💬 Discuss this project
1910Year Built
3Stories
O2Building Class
R8BZoning
5,294 sfGross Floor Area
3Units
Office only, 2-6 stories · Owner of record: Carriage House Annex · 2,773 sf lot · 1.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRoof, stair, window, and HVAC replacementUnder Construction11p · 2 filings · 20 docs
Floor 3Roof, stair, window, and HVAC replacementUnder Construction11p · 1 filing · 15 docs
Floor 2Roof, stair, window, and HVAC replacementUnder Construction9p · 1 filing · 15 docs
Floor 1Carriage House Annex LLCUnder Construction14p · 2 filings · 19 docs
Site & exteriorSupported scaffold installationUnder Construction24p · 3 filings · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/17/2014$4.9M—HENSON ANNEX, LLC → Carriage House Annex$926/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Abco-Peerless Sprinkler203/21/2026
Rigid Structural Design1003/21/2026
Municipal Building Consultants303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jepol ConstructionGeneral Contractor704/09/2026
Intersystem ConstructionScaffold407/30/2026
Intersystems Installation S&SScaffold307/08/2026
Metrodesign RemodelingGeneral Contractor104/09/2026
Abco-Peerless SprinklerFire Protection107/08/2026
A.M.NPlumbing109/29/2026
Aurora Electrical ContgElectrical103/22/2026
Amn FireFire Protection107/08/2026
Kobryn Electrical ServicesElectrical103/22/2026
Hamilton Air CompanyGeneral Contractor109/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Advanced Professional Engineering1599101/09/2026
HBD Architecture4092201/09/2026
Angelos Georgopoulos2955110/03/2024
Skyline Engineering267103/21/2024
Building Lifecycle
All (60)Filed (10)Permit Issued (16)Signed Off (2)Inspection (2)Objection (4)Special Inspection (26)
09/28/2026
Permit issued — Plumbing
M01108459-S2-PL
09/23/2026
Filed — Alteration
TEMPORARY SPRINKLER HEADS INSTALLATION FOR 3RD FL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01108459-S2
09/16/2026
Permit issued — Structural
M01108459-I1-MS
07/29/2026
Permit issued — Supported Scaffold
M01282366-I1-SF
02/18/2026
Permit issued — Protection and Mechanical Methods
M01288738-I1-PMM
01/23/2026
Permit issued — Sprinklers
M01108459-S1-EW-SP
01/20/2026
Permit issued — Sidewalk Shed
M01282335-I1-SH
01/15/2026
Permit issued — Supported Scaffold
M01282366-I1-SF
01/09/2026
Filed — Alteration
TEMPORARY SPRINKLER HEADS INSTALLATION FOR 3RD FL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01108459-S1
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Carol Henderson
12/23/2025
Special inspection requirement — Sprinkler Systems
BRUCE MERDJAN
12/04/2025
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01288738-I1
12/04/2025
Permit issued — Protection and Mechanical Methods
M01288738-I1-PMM
12/03/2025
Permit issued — General Construction
M01108459-I1-ST
12/02/2025
Permit issued — Mechanical Systems
M01108459-I1-GC
10/03/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01282366-P1
10/03/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01282335-P1
09/18/2025
Permit issued — Supported Scaffold
M01282366-I1-SF
09/17/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01282335-I1
09/17/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01282366-I1
09/17/2025
Permit issued — Sidewalk Shed
M01282335-I1-SH
03/31/2025
Signed off — Alteration
Modification of the sprinkler system as per the filed drawings.
M01012793-I1
03/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/03/2024
Filed — Alteration
TEMPORARY SPRINKLER HEADS INSTALLATION FOR 3RD FL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01108459-I1
09/16/2024
Signed off — Alteration
ROOF TERRACE REPLACEMENT AND RAILINGS EXTENSION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00921673-I1
09/09/2024
Special inspection requirement — Mechanical Systems
Carol Henderson
09/09/2024
Special inspection requirement — Masonry
Carol Henderson
09/09/2024
Special inspection requirement — Structural Steel - Details
Carol Henderson
09/09/2024
Special inspection requirement — Concrete - Cast-In-Place
Carol Henderson
09/09/2024
Special inspection requirement — Post-installed Anchors
Carol Henderson
09/09/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Angelos Georgopoulos
09/09/2024
Special inspection requirement — Structural Steel - Welding
Angelos Georgopoulos
09/09/2024
Special inspection requirement — Final
Carol Henderson
09/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Carol Henderson
09/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Carol Henderson
09/09/2024
Special inspection requirement — Duct leakage testing, insulation and design
Carol Henderson
09/09/2024
Special inspection requirement — Shutoff dampers
Carol Henderson
09/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Carol Henderson
09/09/2024
Special inspection requirement — Fenestration air leakage
Carol Henderson
09/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Carol Henderson
09/09/2024
Special inspection requirement — Ventilation and air distribution system
Carol Henderson
09/09/2024
Special inspection requirement — Insulation placement and R values
Carol Henderson
09/09/2024
Special inspection requirement — Maintenance information
Carol Henderson
09/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Carol Henderson
09/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Angelos Georgopoulos
03/22/2024
Permit issued — Sprinklers
M01012793-I1-EW-SP
03/21/2024
Filed — Alteration
Modification of the sprinkler system as per the filed drawings.
M01012793-I1
02/29/2024
Special inspection requirement — Sprinkler Systems
Matthew Wavro
02/01/2024
Permit issued — General Construction
M00921673-I1-GC
01/10/2024
Permit issued — General Construction
M00921673-I1-GC
10/10/2023
Permit issued — General Construction
M00921673-I1-GC
09/12/2023
Objection resolved — Addressed
09/12/2023
Objection resolved — Addressed
08/30/2023
Objection raised — Other
08/30/2023
Objection raised — Energy
08/28/2023
Filed — Alteration
ROOF TERRACE REPLACEMENT AND RAILINGS EXTENSION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00921673-I1
08/18/2023
Special inspection requirement — Final
Carol Henderson
08/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Carol Henderson
08/18/2023
Special inspection requirement — Insulation placement and R values
Carol Henderson
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA.M.N09/28/2026
DOB NOWStructuralPermit IssuedHamilton Air Company09/16/2026
DOB NOWSupported ScaffoldPermit IssuedIntersystem Construction07/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedIntersystem Construction02/18/2026
DOB NOWSprinklersPermit IssuedAmn Fire01/23/2026
DOB NOWSidewalk ShedPermit IssuedIntersystem Construction01/20/2026
DOB NOWSupported ScaffoldPermit IssuedIntersystem Construction01/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedIntersystems Installation S&S12/04/2025
DOB NOWGeneral ConstructionPermit IssuedHudson Meridian Construction GP12/03/2025
DOB NOWMechanical SystemsPermit IssuedMetrodesign Remodeling12/02/2025
DOB NOWSupported ScaffoldPermit IssuedIntersystems Installation S&S09/18/2025
DOB NOWSidewalk ShedPermit IssuedIntersystems Installation S&S09/17/2025
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler03/22/2024
DOB NOWGeneral ConstructionSigned-offHudson Meridian Construction GP02/01/2024
DOB NOWGeneral ConstructionSigned-offHudson Meridian Construction GP01/10/2024
DOB NOWGeneral ConstructionSigned-offHudson Meridian Construction GP10/10/2023
1 project · most recent 09/23/2026
FiledStatusContractorScope
09/23/2026Permit IssuedAmn Fire112 heads
1 project · most recent 09/23/2026
Water/Sanitary
FiledStatusContractorScope
09/23/2026Permit IssuedA.M.NWater/Sanitary
3 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedKobryn Electrical ServicesGeneral Wiring
12/19/2025Permit IssuedKobryn Electrical Services—
09/23/2025Permit IssuedAurora Electrical Contg—
2 projects · most recent 10/03/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
10/03/2025Permit IssuedIntersystem ConstructionSidewalk Shed
10/03/2025Permit IssuedIntersystem ConstructionScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
12/23/2025Fire-Resistant Penetrations and JointsCarol Hendersonspecial
12/23/2025Sprinkler SystemsBRUCE MERDJANspecial
09/09/2024Mechanical SystemsCarol Hendersonspecial
09/09/2024MasonryCarol Hendersonspecial
09/09/2024Structural Steel - DetailsCarol Hendersonspecial
09/09/2024Concrete - Cast-In-PlaceCarol Hendersonspecial
09/09/2024Post-installed AnchorsCarol Hendersonspecial
09/09/2024Structural Steel - High Strength BoltingAngelos Georgopoulosspecial
09/09/2024Structural Steel - WeldingAngelos Georgopoulosspecial
09/09/2024FinalCarol Hendersonprogress
09/09/2024Energy Code Compliance InspectionsCarol Hendersonprogress
09/09/2024HVAC-R and service water heating equipmentCarol Hendersonenergy_progress
09/09/2024Duct leakage testing, insulation and designCarol Hendersonenergy_progress
09/09/2024Shutoff dampersCarol Hendersonenergy_progress
09/09/2024Fenestration and door U-factor and product ratingsCarol Hendersonenergy_progress
09/09/2024Fenestration air leakageCarol Hendersonenergy_progress
09/09/2024HVAC-R and service water heating system controlsCarol Hendersonenergy_progress
09/09/2024Ventilation and air distribution systemCarol Hendersonenergy_progress
09/09/2024Insulation placement and R valuesCarol Hendersonenergy_progress
09/09/2024Maintenance informationCarol Hendersonenergy_progress
09/09/2024HVAC-R and service water piping design and insulationCarol Hendersonenergy_progress
09/09/2024Structural Stability – Alterations of existing buildingsAngelos Georgopoulosspecial
02/29/2024Sprinkler SystemsMatthew Wavrospecial
08/18/2023FinalCarol Hendersonprogress
08/18/2023Energy Code Compliance InspectionsCarol Hendersonprogress
Latest 25 of 26.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/29/2026M00921673-I1Request digital key ↗
08/27/2026M01012793-I1Request digital key ↗
08/21/2026M01282335-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/29/2026M01108459-S2Open ↗
09/29/2026M01108459-P1Open ↗
08/29/2026M00921673-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M01108459-S1Open ↗
09/23/2026M01108459-S1Open ↗
08/23/2026M01108459-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026M00921673-I1Open ↗
09/02/2026M00921673-I1Open ↗
08/23/2026M01108459-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/29/2026M01108459-S2Open ↗
08/29/2026M00921673-I1Open ↗
08/13/2026M01108459-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01108459-I1Open ↗