← Back
BuildNYC
Elevator apt, semi-fireproof with stores
225 WEST 23RD STREET
MANHATTAN · BIN 1014148
💬 Discuss this project
1930Year Built
7Stories
D7Building Class
C2-7AZoning
66,524 sfGross Floor Area
138Units
LL97 CoveredRent Stabilized3 Active Violations ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: 5537 - 225 West 23rd and 220 West 24th S Treet · 12,961 sf lot · 5.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAkelius6p · 3 filings · 20 docs
BulkheadElevator bulkhead structural work2p · 1 filing · 11 docs
Floor 7Corridor and lobby ventilation10p · 1 filing · 20 docs
Floor 6Unit 6P14p · 2 filings · 20 docs
Floor 5Corridor and lobby ventilation10p · 1 filing · 20 docs
Floor 4Corridor and lobby ventilation10p · 1 filing · 20 docs
Floor 3Corridor and lobby ventilation10p · 1 filing · 20 docs
Floor 2Unit 2JUnder Construction21p · 2 filings · 20 docs
Floor 1H&R Block, Unit 1GUnder Construction43p · 6 filings · 20 docs
CellarAkelius1p · 1 filing · 9 docs
Site & exteriorH&R Block, Metro by T-Mobile29p · 9 filings · 20 docs
Filed — no permit issuedOasis Cafe1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5537 - 225 West 23rd and 220 West 24th S Treet5007/08/2026
Akelius Real Estate2310/06/2026
5537-225 W23 220 W24 MN2003/21/2026
2324 Realty1903/21/2026
23rd Street Owners1303/21/2026
Shipnation503/22/2026
2324 Realty LLC Co Abs Partner203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Akelius Real Estate Management610/05/2026
Mike Polychroniades P.E606/17/2026
James Stout Architect & Associates105/27/2026
Farhad Bassiri-Tehrani105/15/2026
Studio Huji106/27/2025
VPH Engineering Services206/06/2025
Lawrence Group106/06/2025
Arquitectura Varela102/10/2025
Enthink Engineers305/12/2023
Syed Shoaib104/24/2023
Lawless & Mangione104/19/2023
Emtg Consultants410/28/2022
Leon Skvirsky PE209/02/2021
PS Engineers108/17/2020
Gurvinder Singh103/09/2020
Skyline202/05/2020
Murdoch Engineering103/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JLC Code Consulting1003/21/2026
Signs Cad203/21/2026
Code403/21/2026
Codegreen303/21/2026
Sandeep Kaur103/21/2026
Akelius Real Estate Management203/21/2026
Building Brothers403/21/2026
Kazam Consultants203/21/2026
PS Engineers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold1007/08/2026
Cedar Electrical ContractorsElectrical603/21/2026
Platinum Services NYScaffold603/21/2026
Pine Street CarpentersGeneral Contractor407/08/2026
CVM ConstructionGeneral Contractor407/08/2026
Galaxy ElectricElectrical403/22/2026
Takos and K ElectricElectrical303/22/2026
Takos and K ElectricElectrical303/21/2026
Andamio ScaffoldingScaffold303/21/2026
SNB Electrical ContngElectrical303/21/2026
Ariana ContractingPlumbing207/08/2026
Lawrence Exterior Restorationspecialty_contractor207/08/2026
National MaintenanceSign hanger207/08/2026
Atlas Construction of NYGeneral Contractor207/08/2026
Vrisi Plumbing & HeatingPlumbing107/08/2026
Century Electric CoElectrical103/22/2026
Signs CadElectrical103/21/2026
Timothy Coleman LicensedElectrical103/21/2026
Godfrey's Refrigerationspecialty_contractor107/08/2026
Proto ConstructionGeneral Contractor104/09/2026
Sunkeeper Solar Electricspecialty_contractor107/04/2026
Atlas Construction of NYScaffold107/08/2026
Two-Tone ContractingScaffold107/08/2026
Paul SignsSign hanger107/08/2026
Signs CadSign hanger107/08/2026
Master 2 Plumbing & HeatingPlumbing107/08/2026
MPC Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544310/05/2026
Mike Polychroniades8407306/17/2026
James J Stout Architects5913105/27/2026
Jack Green Associates422306/06/2025
Joseph Martines PE1428604/24/2023
Skyline Engineering267402/05/2020
Building Lifecycle
All (196)Filed (35)Permit Issued (31)Signed Off (18)Facade (FISP) (12)Violation (60)Inspection (8)Objection (2)Special Inspection (30)
10/16/2026
Signed off — Alteration
New plumbing fixtures as per plans
M01355805-S4
10/05/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 2J LOCATED ON THE SECOND FLOOR. THE GAS METER AT CELLAR SHALL BE SHUT OFF BY THE UTILITY COMPANY. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01289436-P1
09/09/2026
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 2J LOCATED ON THE SECOND FLOOR. THE GAS METER AT CELLAR SHALL BE SHUT OFF BY THE UTILITY COMPANY. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01289436-S1
06/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2026
Filed — Alteration
New plumbing fixtures as per plans
M01355805-P2
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
mike polychroniades
06/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
mike polychroniades
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
mike polychroniades
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
mike polychroniades
06/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
06/08/2026
Special inspection requirement — Final
EUGENE BIFULCO
06/08/2026
Special inspection requirement — Metering
EUGENE BIFULCO
06/08/2026
Special inspection requirement — Lighting in dwelling units
EUGENE BIFULCO
06/08/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
06/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
06/01/2026
Permit issued — Solar
M01405401-I1-SL
05/29/2026
Permit issued — Mechanical Systems
M01355805-S3-MS
05/28/2026
Permit issued — Plumbing
M01355805-S4-PL
05/27/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.
M01405401-I1
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES J STOUT
05/20/2026
Special inspection requirement — Final
JAMES J STOUT
05/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES J STOUT
05/20/2026
Special inspection requirement — Air barrier - visual inspection
JAMES J STOUT
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES J STOUT
05/20/2026
Special inspection requirement — Maintenance information
JAMES J STOUT
05/15/2026
Filed — Alteration
INSTALL NEW ILLUMINATED SIGN READ "OASIS CAFE" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M01401694-I1
05/14/2026
Filed — Alteration
New plumbing fixtures as per plans
M01355805-S4
05/14/2026
Filed — Alteration
New plumbing fixtures as per plans
M01355805-S3
05/07/2026
Signed off — Alteration
New plumbing fixtures as per plans
M01355805-S1
05/06/2026
Permit issued — Construction Fence
M01355805-S1-FN
05/05/2026
Special inspection requirement — Final
mike polychroniades
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/02/2026
Filed — Alteration
New plumbing fixtures as per plans
M01355805-P1
04/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/15/2026
Special inspection requirement — Final
mike polychroniades
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/06/2026
Permit issued — General Construction
M01355805-I1-GC
02/24/2026
Filed — Alteration
New plumbing fixtures as per plans
M01355805-S1
02/22/2026
Filed — Alteration
New plumbing fixtures as per plans
M01355805-I1
02/09/2026
Permit issued — Plumbing
M01289436-S1-PL
01/21/2026
Permit issued — General Construction
M01289436-I1-GC
01/21/2026
Violation issued (HPD, closed)
C
01/19/2026
Violation issued (HPD, closed)
C
11/21/2025
Signed off — Alteration
ERECT ILLUMINATED WALL SIGN "BLOCK ADVISORS" AS SHOWN ON DRAWINGS FILED HEREWITH.
M01210520-I1
10/17/2025
Objection resolved — Addressed
10/14/2025
Objection raised — Scope
10/04/2025
Violation issued (ECB, closed)
Unknown
09/26/2025
Signed off — Alteration
Mechanical modification as per plans filed herewith. No change in use, egress or occupancy.
M01223089-I1
09/26/2025
Signed off — Alteration
Mechanical modification as per plans filed herewith. No change in use, egress or occupancy.
M01223089-S2
09/26/2025
Signed off — Alteration
Mechanical modification as per plans filed herewith. No change in use, egress or occupancy.
M01223089-S1
09/23/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 2J LOCATED ON THE SECOND FLOOR. THE GAS METER AT CELLAR SHALL BE SHUT OFF BY THE UTILITY COMPANY. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01289436-S1
09/23/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 2J LOCATED ON THE SECOND FLOOR. THE GAS METER AT CELLAR SHALL BE SHUT OFF BY THE UTILITY COMPANY. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01289436-I1
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSunkeeper Solar Electric06/01/2026
DOB NOWMechanical SystemsPermit IssuedAtlas Construction of NY05/29/2026
DOB NOWPlumbingSigned-offMaster 2 Plumbing & Heating05/28/2026
DOB NOWConstruction FenceSigned-offAtlas Construction of NY05/06/2026
DOB NOWGeneral ConstructionPermit IssuedAtlas Construction of NY04/06/2026
DOB NOWPlumbingSigned-offVrisi Plumbing & Heating02/09/2026
DOB NOWGeneral ConstructionPermit IssuedProto Construction01/21/2026
DOB NOWGeneral ConstructionSigned-offPine Street Carpenters07/11/2025
DOB NOWMechanical SystemsSigned-offPine Street Carpenters07/11/2025
DOB NOWSignSigned-offSigns Cad06/27/2025
DOB NOWMechanical SystemsSigned-offPine Street Carpenters06/13/2025
DOB NOWGeneral ConstructionSigned-offPine Street Carpenters06/13/2025
DOB NOWPlumbingSigned-offMPC Plumbing & Heating06/13/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY02/10/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY02/10/2025
DOB NOWGeneral ConstructionSigned-offLawrence Exterior Restoration05/15/2023
DOB NOWStructuralSigned-offLawrence Exterior Restoration05/15/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding05/12/2023
DOB NOWMechanical SystemsSigned-offGodfreys Refrigeration02/23/2022
DOB NOWSignSigned-offPaul Signs09/10/2021
DOB NOWSidewalk ShedPermit IssuedKings Group NY05/05/2021
DOB NOWGeneral ConstructionSigned-offCVM Construction03/25/2021
DOB NOWSidewalk ShedPermit IssuedKings Group NY02/24/2021
DOB NOWSignSigned-offNational Maintenance08/18/2020
DOB NOWSupported ScaffoldPermit IssuedTwo-Tone Contracting08/17/2020
DOB NOWPlumbingSigned-offAriana Contracting07/21/2020
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/17/2020
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/11/2020
DOB NOWPlumbingSigned-offAriana Contracting02/12/2020
DOB NOWStructuralPermit IssuedCVM Construction10/25/2019
DOB NOWSignSigned-offNational Maintenance03/20/2019
BISOTISSUEDThe Puma Home Repair and04/20/2022
BISOTISSUEDCVM Construction08/24/2021
BISOTISSUEDCVM Construction11/13/2020
BISOTISSUEDCVM Construction07/14/2020
BISOTISSUEDCVM Construction02/18/2020
BISOTISSUEDCVM Construction12/03/2019
BISOTISSUEDProto Construction06/12/2019
BISPLISSUEDDelta-Sigma Mechanical05/30/2019
BISOTISSUEDProto Construction05/22/2019
+ 41 more permits on file
1 project · most recent 06/17/2026
Heating and Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScope
06/17/2026Permit IssuedAtlas Construction of NYHeating and Air Conditioning Systems, Refrigeration Systems
2 projects · most recent 10/05/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/05/2026Signed-offVrisi Plumbing & HeatingGas, Water/Sanitary
06/17/2026Signed-offMaster 2 Plumbing & HeatingWater/Sanitary
25 projects · most recent 06/17/2026
General Wiring
FiledStatusContractorScope
06/17/2026Permit IssuedKJK Electric—
04/30/2026Permit IssuedSunkeeper Solar Electric2 meters, 1 new_meters
04/28/2026Permit IssuedGalaxy ElectricGeneral Wiring
04/21/2026Permit IssuedQec Electrical SvceGeneral Wiring
03/03/2026Permit IssuedQec Electrical Svce—
11/05/2025CompleteSigns Cad—
08/26/2025Permit IssuedSNB Electrical ContngGeneral Wiring
02/10/2025CompleteRichard Neu—
03/27/2024CompleteGalaxy ElectricGeneral Wiring
06/01/2023CompleteGalaxy Electric—
05/16/2023CompleteBorowide Elect'l Contractors—
06/29/2022Permit IssuedGalaxy ElectricGeneral Wiring
02/16/2022CompleteGalaxy ElectricGeneral Wiring
01/28/2022CompleteGalaxy ElectricGeneral Wiring
11/19/2021CompleteGalaxy ElectricGeneral Wiring
1 project · most recent 02/05/2020
Steel
FiledStatusContractorScope
02/05/2020Permit IssuedCVM ConstructionSteel
1 project · most recent 05/27/2026
FiledStatusContractorScope
05/27/2026Permit IssuedSunkeeper Solar Electric76 panels, 40.3 kw, 19,000 roof_area_sqft
3 projects · most recent 08/17/2020
Sidewalk Shed Scaffold
FiledStatusContractorScope
08/17/2020Permit IssuedTwo-Tone ContractingScaffold
08/04/2020Permit IssuedKings Group NYSidewalk Shed
03/09/2020Permit IssuedKings Group NYSidewalk Shed
1 project · most recent 10/05/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
10/05/2026Signed-offVrisi Plumbing & HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
06/17/2026Energy Code Compliance Inspectionsmike polychroniadesprogress
06/17/2026Tenant Protection Plan Compliance—special
06/17/2026Fire-Resistant Penetrations and Jointsmike polychroniadesspecial
06/16/2026Tenant Protection Plan Compliance—special
06/15/2026Energy Code Compliance Inspectionsmike polychroniadesprogress
06/15/2026Fire-Resistant Penetrations and Jointsmike polychroniadesspecial
06/08/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
06/08/2026MeteringEUGENE BIFULCOenergy_progress
06/08/2026Lighting controlsEUGENE BIFULCOenergy_progress
06/08/2026Lighting in dwelling unitsEUGENE BIFULCOenergy_progress
06/08/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
06/08/2026FinalEUGENE BIFULCOprogress
05/20/2026Maintenance informationJAMES J STOUTenergy_progress
05/20/2026Energy Code Compliance InspectionsJAMES J STOUTprogress
05/20/2026Structural Stability – Alterations of existing buildingsJAMES J STOUTspecial
05/20/2026Fire-Resistant Penetrations and JointsJAMES J STOUTspecial
05/20/2026FinalJAMES J STOUTprogress
05/20/2026Air barrier - visual inspectionJAMES J STOUTenergy_progress
05/05/2026Fire-Resistant Penetrations and Joints—special
05/05/2026Tenant Protection Plan Compliance—special
05/05/2026Finalmike polychroniadesprogress
04/15/2026Tenant Protection Plan Compliance—special
04/15/2026Finalmike polychroniadesprogress
04/15/2026Fire-Resistant Penetrations and Joints—special
09/18/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
Latest 25 of 74.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Oasis CafeRestaurant / Food Service—
Project M01401694 Alteration · Approved · 05/15/2026
H&R BlockRetailFloor 1
Project M01210520 Alteration · LOC Issued · 06/27/2025
Project M01223089 Alteration · LOC Issued · 06/06/2025
Metro by T-MobileRetailFloor 1
Project M00364712 Alteration · LOC Issued · 08/14/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,196 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch25
09/05/2026M00031334-I1Request digital key ↗
09/03/2026M00547384-P1Request digital key ↗
09/03/2026M00547384-P2Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/04/2026M00332566-I1Request digital key ↗
08/15/2026M00332566-P1Request digital key ↗
08/15/2026M00328939-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00188284-P1Request digital key ↗
09/05/2026M00188284-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00272482-I1Request digital key ↗
09/04/2026M00366879-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00372849-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00364712-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00469744-I1Request digital key ↗
▸Applications & Permits185
▸BISWORK PERMIT APPLICATION103
04/20/2022140881160Open ↗
07/14/2020140922170Open ↗
02/18/2020140881160Open ↗
Showing 3 of 103 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION82
02/13/2024140950406Open ↗
11/09/2022140881160Open ↗
10/03/2022140881160Open ↗
Showing 3 of 82 on file for this type
▸Seals & Professional Certifications319
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION93
04/24/2020140712968Open ↗
04/24/2020140712968Open ↗
03/27/2020140728274Open ↗
Showing 3 of 93 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT41
07/09/2020140922170Open ↗
01/23/2020140884283Open ↗
01/14/2020140881160Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
10/15/2026M01355805-P1Open ↗
10/06/2026M01289436-P1Open ↗
10/06/2026M01289436-P1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/05/2026M00188284-P1Open ↗
09/05/2026M00188284-I1Open ↗
09/05/2026M00272482-I1Open ↗
Showing 3 of 35 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY29
09/11/2020140950406Open ↗
07/09/2020140922170Open ↗
01/23/2020140884283Open ↗
Showing 3 of 29 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION28
07/09/2020140922170Open ↗
01/23/2020140884283Open ↗
01/14/2020140881160Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
10/06/2026M01289436-P1Open ↗
09/12/2026M01223089-S1Open ↗
09/12/2026M01223089-S1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/25/2021140950406Open ↗
Showing 1 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment50
▸BISSCHEDULE B - PLUMBING23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
01/16/2020140728274Open ↗
01/10/2020140728274Open ↗
07/31/2019140847270Open ↗
Showing 3 of 22 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection44
▸BISTENANT PROTECTION PLAN AND NOTES35
01/25/2021140950406Open ↗
07/09/2020140922170Open ↗
01/23/2020140884283Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWTenant Protection Plan9
09/05/2026M00188284-I1Open ↗
09/05/2026M00188284-P1Open ↗
09/05/2026M00272482-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos65
▸BISASBESTOS: CERTIFICATION (DEP ACP5)39
09/11/2020140950406Open ↗
07/09/2020140922170Open ↗
01/23/2020140884283Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/05/2026M00272482-I1Open ↗
09/04/2026M00366879-I1Open ↗
08/31/2026M00858859-S1Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/05/2026M00188284-I1Open ↗
09/03/2026M00547384-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/10/2019140861011Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance178
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY62
01/25/2021140950406Open ↗
11/06/2020140922170Open ↗
08/10/2020140879137Open ↗
Showing 3 of 62 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS46
04/24/2020140712968Open ↗
03/27/2020140728274Open ↗
03/27/2020140728274Open ↗
Showing 3 of 46 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS29
09/11/2020140950406Open ↗
07/09/2020140922170Open ↗
01/23/2020140884283Open ↗
Showing 3 of 29 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS29
08/10/2020140879137Open ↗
07/01/2020140732358Open ↗
04/24/2020140712968Open ↗
Showing 3 of 29 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/03/2023140881160Open ↗
11/06/2020140922170Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/03/2023140881160Open ↗
▸BISLIGHTING CONTROLS1
01/03/2023140881160Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
01/03/2023140881160Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/03/2023140881160Open ↗
▸BISINTERIOR LIGHTING POWER1
01/03/2023140881160Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/03/2023140881160Open ↗
▸BISFENESTRATION AREAS1
01/03/2023140881160Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/03/2023140881160Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00547384-I1Open ↗
▸Inspections & Test Reports73
▸BISTECHNICAL REPORT: RESPONSIBILITY69
01/25/2021140950406Open ↗
11/06/2020140922170Open ↗
11/06/2020140922170Open ↗
Showing 3 of 69 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/03/2023140881160Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/03/2023140881160Open ↗
▸Approvals, Objections & Sign-offs50
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST38
01/03/2023140881160Open ↗
11/06/2020140922170Open ↗
08/10/2020140879137Open ↗
Showing 3 of 38 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/20/2022140881160Open ↗
Showing 1 of 3 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
01/03/2023140881160Open ↗
▸Cost, Insurance & Ownership83
▸BISCOST AFFIDAVIT81
09/11/2020140950406Open ↗
08/10/2020140879137Open ↗
07/09/2020140922170Open ↗
Showing 3 of 81 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/03/2023140881160Open ↗
11/06/2020140922170Open ↗
▸Filing & Intake Forms112
▸BISBOROUGH INTAKE FORM34
04/24/2020140712968Open ↗
03/27/2020140728274Open ↗
02/28/2020140728274Open ↗
Showing 3 of 34 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET30
09/11/2020140950406Open ↗
07/09/2020140922170Open ↗
01/23/2020140884283Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION28
11/09/2022140881160Open ↗
02/03/2022140881160Open ↗
08/17/2021140881160Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING COVER SHEET20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/04/2020140881160Open ↗
Showing 1 of 2 on file for this type