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ALEXIS SCHLESSINGERMAN
08/21/2024
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
08/12/2024
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Tomasz Kozub
B01065159-P1
08/09/2024
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Tomasz Kozub
B01084792-I1
07/24/2024
Permit issued — Suspended Scaffold
B01065159-I1-SC
07/23/2024
Objection resolved — Addressed
07/17/2024
Objection raised — Other
07/16/2024
Objection raised — Other
07/12/2024
Permit issued — Sidewalk Shed
B01067732-I1-SH
07/10/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01067732-I1
07/05/2024
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Tomasz Kozub
B01065159-I1
07/05/2024
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Tomasz Kozub
B01065160-I1
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/04/2024
Filed — Alteration
FILING FOR FACADE REPAIRS, BALCONY REPAIRS, BRICK REPLACEMENT, POINTING, SILL REPLACEMENT, SHELF ANGLE REPLACEMENT, INTERIOR REPAIRS/UPGRADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01027309-I1
05/16/2022
Signed off — Alteration
REPLACE ONE (1) GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00624612-I1
05/06/2022
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00624626-I1
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM09/29/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S03/23/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM09/29/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/07/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM07/02/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM07/02/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM10/02/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM08/23/2024
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM08/21/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM07/24/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/12/2024
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP02/16/2022
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH02/15/2022
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME01/27/2022
BISEQISSUEDXINOS CONSTRUCTION CORP03/23/2017
BISOTISSUEDXINOS CONSTRUCTION CORP02/27/2017
BISOTISSUEDXINOS CONSTRUCTION CORP03/30/2016
BISEQISSUEDXINOS CONSTRUCTION CORP12/04/2015
BISPLISSUEDCASINO MECHANICAL CORP03/03/2015
BISPLISSUEDCASINO MECHANICAL CORP07/03/2014
BISFSISSUEDMICHAEL S. KAPLAN06/20/2014
BISOTISSUEDVERTICAL SOLUTIONS INC03/25/2011
BISOTISSUEDPREFERRED BUILDERS INC06/11/2010
BISFSISSUEDROBERT C. VEGA01/03/2007
BISPLISSUEDJOSEPH FERRIGNO P&H CO01/03/2007
BISOTISSUEDWIRELESS NETWORK GROUP IN04/13/2005
BISOTISSUEDBERLINER COMMUNICATIONS INC07/26/2004
BISOTISSUEDARTISAN RESTORATION GROUP01/28/2004
BISOTISSUEDBERLINER COMMUNICATIONS INC10/08/2003
BISEQISSUEDCOLGATE SCAFFOLDING05/30/2003
BISOTISSUEDARTISAN RESTORATION GROUP05/22/2003
BISOTISSUEDGJFCONST CORP DBA BLDRS GROUP09/25/2002
BISOTISSUEDCROSSLINK WIRELESS LLC08/28/2002
BISFSISSUEDMANHATTAN BOILER & EQUIPMENT03/11/2002
1 project · most recent 06/21/2024
FiledStatusContractorScope
06/21/2024Permit IssuedILLUMINOUS ELECTRIC CORP.—
1 project · most recent 09/02/2024
Sidewalk Shed
FiledStatusContractorScope
09/02/2024Signed-offPLATINUM SERVICES NY LLCSidewalk Shed
2 projects · most recent 03/18/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/18/2026Permit IssuedSTRUCTURAL PRESERVATION S—
07/05/2024——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/04/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
11/12/2025Tenant Protection Plan Compliance—special
11/05/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
11/05/2025FinalANTHONY ORLANDOprogress
11/05/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
11/05/2025Air barrier - visual inspectionANTHONY ORLANDOenergy_progress
11/05/2025Insulation placement and R valuesANTHONY ORLANDOenergy_progress
11/05/2025Fire-Resistance Rated ConstructionANTHONY ORLANDOprogress
10/17/2025Tenant Protection Plan Compliance—special
10/16/2025Fire-Resistance Rated ConstructionANTHONY ORLANDOprogress
10/15/2025FinalANTHONY ORLANDOprogress
10/15/2025Insulation placement and R valuesANTHONY ORLANDOenergy_progress
10/15/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
10/15/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
10/15/2025Air barrier - visual inspectionANTHONY ORLANDOenergy_progress
09/11/2024Tenant Protection Plan Compliance—special
09/11/2024Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
09/11/2024MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
09/11/2024Insulation placement and R valuesANTHONY ORLANDOenergy_progress
09/11/2024Air barrier - visual inspectionANTHONY ORLANDOenergy_progress
09/11/2024FinalANTHONY ORLANDOprogress
08/21/2024Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
08/21/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
11/03/2021HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/03/2026B01370647-I1Request digital key ↗
08/31/2026B00662379-I1Request digital key ↗
08/31/2026B00624612-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION8
04/03/2017340325598Open ↗
04/12/2016321319774Open ↗
12/03/2015340325598Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
12/03/2015340325598Open ↗
03/18/2011320284456Open ↗
06/11/2010320170765Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications47
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
03/22/2018340325598Open ↗
12/11/2017321319774Open ↗
12/11/2017321319774Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/17/2026B01027309-P2Open ↗
09/17/2026B01027309-P2Open ↗
09/17/2026B01027309-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026B00662379-I1Open ↗
08/31/2026B00624612-I1Open ↗
08/31/2026B00624626-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/17/2026B01027309-P2Open ↗
09/02/2026B01065159-I1Open ↗
09/02/2026B01065159-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/03/2015340325598Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/03/2015340325598Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/14/2014321029276Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/03/2015340325598Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/14/2014321029276Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING1
07/14/2014321029276Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/14/2014321029276Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
03/13/2015321029276Open ↗
▸Environmental & Asbestos10
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
03/18/2011320284456Open ↗
06/11/2010320170765Open ↗
10/25/2007310052554Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00662379-I1Open ↗
08/31/2026B00624612-I1Open ↗
08/31/2026B00624626-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
07/14/2014321029276Open ↗
07/14/2014321029276Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/06/2017321319774Open ↗
05/04/2016321029276Open ↗
▸BISTR8: Energy Code Progress Inspections2
07/14/2014321029276Open ↗
07/14/2014321029276Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/06/2017321319774Open ↗
05/04/2016321029276Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/31/2026B00624612-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/03/2015340325598Open ↗
▸Approvals, Objections & Sign-offs25
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/31/2026B00662379-I1Open ↗
08/31/2026B00624612-I1Open ↗
08/31/2026B00624626-I1Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
03/22/2018340325598Open ↗
12/11/2017321319774Open ↗
12/06/2017321319774Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/14/2014321029276Open ↗
06/11/2010320170765Open ↗
10/25/2007310052554Open ↗
▸BISSUPERSEDING LETTER1
03/04/2015321029276Open ↗
▸BISSHED LETTER1
04/03/2017340325598Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B01027309-I1Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
12/06/2017321319774Open ↗
05/04/2016321029276Open ↗
06/26/2012320284456Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM3
03/22/2018340325598Open ↗
12/11/2017321319774Open ↗
12/06/2017321319774Open ↗
▸BISADDITIONAL INFORMATION3
12/03/2015340325598Open ↗
12/03/2015340325598Open ↗
10/22/2014321029276Open ↗
▸BISEFILING COVER SHEET2
03/09/2016321319774Open ↗
07/14/2014321029276Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/03/2015340325598Open ↗
▸Other Documents10
▸DOB NOWManufacturer's Specifications4
08/13/2026B01065159-P1Open ↗
08/13/2026B01065159-I1Open ↗
08/13/2026B01084792-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026B01065159-I1Open ↗
08/13/2026B01065159-P1Open ↗
08/13/2026B01065160-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/14/2014321029276Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01370647-I1Open ↗