← Back
BuildNYC
Elevator apt, fireproof with stores
225 WEST 106TH STREET
MANHATTAN · BIN 1056631
💬 Discuss this project
1928Year Built
16Stories
D6Building Class
C2-8AZoning
249,756 sfGross Floor Area
181Units
LL97 CoveredRent Stabilized0 Active Violations 1 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, fireproof with stores · Owner of record: Stahl Broadway Company · 20,449 sf lot · 12.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofStahl Broadway CompanyUnder Construction15p · 3 filings · 20 docs
Floor 16Temporary equipment pipe scaffold11p · 1 filing · 4 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Duane Reade18p · 3 filings · 20 docs
MezzanineDuane Reade18p · 2 filings · 20 docs
CellarDuane Reade24p · 4 filings · 20 docs
Site & exteriorStahl Broadway CompanyUnder Construction43p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stahl Broadway Co4403/22/2026
Walgreens403/22/2026
Stahl Real Estate Co303/22/2026
Gamestop103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Perdek, Prof. Engineering309/02/2025
KZ Engineering408/25/2025
Nic 88405/07/2025
The Vsa Group304/08/2025
CS Engineering PC (CBP Engineering)207/13/2020
Andrew Katz Engineers109/09/2019
Paknia Engineering109/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1203/21/2026
Basic Groups803/21/2026
VSA303/21/2026
Synergy Building Consultants403/21/2026
Paul Fusco Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arsenal ScaffoldScaffold1008/22/2026
3 J'S Restorationspecialty_contractor907/08/2026
Cube Builders Group NYGeneral Contractor603/21/2026
3 J'S RestorationScaffold308/30/2026
J Y ElectricElectrical303/21/2026
P&H Electric D/B/A Mage ElectricElectrical303/22/2026
Universal Fire SprinklerFire Protection207/08/2026
Metropolitan Mechanicalspecialty_contractor203/21/2026
Michael Gangi P&H ContractingPlumbing107/08/2026
PipestylistsPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Nic 888371405/07/2025
The Vsa Group1767304/08/2025
Vertical8740204/08/2025
Structural Engineering Integ4174104/08/2025
Metropolitan Mechanical2277207/13/2020
Paknia Engineering1462109/09/2019
Andrew Katz1030109/09/2019
Building Lifecycle
All (177)Filed (21)Permit Issued (27)Signed Off (4)Facade (FISP) (15)Violation (60)Inspection (2)Objection (18)Special Inspection (30)
08/27/2026
Permit issued — Protection and Mechanical Methods
M01278516-I1-PMM
08/21/2026
Permit issued — Sidewalk Shed
M00829794-I1-SH
07/30/2026
Permit issued — Supported Scaffold
M01270169-I1-SF
06/01/2026
Permit issued — Sidewalk Shed
M00829794-I1-SH
02/26/2026
Permit issued — Sidewalk Shed
M00829794-I1-SH
02/02/2026
Permit issued — General Construction
M00843473-I1-GC
11/06/2025
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE WORK OR INSPECTION. AMEND#1, ADDED HOIST
M01002919-I1
10/29/2025
Cycle 9 facade report submitted
10/21/2025
Cycle 9 facade inspection completed
09/15/2025
Cycle 9 facade report signed — UNSAFE
09/03/2025
Permit issued — Protection and Mechanical Methods
M01278516-I1-PMM
09/02/2025
Filed — Alteration
M01278516-I1
08/25/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01270169-P1
08/21/2025
Permit issued — Supported Scaffold
M01270169-I1-SF
08/20/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01270169-I1
05/22/2025
Signed off — Alteration
INTERIOR RENOVATION STORE #2764 ON 1ST FLOOR OF THE EXISTING 16 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01158600-I1
05/22/2025
Signed off — Alteration
INTERIOR RENOVATION STORE #2764 ON 1ST FLOOR OF THE EXISTING 16 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01158600-S1
05/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
05/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
05/09/2025
Special inspection requirement — Interior lighting power
Eric Sun
05/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/09/2025
Special inspection requirement — Final
Eric Sun
05/07/2025
Filed — Alteration
INTERIOR RENOVATION STORE #2764 ON 1ST FLOOR OF THE EXISTING 16 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01158600-P2
05/06/2025
Filed — Alteration
INTERIOR RENOVATION STORE #2764 ON 1ST FLOOR OF THE EXISTING 16 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01158600-P1
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
05/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
05/06/2025
Special inspection requirement — Final
Eric Sun
05/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
05/06/2025
Special inspection requirement — Interior lighting power
Eric Sun
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
05/01/2025
Permit issued — Structural
M01186535-I1-ST
04/28/2025
Objection raised — Other
04/28/2025
Objection resolved — Addressed
04/23/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE WORK OR INSPECTION. AMEND#1, ADDED HOIST
M01002919-P2
04/08/2025
Filed — Alteration
Steel Reinforcement at East EMR bulkhead on main roof level. No change of use, egress or occupancy.
M01186535-I1
03/24/2025
Permit issued — General Construction
M01158600-I1-GC
03/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/28/2025
Permit issued — Sidewalk Shed
M00829794-I1-SH
02/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01068629-P1
02/03/2025
Permit issued — Suspended Scaffold
M01002919-I1-SC
01/31/2025
Permit issued — Plumbing
M01158600-S1-PL
01/30/2025
Permit issued — General Construction
M01158600-I1-GC
01/30/2025
Permit issued — General Construction
M00843473-I1-GC
01/27/2025
Filed — Alteration
INTERIOR RENOVATION STORE #2764 ON 1ST FLOOR OF THE EXISTING 16 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01158600-I1
01/27/2025
Filed — Alteration
INTERIOR RENOVATION STORE #2764 ON 1ST FLOOR OF THE EXISTING 16 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01158600-S1
12/02/2024
Violation issued (ECB, closed)
Construction
10/29/2024
Special inspection requirement — Masonry
Francesco Bruni
10/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Francesco Bruni
10/29/2024
Special inspection requirement — Final
Francesco Bruni
10/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
MUHAMMAD HUQ
10/17/2024
Filed — Alteration
Local Law Cycle 9 Facade Repairs as shown in filed drawings. No change in occupancy, use or egress .
M00843473-P1
10/01/2024
Special inspection requirement — Masonry
Francesco Bruni
10/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Francesco Bruni
10/01/2024
Special inspection requirement — Final
Francesco Bruni
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit Issued3 J'S Restoration08/27/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold08/21/2026
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold07/30/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold06/01/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold02/26/2026
DOB NOWGeneral ConstructionPermit Issued3 JS Restoration02/02/2026
DOB NOWProtection and Mechanical MethodsPermit Issued3 JS Restoration09/03/2025
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold08/21/2025
DOB NOWStructuralPermit Issued3 JS Restoration05/01/2025
DOB NOWGeneral ConstructionSigned-offCube Builders Group NY03/24/2025
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold02/28/2025
DOB NOWSuspended ScaffoldSigned-off3J'S Restoration02/03/2025
DOB NOWPlumbingSigned-offT & T Plumbing01/31/2025
DOB NOWGeneral ConstructionSigned-offCube Builders Group NY01/30/2025
DOB NOWGeneral ConstructionPermit Issued3 JS Restoration01/30/2025
DOB NOWSuspended ScaffoldPermit Issued3J'S Restoration07/03/2024
DOB NOWSupported ScaffoldPermit Issued3 JS Restoration06/28/2024
DOB NOWGeneral ConstructionPermit Issued3 JS Restoration02/28/2024
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold02/26/2024
DOB NOWSuspended ScaffoldSigned-off3J'S Restoration02/14/2024
DOB NOWGeneral ConstructionPermit Issued3 JS Restoration02/06/2024
DOB NOWGeneral ConstructionPermit Issued3 JS Restoration06/02/2023
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold02/22/2023
DOB NOWSprinklersPermit IssuedUniversal Fire Sprinkler02/11/2021
DOB NOWMechanical SystemsSigned-offMetropolitan Mechanical03/30/2020
DOB NOWSprinklersPermit IssuedUniversal Fire Sprinkler03/07/2020
DOB NOWPlumbingSigned-offMichael Gangi P&H Contracting01/17/2020
BIS—ISSUEDNevcon Builders10/10/2023
BIS—ISSUEDNevcon Builders03/08/2021
BIS—ISSUEDNevcon Builders03/03/2020
BIS—ISSUEDNevcon Builders01/17/2020
BISEQISSUEDArsenal Scaffold07/13/2018
BISOTISSUED3 J'S Restoration03/30/2018
BISEQISSUEDArsenal Scaffold07/13/2017
BISOTISSUED3 J'S Restoration05/23/2017
BISOTISSUEDNational Mechanical Services07/30/2014
BISOTISSUEDEtna Contracting07/14/2014
BISOTISSUEDNational Mechanical Services07/10/2014
BISPLISSUEDNational Mechanical Services Plumbing07/10/2014
BISEQISSUEDRepublic Scaffold & Hoist03/28/2014
+ 37 more permits on file
1 project · most recent 09/09/2019
FiledStatusContractorScope
09/09/2019Permit IssuedUniversal Fire Sprinkler81 heads
1 project · most recent 09/09/2019
Water/Sanitary
FiledStatusContractorScope
09/09/2019Signed-offMichael Gangi P&H ContractingWater/Sanitary
15 projects · most recent 07/16/2025
General Wiring
FiledStatusContractorScope
07/16/2025CompleteJ Y ElectricGeneral Wiring
04/26/2023CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
04/26/2023CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
04/26/2023CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
04/26/2023CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
04/26/2023CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
04/26/2023CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
04/26/2023CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
04/26/2023CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
04/26/2023CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
02/15/2023Permit IssuedNash Electric Services—
04/10/2021Permit IssuedRobert Chimenti5 meters, 1 new_meters
08/13/2020Permit IssuedMartinez Electrical ContGeneral Wiring
05/14/2020CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
07/19/2019CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
1 project · most recent 04/08/2025
Steel
FiledStatusContractorScope
04/08/2025Permit Issued3 J'S RestorationSteel
3 projects · most recent 08/25/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/25/2025Permit IssuedArsenal ScaffoldScaffold
02/17/2025Permit Issued3 J'S RestorationScaffold
04/11/2024Permit IssuedArsenal ScaffoldSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
05/09/2025Energy Code Compliance InspectionsEric Sunprogress
05/09/2025Fire-Resistance Rated ConstructionEric Sunprogress
05/09/2025Interior lighting powerEric Sunenergy_progress
05/09/2025Tenant Protection Plan ComplianceEric Sunspecial
05/09/2025Fire-Resistant Penetrations and JointsEric Sunspecial
05/09/2025FinalEric Sunprogress
05/06/2025Fire-Resistant Penetrations and JointsEric Sunspecial
05/06/2025Tenant Protection Plan ComplianceEric Sunspecial
05/06/2025Energy Code Compliance InspectionsEric Sunprogress
05/06/2025FinalEric Sunprogress
05/06/2025Fire-Resistance Rated ConstructionEric Sunprogress
05/06/2025Interior lighting powerEric Sunenergy_progress
05/06/2025Fire-Resistant Penetrations and JointsEric Sunspecial
05/06/2025Energy Code Compliance InspectionsEric Sunprogress
05/06/2025Tenant Protection Plan ComplianceEric Sunspecial
10/29/2024MasonryFrancesco Brunispecial
10/29/2024Energy Code Compliance InspectionsFrancesco Bruniprogress
10/29/2024FinalFrancesco Bruniprogress
10/29/2024Tenant Protection Plan ComplianceMUHAMMAD HUQspecial
10/01/2024MasonryFrancesco Brunispecial
10/01/2024Tenant Protection Plan Compliance—special
10/01/2024Energy Code Compliance InspectionsFrancesco Bruniprogress
10/01/2024FinalFrancesco Bruniprogress
07/13/2020HVAC and service water heating equipment PATRICK MCDONALDenergy_progress
07/13/2020HVAC insulation and sealing PATRICK MCDONALDenergy_progress
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Duane ReadeRetailCellar, Floor 1, Mezzanine
Project M00209207 Alteration · Permit Entire · 09/09/2019
Project M00211672 Alteration · Permit Entire · 09/09/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 298 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch19
08/27/2026M00829794-P1Request digital key ↗
08/27/2026M00829794-I1Request digital key ↗
08/26/2026M00843473-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00328530-I1Request digital key ↗
08/15/2026M00328530-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/14/2026M00211672-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00209207-I1Request digital key ↗
▸Applications & Permits59
▸BISPLAN / WORK APPROVAL APPLICATION34
09/21/2023102765241Open ↗
09/18/2023123692209Open ↗
09/07/2023102765241Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION24
10/10/2023123692209Open ↗
03/04/2020123692209Open ↗
01/21/2020123692209Open ↗
Showing 3 of 24 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/21/2023123692209Open ↗
▸Seals & Professional Certifications87
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
08/27/2019123692209Open ↗
05/09/2019140665796Open ↗
05/03/2019140665796Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/04/2026M00328530-I1Open ↗
08/26/2026M00843473-I1Open ↗
08/26/2026M00843473-P4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/21/2026M00328530-I1Open ↗
09/21/2026M00328530-I1Open ↗
09/21/2026M00328530-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/21/2026M00328530-I1Open ↗
09/01/2026M00843473-I1Open ↗
09/01/2026M00843473-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
07/17/2014122064693Open ↗
07/15/2014122052884Open ↗
07/18/2012121143985Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/12/2017140665796Open ↗
02/06/2017140603078Open ↗
07/17/2014122064693Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/18/2012121143985Open ↗
01/06/2010120238634Open ↗
09/17/2009120155394Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/12/2017140665796Open ↗
02/06/2017140603078Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/12/2017140665796Open ↗
02/06/2017140603078Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE2
05/05/2015122064693Open ↗
03/11/2015122064693Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/17/2014122064693Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
05/05/2015122064693Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/17/2014122064693Open ↗
▸Safety & Tenant Protection10
▸BISTENANT PROTECTION PLAN AND NOTES4
10/16/2023102765241Open ↗
07/12/2017140665796Open ↗
02/06/2017140603078Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan4
09/04/2026M00328530-I1Open ↗
08/13/2026M00209207-I1Open ↗
08/13/2026M00328530-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
08/27/2019123692209Open ↗
08/27/2019123692209Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/04/2026M00328530-I1Open ↗
08/26/2026M00843473-P1Open ↗
08/26/2026M00843473-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
01/06/2010120238634Open ↗
12/09/2009120215677Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/21/2020123692209Open ↗
07/17/2014122064693Open ↗
07/09/2014122052884Open ↗
▸BISASBESTOS INSPECTION REPORT1
05/08/2012121067727Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
02/06/2017140603078Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01186535-I1Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
08/27/2019123692209Open ↗
03/11/2019140603078Open ↗
08/15/2016122064693Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/11/2019140603078Open ↗
08/15/2016122064693Open ↗
08/05/2015122052884Open ↗
Showing 3 of 5 on file for this type
▸BISNYCECC ANALYSIS1
02/06/2017140603078Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/17/2014122064693Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/06/2017140603078Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/12/2017140665796Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/06/2017140603078Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/18/2023102765241Open ↗
10/18/2023102765241Open ↗
09/15/2023102765241Open ↗
Showing 3 of 5 on file for this type
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
10/10/2023102765241Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
10/23/2023102765241Open ↗
05/09/2019140665796Open ↗
05/03/2019140665796Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/19/2018140665796Open ↗
08/15/2016122064693Open ↗
08/15/2016122064693Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
07/18/2012121143985Open ↗
05/08/2012121067727Open ↗
01/06/2010120238634Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
01/21/2020123692209Open ↗
01/21/2020123692209Open ↗
08/27/2019123692209Open ↗
▸BISSHED LETTER3
04/02/2014121143985Open ↗
09/18/2012120238634Open ↗
09/07/2012121143985Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
04/01/2013121143985Open ↗
▸BISCCD1-Construction Code Determination1
12/19/2012121067727Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
08/27/2019123692209Open ↗
08/27/2019123692209Open ↗
03/11/2019140603078Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms23
▸BISBOROUGH INTAKE FORM8
01/21/2020123692209Open ↗
05/09/2019140665796Open ↗
05/03/2019140665796Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET8
08/27/2019123692209Open ↗
07/17/2014122064693Open ↗
07/15/2014122052884Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
02/15/2019140603078Open ↗
04/21/2016122064693Open ↗
12/20/2012121067727Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/12/2017140665796Open ↗
02/06/2017140603078Open ↗
▸Other Documents9
▸DOB NOWManufacturer's Specifications3
08/13/2026M01002919-I1Open ↗
08/13/2026M01002919-P2Open ↗
08/13/2026M01002919-P1Open ↗
▸DOB NOWCalculations3
08/13/2026M01002919-P2Open ↗
08/13/2026M01002919-P1Open ↗
08/13/2026M01002919-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/16/2023102765241Open ↗
08/24/2010120215677Open ↗
▸BISPLOT DIAGRAM1
08/27/2019123692209Open ↗