← Back
BuildNYC
Church, synagogue, chapel
Saint Michael's Church
225 WEST 99TH STREET · Name © OpenStreetMap contributors · BIN 1084035
💬 Discuss this project
1900Year Built
3Stories
M1Building Class
R8Zoning
2,625 sfGross Floor Area
2Units
0 Active Violations
Church, synagogue, chapel · Owner of record: St Michael's Episcopal Church · 30,175 sf lot · 0.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSt. Michael's ChurchUnder Construction127p · 3 filings · 20 docs
Floor 3St. Michael's Church125p · 1 filing · 20 docs
Floor 2St. Michael's Church127p · 1 filing · 20 docs
Floor 1St. Michael's ChurchUnder Construction136p · 3 filings · 20 docs
CellarSt. Michael's Church1 filing · 7 docs
BasementSt. Michael's Church13p · 1 filing · 20 docs
Sub-BasementSt. Michael's ChurchUnder Construction115p · 3 filings · 20 docs
Site & exteriorSt. Michael's ChurchUnder Construction37p · 4 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St Michaels RC Church9710/13/2026
St Michael's Episcopal Church1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Altieriseborwieber908/27/2026
Richard McElhiney Architects608/27/2026
Rigid Structural Design103/16/2026
Mje Professional Services110/21/2025
Silman105/27/2025
Langan Engineering401/23/2024
Bilow Engineering206/29/2022
Bazini Engineering101/22/2020
Dooling & Company Architects103/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nyccode4003/21/2026
SNR Expediting Design203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cypress Green Construction CoGeneral Contractor2907/08/2026
ConstructomicsGeneral Contractor708/30/2026
Buildcox ConstructionScaffold309/07/2026
AP Plumbing & HVACPlumbing207/08/2026
Aqua Plumbing & HeatingPlumbing208/25/2026
JascoScaffold204/09/2026
Everest ScaffoldingScaffold203/21/2026
Varuzzi Plumbg & HeatingPlumbing107/08/2026
Napstar ElectricElectrical103/21/2026
U.S. ChimneyGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
W. Allen Engineering6641412/10/2025
Bilow Engineering4095206/29/2022
Bazini Engineering1808101/22/2020
Building Lifecycle
All (161)Filed (26)Permit Issued (33)Signed Off (10)Violation (16)Inspection (12)Objection (34)Special Inspection (30)
10/13/2026
Objection resolved — Resolved
10/13/2026
Objection resolved — Resolved
10/13/2026
Objection resolved — Resolved
10/13/2026
Objection resolved — Resolved
10/08/2026
Objection raised — Cost
10/08/2026
Objection raised — Scope
10/08/2026
Objection raised — Scope
10/08/2026
Objection raised — Scope
08/31/2026
Permit issued — Sidewalk Shed
M01331410-I1-SH
08/27/2026
Filed — Alteration
Interior General Construction scope related to installation of new sprinkler line of domestic on Basement. No change to use, occupancy, or egress.
M01442842-I1
08/27/2026
Filed — Alteration
Interior General Construction scope related to installation of new sprinkler line of domestic on Basement. No change to use, occupancy, or egress.
M01442842-S1
08/27/2026
Permit issued — General Construction
M01211836-I1-GC
08/24/2026
Permit issued — Structural
M01211836-S3-ST
08/24/2026
Permit issued — Mechanical Systems
M01211836-S1-MS
08/24/2026
Permit issued — Plumbing
M01211836-S2-PL
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD MCELHINEY
08/07/2026
Special inspection requirement — Final
RICHARD MCELHINEY
05/07/2026
Signed off — Alteration
M01305933-I1
03/16/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01331410-I1
03/16/2026
Permit issued — Supported Scaffold
M01331410-I1-SH
03/16/2026
Permit issued — Supported Scaffold
M01331410-I1-SF
01/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
WAYNE ALLEN
01/30/2026
Special inspection requirement — Final
RICHARD MCELHINEY
01/30/2026
Special inspection requirement — Post-installed Anchors
WAYNE ALLEN
01/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAYNE ALLEN
01/30/2026
Special inspection requirement — Masonry
WAYNE ALLEN
01/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
WAYNE ALLEN
01/22/2026
Objection resolved — Addressed
01/20/2026
Objection raised — Scope
12/10/2025
Filed — Alteration
MECHANICAL SCOPE ASSOCIATED WITH THE INTERIOR ND MINOR EXTERIOR RENOVATION OF THE PARISH HOUSE INCLUDING RELOATION OF AN EXISTING KITCHEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01211836-P1
12/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
WAYNE ALLEN
11/07/2025
Special inspection requirement — Post-installed Anchors
WAYNE ALLEN
11/07/2025
Special inspection requirement — Masonry
WAYNE ALLEN
11/07/2025
Special inspection requirement — Final
RICHARD MCELHINEY
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAYNE ALLEN
11/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/24/2025
Permit issued — Sidewalk Shed
M01305933-I1-SF
10/23/2025
Permit issued — Supported Scaffold
M01305933-I1-SH
10/21/2025
Filed — Alteration
M01305933-I1
07/23/2025
Permit issued — Mechanical Systems
M01211836-S1-MS
07/23/2025
Permit issued — Plumbing
M01211836-S2-PL
07/23/2025
Permit issued — General Construction
M01211836-I1-GC
07/22/2025
Permit issued — Structural
M01211836-S3-ST
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/03/2025
Objection raised — Admin
06/03/2025
Objection raised — Admin
06/03/2025
Objection raised — Admin
05/27/2025
Filed — Alteration
MECHANICAL SCOPE ASSOCIATED WITH THE INTERIOR ND MINOR EXTERIOR RENOVATION OF THE PARISH HOUSE INCLUDING RELOATION OF AN EXISTING KITCHEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01211836-S3
05/27/2025
Filed — Alteration
MECHANICAL SCOPE ASSOCIATED WITH THE INTERIOR ND MINOR EXTERIOR RENOVATION OF THE PARISH HOUSE INCLUDING RELOATION OF AN EXISTING KITCHEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01211836-S2
05/27/2025
Filed — Alteration
MECHANICAL SCOPE ASSOCIATED WITH THE INTERIOR ND MINOR EXTERIOR RENOVATION OF THE PARISH HOUSE INCLUDING RELOATION OF AN EXISTING KITCHEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01211836-S1
05/23/2025
Objection raised — Scope
05/22/2025
Objection raised — Admin
05/14/2025
Special inspection requirement — Post-installed Anchors
WAYNE ALLEN
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAYNE ALLEN
05/08/2025
Special inspection requirement — Masonry
WAYNE ALLEN
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedBuildcox Construction08/31/2026
DOB NOWGeneral ConstructionPermit IssuedConstructomics08/27/2026
DOB NOWStructuralPermit IssuedConstructomics08/24/2026
DOB NOWMechanical SystemsPermit IssuedConstructomics08/24/2026
DOB NOWPlumbingPermit IssuedAqua Plumbing & Heating08/24/2026
DOB NOWSupported ScaffoldPermit IssuedBuildcox Construction03/16/2026
DOB NOWSupported ScaffoldPermit IssuedBuildcox Construction03/16/2026
DOB NOWSidewalk ShedSigned-offJasco10/24/2025
DOB NOWSupported ScaffoldSigned-offJasco10/23/2025
DOB NOWMechanical SystemsPermit IssuedConstructomics07/23/2025
DOB NOWPlumbingPermit IssuedAqua Plumbing & Heating07/23/2025
DOB NOWGeneral ConstructionPermit IssuedConstructomics07/23/2025
DOB NOWStructuralPermit IssuedConstructomics07/22/2025
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating10/30/2024
DOB NOWGeneral ConstructionSigned-offCypress Green Construction Co03/12/2024
DOB NOWSupport of ExcavationSigned-offCypress Green Construction Co02/16/2024
DOB NOWFoundationSigned-offCypress Green Construction Co02/15/2024
DOB NOWMechanical SystemsSigned-offCypress Green Construction Co02/14/2024
DOB NOWStructuralSigned-offCypress Green Construction Co02/14/2024
DOB NOWPlumbingSigned-offVaruzzi Plumbg & Heating08/22/2023
DOB NOWStructuralSigned-offCypress Green Construction Co03/01/2023
DOB NOWSupport of ExcavationSigned-offCypress Green Construction Co02/28/2023
DOB NOWGeneral ConstructionSigned-offCypress Green Construction Co02/28/2023
DOB NOWMechanical SystemsSigned-offCypress Green Construction Co02/28/2023
DOB NOWFoundationSigned-offCypress Green Construction Co02/28/2023
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating07/29/2022
DOB NOWFoundationSigned-offCypress Green Construction Co07/26/2022
DOB NOWSupport of ExcavationSigned-offCypress Green Construction Co07/21/2022
DOB NOWFoundationSigned-offCypress Green Construction Co07/21/2022
DOB NOWGeneral ConstructionSigned-offCypress Green Construction Co07/19/2022
DOB NOWMechanical SystemsSigned-offCypress Green Construction Co07/19/2022
DOB NOWMechanical SystemsSigned-offU.S. Chimney01/24/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding03/25/2019
BISOTISSUEDHexagon HNC09/09/2021
BISPLISSUEDPower Plumbing & Heating03/21/2017
BISPLISSUEDI Do Plumbing & Heating11/25/2016
BISMHISSUEDHexagon HNC11/22/2016
BISOTISSUEDNicholson & Galloway07/01/2013
BISEQISSUEDA.A.L. Construction10/17/2012
BISOTISSUEDLendlease (US) Construction07/15/2005
+ 4 more permits on file
1 project · most recent 12/10/2025
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/10/2025Permit IssuedConstructomicsHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Captiveaire CAS-HVAC2-E.452-18-10T 131,000 BTU · Fan Coil Indoor ×1
Mitsubishi Electric MITSUBISHI/NTXSH48A182BA 48,000 BTU · Heat Pump Outdoor ×1
Heating
N/A N/A 6,820 BTU · Radiant ×4
2 projects · most recent 08/27/2026
Water/Sanitary Plumbing-Sprinkler Gas
FiledStatusContractorScope
08/27/2026——Plumbing-Sprinkler, Water/Sanitary
12/10/2025Permit IssuedAqua Plumbing & HeatingGas, Water/Sanitary
8 projects · most recent 03/13/2026
General Wiring
FiledStatusContractorScope
03/13/2026Permit IssuedSpice Electric Company—
10/22/2025Permit IssuedRichard Neu—
07/27/2025Permit IssuedSolas Electrical ContractingGeneral Wiring
04/22/2025CompleteNapstar ElectricGeneral Wiring
08/01/2023CompleteDaven ElectricGeneral Wiring
07/27/2023CompleteDaven Electric—
05/16/2023CompleteJam Electrical—
08/01/2022CompleteV-Mar ElectricGeneral Wiring
1 project · most recent 12/10/2025
Steel
FiledStatusContractorScope
12/10/2025Permit IssuedConstructomicsSteel
1 project · most recent 03/16/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/16/2026Permit IssuedBuildcox ConstructionScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
12/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2024Pass-Final PL - UndergroundPassView ↗
03/01/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2024Pass-Final PL - UndergroundPassView ↗
12/01/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/29/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/29/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
08/11/2026Fire-Resistance Rated ConstructionRICHARD MCELHINEYprogress
08/07/2026FinalRICHARD MCELHINEYprogress
01/30/2026Fire-Resistance Rated ConstructionWAYNE ALLENprogress
01/30/2026FinalRICHARD MCELHINEYprogress
01/30/2026Fire-Resistant Penetrations and JointsWAYNE ALLENspecial
01/30/2026MasonryWAYNE ALLENspecial
01/30/2026Post-installed AnchorsWAYNE ALLENspecial
01/30/2026Tenant Protection Plan ComplianceWAYNE ALLENspecial
11/07/2025Fire-Resistant Penetrations and JointsWAYNE ALLENspecial
11/07/2025Fire-Resistance Rated ConstructionWAYNE ALLENprogress
11/07/2025FinalRICHARD MCELHINEYprogress
11/07/2025Tenant Protection Plan Compliance—special
11/07/2025Post-installed AnchorsWAYNE ALLENspecial
11/07/2025MasonryWAYNE ALLENspecial
05/14/2025Post-installed AnchorsWAYNE ALLENspecial
05/14/2025Fire-Resistant Penetrations and JointsWAYNE ALLENspecial
05/08/2025MasonryWAYNE ALLENspecial
05/07/2025Tenant Protection Plan ComplianceWAYNE ALLENspecial
05/07/2025Heating SystemsWAYNE ALLENspecial
05/07/2025Smoke Control Systems TestingWAYNE ALLENspecial
05/07/2025Tenant Protection Plan ComplianceWAYNE ALLENspecial
05/07/2025Fire-Resistant Penetrations and JointsWAYNE ALLENspecial
05/02/2025FinalWAYNE ALLENprogress
05/02/2025FinalWAYNE ALLENprogress
05/02/2025Tenant Protection Plan ComplianceWAYNE ALLENspecial
Latest 25 of 76.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
St. Michael's ChurchReligiousCellar, Sub-basement, Floors 1–3, Roof
Project M01211836 Alteration · Permit Entire · 05/07/2025
Project M00663059 Alteration · LOC Issued · 02/08/2022
Project M00203103 Alteration · LOC Issued · 01/22/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 257 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch22
09/06/2026M01331410-I1Request digital key ↗
08/28/2026M00663059-P4Request digital key ↗
08/28/2026M00663059-P9Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00136828-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00203103-I1Request digital key ↗
▸Applications & Permits36
▸DOB NOWLPC Approval/Permit16
10/14/2026M01442842-I1Open ↗
08/13/2026M00663059-I1Open ↗
08/13/2026M01211836-S1Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
07/03/2023103480662Open ↗
06/27/2023103480662Open ↗
06/02/2023103480662Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION7
09/10/2021122805884Open ↗
04/03/2017122805884Open ↗
12/01/2016122805884Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications113
▸DOB NOWSpecial Inspector Seal & Signature56
09/01/2026M00663059-S4Open ↗
09/01/2026M00663059-S4Open ↗
09/01/2026M00663059-S4Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
10/14/2026M01442842-I1Open ↗
10/14/2026M01442842-S1Open ↗
09/06/2026M01331410-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
10/14/2026M01442842-I1Open ↗
10/14/2026M01442842-I1Open ↗
09/01/2026M00663059-S4Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
12/01/2016122805884Open ↗
06/17/2016122805884Open ↗
06/17/2016122805884Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/19/2012121400108Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/19/2012121400108Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/29/2017122805884Open ↗
06/17/2016122805884Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/09/2017122476089Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
10/14/2026M01442842-I1Open ↗
10/14/2026M01442842-S1Open ↗
08/23/2026M01211836-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/28/2026M00663059-S3Open ↗
08/28/2026M00663059-S1Open ↗
08/28/2026M00663059-S2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/19/2012121400108Open ↗
10/19/2012121400108Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/09/2013121591839Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/21/2016122805884Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/17/2016122805884Open ↗
04/23/2013121591839Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/25/2021122805884Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/25/2021122805884Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/24/2021122805884Open ↗
09/24/2021122805884Open ↗
08/25/2021122805884Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
10/14/2026M01442842-I1Open ↗
10/14/2026M01442842-S1Open ↗
08/13/2026M00663059-P4Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
04/23/2013121591839Open ↗
10/19/2012121400108Open ↗
02/06/2008110283425Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/03/2017122805884Open ↗
04/23/2013121591839Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/24/2021122805884Open ↗
02/24/2014121591839Open ↗
▸BISLANDMARKS APPROVAL2
11/29/2016122805884Open ↗
04/23/2013121591839Open ↗
▸BISLANDMARKS SIGNOFF1
09/24/2021122805884Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
09/24/2021122805884Open ↗
06/17/2016122805884Open ↗
06/17/2016122805884Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
06/17/2016122805884Open ↗
08/04/2015122476089Open ↗
04/23/2013121591839Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
08/25/2021122805884Open ↗
01/25/2017122805884Open ↗
▸Other Documents6
▸DOB NOWProof of Historic Building4
08/13/2026M00663059-I1Open ↗
08/13/2026M00663059-P4Open ↗
08/13/2026M01211836-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROVIDE A VALID LNO FOR THE DAYCARE USE1
09/24/2021122805884Open ↗
▸BISSupporting Document: Fee Deferment1
06/17/2016122805884Open ↗