| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01439563 | 1095 AVENUE OF THE AMER MANHATTAN | — | Permit Issued | — | 09/29/2026 | Design NATASHA L SUZANSKY ARCHITECT Filer RIZZO GROUP | Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as p… |
| M01439555 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | — | Permit Issued | — | 09/17/2026 | Design NATASHA L SUZANSKY ARCHITECT Filer RIZZO GROUP | Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 40th Floor as … |
| M01440227 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 09/10/2026 | 09/14/2026 | Design STANTEC Filer RIZZO GROUP | Modifications to the existing HVAC System. Install new ductwork, piping, controls and equipment on the 40th Floor as per plans (LL Work - D… |
| B01329666 ↗ | 158 SOUTH OXFORD STREET BROOKLYN | New Building | Permit Issued | 12/18/2025 | 09/01/2026 | Design ND ARCHITECTURE & DESIGN PC Owner OWNERS REP | supportive excavation in conjunction with NB |
| M01425602 ↗ | 362 9 AVENUE MANHATTAN | Alteration | Permit Issued | 07/06/2026 | 08/04/2026 | Owner Cushman & Wakefield | Minor modification to exiting ductwork for two offices. |
| M01354134 ↗ | 345 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/11/2026 | 08/03/2026 | Design JAROS BAUM & BOLLES Owner RUDIN MANAGEMENT CO INC | PAA filed to correct floor from SC to SC1. No change to plans. |
| Name | Projects together | Most recent |
|---|---|---|
| LORING CONSULTING ENGINEERS, INC. | 24 | 07/06/2026 |
| ANTONIO LEO ARCHITECT | 17 | 07/24/2026 |
| M. CHETRIT CONSULTING ENGINEERS P.C | 15 | 10/24/2024 |
| ROBERT DERECTOR ASSOCIATES | 10 | 01/12/2026 |
| STANTEC | 9 | 09/10/2026 |
| TPG ARCHITECTURE, LLP | 9 | 01/12/2026 |
| FOGARTY FINGER ARCHITECTURE PLLC | 8 | 07/03/2025 |
| MKNH ARCHITECTS | 7 | 10/12/2023 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 6 | 03/20/2026 |
| MG ENGINEERING D.P.C. | 6 | 11/26/2024 |
| AMA CONSULTING ENGINEERS, PC | 5 | 05/21/2024 |
| NATASHA L SUZANSKY ARCHITECT | 5 | 04/07/2026 |
| RIVKIN/WEISMAN P.C. | 5 | 10/30/2024 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 4 | 09/06/2023 |
| JAROS BAUM & BOLLES | 3 | 07/24/2026 |
| LITTLE DIVERSIFIED ARCHITECTURAL & | 2 | 12/03/2021 |
| LITTLE DIVERSIFIED ARCHITECTURAL CO | 2 | 12/03/2021 |
| MKNS ARCHITECTS LLC | 2 | 12/22/2022 |
| SCHRIMMER DESIGN GROUP | 2 | 08/10/2023 |
| ANTON H. WONG ARCHITECT | 1 | 03/03/2025 |
| AVID DESIGNS, INC | 1 | 09/13/2022 |
| BO LEE ARCHITECT PC | 1 | 10/13/2023 |
| FLORINELA MURESAN | 1 | 06/11/2026 |
| GENSLER | 1 | 08/29/2024 |
| GEORGE SCHELL ENGINEERING | 1 | 09/20/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| A&A PLUMBING CORP | 5 | 04/22/2026 |
| PSI PARTNERS, LLC | 5 | 03/20/2026 |
| MAC FELDER, INC | 4 | 07/24/2026 |
| AGRESSIVE FIRE PROT LLC | 3 | 07/24/2026 |
| TRISTATE PLBG SVCS CORP | 3 | 05/18/2020 |
| ALLSTATE SPRINKLER CORP | 2 | 04/22/2026 |
| GEOFFREY A. LAGAS & ASSOC | 2 | 01/12/2026 |
| ABCO-PEERLESS SPRKLR CORP | 1 | 01/12/2026 |
| AMARO CONSTRUCTION CORP | 1 | 10/13/2023 |
| B CONTRACTORS GROUP LLC | 1 | 06/11/2026 |
| DNA PLUMBING CONTR. INC | 1 | 10/13/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| RUDIN MANAGEMENT CO INC | 37 | 07/24/2026 |
| CIRCLE REALTY GROUP LLC | 21 | 10/24/2024 |
| HINES INTERESTS LIMITED PARTNERSHIP | 8 | 09/10/2026 |
| SILVERSTEIN PROPERTIES INC. | 7 | 08/10/2023 |
| 1411 IC-SIC PROPERTY LLC | 4 | 07/03/2025 |
| HINES INTEREST LP | 4 | 03/03/2025 |
| SVF PARK NEW YORK, LLC | 4 | 05/21/2024 |
| CBRE | 2 | 01/12/2026 |
| JLL | 2 | 10/05/2023 |
| NYC ECONOMIC DEVELOPMENT CORP | 2 | 08/30/2022 |
| RXR REALTY | 2 | 12/03/2021 |
| 140 BW LLC | 1 | 02/11/2022 |
| 950 THIRD AVENUE LLC | 1 | 09/04/2025 |
| CUSHMAN & WAKEFIELD | 1 | 07/06/2026 |
| KAUFMAN ORGANIZATION | 1 | 10/13/2023 |
| OWNERS REP | 1 | 06/11/2026 |
| TISHMAN SPEYER | 1 | 06/15/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| GREEN LIGHT EXPEDITING LLC | 23 | 04/22/2026 |
| A1 EXPEDITING SERVICE CORP. | 17 | 07/03/2025 |
| EA DESIGN GROUP, INC. | 16 | 10/24/2024 |
| RIZZO GROUP | 13 | 09/10/2026 |
| WILLIAM VITACCO ASSOCIATES | 7 | 07/24/2026 |
| CORNERSTONE CONSULTING | 4 | 03/03/2025 |
| ARCHETYPE CONSULTANTS, INC. | 3 | 08/10/2023 |
| JAM CONSULTANTS, INC. | 3 | 09/15/2022 |
| ANZALONE ARCHITECTURE, PLLC | 1 | 10/13/2023 |
| LORING CONSULTING ENGINEERS, INC, | 1 | 07/06/2026 |
| METROPOLIS GROUP INC | 1 | 06/15/2022 |
| ND ARCHITECTURE AND DESIGN | 1 | 06/11/2026 |
| O R A C | 1 | 06/11/2026 |
| PROJECT TACTICAL SOLUTIONS | 1 | 05/21/2024 |
| RETHY ASSOCIATES, INC. | 1 | 09/04/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01439563 | 1095 AVENUE OF THE AMER MANHATTAN | — | Permit Issued | — | 09/29/2026 | Design NATASHA L SUZANSKY ARCHITECT Filer RIZZO GROUP | Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as p… |
| M01439555 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | — | Permit Issued | — | 09/17/2026 | Design NATASHA L SUZANSKY ARCHITECT Filer RIZZO GROUP | Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 40th Floor as … |
| M01440227 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 09/10/2026 | 09/14/2026 | Design STANTEC Filer RIZZO GROUP | Modifications to the existing HVAC System. Install new ductwork, piping, controls and equipment on the 40th Floor as per plans (LL Work - D… |
| B01329666 ↗ | 158 SOUTH OXFORD STREET BROOKLYN | New Building | Permit Issued | 12/18/2025 | 09/01/2026 | Design ND ARCHITECTURE & DESIGN PC Owner OWNERS REP | supportive excavation in conjunction with NB |
| M01425602 ↗ | 362 9 AVENUE MANHATTAN | Alteration | Permit Issued | 07/06/2026 | 08/04/2026 | Owner Cushman & Wakefield | Minor modification to exiting ductwork for two offices. |
| M01354134 ↗ | 345 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/11/2026 | 08/03/2026 | Design JAROS BAUM & BOLLES Owner RUDIN MANAGEMENT CO INC | PAA filed to correct floor from SC to SC1. No change to plans. |
| M01359684 ↗ | 345 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 04/21/2026 | 08/03/2026 | Design ANTONIO LEO ARCHITECT Owner RUDIN MANAGEMENT INC | FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH INTERIOR RENOVATION OF SUB CELLAR DOLCE VIDA AS PER PLANS SUBMITTED HEREWITH. |
| M01347949 ↗ | 35 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/19/2026 | 04/15/2026 | Owner RUDIN MANAGEMENT INC | FILING FOR SPRINKLER WORK ASSOCIATED WITH THE INTERIOR DEMO OF THE 30TH FLOOR AS PER PLANS. |
| M01334133 ↗ | 35 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/29/2026 | 02/26/2026 | Design ANTONIO LEO ARCHITECT Owner RUDIN MANAGEMENT INC | FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH INTERIOR DEMO OF 14TH FLOOR OFFICE SPACE AS PER PLAN SUBMITTED HEREWITH. |
| M01347575 ↗ | 35 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/17/2026 | 02/25/2026 | FILING FOR SPRINKLER WORK ASSOCIATED WITH INTERIOR RENO OF 32ND FLOOR BRIGHTTOWER OFFICE AS PER PLANS SUBMITTED HEREWITH. | |
| M01329032 | 140 BROADWAY MANHATTAN | Alteration | Permit Issued | 01/09/2026 | 01/20/2026 | Design ROBERT DERECTOR ASSOCIATES Owner CBRE | MOdifications to existing plumbing / sprinkler system on 45th floor, various suites. |
| M01300531 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 01/07/2026 | 01/15/2026 | Design TPG ARCHITECTURE, LLP Owner CBRE | Modifications to pantry area in suite 4510 |
| M01263169 ↗ | 950 3 AVENUE MANHATTAN | Alteration | Signed-off | 09/04/2025 | 09/08/2025 | Design NATASHA L SUZANSKY ARCHITECT Owner 950 THIRD AVENUE LLC Filer RETHY ASSOCIATES, INC. | Interior Cosmetic Renovation of Building Main Lobby on Part of 1st Floor. No Change to Occupancy, Use or Egress is Proposed |
| M01244267 ↗ | 1411 BROADWAY MANHATTAN | Alteration | Signed-off | 07/03/2025 | 08/21/2025 | Design STANTEC Owner 1411 IC-SIC PROPERTY LLC | MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01244257 ↗ | 1411 BROADWAY MANHATTAN | Alteration | Signed-off | 07/03/2025 | 08/20/2025 | INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| M01174319 ↗ | 1411 BROADWAY MANHATTAN | Alteration | Signed-off | 02/19/2025 | 05/20/2025 | Design STANTEC Owner 1411 IC-SIC PROPERTY LLC Filer RIZZO GROUP | Modifications to the existing HVAC System on the 6th Floor as per plans (Elevator Lobby.) No change to use, egress or occupancy. |
| M01174290 ↗ | 1411 BROADWAY MANHATTAN | Alteration | Signed-off | 02/19/2025 | 05/19/2025 | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 6th Floor as per… | |
| M01174297 ↗ | 1411 BROADWAY MANHATTAN | Alteration | Signed-off | 02/26/2025 | 05/19/2025 | Design IMEG Consulting Corp. Owner 1411 IC-SIC PROPERTY LLC Filer RIZZO GROUP | Modifications to the existing HVAC System: Install AC units, ductwork, VAVs, piping and associated accessories on the 6th Floor as per plans… |
| M01174317 ↗ | 1411 BROADWAY MANHATTAN | Alteration | Signed-off | 02/19/2025 | 05/19/2025 | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 6th Floor as per… | |
| M01179808 ↗ | 35 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 03/04/2025 | 03/14/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN MANAGEMENT INC | FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH INTERIOR DEMO OF 3RD & 18TH FLOORS AS PER PLANS. |
| M01178809 ↗ | 845 3 AVENUE MANHATTAN | Alteration | Signed-off | 02/21/2025 | 02/27/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN MANAGEMENT COMPANY | Filing for interior renovation of 14th floor Vector Media office as per plans submitted herewith. |
| M01131525 ↗ | 35 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/02/2024 | 12/17/2024 | Owner RUDIN MANAGEMENT INC | FILING PLUMBING WORK ASSOCIATED WITH INTERIOR DEMO OF 38TH FLOOR AS PER PLANS SUBMITTED HEREWITH. |
| M01079186 ↗ | 120 WALL STREET MANHATTAN | Alteration | Signed-off | 11/26/2024 | 12/02/2024 | Architectural work on the 18th floor (CP Studios) as indicated on drawings. | |
| M01079196 ↗ | 120 WALL STREET MANHATTAN | Alteration | Signed-off | 11/26/2024 | 12/02/2024 | Design MG ENGINEERING D.P.C. | Mechanical work on the 18th floor (CP Studios) as indicated on drawings. |
| M01124614 ↗ | 431 CANAL STREET MANHATTAN | Alteration | Signed-off | 11/15/2024 | 11/26/2024 | Design ROBERT DERECTOR ASSOCIATES Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | minor mechanical work as per plans |
| M01125052 ↗ | 431 CANAL STREET MANHATTAN | Alteration | Signed-off | 11/15/2024 | 11/26/2024 | Design VOCON Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | WHITEBOX OF SPACE AS PER PLANS. |
| M01001719 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | Alteration CO | Permit Issued | 03/11/2024 | 11/06/2024 | Design NATASHA L SUZANSKY ARCHITECT Filer RIZZO GROUP | Herewith filing administrative removal of Place of assembly occupancies on the 25th and 33rd office floors. Related Alt-2 application number… |
| M01110540 ↗ | 431 CANAL STREET MANHATTAN | Alteration | Signed-off | 10/15/2024 | 11/01/2024 | Design ANTON H. WONG ARCHITECT Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | RENOVATION TO ADA BATHROOM AND CORRIDOR AS PER PLANS |
| M01125886 ↗ | 641 LEXINGTON AVE MANHATTAN | Alteration | Signed-off | 10/30/2024 | 11/01/2024 | Design RIVKIN/WEISMAN P.C. | FILING FOR INTERIOR CONSTRUCTION OF CELLAR STORAGE SPACE AS PER PLANS SUBMITTED HEREWITH. |
| M01110450 ↗ | 431 CANAL STREET MANHATTAN | Alteration | Signed-off | 10/15/2024 | 10/25/2024 | Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | RENOVATION OF EXISTING ADA & CORE RESTROOMS AND CORRIDOR AS PER PLANS. |
| M01087637 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 08/30/2024 | 09/10/2024 | Design STANTEC Filer RIZZO GROUP | Modifications to the existing HVAC System. Install new ductwork, piping, controls and equipment on the 25th Floor as per plans (LL Work - R… |
| M01085014 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 08/29/2024 | 09/03/2024 | Design GENSLER | Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 33rd Floors as per plans (Corridors & Bathr… |
| M01085096 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 08/25/2024 | 08/30/2024 | Design STANTEC | Modifications to the existing HVAC System: Remove existing ductwork, grilles, wires. Install new ductwork, diffusers, controls and registers… |
| M01073269 ↗ | 35 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 07/12/2024 | 07/18/2024 | Design RIVKIN/WEISMAN P.C. Owner RUDIN MANAGEMENT CO INC | Interior renovation to include demolition of existing partitions and construction of new partitions and finishes as shown on plans. No chang… |
| M01000232 ↗ | 35 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/22/2024 | 03/04/2024 | Owner RUDIN MANAGEMENT CO INC | Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy. |
| M00988333 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 02/12/2024 | 02/15/2024 | Design STANTEC | Modifications to the existing HVAC System. Removal of existing ductwork, piping, controls and equipment on the 25th Floor as per plans (LL W… |
| M00987959 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 02/08/2024 | 02/13/2024 | Design NATASHA L SUZANSKY ARCHITECT Filer RIZZO GROUP | Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 25th Floor as per pl… |
| M00896621 ↗ | 229 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 09/28/2023 | 02/08/2024 | Design BO LEE ARCHITECT PC Owner KAUFMAN ORGANIZATION | PLUMBING WORK FILED IN CONJUNCTION WITH APARTMENT COMBINATION (#14 E&F). RENOVATE EXISTING BATHROOMS AND KITCHEN. CAP ONE EXISTING KITCHEN. … |
| M00948823 ↗ | 1411 BROADWAY MANHATTAN | Alteration | Signed-off | 12/19/2023 | 12/28/2023 | Minor Interior Demo. Installation of new interior partitions, doors, office fronts, suspended ceilings, millwork, flooring and finishes on t… | |
| M00948845 ↗ | 1411 BROADWAY MANHATTAN | Alteration | Signed-off | 12/19/2023 | 12/28/2023 | Design STANTEC | Modifications to the existing HVAC System: Redistribution of ductwork from existing main shaft with volume dampers on the 12th Floor as per … |
| M00939745 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/30/2023 | 11/20/2023 | Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 6TH FLOOR (F.L. PUTNAM) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES… |
| M00929760 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/17/2023 | 10/30/2023 | APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS IN THE CELLAR AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS … | |
| M00939014 ↗ | 845 3 AVENUE MANHATTAN | Alteration | Signed-off | 10/11/2023 | 10/18/2023 | Design ANTONIO LEO ARCHITECT | FILING FOR MINOR INTERIOR RENOVATION OF 7TH FLOOR HUMANA OFFICE AS PER PLANS SUBMITTED HEREWITH. |
| M00939743 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/12/2023 | 10/18/2023 | Design MKNH ARCHITECTS Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 6TH FLOOR (F.L. PUTNAM) AS PER PLANS… |
| M00932190 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 10/05/2023 | 10/17/2023 | Owner JLL | Structural modifications as per plans filed herewith (Installation of steel beams to support fire rated ceiling assembly). No change in use,… |
| M00927450 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/12/2023 | 09/26/2023 | Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FL (HERITAGE AUCTIONS) AS PER PLANS FIELD HEREWITH. NO CHANGE IN USE, EG… |
| M00927494 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/07/2023 | 09/26/2023 | Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS IN THE CELLAR AND ON THE 1ST FL (HERITAGE AUCTIONS) AS PER PLANS FIELD HEREWITH. NO… |
| M00916152 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 09/20/2023 | 09/22/2023 | Design TPG ARCHITECTURE, LLP Owner JLL | Minor partition changes for Suite 2240 |
| M00927338 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/06/2023 | 09/12/2023 | Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR (HERITAGE AUCTIONS) AS PER… |
| M00927353 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/06/2023 | 09/12/2023 | Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES IN THE CELLAR (HERITAGE AUCTIONS) AS PER PL… |
| M00907726 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 09/01/2023 | 09/06/2023 | Design TPG ARCHITECTURE, LLP | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or oc… |
| M00881951 ↗ | 1411 BROADWAY MANHATTAN | Alteration | Signed-off | 08/24/2023 | 08/29/2023 | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 18th floor (Pre-Built Suite) as per plan… | |
| M00881958 ↗ | 1411 BROADWAY MANHATTAN | Alteration | Signed-off | 08/23/2023 | 08/28/2023 | Design STANTEC Owner 1411 IC-SIC PROPERTY LLC Filer RIZZO GROUP | Modifications to the existing HVAC system on the 18th floor (Pre-Built Suite) as per plans. No change to use, egress or occupancy. |
| M00913692 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/23/2023 | 08/24/2023 | Design MKNH ARCHITECTS Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE ON THE 1ST FLOOR EXTERIOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE… |
| M00913715 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/16/2023 | 08/24/2023 | Design MKNH ARCHITECTS Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | Application filed for interior/exterior renovation of existing storefront (Replace existing storefront with new) as per plans filed herewith… |
| M00864129 ↗ | 499 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/05/2023 | 08/03/2023 | Design AMA CONSULTING ENGINEERS, PC Owner SVF PARK NEW YORK, LLC | MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF COMMERCIAL OFFICE SPACE ON THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE … |
| M00890020 ↗ | 641 LEXINGTON AVE MANHATTAN | Alteration | Signed-off | 06/21/2023 | 08/03/2023 | Design ANTONIO LEO ARCHITECT Owner RUDIN MANAGEMENT | FILING FOR INTERIOR DEMO OF 7TH FLOOR OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. |
| M00890037 ↗ | 641 LEXINGTON AVE MANHATTAN | Alteration | Signed-off | 06/23/2023 | 08/03/2023 | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR DEMO OF 7TH FLOOR OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. | |
| M00698816 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 04/25/2022 | 08/02/2023 | Design ROBERT DERECTOR ASSOCIATES | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. |
| M00818262 ↗ | 120 WALL STREET MANHATTAN | Alteration | Signed-off | 05/23/2023 | 08/01/2023 | Design MG ENGINEERING D.P.C. | Prebuilts - Mechanical work on the 16th and 18th floor as indicated on drawings |
| M00818313 ↗ | 120 WALL STREET MANHATTAN | Alteration | Signed-off | 05/22/2023 | 08/01/2023 | Design SCHRIMMER DESIGN GROUP | Prebuilts - Construction work on the 16th and 18th floor as indicated on drawings. EN lighting drawings are submitted under M00818262-I1 |
| M00864128 ↗ | 499 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/04/2023 | 08/01/2023 | INTERIOR RENOVATION OF COMMERCIAL OFFICE SPACE ON THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| S00792182 ↗ | 93 MADSEN AVE STATEN ISLAND | Alteration | Signed-off | 09/13/2022 | 06/14/2023 | Design AVID DESIGNS, INC | LEGALIZATION OF WORK PERFORMED W/O BENEFIT OF PERMIT TO RESOLVE OPEN ECB VIOLATION(S): #35184350R, 35184349J, & 35184348H. (3) VIOLATIONS AR… |
| M00821249 ↗ | 120 WALL STREET MANHATTAN | Alteration | Signed-off | 02/22/2023 | 04/06/2023 | Design SCHRIMMER DESIGN GROUP | Interior demolition of non load bearing partitions on the 18th floor as indicated on drawings |
| M00823572 ↗ | 256 WEST 38 STREET MANHATTAN | Alteration | Signed-off | 02/17/2023 | 03/28/2023 | Renovation to existing restrooms for compliance with NYC Building code Chapter 11 Accessibility. No change in use, egress or occupancy. | |
| M00790285 ↗ | 499 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/24/2022 | 03/24/2023 | Owner SVF PARK NEW YORK, LLC Filer RIZZO GROUP | Removal and disposal of interior partitions, doors, suspended ceilings and finishes on the 22nd floor (LL Work) as per plans. No change to … |
| M00790316 ↗ | 499 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/25/2022 | 03/24/2023 | Design AMA CONSULTING ENGINEERS, PC Owner SVF PARK NEW YORK, LLC Filer RIZZO GROUP | HVAC removals on the 22nd floor (LL Work) as per plans. No change to use, egress or occupancy. |
| M08049879 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/31/2023 | 02/02/2023 | Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 6TH FLOOR (OAKNORTH BANK) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR… |
| M08049855 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/16/2023 | 01/19/2023 | Design MKNH ARCHITECTS Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 6TH FLOOR (OAKNORTH BANK) AS PER PLA… |
| M08046863 ↗ | 35 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/20/2022 | 01/06/2023 | Design RIVKIN/WEISMAN P.C. | Removal of interior partitions as shown on plans. No change to use, egress, or occupancy, |
| M07995134 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 12/29/2022 | 01/05/2023 | Design STANTEC Filer RIZZO GROUP | Modifications to the existing HVAC System: Removal and disposal of 2.5 ton ceiling mounted AC unit and associated ductwork on the 35th Floor… |
| M08046887 ↗ | 35 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/20/2022 | 01/05/2023 | Owner RUDIN MANAGEMENT CO INC | Mechanical work as shown on plans filed herewith. |
| M08047569 ↗ | 845 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/21/2022 | 01/05/2023 | Design ANTONIO LEO ARCHITECT Owner RUDIN MANAGEMENT | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or oc… |
| M07994665 ↗ | 1095 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 12/22/2022 | 12/28/2022 | Design MKNS ARCHITECTS LLC Filer RIZZO GROUP | Minor interior demolition; Removal and disposal of interior partitions, fixtures, suspended ceilings, flooring and finishes on the 35th Floo… |
| M08015016 ↗ | 35 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 10/28/2022 | 11/09/2022 | Design RIVKIN/WEISMAN P.C. | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or oc… |
| M00784141 ↗ | 225 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 09/15/2022 | 09/21/2022 | Owner CIRCLE REALTY GROUP LLC Filer JAM CONSULTANTS, INC. | Filing for the modification of the ductwork and interior lighting to the existing mechanical & lighting system. Partial floor office renovat… |
| M00783905 ↗ | 225 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 09/15/2022 | 09/20/2022 | Design MKNH ARCHITECTS | Filing for renovation to existing office on 16th floor, scope to include removal and installation of non-load bearing partitions, doors, and… |
| M00793615 ↗ | 3 TIMES SQUARE MANHATTAN | Alteration | Signed-off | 08/30/2022 | 09/06/2022 | Design ANTONIO LEO ARCHITECT | FILING FOR INTERIOR RENOVATION OF 12TH FLOOR KIND OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. |
| M00794306 ↗ | 3 TIMES SQUARE MANHATTAN | Alteration | Signed-off | 08/30/2022 | 09/06/2022 | Design AMA CONSULTING ENGINEERS, PC | FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF 12TH FLOOR KIND OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. |
| M00528260 ↗ | 641 LEXINGTON AVE MANHATTAN | Alteration | Signed-off | 08/09/2021 | 08/03/2022 | Minor non-structural demolition as shown. | |
| M00697027 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 05/04/2022 | 08/03/2022 | Design TPG ARCHITECTURE, LLP | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith (Construction Floor 19/Marketin… |
| M00737779 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 06/16/2022 | 08/03/2022 | — | REMOVE AND INSTALL WALLS, DOORS, FLOOR FINISHES AND CEILINGS AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M00697048 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 05/03/2022 | 08/02/2022 | Design ROBERT DERECTOR ASSOCIATES | Modification to existing HVAC system as per plans filed herewith (Construction Floor 19/Marketing Floor 21, Suite 2120). No change in use, e… |
| M00698372 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 04/27/2022 | 08/02/2022 | Design TPG ARCHITECTURE, LLP | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or oc… |
| M00699485 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 04/22/2022 | 08/02/2022 | Design ROBERT DERECTOR ASSOCIATES | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. |
| M00737817 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 06/15/2022 | 08/02/2022 | Design ROBERT DERECTOR ASSOCIATES Owner TISHMAN SPEYER Filer METROPOLIS GROUP INC | REMOVAL AND INSTALLATION OF DUCTWORK AND CEILING DIFFUSERS AS SHOWN ON DRAWINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00699483 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 04/25/2022 | 04/27/2022 | Design TPG ARCHITECTURE, LLP | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or oc… |
| M00700498 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 04/22/2022 | 04/27/2022 | Design ROBERT DERECTOR ASSOCIATES | Modification to existing HVAC system as per plans filed herewith (Floor 19_Tenant Floor 22 Suite 2250). No change in use, egress or occupa… |
| M00700476 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 04/22/2022 | 04/26/2022 | Design TPG ARCHITECTURE, LLP | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith (Construction Floor 19_Tenant F… |
| M00526161 ↗ | 16 WALKER STREET MANHATTAN | Alteration | Signed-off | 05/28/2021 | 03/16/2022 | Design ANTONIO LEO ARCHITECT | FILING FOR INTERIOR DEMO OF 16TH FLOOR AS PER PLANS SUBMITTED HEREWITH. |
| M00524155 ↗ | 16 WALKER STREET MANHATTAN | Alteration | Signed-off | 05/28/2021 | 03/15/2022 | Design ANTONIO LEO ARCHITECT | FILING FOR INTERIOR DEMO OF 27TH FLOOR SPACE AS PER PLANS SUBMITTED HEREWITH. |
| M00613001 ↗ | 355 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2021 | 03/15/2022 | Design ANTONIO LEO ARCHITECT | FILING FOR INTERIOR DEMO AND CORE TOILET RENOVATION OF 13TH FLOOR OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. |
| M00613010 ↗ | 355 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/16/2021 | 03/15/2022 | MECHANICAL WORK ASSOCIATED WITH INTERIOR DEMO AND CORE TOILET RENOVATION OF 13TH FLOOR OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. | |
| M00625933 ↗ | 499 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/21/2021 | 03/15/2022 | Design AMA CONSULTING ENGINEERS, PC | HVAC removals on the 1st floor (Retail Space) as per plans. No change to use, egress or occupancy. |
| M00553292 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/01/2021 | 03/14/2022 | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES IN THE CELLAR AS PER PLANS FILED HEREWITH. … | |
| M00553314 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/31/2021 | 03/14/2022 | Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS IN THE CELLAR AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, … |
| M00565763 ↗ | 140 BROADWAY MANHATTAN | Alteration | Signed-off | 08/24/2021 | 03/14/2022 | Suite # 3620 Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. | |
| M00570960 ↗ | 77 FRONT STREET MANHATTAN | Alteration | Permit Issued | 09/16/2021 | 03/14/2022 | Owner RXR REALTY | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. |
| M00572854 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/22/2021 | 03/14/2022 | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR AS PER PLANS FILED HEREWIT… | |
| M00572856 ↗ | 445 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/14/2021 | 03/14/2022 | Owner CIRCLE REALTY GROUP LLC Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANC… |
| Building | Filings | Most Recent |
|---|---|---|
| 1095 AVENUE OF THE AMER ↗ | 14 | 09/30/2026 |
| 345 PARK AVENUE ↗ | 8 | 08/26/2026 |
| 362 9 AVENUE ↗ | 4 | 08/05/2026 |
| 256 WEST 38 STREET ↗ | 1 | 07/08/2026 |
| 445 PARK AVENUE ↗ | 50 | 07/08/2026 |
| 3 TIMES SQUARE ↗ | 2 | 07/08/2026 |
| 1411 BROADWAY ↗ | 18 | 07/08/2026 |
| 120 BROADWAY ↗ | 4 | 07/08/2026 |
| 77 FRONT STREET ↗ | 6 | 07/08/2026 |
| 140 BROADWAY ↗ | 50 | 07/08/2026 |
| 1675 BROADWAY ↗ | 7 | 07/08/2026 |
| 845 3 AVENUE ↗ | 10 | 07/08/2026 |
| 16 WALKER STREET ↗ | 23 | 07/08/2026 |
| 499 PARK AVENUE ↗ | 16 | 07/08/2026 |
| 35 MADISON AVENUE ↗ | 33 | 07/08/2026 |
| 1260 AVENUE OF THE AMER ↗ | 5 | 07/08/2026 |
| 355 LEXINGTON AVENUE ↗ | 17 | 07/08/2026 |
| 120 WALL STREET ↗ | 13 | 07/08/2026 |
| 1177 AVENUE OF THE AMER ↗ | 3 | 07/08/2026 |
| 431 CANAL STREET ↗ | 5 | 07/08/2026 |
| 55 BROAD STREET ↗ | 9 | 07/08/2026 |
| 24 STATE STREET ↗ | 5 | 07/08/2026 |
| 641 LEXINGTON AVE ↗ | 13 | 07/08/2026 |
| 950 3 AVENUE ↗ | 1 | 04/09/2026 |
| 225 WEST 34 STREET ↗ | 6 | 03/21/2026 |
| 93 MADSEN AVE ↗ | 2 | 03/21/2026 |
| 110 MAIDEN LANE ↗ | 2 | 03/21/2026 |