| Owner | Filings | Most Recent |
|---|---|---|
| CIRCLE REALTY GROUP | 353 | 09/22/2026 |
| PRESERV BUILDING RESTORATION MANAGE | 7 | 09/12/2026 |
| INTERSYSTEM S&S CORP | 12 | 07/08/2026 |
| PRATT CONSTRUCTION INC. | 5 | 03/22/2026 |
| 14 SO WILLIAMS PORT HOLD C O B | 622 | 03/22/2026 |
| 1450 WILLIAMSPORT HOLDING | 2 | 03/22/2026 |
| A & E MECHANICAL CORP | 2 | 03/22/2026 |
| BALMEL PARK LLC | 1 | 03/22/2026 |
| 14 S WILLIAM SPORT HOLDINGS | 5 | 03/22/2026 |
| PENNSYLVANIA BUILDING COMPANY | 227 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ALWAYS FAST SERVICES CORP | 7 | 08/26/2026 |
| MKNH ARCHITECTS | 25 | 08/21/2026 |
| M. CHETRIT CONSULTING ENGINEERS, PC | 27 | 08/05/2026 |
| SONI ENGINEERING CONSULTING | 2 | 08/04/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 2 | 07/31/2026 |
| SOCOTEC, INC. | 1 | 03/31/2026 |
| MOLONEY CONSULTING ENGINEERING PLLC | 3 | 03/11/2026 |
| M. CHETRIT CONSULTING ENGINEERS P.C | 44 | 08/13/2025 |
| RICHARD KORNBLAU | 5 | 11/21/2024 |
| ASHRAF CORP | 1 | 12/11/2018 |
| LIGHT HOUSE | 2 | 06/21/2018 |
| MCRB SERVICE CORP | 1 | 05/09/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| EA DESIGN GROUP | 126 | 03/21/2026 |
| RETHY ASSOCIATES | 24 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 5 | 03/21/2026 |
| HH BUILDING CONSULTING & ARCHITECTU | 8 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RINNOVO CONSTRUCTION, LLC | General Contractor | 20 | 07/08/2026 |
| D.B.J. CONTRACTING CORP | General Contractor | 15 | 07/08/2026 |
| MONUMENTAL CONSTRUCTION * | General Contractor | 11 | 09/16/2026 |
| A.W. & S. CONSTRUCTION CO | General Contractor | 11 | 09/12/2026 |
| PRATT CONSTRUCTION & REST | General Contractor | 10 | 07/08/2026 |
| THEODORE WILLIAMS CONSTR | General Contractor | 6 | 03/21/2026 |
| WILLIAM C. GERAKARIS P&H | Plumbing | 6 | 09/18/2026 |
| ALL TECH MECHANICAL INC | General Contractor | 6 | 07/08/2026 |
| UNISOL INC | General Contractor | 6 | 07/08/2026 |
| AQUEDUCT MECHANICAL CORP | Fire Protection | 6 | 07/08/2026 |
| DARBY CONSTRUCTION SVC LL | General Contractor | 5 | 07/08/2026 |
| AQUEDUCT MECHANICAL CORP | Plumbing | 5 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 4 | 09/12/2026 |
| DENKO MECHANICAL INC | Fire Protection | 4 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 4 | 07/08/2026 |
| PRESERV BLD RESTOR MGT IN | General Contractor | 3 | 08/26/2026 |
| TORRONE, ARTHUR | Electrical | 3 | 03/21/2026 |
| SENID PLBG & HTG CORP | Electrical | 3 | 03/21/2026 |
| FIREQUEST CORP | Fire Protection | 3 | 07/08/2026 |
| TAURINO MANAGEMENT, INC | General Contractor | 3 | 03/21/2026 |
| AUTHENTIC PLBG CORP | Plumbing | 3 | 08/25/2026 |
| A PLUS PLUMBING CORP | Fire Protection | 2 | 08/18/2026 |
| METROPOLITAN OPERA ASSOCI | Electrical | 2 | 03/21/2026 |
| JLC ELEC'L CONTR'G INC | Electrical | 2 | 03/22/2026 |
| PHASE 3 INTERIORS LLC | General Contractor | 2 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ASSURE PROFESSIONAL ENGIN | 6962 | 19 | 08/05/2026 |
| SONI ENGINEERING CONSULTI | 9819 | 2 | 08/04/2026 |
| CROSSCHECK INSPECTION SER | 544 | 9 | 04/07/2026 |
| SOCOTEC, INC. | 301 | 1 | 03/31/2026 |
| JOSEPH MARTINES PE, PLLC | 1428 | 59 | 08/13/2025 |
| RICHARD B. KORNBLAU, AIA | 3208 | 3 | 11/21/2024 |
| RICHARD H. BALSER ENGINEE | 3028 | 1 | 09/05/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | WILLIAM C. GERAKARIS P&H | 09/17/2026 |
| DOB NOW | Plumbing | Permit Issued | WILLIAM C. GERAKARIS P&H | 09/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MONUMENTAL CONSTRUCTION * | 09/15/2026 |
| DOB NOW | General Construction | Permit Issued | MONUMENTAL CONSTRUCTION * | 09/14/2026 |
| DOB NOW | General Construction | Permit Issued | A.W. & S. CONSTRUCTION CO | 09/10/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 09/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | A.W. & S. CONSTRUCTION CO | 09/10/2026 |
| DOB NOW | Plumbing | Permit Issued | WILLIAM C. GERAKARIS P&H | 08/28/2026 |
| DOB NOW | Sprinklers | Permit Issued | AUTHENTIC PLBG CORP | 08/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | A PLUS PLUMBING CORP | 08/17/2026 |
| DOB NOW | Plumbing | Permit Issued | AUTHENTIC PLBG CORP | 08/14/2026 |
| DOB NOW | Plumbing | Permit Issued | WILLIAM C. GERAKARIS P&H | 08/07/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | A.W. & S. CONSTRUCTION CO | 08/05/2026 |
| DOB NOW | General Construction | Permit Issued | A.W. & S. CONSTRUCTION CO | 08/03/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PRESERV BLD RESTOR MGT IN | 08/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | A PLUS PLUMBING CORP | 07/31/2026 |
| DOB NOW | Plumbing | Permit Issued | WILLIAM C. GERAKARIS P&H | 07/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | A.W. & S. CONSTRUCTION CO | 07/22/2026 |
| DOB NOW | General Construction | Permit Issued | A.W. & S. CONSTRUCTION CO | 07/22/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PRESERV BLD RESTOR MGT IN | 07/21/2026 |
| DOB NOW | General Construction | Permit Issued | PRESERV BLD RESTOR MGT IN | 06/29/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 06/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DARBY CONSTRUCTION SVC LL | 06/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | FIVE BOROUGH NYC LLC | 06/05/2026 |
| DOB NOW | General Construction | Permit Issued | DARBY CONSTRUCTION SVC LL | 05/29/2026 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 05/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | ORBIT SPRINKLER CORP | 05/07/2026 |
| DOB NOW | Sprinklers | Signed-off | NONSTOP PLUMBERS CORP | 04/14/2026 |
| DOB NOW | Plumbing | Signed-off | AUTHENTIC PLBG CORP | 04/14/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | PRESERV BUILDING RESTORAT | 04/07/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 03/26/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | ANDAMIO SCAFFOLDING LLC | 03/24/2026 |
| DOB NOW | General Construction | Permit Issued | DARBY CONSTRUCTION SVC LL | 03/20/2026 |
| DOB NOW | Plumbing | Permit Issued | FRANKIE PLBG & HTG L.L.C | 03/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DARBY CONSTRUCTION SVC LL | 03/20/2026 |
| DOB NOW | Structural | Signed-off | DARBY CONSTRUCTION SVC LL | 03/19/2026 |
| DOB NOW | Sprinklers | Permit Issued | FIVE BOROUGH NYC LLC | 03/19/2026 |
| DOB NOW | General Construction | Signed-off | MONUMENTAL CONSTRUCTION * | 01/23/2026 |
| DOB NOW | Mechanical Systems | Signed-off | MONUMENTAL CONSTRUCTION * | 01/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PHASE 3 INTERIORS LLC | 12/30/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/21/2026 | Permit Issued | A.W. & S. CONSTRUCTION CO | Heating and Air Conditioning Systems, Ventilation Systems | |
| 08/05/2026 | Permit Issued | MONUMENTAL CONSTRUCTION * | Ventilation Systems | Ventilation Greenheck SP-A510-VG 200 CFM · Exhaust Fan ×1 |
| 07/23/2026 | Permit Issued | A.W. & S. CONSTRUCTION CO | Heating and Air Conditioning Systems, Ventilation Systems | |
| 06/01/2026 | Permit Issued | DARBY CONSTRUCTION SVC LL | Air Conditioning Systems | Cooling Trane GEHK036 38,360 BTU · Wshp ×1 |
| 06/17/2025 | Signed-off | UNISOL INC | Ventilation Systems | Ventilation Greenheck CSP-A710-VG 300 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/21/2026 | — | — | 53 heads |
| 08/05/2026 | — | — | 71 heads |
| 07/23/2026 | Permit Issued | A PLUS PLUMBING CORP | 38 heads |
| 06/01/2026 | Permit Issued | FIVE BOROUGH NYC LLC | — |
| 04/07/2026 | Permit Issued | ORBIT SPRINKLER CORP | 139 heads |
| 03/11/2026 | Permit Issued | FIVE BOROUGH NYC LLC | 113 heads |
| 01/16/2026 | Signed-off | NONSTOP PLUMBERS CORP | 33 heads |
| 06/17/2025 | Signed-off | FIREQUEST CORP | 15 heads |
| 09/05/2023 | Signed-off | PAR FIRE PROTECTION LLC | — |
| 11/13/2019 | Signed-off | AQUEDUCT MECHANICAL CORP | 35 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/21/2026 | Permit Issued | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| 08/05/2026 | Permit Issued | NONSTOP PLUMBERS CORP | Water/Sanitary |
| 07/23/2026 | Permit Issued | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| 07/21/2026 | Permit Issued | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| 03/11/2026 | Permit Issued | FRANKIE PLBG & HTG L.L.C | Water/Sanitary |
| 01/16/2026 | Signed-off | NONSTOP PLUMBERS CORP | Water/Sanitary |
| 11/21/2024 | Permit Issued | ACCESS PLUMBING CORP | Water/Sanitary |
| 09/05/2023 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 11/13/2019 | Signed-off | AQUEDUCT MECHANICAL CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/17/2026 | Permit Issued | A2K ELECTRIC CORP | General Wiring |
| 09/16/2026 | Complete | VALENTIS ELECTRIC, INC. | General Wiring |
| 09/09/2026 | Permit Issued | VALENTIS ELECTRIC, INC. | General Wiring |
| 09/09/2026 | Permit Issued | VALENTIS ELECTRIC, INC. | General Wiring |
| 06/10/2026 | Permit Issued | VALENTIS ELECTRIC, INC. | General Wiring |
| 03/23/2026 | Permit Issued | BOROWIDE ELECT'L CONTR'S | — |
| 03/20/2026 | Permit Issued | VALENTIS ELECTRIC, INC. | General Wiring |
| 06/30/2025 | Permit Issued | GMC ELECTRICAL INC | General Wiring |
| 06/25/2025 | Complete | TOP NOTCH ELECTRIC INC | General Wiring |
| 12/02/2024 | Complete | EMPIRE STATE ELECTL CORP | General Wiring |
| 10/01/2024 | Permit Issued | OMD ELECTRICAL CORP | 1 meters, 1 new_meters |
| 07/26/2024 | Complete | VALENTIS ELECTRIC, INC. | General Wiring |
| 04/23/2024 | Complete | VALENTIS ELECTRIC, INC. | General Wiring |
| 03/04/2024 | Permit Issued | ALLSTATE ELECTRIC CORP | General Wiring |
| 02/01/2024 | Complete | INFINITI ELECTRIC CORP | 2 meters, 2 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Scaffold |
| 08/01/2026 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Sidewalk Shed |
| 06/21/2018 | Permit Issued | PRATT CONSTRUCTION & REST | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | Permit Issued | PRESERV BUILDING RESTORAT | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/11/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/28/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 04/24/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/21/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 03/26/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 01/15/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/15/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/09/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/18/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/16/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/12/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/13/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/13/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/16/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/11/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/21/2026 | Fire-Resistant Penetrations and Joints | GUNJAN KHANDWALA | special |
| 08/06/2026 | Final | MICHAEL KAZAZIS | progress |
| 08/04/2026 | Shutoff dampers | GUNJAN KHANDWALA | energy_progress |
| 08/04/2026 | HVAC-R and service water piping design and insulation | GUNJAN KHANDWALA | energy_progress |
| 08/04/2026 | Post-installed Anchors | GUNJAN KHANDWALA | special |
| 08/04/2026 | Energy Code Compliance Inspections | GUNJAN KHANDWALA | progress |
| 08/04/2026 | HVAC-R and service water heating system controls | GUNJAN KHANDWALA | energy_progress |
| 08/04/2026 | Lighting controls | GUNJAN KHANDWALA | energy_progress |
| 08/04/2026 | Interior lighting power | GUNJAN KHANDWALA | energy_progress |
| 08/04/2026 | HVAC-R and service water heating equipment | GUNJAN KHANDWALA | energy_progress |
| 08/04/2026 | Maintenance information | GUNJAN KHANDWALA | energy_progress |
| 07/21/2026 | HVAC-R and service water piping design and insulation | GUNJAN KHANDWALA | energy_progress |
| 07/21/2026 | Energy Code Compliance Inspections | GUNJAN KHANDWALA | progress |
| 07/21/2026 | Interior lighting power | GUNJAN KHANDWALA | energy_progress |
| 07/21/2026 | HVAC-R and service water heating system controls | GUNJAN KHANDWALA | energy_progress |
| 07/21/2026 | Maintenance information | GUNJAN KHANDWALA | energy_progress |
| 07/21/2026 | Shutoff dampers | GUNJAN KHANDWALA | energy_progress |
| 07/21/2026 | Lighting controls | GUNJAN KHANDWALA | energy_progress |
| 07/21/2026 | HVAC-R and service water heating equipment | GUNJAN KHANDWALA | energy_progress |
| 07/21/2026 | Post-installed Anchors | GUNJAN KHANDWALA | special |
| 07/12/2026 | Sprinkler Systems | GUNJAN KHANDWALA | special |
| 07/12/2026 | Final | GUNJAN KHANDWALA | progress |
| 07/12/2026 | Mechanical Systems | GUNJAN KHANDWALA | special |
| 06/29/2026 | Final | GUNJAN KHANDWALA | progress |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | GUNJAN KHANDWALA | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Calibre | Office | Floor 20 | Project M01429487 |
| Jan Brown Law | Office | Floor 13 | Project M01424080 |
| K-Force | Office | Floor 16 | Project M01229169 Project M00305026 Project M00305033 |
| CSG/EMCOR | Office | Floor 3 | Project M01149453 |
| Regus | Office | Floors 9, 10 | Project M01053844 |
| Vm Ware | Office | Floor 7 | Project M00954261 Project M00954264 |
| CBMS | Office | Floor 8 | Project M00954839 |
| KM Associates Realty | Office | Floor 16 | Project M00784141 |
| JCRC | Office | Floor 16 | Project M00429478 |
| LAC Group | Office | Floor 4 | Project M00262919 |