← Back
Elevator cooperative
225 AVENUE T
BROOKLYN · BIN 3385341
💬 Discuss this project
1960Year Built
8Stories
D4Building Class
R5BZoning
113,368 sfGross Floor Area
125Units
LL97 CoveredRent Stabilized29 Open Violations 23 unresolved · 6 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: HIGHLAWN TERRACE INC · 38,763 sf lot · 2.92 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction11p · 4 filings · 20 docs
Floor 8Under Construction6p · 1 filing · 20 docs
Floor 7Under Construction6p · 1 filing · 20 docs
Floor 6Under Construction6p · 1 filing · 20 docs
Floor 5Under Construction6p · 1 filing · 20 docs
Floor 4Under Construction6p · 1 filing · 20 docs
Floor 3Under Construction6p · 1 filing · 20 docs
Floor 2Under Construction6p · 1 filing · 20 docs
Floor 1Under Construction6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY607/08/2026
METRO MANAGEMENT DEVELOPMENT504/09/2026
AT&T MOBILITY503/22/2026
HIGHLAWN TERRACE INC METR103/22/2026
XINOS CONSTRUCTION603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAWLESS & MANGIONE403/04/2026
ASHRAF CORP106/25/2024
GT WIRELESS ENGINEERING, PLLC110/07/2020
TECTONIC ENGINEERING102/27/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.203/21/2026
BG & ASSOCIATES803/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
GREEN STUDIO203/21/2026
RIGGINING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
STRUCTURAL PRESERV SYSTEMGeneral Contractor304/09/2026
CROSSLINK WIRELESS LLCGeneral Contractor203/21/2026
MELVYN ZWEBNERElectrical103/21/2026
LG TECH LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688403/04/2026
SOCOTEC ENGINEERING4983208/12/2024
R MARSAC CONSULTING LLC329110/07/2020
Building Lifecycle
All (91)Filed (10)Permit Issued (10)Signed Off (3)Facade (FISP) (18)Violation (33)Objection (2)Special Inspection (15)
05/09/2026
Violation issued (HPD, closed)
C
05/01/2026
Violation issued (HPD, open)
A
04/06/2026
Cycle 10 facade report signed — SAFE
03/23/2026
Permit issued — Suspended Scaffold
B01371856-I1-SC
03/18/2026
Filed — Alteration
Facade Inspection
B01371856-I1
03/06/2026
Cycle 10 facade inspection completed
03/04/2026
Filed — Alteration
FILING FOR FACADE REPAIRS, BALCONY REPAIRS, BRICK REPLACEMENT, POINTING, SILL REPLACEMENT, SHELF ANGLE REPLACEMENT, INTERIOR REPAIRS/UPGRADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01027289-P3
02/23/2026
Cycle 10 facade report submitted
11/20/2025
Violation issued (HPD, open)
I
10/27/2025
Permit issued — General Construction
B01027289-I1-GC
10/20/2025
Signed off — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Oscar Castro
B01065167-I1
10/17/2025
Filed — Alteration
FILING FOR FACADE REPAIRS, BALCONY REPAIRS, BRICK REPLACEMENT, POINTING, SILL REPLACEMENT, SHELF ANGLE REPLACEMENT, INTERIOR REPAIRS/UPGRADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01027289-P2
10/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
10/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY ORLANDO
10/16/2025
Special inspection requirement — Final
ANTHONY ORLANDO
10/16/2025
Special inspection requirement — Air barrier - visual inspection
ANTHONY ORLANDO
10/16/2025
Special inspection requirement — Insulation placement and R values
ANTHONY ORLANDO
10/16/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Permit issued — Suspended Scaffold
B01065167-I1-SC
06/23/2025
Permit issued — Sidewalk Shed
B01065803-I1-SH
04/22/2025
Violation issued (FDNY_NOV, closed)
02/20/2025
Cycle 9 facade report submitted
02/19/2025
Cycle 9 facade inspection completed
02/19/2025
Cycle 9 facade report signed — SWARMP
10/22/2024
Permit issued — General Construction
B01027289-I1-GC
09/25/2024
Filed — Alteration
FILING FOR FACADE REPAIRS, BALCONY REPAIRS, BRICK REPLACEMENT, POINTING, SILL REPLACEMENT, SHELF ANGLE REPLACEMENT, INTERIOR REPAIRS/UPGRADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01027289-P1
09/11/2024
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
09/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
09/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/11/2024
Special inspection requirement — Final
ANTHONY ORLANDO
09/11/2024
Special inspection requirement — Insulation placement and R values
ANTHONY ORLANDO
09/11/2024
Special inspection requirement — Air barrier - visual inspection
ANTHONY ORLANDO
08/20/2024
Permit issued — Suspended Scaffold
B01065167-P1-SC
08/20/2024
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
08/20/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ALEXIS SCHLESSINGERMAN
08/12/2024
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Oscar Castro
B01065167-P1
08/07/2024
Violation issued (FDNY_NOV, closed)
07/24/2024
Permit issued — Suspended Scaffold
B01065167-I1-SC
07/23/2024
Objection resolved — Addressed
07/15/2024
Objection raised — Other
07/05/2024
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Oscar Castro
B01065167-I1
06/25/2024
Filed — Alteration
B01065803-I1
06/25/2024
Permit issued — Sidewalk Shed
B01065803-I1-SH
04/04/2024
Filed — Alteration
FILING FOR FACADE REPAIRS, BALCONY REPAIRS, BRICK REPLACEMENT, POINTING, SILL REPLACEMENT, SHELF ANGLE REPLACEMENT, INTERIOR REPAIRS/UPGRADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01027289-I1
12/29/2022
Violation issued (ECB, open)
Construction
12/22/2022
Violation issued (ECB, open)
Local Law
11/14/2022
Violation issued (ECB, open)
Construction
02/23/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/04/2021
Signed off — Alteration
B00398885-I1
01/20/2021
Permit issued — Antenna
B00398885-I1-AN
10/07/2020
Filed — Alteration
B00398885-I1
04/05/2019
Signed off — Alteration
B00018872-I1
10/19/2018
Permit issued — Antenna
B00018872-I1-AN
05/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2018
Filed — Alteration
B00018872-I1
02/08/2018
Violation issued (FDNY_NOV, closed)
10/12/2017
Cycle 8 facade report submitted
10/12/2017
Cycle 8 facade report signed — SAFE
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S03/23/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM10/27/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM07/02/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/23/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM10/22/2024
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM08/20/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM07/24/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/25/2024
DOB NOWAntennaSigned-offLG TECH LLC01/20/2021
DOB NOWAntennaSigned-offSTEADFAST DEVEL AND CONS10/19/2018
BISEQISSUEDXINOS CONSTRUCTION CORP03/23/2017
BISOTISSUEDXINOS CONSTRUCTION CORP02/27/2017
BISOTISSUEDXINOS CONSTRUCTION CORP03/30/2016
BISEQISSUEDXINOS CONSTRUCTION CORP03/13/2016
1 project · most recent 06/20/2024
FiledStatusContractorScope
06/20/2024Permit IssuedILLUMINOUS ELECTRIC CORP.—
1 project · most recent 03/18/2026
FiledStatusContractorScope
03/18/2026Permit IssuedSTRUCTURAL PRESERVATION S—
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/16/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
10/16/2025Tenant Protection Plan Compliance—special
10/16/2025Fire-Resistance Rated ConstructionANTHONY ORLANDOprogress
10/16/2025FinalANTHONY ORLANDOprogress
10/16/2025Air barrier - visual inspectionANTHONY ORLANDOenergy_progress
10/16/2025Insulation placement and R valuesANTHONY ORLANDOenergy_progress
10/16/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
09/11/2024MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
09/11/2024Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
09/11/2024Tenant Protection Plan Compliance—special
09/11/2024FinalANTHONY ORLANDOprogress
09/11/2024Insulation placement and R valuesANTHONY ORLANDOenergy_progress
09/11/2024Air barrier - visual inspectionANTHONY ORLANDOenergy_progress
08/20/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
08/20/2024Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/03/2026B01371856-I1Request digital key ↗
09/03/2026B00018872-I1Request digital key ↗
08/24/2026B01065803-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
09/02/2026B00398885-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
04/03/2017340360344Open ↗
04/12/2016321319765Open ↗
03/11/2016340360344Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
03/11/2016340360344Open ↗
03/09/2016321319765Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026B00018872-I1Open ↗
08/24/2026B01065803-I1Open ↗
08/20/2026B01027289-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026B01027289-P2Open ↗
08/31/2026B01027289-P2Open ↗
08/31/2026B01027289-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B01027289-P1Open ↗
08/31/2026B01027289-P2Open ↗
08/24/2026B01065167-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/22/2018340360344Open ↗
09/25/2017321319765Open ↗
03/09/2016321319765Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/11/2016340360344Open ↗
03/09/2016321319765Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/09/2016321319765Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/11/2016340360344Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/11/2016340360344Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
03/09/2016321319765Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00398885-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026B00018872-I1Open ↗
08/13/2026B00398885-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/09/2016321319765Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/25/2017321319765Open ↗
03/09/2016321319765Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/25/2017321319765Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/11/2016340360344Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/24/2026B01065167-I1Open ↗
08/13/2026B01027289-P3Open ↗
08/13/2026B01027289-I1Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/22/2018340360344Open ↗
09/25/2017321319765Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/09/2016321319765Open ↗
▸BISSHED LETTER1
04/03/2017340360344Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B01027289-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/25/2017321319765Open ↗
03/09/2016321319765Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION2
03/11/2016340360344Open ↗
03/11/2016340360344Open ↗
▸BISBOROUGH INTAKE FORM2
03/22/2018340360344Open ↗
09/25/2017321319765Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/11/2016340360344Open ↗
▸BISEFILING COVER SHEET1
03/09/2016321319765Open ↗
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/24/2026B01065167-I1Open ↗
08/13/2026B01065167-P1Open ↗
▸DOB NOWCalculations2
08/24/2026B01065167-I1Open ↗
08/13/2026B01065167-P1Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01371856-I1Open ↗