← Back
BuildNYC
Legitimate theatre, sole use
Shubert Theatre
225 WEST 44TH STREET · BIN 1080842
💬 Discuss this project
1913Year Built
5Stories
J4Building Class
C6-5Zoning
60,232 sfGross Floor Area
2Units
LL97 Covered0 Active Violations
Legitimate theatre, sole use · Owner of record: Shubert and Booth Theatre · 25,305 sf lot · 2.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofShubert Theatre8p · 5 filings · 20 docs
Floor 4Shubert Theatre4p · 1 filing · 6 docs
Floor 3Shubert Theatre4p · 1 filing · 6 docs
Floor 2Shubert Theatre7p · 3 filings · 13 docs
Floor 1Shubert Theatre12p · 4 filings · 14 docs
Basement1p · 1 filing · 4 docs
Site & exteriorShubert Theatre62p · 9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Shuber103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystem InstallationScaffold2507/08/2026
Pratt Construction & RestorationScaffold507/08/2026
Soho ContractingGeneral Contractor407/08/2026
Soho ContractingScaffold307/08/2026
The Shubert OrganizationGeneral Contractor307/08/2026
Tristate Maintenance & SEGeneral Contractor303/21/2026
V. Vass ElectricElectrical103/21/2026
Air Stream Air Conditioningspecialty_contractor107/08/2026
Going Sign & Servicing Cospecialty_contractor107/08/2026
TristruxGeneral Contractor104/09/2026
Balaton ConsultingSign hanger107/08/2026
Bestco General Electric MaintenanceElectrical103/21/2026
Going Sign & Servicing CoSign hanger107/08/2026
Dooley Electric CoElectrical103/21/2026
H. & L. ElectricElectrical103/21/2026
Hugh O'Kane Electric CoElectrical103/21/2026
O'Kane JohnElectrical103/21/2026
R. Nuzzolo ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vincent J. Liotta P. E1974207/19/2023
George J. Xerakias, PE1658103/30/2023
Sag Engineering & Consulting608311/18/2022
Choi Engineering2264105/18/2021
Building Lifecycle
All (98)Filed (21)Permit Issued (29)Signed Off (15)Violation (17)Objection (6)Special Inspection (10)
10/30/2025
Signed off — Alteration
M01206738-I1
09/19/2025
Permit issued — Antenna
M01206738-I1-AN
09/02/2025
Filed — Alteration
M01206738-I1
06/14/2024
Signed off — Alteration
M00466504-I1
12/01/2023
Signed off — Alteration
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00840867-I1
12/01/2023
Signed off — Alteration
ERECT, MAINTAIN & DISMANTLE OF SIDEWALK SHED FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH.
M00840765-I1
09/26/2023
Permit issued — General Construction
M00466504-I1-GC
08/22/2023
Signed off — Alteration
M00844563-I1
07/19/2023
Filed — Alteration
M00844563-I1
07/19/2023
Permit issued — Mechanical Systems
M00844563-I1-MS
07/12/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLAN
M00173590-I1
05/30/2023
Signed off — Alteration
ERECT (3) LED SIGNS ON EXISTING MARQUEE WITH CHANGEABLE COPY ACCESSORY TO THEATRE USE
M08042365-I1
05/30/2023
Signed off — Alteration
M08042330-I1
04/11/2023
Permit issued — Supported Scaffold
M00840867-I1-SF
04/06/2023
Signed off — Alteration
INSTALLATION OF SPLIT SYSTEM ON THE ROOF AND 2ND FLOOR WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M08012868-I1
03/30/2023
Filed — Alteration
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00840867-I1
03/29/2023
Permit issued — Sidewalk Shed
M00840765-I1-SH
03/28/2023
Filed — Alteration
ERECT, MAINTAIN & DISMANTLE OF SIDEWALK SHED FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH.
M00840765-I1
03/08/2023
Special inspection requirement — Post-installed Anchors
George Xerakias
01/18/2023
Signed off — Alteration
ERECT STRUCTURE SUPPORTING TWO VIDEO SIGNS
M08012897-I1
12/22/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLAN
M00173597-I1
12/16/2022
Signed off — Alteration
M00646588-I1
12/16/2022
Signed off — Alteration
Installation of a temporarily shoring per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00543893-I1
12/09/2022
Permit issued — Structural
M08042330-I1-ST
12/05/2022
Signed off — Alteration
ERECT (2) LED ACCESSORY BUSINESS PRODUCTION SIGNS ON STRUCTURE FOR THE SHUBERT THEATRE WITH CHANGEABLE COPY
M08012916-I1
11/30/2022
Permit issued — Mechanical Systems
M08012868-I1-MS
11/25/2022
Permit issued — Sign
M08042365-I1-SG
11/18/2022
Filed — Alteration
ERECT (3) LED SIGNS ON EXISTING MARQUEE WITH CHANGEABLE COPY ACCESSORY TO THEATRE USE
M08042365-I1
11/18/2022
Filed — Alteration
M08042330-I1
11/18/2022
Filed — Alteration
INSTALLATION OF SPLIT SYSTEM ON THE ROOF AND 2ND FLOOR WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M08012868-I1
10/25/2022
Permit issued — Sign
M08012916-I1-SG
10/14/2022
Permit issued — General Construction
M08012897-I1-GC-CX
10/07/2022
Filed — Alteration
ERECT STRUCTURE SUPPORTING TWO VIDEO SIGNS
M08012897-I1
10/07/2022
Filed — Alteration
ERECT (2) LED ACCESSORY BUSINESS PRODUCTION SIGNS ON STRUCTURE FOR THE SHUBERT THEATRE WITH CHANGEABLE COPY
M08012916-I1
09/29/2022
Special inspection requirement — Structural Steel - Details
Chester Kowalski
09/29/2022
Special inspection requirement — Structural Steel - Welding
Chester Kowalski
09/29/2022
Special inspection requirement — Final
William Gorlin
09/29/2022
Special inspection requirement — Post-installed Anchors
Chester Kowalski
09/29/2022
Special inspection requirement — Final
William Gorlin
09/27/2022
Permit issued — Supported Scaffold
M00173597-I1-SF
09/27/2022
Permit issued — Sidewalk Shed
M00173590-I1-SH
09/26/2022
Permit issued — Protection and Mechanical Methods
M00646588-I1-PM
09/26/2022
Permit issued — Protection and Mechanical Methods
M00543893-I1-PM
09/21/2022
Permit issued — General Construction
M00466504-I1-GC
07/19/2022
Permit issued — Sidewalk Shed
M00173590-I1-SH
07/07/2022
Permit issued — Protection and Mechanical Methods
M00543893-I1-PM
02/11/2022
Permit issued — Supported Scaffold
M00173597-I1-SF
12/20/2021
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLAN
M00173590-P2
12/14/2021
Permit issued — Protection and Mechanical Methods
M00646588-I1-PM
12/13/2021
Filed — Alteration
M00646588-I1
10/13/2021
Permit issued — General Construction
M00466504-I1-GC
09/29/2021
Signed off — Alteration
Herewith in filing packaged unit air conditioning system. No change to use, egress occupancy.
M00523066-I1
09/14/2021
Permit issued — Sidewalk Shed
M00173590-I1-SH
09/10/2021
Filed — No Work
M00576907-I1
08/02/2021
Permit issued — Protection and Mechanical Methods
M00543893-I1-PM
06/23/2021
Permit issued — Protection and Mechanical Methods
M00543893-I1-PM
06/22/2021
Filed — Alteration
Installation of a temporarily shoring per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00543893-I1
06/21/2021
Filed — Alteration
M00466504-I1
06/19/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLAN
M00173597-P1
05/20/2021
Permit issued — Mechanical Systems
M00523066-I1-MS
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offTristrux09/19/2025
DOB NOWGeneral ConstructionSigned-offSoho Contracting09/26/2023
DOB NOWMechanical SystemsSigned-offThe Shubert Organization07/19/2023
DOB NOWSupported ScaffoldSigned-offSoho Contracting04/11/2023
DOB NOWSidewalk ShedSigned-offSoho Contracting03/29/2023
DOB NOWStructuralSigned-offGoing Sign Servicing12/09/2022
DOB NOWMechanical SystemsSigned-offAir Stream Air Conditioni11/30/2022
DOB NOWSignSigned-offPolsinelli, Henry11/25/2022
DOB NOWSignPermit IssuedNorth Shore Neon Sign Co10/25/2022
DOB NOWGeneral ConstructionSigned-offThe Shubert Organization10/14/2022
DOB NOWSupported ScaffoldSigned-offIntersystem Installation09/27/2022
DOB NOWSidewalk ShedSigned-offIntersystem Installation09/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offIntersystem Installation09/26/2022
DOB NOWProtection and Mechanical MethodsSigned-offIntersystem Installation09/26/2022
DOB NOWGeneral ConstructionSigned-offSoho Contracting09/21/2022
DOB NOWSidewalk ShedSigned-offIntersystem Installation07/19/2022
DOB NOWProtection and Mechanical MethodsSigned-offIntersystem Installation07/07/2022
DOB NOWSupported ScaffoldSigned-offIntersystem Installation02/11/2022
DOB NOWProtection and Mechanical MethodsSigned-offIntersystem Installation12/14/2021
DOB NOWGeneral ConstructionSigned-offSoho Contracting10/13/2021
DOB NOWSidewalk ShedSigned-offIntersystem Installation09/14/2021
DOB NOWProtection and Mechanical MethodsSigned-offIntersystem Installation08/02/2021
DOB NOWProtection and Mechanical MethodsSigned-offIntersystem Installation06/23/2021
DOB NOWMechanical SystemsSigned-offTristate Maintenance & SE05/20/2021
DOB NOWSupported ScaffoldSigned-offPratt Construction & Res*01/11/2021
DOB NOWSidewalk ShedSigned-offIntersystem Installation07/16/2020
DOB NOWSupported ScaffoldSigned-offPratt Construction & Res*01/02/2020
DOB NOWSupported ScaffoldSigned-offPratt Construction & Res*06/03/2019
DOB NOWSidewalk ShedSigned-offIntersystem Installation06/03/2019
BISOTISSUEDShow Motion10/30/2018
BISOTISSUEDThe Shubert Organization07/18/2018
BISOTISSUEDThe Shubert Organization07/06/2018
BISOTISSUEDTelcom Engineering GP10/18/2017
BISOTISSUEDShow Motion03/27/2017
BISOTISSUEDThe Shubert Organization12/22/2016
BISSDISSUEDAshlar Mechanical03/02/2016
BISOTISSUEDKoenig Iron Works02/19/2016
BISMHISSUEDKoenig Iron Works02/19/2016
BISOTISSUEDTelcom Engineering GP09/03/2015
BISOTISSUEDTelcom Engineering GP02/25/2015
+ 37 more permits on file
11 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026Permit IssuedR. Nuzzolo Electric—
05/11/2026CompleteR. Nuzzolo Electric—
03/15/2024CompleteR. Nuzzolo Electric—
12/06/2022CompleteH. & L. ElectricGeneral Wiring
10/28/2022CompleteH. & L. ElectricGeneral Wiring
10/26/2022CompleteR. Nuzzolo Electric—
09/23/2022CompleteH. & L. ElectricGeneral Wiring
04/10/2022CompleteR. Nuzzolo Electric—
10/08/2019CompleteSteven Farkas—
05/29/2019CompleteSteven Farkas—
10/12/2018CompleteErbach Electrical Contracting—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/08/2023Post-installed AnchorsGeorge Xerakiasspecial
09/29/2022Structural Steel - DetailsChester Kowalskispecial
09/29/2022Structural Steel - WeldingChester Kowalskispecial
09/29/2022FinalWilliam Gorlinprogress
09/29/2022Post-installed AnchorsChester Kowalskispecial
09/29/2022FinalWilliam Gorlinprogress
05/17/2021Mechanical SystemsEugene Choispecial
05/17/2021FinalEugene Choiprogress
02/05/2021MasonryChester Kowalskispecial
02/05/2021FinalRICHARD LEFEVERprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Shubert TheatreArts / Culture / EntertainmentRoof
Project M08012916 Alteration · LOC Issued · 10/07/2022
Project M00523066 Alteration · LOC Issued · 05/18/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 404 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch12
09/03/2026M00523066-I1Request digital key ↗
09/03/2026M00543893-I1Request digital key ↗
09/03/2026M00646588-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
09/05/2026M00180304-I1Request digital key ↗
09/03/2026M00576907-I1Request digital key ↗
08/15/2026M00127476-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00173590-I1Request digital key ↗
09/05/2026M00173590-P1Request digital key ↗
09/05/2026M00173590-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/03/2026M00173597-I1Request digital key ↗
08/15/2026M00173597-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00466504-I1Request digital key ↗
▸Applications & Permits70
▸BISPLAN / WORK APPROVAL APPLICATION30
04/06/2022123533649Open ↗
10/30/2018123533649Open ↗
07/09/2018123377167Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION30
10/30/2018123533649Open ↗
07/19/2018123580375Open ↗
07/06/2018123377167Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWLPC Approval/Permit9
08/13/2026M01206738-I1Open ↗
08/13/2026M00523066-I1Open ↗
08/13/2026M08012897-I1Open ↗
Showing 3 of 9 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/24/2017121496434Open ↗
▸Seals & Professional Certifications119
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION50
10/30/2018123533649Open ↗
09/26/2018123039461Open ↗
07/27/2018123580375Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00127476-I1Open ↗
09/05/2026M00173590-P1Open ↗
09/05/2026M00173590-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
10/30/2018123533649Open ↗
07/09/2018123377167Open ↗
06/26/2018123580375Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
03/08/2013121537024Open ↗
12/10/2012121428419Open ↗
11/21/2012121439568Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
10/30/2018123533649Open ↗
07/09/2018123377167Open ↗
06/26/2018123580375Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026M00466504-I1Open ↗
08/28/2026M00523066-I1Open ↗
08/23/2026M08012897-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026M08012916-I1Open ↗
08/29/2026M00466504-I1Open ↗
08/28/2026M00523066-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment17
▸BISEQUIPMENT USE PERMITS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
04/11/2013121439568Open ↗
04/11/2013121402231Open ↗
12/13/2012121439568Open ↗
▸BISSCHEDULE B - PLUMBING2
11/21/2012121439568Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
12/17/2014121968479Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/08/2014121998106Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/27/2012120685570Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
09/05/2026M00173590-P2Open ↗
08/13/2026M00173597-P1Open ↗
▸Environmental & Asbestos33
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
10/30/2018123533649Open ↗
06/26/2018123580375Open ↗
03/29/2017123039461Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00173597-I1Open ↗
09/01/2026M08012868-I1Open ↗
08/29/2026M00844563-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/05/2016122636549Open ↗
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
05/08/2014121998106Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
07/27/2018123580375Open ↗
06/26/2018123580375Open ↗
04/19/2018121707448Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/27/2018123580375Open ↗
04/19/2018121707448Open ↗
12/27/2012120685570Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
10/30/2018123533649Open ↗
02/05/2016122636549Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M08012868-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/24/2022123533649Open ↗
01/20/2022121801381Open ↗
01/12/2022121801381Open ↗
▸Approvals, Objections & Sign-offs57
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
04/06/2022123533649Open ↗
09/26/2018123039461Open ↗
07/27/2018123580375Open ↗
Showing 3 of 23 on file for this type
▸BISLANDMARKS APPROVAL19
09/26/2018123039461Open ↗
07/27/2018123580375Open ↗
07/09/2018123377167Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
07/24/2013121707448Open ↗
03/08/2013121537024Open ↗
12/10/2012121428419Open ↗
Showing 3 of 13 on file for this type
▸BISFINAL1
04/05/2022123533649Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
12/27/2012120685570Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT41
10/30/2018123533649Open ↗
09/26/2018123039461Open ↗
07/27/2018123580375Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/24/2022123533649Open ↗
▸Filing & Intake Forms24
▸BISEFILING COVER SHEET19
10/30/2018123533649Open ↗
07/09/2018123377167Open ↗
06/26/2018123580375Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM4
09/26/2018123039461Open ↗
07/27/2018123580375Open ↗
07/13/2018123377167Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
12/19/2014121707448Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type