Special Inspection Agency
ANDREW KATZ
Special Inspection Agency
7 jobs with open permitsBROOKLYN · 20MANHATTAN · 10QUEENS · 6
33 buildings
61
Total Filings
42
Jobs on File
33
Buildings Worked
7
Jobs w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Jobs by first filing month42 jobs all-time
0257Jul '19 · 1Aug '19 · 2Sep '19 · 3Oct '19 · 2Nov '19 · 1Dec '19 · 6Jan '20 · 3Feb '20 · 1Mar '20 · 4Apr '20 · 3May '20 · 2Oct '20 · 2Nov '20 · 1Dec '20 · 1May '21 · 1Nov '22 · 1Dec '22 · 2Jan '23 · 2Feb '23 · 1May '23 · 32020202120222023
bars = month · line = 3-mo average
Portfolio status
Browse jobs →
Open permit717%
Signed off3379%
Filed only25%
By job type
Alteration42
Most active buildings
All buildings →
28 EAST 60 STREETMANHATTAN · latest 02/10/2021
4 jobs
3023 3 AVENUEBRONX · latest 10/25/2023
2 jobs
236 BROADWAYBROOKLYN · latest 07/08/2020
2 jobs
4219 15 AVENUEBROOKLYN · latest 02/27/2020
2 jobs
317 GLENMORE AVENUEBROOKLYN · 2 open · latest 01/16/2020
2 jobs
2859 FLATBUSH AVENUEBROOKLYN · latest 09/03/2024
2 jobs
Most recent jobs
All jobs →
JobAddressTypeStatusFiledLatest permitDescription
B00305957 ↗1825 BENSON AVENUE
BROOKLYN
AlterationPermit Issued02/06/202008/10/2026INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM. APPLICATION FILED IN CONJUNCTION WITH NB#321254780. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00219399 ↗2859 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off01/13/202009/03/2024REVISED PLACES PER FDNY OBJECTION LETTER DATED JUNE 5 2023 2023-TMENGR-004016-PLAN
Q00348066 ↗7-12 VIRGINIA STREET
QUEENS
AlterationSigned-off05/10/202002/26/2024PLUMBING WORK IN CONJUNCTION WITH NB#421735590
X00274816 ↗3023 3 AVENUE
BRONX
AlterationSigned-off01/02/202010/25/2023FILING TO REGISTER 6 HOT WATER SLANT FIN BOILERS. ALL ASSOCIATED PL WORK FILED UNDER SEPARATE APPLICATION #X00274827.NO CHANGE IN USE, EGRE…
X00864989 ↗430 EAST 138 STREET
BRONX
AlterationSigned-off05/04/202305/16/2023#440 FACADE REPAIRS AS PER PLANS SUBMITTED. PLANSET SUBMITTED IS FOR ALL BUILDINGS ON THIS BLOCK/LOT. COMPLETE PW3 FILED UNDER X00215634. …
X00864994 ↗430 EAST 138 STREET
BRONX
AlterationSigned-off05/04/202305/16/2023#425 FACADE REPAIRS AS PER PLANS SUBMITTED. PLANSET SUBMITTED IS FOR ALL BUILDINGS ON THIS BLOCK/LOT. COMPLETE PW3 FILED UNDER X00215634. …
Counts cover all 42 jobs (42 DOB NOW). Dated by first filing; BIS jobs by first permit issuance.
42 DOB NOW jobs, anchored the same way as Buildings Worked. Status is the job's permit state today: open = at least one permit currently issued. BIS jobs show their raw permit status and are not counted as open.
All 42Open permit 7Signed off 33Filed only 2
42 jobs
JobAddressTypeStatusFiledLatest permitDescription
B00305957 ↗1825 BENSON AVENUE
BROOKLYN
AlterationPermit Issued02/06/202008/10/2026INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM. APPLICATION FILED IN CONJUNCTION WITH NB#321254780. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00219399 ↗2859 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off01/13/202009/03/2024REVISED PLACES PER FDNY OBJECTION LETTER DATED JUNE 5 2023 2023-TMENGR-004016-PLAN
Q00348066 ↗7-12 VIRGINIA STREET
QUEENS
AlterationSigned-off05/10/202002/26/2024PLUMBING WORK IN CONJUNCTION WITH NB#421735590
X00274816 ↗3023 3 AVENUE
BRONX
AlterationSigned-off01/02/202010/25/2023FILING TO REGISTER 6 HOT WATER SLANT FIN BOILERS. ALL ASSOCIATED PL WORK FILED UNDER SEPARATE APPLICATION #X00274827.NO CHANGE IN USE, EGRE…
X00864989 ↗430 EAST 138 STREET
BRONX
AlterationSigned-off05/04/202305/16/2023#440 FACADE REPAIRS AS PER PLANS SUBMITTED. PLANSET SUBMITTED IS FOR ALL BUILDINGS ON THIS BLOCK/LOT. COMPLETE PW3 FILED UNDER X00215634. …
X00864994 ↗430 EAST 138 STREET
BRONX
AlterationSigned-off05/04/202305/16/2023#425 FACADE REPAIRS AS PER PLANS SUBMITTED. PLANSET SUBMITTED IS FOR ALL BUILDINGS ON THIS BLOCK/LOT. COMPLETE PW3 FILED UNDER X00215634. …
X00865004 ↗430 EAST 138 STREET
BRONX
AlterationSigned-off05/04/202305/16/2023#441 FACADE REPAIRS AS PER PLANS SUBMITTED. PLANSET SUBMITTED IS FOR ALL BUILDINGS ON THIS BLOCK/LOT. COMPLETE PW3 FILED UNDER X00215634. …
M00816992 ↗156 FRONT STREET
MANHATTAN
AlterationSigned-off01/25/202302/22/2023SPRINKLER MODIFICATIONS FOR NEW STARBUCKS AT FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00822021 ↗4012 14 AVENUE
BROOKLYN
AlterationFiled — no permit on record02/09/2023——
M08046096 ↗101 DELANCEY STREET
MANHATTAN
AlterationSigned-off12/12/202201/16/2023FACADE REPAIR AS PER LOCAL LAW 11 INSPECTION. COMPLY WITH ECB VIOLATION 35651566X. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLIC…
M00809281 ↗58 EAST 56 STREET
MANHATTAN
AlterationSigned-off01/10/202301/13/2023FILING TO REGISTER (2) CEILING MOUNTED FORCED AIR FURNACES ON 001 SUPPLYING HEAT UPPER FLOORS. PREVIOUSLY FILED UNDER 122211659. NO CHANGE…
B08051320 ↗519 MARCY AVENUE
BROOKLYN
AlterationSigned-off12/12/202212/19/2022DIRECT REPLACEMENT OF 41 EXISTING COMBI BOILERS AS PER PLANS SUBMITTED. RECONNECT TO EXISTING GAS/HW/CW/DRAIN AND VENTING PIPING. NO CHANG…
B08041913 ↗100 HART STREET
BROOKLYN
AlterationSigned-off11/21/202212/09/2022COMBINATION OF EXISTING RESIDENTIAL APRATMENTS 4C AND 4D TO MAKE NEW APARTMENT - 4E. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00274827 ↗3023 3 AVENUE
BRONX
AlterationSigned-off12/19/201910/20/2022FILING TO REGISTER 7 HOT WATER HEATERS IN EXISTING BOILER ROOM. PROVIDE GAS PRESSURE TEST ON ALL GAS PIPING AS REQUIRED. BOILERS FILED UNDE…
B00219450 ↗2859 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off01/13/202008/09/2022EXTENSION OF EXISTING SPRINKLER SYSTEM PIPING TO PAINT SPRAY BOOTH AND MIXING ROOM FOR FIRE SUPPRESSION. NO CHANGE TO EGRESS, CO, OR ZONING.…
B00423119 ↗258 41 STREET
BROOKLYN
AlterationSigned-off11/04/202007/19/2021MODIFICATIONS TO EXISTING SPRINKLER PIPING ON 001 AND 002. FILED IN CONJUNCTION WITH ALT1 APPLICATION 321807826. NO CHANGE TO USE, EGRESS O…
M00479659 ↗2 PARK AVENUE
MANHATTAN
AlterationSigned-off05/10/202105/14/2021INTERIOR RENOVATION OF GROUND FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00406541 ↗4343 AMBOY ROAD
STATEN ISLAND
AlterationSigned-off10/26/202005/10/2021STOP N SHOP: DIRECT REPLACEMENTOF EXISTING (3) ROOFTOP GAS-FIRED AC UNITS. DISCONNECT/RECONNECT OF GAS PIPING FILED UNDER S00408253. NO CH…
Q00278568 ↗256-01 JERICHO TURNPIKE
QUEENS
AlterationPermit Issued10/21/202004/07/2021INSTALLATION OF MECHANICAL SYSTEM FOR PAINT SPRAY BOOTH THRU ROOF. NO CHANGE CO, EGRESS OR ZONING. OT DOB JOB# 421794268.
B00209053 ↗717 AVENUE C
BROOKLYN
AlterationSigned-off09/05/201904/06/2021INTERIOR RENOVATION OF APT C6. FILING JOB IN ORDER TO ADDRESS ECB VIOLATION # 39005039N. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00318336 ↗100-25 91 AVENUE
QUEENS
AlterationPermit Issued12/21/202003/31/2021INSTALLATION OF PREFABRICATED PAINT SPRAY BOOTH WITH HEAT AND PREFAB MIXING ROOM. INSTALLATION OF DUCT WORK THRU ROOF. DRY CHEM FILED UNDER …
M00211672 ↗2760 BROADWAY
MANHATTAN
AlterationPermit Issued09/09/201902/11/2021NEW SPRINKLER SYSTEM FOR MEZZ AND 001 FOR EXISTING DUANE READE. RE-CONNECT TO EXISTING SPRINKLER PIPING AND HEADS IN CEL INSTALL NEW SPRINKL…
M00215640 ↗28 EAST 60 STREET
MANHATTAN
AlterationSigned-off04/07/202002/10/2021INSTALL SPRINKLER HEADS WITH SPRINKLER PIPING CONNECT TO EX. SYSTEM ON 11TH, 12TH, AND 14TH FL AS PER PLANS. APPLICATION FILED AS SELF-CERTI…
B00260910 ↗918 EAST 12 STREET
BROOKLYN
AlterationSigned-off12/10/201910/29/2020INSTALLATION OF NEW COMBINED WATER SERVICE AND SPRINKLER SYSTEM. FILED IN CONJUNCTION WITH ALT 1 APP #321981539. NO CHANGE IN USE, EGRESS …
Q00210114 ↗114-03 QUEENS BOULEVARD
QUEENS
AlterationSigned-off08/20/201909/08/2020MINOR MODIFICATIONS TO THE EXISTING FUNERAL PREP ROOM AND TAHARA ROOM IN CELLAR. INSTALL NEW HVAC ON ROOF. NO CHANGE IN USE, EGRESS OR OCC…
Q00304705 ↗108-01 QUEENS BOULEVARD
QUEENS
AlterationSigned-off03/11/202007/23/2020MECHANICAL WORK AS PER PLANS FILED, IN CONJUNCTION WITH ALT1 420666381.
B00329655 ↗236 BROADWAY
BROOKLYN
AlterationSigned-off03/11/202007/08/2020MECHANICAL WORK AS PER PLANS FILED, IN CONJUNCTION WITH ALT1 322003522.
B00350428 ↗236 BROADWAY
BROOKLYN
AlterationSigned-off05/26/202006/19/2020application filed to install an electric hot water heater and piping in order to distribute hot water to fixtures installed by the landlord …
M00214881 ↗28 EAST 60 STREET
MANHATTAN
AlterationSigned-off04/07/202005/06/2020INSTALL SPRINKLER HEADS WITH SPRINKLER PIPING CONNECT TO EX. SYSTEM ON 5TH, 6TH, AND 7TH FL AS PER PLANS. APPLICATION FILED AS SELF-CERTIFIE…
M00215597 ↗28 EAST 60 STREET
MANHATTAN
AlterationSigned-off04/07/202005/06/2020INSTALL SPRINKLER HEADS WITH SPRINKLER PIPING CONNECT TO EX. SYSTEM ON 8TH, 9TH, AND 10TH FL AS PER PLANS. APPLICATION FILED AS SELF-CERTIFI…
Q00304691 ↗108-01 QUEENS BOULEVARD
QUEENS
AlterationSigned-off03/10/202004/30/2020PLUMBING WORK FOR NEW TENANT FIT OUT INVESTORS BANK IN CONJUNCTION WITH ALT2# 421779962
B00331473 ↗372 FULTON STREET
BROOKLYN
AlterationSigned-off03/16/202003/17/2020INSTALLATION OF AC UNITS ON ROOF. FILING TO OBTAIN CERTIFICATES OF COMPLIANCE.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00203080 ↗28 EAST 60 STREET
MANHATTAN
AlterationSigned-off08/15/201903/05/2020INSTALL SPRINKLER HEADS WITH SPRINKLER PIPING CONNECT TO EX. SYSTEM ON 3RD, AND 4TH FL AS PER PLANS. APPLICATION FILED AS SELF-CERTIFIED UND…
B00215374 ↗4219 15 AVENUE
BROOKLYN
AlterationSigned-off09/03/201902/27/2020INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS AS PER PLANS SUBMITTED. FILED IN CONJUNCTION WITH ALT2 APPLICATION #321535692. NO CHANGE IN…
B00258664 ↗317 GLENMORE AVENUE
BROOKLYN
AlterationPermit Issued12/28/201901/16/2020Install plumbing fixtures and sprinkler heads in selective areas as indicated. no change to egress, occupancy or use. filed in conjunction …
B00258441 ↗317 GLENMORE AVENUE
BROOKLYN
AlterationPermit Issued12/30/201912/30/2019New Mechanical systems for new tenant as per plans submitted. Filed in conjunction with job #321998488. No change to egress,occupancy or …
M00269909 ↗150 RIVERSIDE DRIVE
MANHATTAN
AlterationSigned-off12/19/201912/19/2019INSTALLATION OF (5) SPLIT AIR CONDITIONING SYSTEMS FOR 1ST FLOOR KITCHEN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00226252 ↗80 RICHARDS STREET
BROOKLYN
AlterationPermit Issued12/02/201912/02/2019INSTALLATION OF AIR CONDITIONING SYSTEM FOR TENANT ON 3RD FLOOR NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00253890 ↗1230 46TH STREET
BROOKLYN
AlterationSigned-off11/19/201911/19/2019INSTALLATION OF (3) HI-EFFICIENCY CONDENSING BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00207213 ↗652 KENT AVENUE
BROOKLYN
AlterationFiled — no permit on record10/18/2019——
B00239160 ↗4219 15 AVENUE
BROOKLYN
AlterationSigned-off10/10/201910/11/2019INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS SUBMITTED. FILED IN CONJUNCTION WITH ALT2 APPLICATION #321535692. NO CHANGE IN USE, EGRESS…
B00188548 ↗235 ST MARKS AVENUE
BROOKLYN
AlterationSigned-off07/16/201909/11/2019convert existing roof into open terrace
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
ANDREW KATZ ENGINEERS3012/06/2023
ASSOCIATED TECHNOLOGY INC.405/26/2020
OCEAN ENTERPRISES INC.411/10/2020
AVISHAY I. MAZOR, P.E.107/16/2019
BARBARA F KUPFERSTEIN, RA110/21/2020
KAPUSCINSKI LUONGO ARCHITECTS105/10/2021
KATZ ARCHITECTURE112/19/2022
SHMUEL D. FLAUM, ARCHITECT103/14/2024
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
BLUE USA CONSTR COMP INC*405/04/2023
SKH MECHANICAL CORP411/10/2020
AUTOMOTIVE FACILITY SVCS308/18/2023
SAFETY PLMBG & HTG LLC310/16/2023
B&B MECH PLBG & HTG LLC212/12/2022
BEDROCK PLBG. & HTG., INC205/26/2020
COOK & KRUPA LLC203/11/2020
COOL RITE COOLING CORP212/19/2019
PHILIP NABLE211/11/2020
PRODUCTION CONTRACT. LLC212/30/2019
VERRAZANO PLMBG CONT INC210/16/2023
A M B MECHANICAL INC111/19/2019
ABR PLBG&HTG CONTR INC101/10/2023
ALL-BORO REHAB CONST CORP103/14/2024
CAPITOL FIRE SPRINKLER CO101/25/2023
COPPER PLUMBING INC109/05/2019
DGC CAPITAL CONTRACTING C110/26/2020
I.M.P. PLBG & HTG CORP112/06/2023
J. CAIAZZO PLBG & HTG COR102/06/2020
KAUFMAN GROUP INC106/08/2020
L&J PLG & HTG CO OF NY IN111/19/2019
PLUMBING NYC, INC112/28/2019
ROCK E SMALL PLBG&HTG INC111/19/2019
SAFETY FIRE SPRINKLER COR108/05/2021
SCHUMACHER & FARLEY P&H C112/28/2019
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
FORTUSA REALTY CORP411/10/2020
ALPINE REFRIGERATION COMPANY111/11/2020
BEDNARK STUDIO, INC112/12/2019
BICAL DEVELOPMENT112/06/2023
BRONSTEIN PROPERTIES LLC103/10/2020
FMARK108/05/2021
HART ST APARTMENTS LLC101/05/2023
MARCY TOWERS LLC112/12/2022
NY PARK N SALEM INC111/10/2020
PPF OFF TWO PARK AVENUE OWNER LLC105/10/2021
SAMSON MANAGEMENT LLC101/25/2023
SHARP MANAGEMENT CORP.105/04/2023
THE STAHL ORGANIZATION109/09/2019
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
BURNHAM NATIONWIDE INC105/10/2021
IMA EXPEDITNG103/14/2024
Click a row for this entity's own jobs, plans and documents at that building.
BuildingFilingsMost Recent
7-12 VIRGINIA STREET ↗303/14/2024
2859 FLATBUSH AVENUE ↗312/06/2023
3023 3 AVENUE ↗407/13/2023
430 EAST 138 STREET ↗105/04/2023
430 EAST 138 STREET ↗105/04/2023
430 EAST 138 STREET ↗105/04/2023
4012 14 AVENUE ↗102/09/2023
156 FRONT STREET ↗101/25/2023
58 EAST 56 STREET ↗101/10/2023
100 HART STREET ↗201/05/2023
101 DELANCEY STREET ↗212/19/2022
519 MARCY AVENUE ↗112/12/2022
258 41 STREET ↗208/05/2021
2 PARK AVENUE ↗105/10/2021
100-25 91 AVENUE ↗112/21/2020
918 EAST 12 STREET ↗211/30/2020
114-03 QUEENS BOULEVARD ↗211/11/2020
28 EAST 60 STREET ↗911/10/2020
4343 AMBOY ROAD ↗110/26/2020
256-01 JERICHO TURNPIKE ↗110/21/2020
4219 15 AVENUE ↗406/08/2020
236 BROADWAY ↗205/26/2020
372 FULTON STREET ↗103/16/2020
108-01 QUEENS BOULEVARD ↗203/11/2020
1825 BENSON AVENUE ↗102/06/2020
317 GLENMORE AVENUE ↗412/30/2019
150 RIVERSIDE DRIVE ↗112/19/2019
80 RICHARDS STREET ↗112/02/2019
1230 46TH STREET ↗111/19/2019
652 KENT AVENUE ↗110/18/2019
2760 BROADWAY ↗109/09/2019
717 AVENUE C ↗109/05/2019
235 ST MARKS AVENUE ↗107/16/2019
▾Special Inspection Requirements — 150
DateRequirementBuildingInspectorRole
06/20/2024Sprinkler Systems2859 FLATBUSH AVENUEANDREW KATZspecial
03/27/2024HVAC and service water heating system controls 7-12 VIRGINIA STREETShmuel Flaumenergy_progress
03/27/2024Maintenance information7-12 VIRGINIA STREETShmuel Flaumenergy_progress
03/27/2024HVAC and service water heating equipment 7-12 VIRGINIA STREETShmuel Flaumenergy_progress
03/27/2024HVAC insulation and sealing 7-12 VIRGINIA STREETShmuel Flaumenergy_progress
03/27/2024Fire-Resistant Penetrations and Joints7-12 VIRGINIA STREETANDREW KATZspecial
08/29/2023Sprinkler Systems2859 FLATBUSH AVENUEANDREW KATZspecial
07/14/2023Fire-Resistant Penetrations and Joints3023 3 AVENUEANDREW KATZspecial
07/14/2023Heating Systems3023 3 AVENUEANDREW KATZspecial
07/14/2023Maintenance information3023 3 AVENUEANDREW KATZenergy_progress
07/14/2023HVAC and service water heating system controls 3023 3 AVENUEANDREW KATZenergy_progress
07/14/2023HVAC and service water heating equipment 3023 3 AVENUEANDREW KATZenergy_progress
07/13/2023Maintenance information3023 3 AVENUEANDREW KATZenergy_progress
07/13/2023HVAC and service water heating system controls 3023 3 AVENUEANDREW KATZenergy_progress
07/13/2023Fire-Resistant Penetrations and Joints3023 3 AVENUEANDREW KATZspecial
07/13/2023HVAC and service water heating equipment 3023 3 AVENUEANDREW KATZenergy_progress
07/13/2023Heating Systems3023 3 AVENUEANDREW KATZspecial
06/08/2023Maintenance information2859 FLATBUSH AVENUEANDREW KATZenergy_progress
06/08/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)2859 FLATBUSH AVENUEDavid Katzspecial
06/08/2023Mechanical Systems2859 FLATBUSH AVENUEANDREW KATZspecial
06/08/2023Energy Code Compliance Inspections2859 FLATBUSH AVENUEDavid Katzprogress
06/08/2023Final2859 FLATBUSH AVENUE—progress
04/26/2023Tenant Protection Plan Compliance430 EAST 138 STREETANDREW KATZspecial
04/26/2023Masonry430 EAST 138 STREETDavid Katzspecial
04/26/2023Final430 EAST 138 STREETDavid Katzprogress
02/06/2023Tenant Protection Plan Compliance4012 14 AVENUEANDREW KATZspecial
02/01/2023Fire-Resistant Penetrations and Joints4012 14 AVENUEDavid Katzspecial
01/23/2023Sprinkler Systems156 FRONT STREETDavid Katzspecial
01/23/2023Tenant Protection Plan Compliance156 FRONT STREETANDREW KATZspecial
01/09/2023Final101 DELANCEY STREETDavid Katzprogress
01/09/2023Tenant Protection Plan Compliance101 DELANCEY STREETANDREW KATZspecial
01/09/2023Masonry101 DELANCEY STREETDavid Katzspecial
01/09/2023Structural Stability – Alterations of existing buildings101 DELANCEY STREETDavid Katzspecial
01/06/2023Final100 HART STREETDavid Katzprogress
01/06/2023Energy Code Compliance Inspections100 HART STREETDavid Katzprogress
01/06/2023Tenant Protection Plan Compliance100 HART STREETANDREW KATZspecial
01/06/2023Lighting in dwelling units100 HART STREETDavid Katzenergy_progress
01/05/2023Tenant Protection Plan Compliance100 HART STREETANDREW KATZspecial
01/05/2023Energy Code Compliance Inspections100 HART STREETDavid Katzprogress
01/05/2023Final100 HART STREETDavid Katzprogress
01/05/2023Lighting in dwelling units100 HART STREETDavid Katzenergy_progress
12/16/2022Final101 DELANCEY STREETDavid Katzprogress
12/16/2022Tenant Protection Plan Compliance101 DELANCEY STREETANDREW KATZspecial
12/16/2022Structural Stability – Alterations of existing buildings101 DELANCEY STREETDavid Katzspecial
12/16/2022Masonry101 DELANCEY STREETDavid Katzspecial
12/08/2022Tenant Protection Plan Compliance519 MARCY AVENUEANDREW KATZspecial
12/06/2022Energy Code Compliance Inspections3023 3 AVENUEANDREW KATZprogress
12/06/2022Fire-Resistant Penetrations and Joints3023 3 AVENUEANDREW KATZspecial
12/06/2022Maintenance information3023 3 AVENUEANDREW KATZenergy_progress
12/06/2022HVAC and service water heating system controls 3023 3 AVENUEANDREW KATZenergy_progress
Latest 50 of 150.
▾Documents — 357 on file (BIS + DOB NOW)
▸Plans & Drawings79
▸DOB NOWPlans/Sketch - Sprinkler22
09/05/2026M00203080-I1Request digital key ↗
09/05/2026M00215597-I1Request digital key ↗
09/05/2026M00214881-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems18
09/05/2026M00269909-I1Request digital key ↗
09/02/2026B00239160-I1Request digital key ↗
09/02/2026B00207213-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing17
09/02/2026B00215374-I1Request digital key ↗
09/02/2026B00209053-I1Request digital key ↗
09/02/2026B00253890-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch16
09/03/2026M00479659-I1Request digital key ↗
09/01/2026M00809281-I1Request digital key ↗
09/01/2026M00816992-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00188548-I1Request digital key ↗
09/01/2026B00188548-I1Open ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/02/2026B00305957-I1Request digital key ↗
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/13/2026B00331473-I1Open ↗
08/13/2026M00269909-I1Open ↗
08/13/2026M00479659-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications211
▸DOB NOWProgress Inspector Seal & Signature76
09/27/2026X00274816-P1Open ↗
09/27/2026X00274816-P1Open ↗
09/27/2026X00274816-P1Open ↗
Showing 3 of 76 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature71
09/27/2026X00274816-P1Open ↗
09/27/2026X00274816-P1Open ↗
09/23/2026X00274816-S1Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature64
09/05/2026M00203080-I1Open ↗
09/05/2026M00215597-I1Open ↗
09/05/2026M00215597-P1Open ↗
Showing 3 of 64 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan7
08/13/2026B00209053-I1Open ↗
08/13/2026B00253890-I1Open ↗
08/13/2026M00211672-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos45
▸DOB NOWDEP ACP-5: Asbestos Assessment Report43
09/05/2026M00203080-I1Open ↗
09/05/2026M00215597-P1Open ↗
09/05/2026M00215597-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/28/2026Q00304705-I1Open ↗
08/13/2026Q00304691-I1Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00479659-I1Open ↗
08/13/2026B00219399-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00331473-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026B00207213-P1Open ↗
08/13/2026B00207213-I1Open ↗
09/01/2026B00207213-I1Open ↗
▸DOB NOWLandmark Approval1
09/01/2026B00207213-P1Open ↗
▸Other Documents2
▸DOB NOWDHCR Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00188548-I1Open ↗