| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X00704861 ↗ | 1879 GLEASON AVENUE BRONX | Alteration | Permit Issued | 03/28/2022 | 09/16/2026 | Design BILOW ENGINEERING, LLC Contractor AVC GENERAL CONTRACTING L | FILING TO EXCAVATE THE SITE FOR NEW BUILDING PURPOSES |
| B00802089 ↗ | 287 COURT STREET BROOKLYN | Alteration CO | Permit Issued | 01/20/2023 | 09/15/2026 | Design OLD STRUCTURES ENGINEERING Owner SUNNY BAY LLC Contractor MARPAT CONSTRUCTION CORP Filer SATWIN ARCHITECT, PC | THREE STORY HORIZONTAL REAR EXTENSION. ADDITION OF 4TH FLOOR ROOFTOP & BULKHEAD. INTERIOR RENO OF ENTIRE BUILDING. CHANGE OF USE APPLICATIO… |
| M00628781 ↗ | BIN 1091952 | New Building | Permit Issued | 11/11/2021 | 09/03/2026 | Design MORRIS ADJMI ARCHITECTS Owner ARTIFACT Contractor YNH CONSTRUCTION NY LLC | IT IS PROPOSED TO INSTALL A SPRINKLER / STANDPIPE SYSTEM AS SHOWN ON PLANS. |
| M07996984 ↗ | 51 EAST 73 STREET MANHATTAN | Alteration CO | Permit Issued | 09/14/2022 | 08/28/2026 | Design SILMAN Owner CHAI 73 LLC Contractor TRIBORO CONSTR ASSOC INC | Support of excavation filing. No change to use, egress or occupancy. |
| B01019213 ↗ | 611 2 STREET BROOKLYN | Alteration | Signed-off | 02/04/2025 | 06/16/2026 | Contractor SHL BUILDERS INC Filer DOMANI CONSULTING | Herewith file foundation plans in conjunction with structural plans permitted under Job #B00849359 and B00846245 permitted general construct… |
| M00962965 ↗ | 243 EAST 48 STREET MANHATTAN | Alteration CO | Permit Issued | 12/01/2023 | 05/21/2026 | Design ABS ENGINEERING, PLLC Owner IUU48 LLC Contractor HIICOMPANY CORP | THIS WORK INVOLVES THE MODIFICATION AND REINFORCING OF THE FLOOR FRAMING FROM BASEMENT TO ROOF, INSTALLATION OF NEW ELEVATOR SHAFT AND NEW R… |
| Name | Projects together | Most recent |
|---|---|---|
| BILOW ENGINEERING, LLC | 12 | 07/06/2026 |
| MADSEN CONSULTING ENGINEERING | 5 | 06/30/2026 |
| A DEGREE OF FREEDOM STRUCTURAL ENGI | 3 | 06/09/2026 |
| OLD STRUCTURES ENGINEERING | 3 | 11/18/2024 |
| SILMAN | 2 | 07/06/2026 |
| ABS ENGINEERING, PLLC | 1 | 03/13/2026 |
| ALTIERISEBORWIEBER LLC | 1 | 02/18/2025 |
| BRAUDE PANKIEWICZ ARCHITECTS | 1 | 02/10/2021 |
| CHOSHIELDS STUDIO | 1 | 11/18/2024 |
| D'ANTONIO CONSULTING ENGINEERS | 1 | 07/06/2026 |
| DERIVE ENGINEERS | 1 | 09/12/2025 |
| DEVIN MILLS ARCHITECT | 1 | 04/30/2024 |
| JOSELOW & ASSOCIATES, LLC | 1 | 06/30/2026 |
| KANE ARCHITECTURE AND URBAN DESIGN | 1 | 03/13/2026 |
| LANGAN ENGINEERING | 1 | 02/18/2025 |
| MICHAEL HOUSE ARCHITECT, PLLC | 1 | 07/06/2026 |
| MOROZOV | 1 | 06/30/2026 |
| MORRIS ADJMI ARCHITECTS | 1 | 06/30/2026 |
| NOROOF ARCHITECTS | 1 | 09/11/2024 |
| PBDW ARCHITECTS | 1 | 09/30/2024 |
| RICHARD MCELHINEY ARCHITECTS LL | 1 | 02/18/2025 |
| S & S ARCHITECTURAL DESIGN,LLC | 1 | 06/24/2025 |
| STRUCTURAL ENGINEERING INTEGRATED | 1 | 03/13/2026 |
| STRUCTURAL ENGINEERING SYSTEMS, PLL | 1 | 06/24/2025 |
| STUDIO LYON/SZOT | 1 | 09/12/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| TRIBORO CONSTR ASSOC INC | 3 | 07/06/2026 |
| AVC GENERAL CONTRACTING L | 2 | 03/28/2022 |
| KMN BUILDERS INC | 2 | 07/06/2026 |
| LODUCA ASSOCIATES INC | 2 | 04/09/2024 |
| SHL BUILDERS INC | 2 | 02/04/2025 |
| AMSTERDAM HARLEM CONSTRUC | 1 | 06/30/2026 |
| BROWNSTONE MANAGEMENT LLC | 1 | 12/07/2023 |
| CROSSFIELD PLBG.&HTG | 1 | 02/18/2025 |
| CYPRESS GREEN CONST CO | 1 | 02/18/2025 |
| EXPERT PLUMBING & HEATING | 1 | 06/09/2026 |
| HATCHET WORKS CORP | 1 | 04/30/2024 |
| HIICOMPANY CORP | 1 | 03/13/2026 |
| INWOOD INTERIOR GROUP COR | 1 | 02/10/2021 |
| L&L CONSTRUCTION DEVELOP | 1 | 01/06/2026 |
| LANZO CONSTRUCTION & HOME | 1 | 09/11/2024 |
| MARPAT CONSTRUCTION CORP | 1 | 11/18/2024 |
| MARQUIS P & H CO., INC | 1 | 09/11/2024 |
| NEW RELIANT CONSTRUCTION | 1 | 07/06/2026 |
| ORBIT PLBG & HTG INC | 1 | 09/12/2025 |
| ORBIT SPRINKLER CORP | 1 | 09/12/2025 |
| PREMIER FLOW PLBG AND HTG | 1 | 03/13/2026 |
| PRIME PIPING & HEATING IN | 1 | 06/30/2026 |
| QMB PLUMBING & HEATING IN | 1 | 07/06/2026 |
| QMB PLUMBING & HTG INC | 1 | 07/06/2026 |
| QWEST CONTRACTING CORP | 1 | 09/30/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| 9E9 LLC | 1 | 09/15/2023 |
| ARTIFACT | 1 | 06/30/2026 |
| BROWNSTONE MANAGEMENT | 1 | 12/07/2023 |
| Building Equity Management LLC | 1 | 10/03/2025 |
| CHAI 73 LLC | 1 | 07/06/2026 |
| HOLY NAME OF JESUS-ST GREGORY THE G | 1 | 09/30/2024 |
| IUU48 LLC | 1 | 03/13/2026 |
| KABAET 3 LLC | 1 | 03/28/2022 |
| MALIK MANAGEMENT | 1 | 06/24/2025 |
| NPL MORTAR LLC | 1 | 01/29/2024 |
| ST. MICHAEL'S CHURCH | 1 | 02/18/2025 |
| SUNNY BAY LLC | 1 | 11/18/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| DOMANI CONSULTING | 2 | 02/04/2025 |
| JM ZONING, LLC. | 2 | 09/30/2024 |
| METROPOLIS GROUP INC | 2 | 10/03/2025 |
| SATWIN ARCHITECT, PC | 2 | 11/18/2024 |
| ADAM MAISER | 1 | 09/11/2024 |
| ANZALONE ARCHITECTURE, PLLC | 1 | 09/12/2025 |
| BIG ORANGE EXPEDITING, INC | 1 | 01/06/2026 |
| CONVERSANO ASSOCIATES, INC. | 1 | 06/09/2026 |
| EAST COAST EXPEDITING | 1 | 12/07/2023 |
| GEORGE E. BERGER & ASS. LLC | 1 | 06/30/2026 |
| GREEN LIGHT EXPEDITING LLC | 1 | 02/10/2021 |
| HM CONSULTING & EXPEDITING INC. | 1 | 06/09/2026 |
| JOSEPH FELLNER | 1 | 01/19/2022 |
| KC EXPEDITING INC | 1 | 03/28/2022 |
| MMSR CONSULTING GROUP LLC | 1 | 06/24/2025 |
| NEXUS CONSULTING NYC, INC | 1 | 07/06/2026 |
| NYCCODE LLC | 1 | 02/18/2025 |
| WILLIAM VITACCO ASSOCIATES | 1 | 03/13/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X00704861 ↗ | 1879 GLEASON AVENUE BRONX | Alteration | Permit Issued | 03/28/2022 | 09/16/2026 | Design BILOW ENGINEERING, LLC Contractor AVC GENERAL CONTRACTING L | FILING TO EXCAVATE THE SITE FOR NEW BUILDING PURPOSES |
| B00802089 ↗ | 287 COURT STREET BROOKLYN | Alteration CO | Permit Issued | 01/20/2023 | 09/15/2026 | Design OLD STRUCTURES ENGINEERING Owner SUNNY BAY LLC Contractor MARPAT CONSTRUCTION CORP Filer SATWIN ARCHITECT, PC | THREE STORY HORIZONTAL REAR EXTENSION. ADDITION OF 4TH FLOOR ROOFTOP & BULKHEAD. INTERIOR RENO OF ENTIRE BUILDING. CHANGE OF USE APPLICATIO… |
| M00628781 ↗ | BIN 1091952 | New Building | Permit Issued | 11/11/2021 | 09/03/2026 | Design MORRIS ADJMI ARCHITECTS Owner ARTIFACT Contractor YNH CONSTRUCTION NY LLC | IT IS PROPOSED TO INSTALL A SPRINKLER / STANDPIPE SYSTEM AS SHOWN ON PLANS. |
| M07996984 ↗ | 51 EAST 73 STREET MANHATTAN | Alteration CO | Permit Issued | 09/14/2022 | 08/28/2026 | Design SILMAN Owner CHAI 73 LLC Contractor TRIBORO CONSTR ASSOC INC | Support of excavation filing. No change to use, egress or occupancy. |
| B01019213 ↗ | 611 2 STREET BROOKLYN | Alteration | Signed-off | 02/04/2025 | 06/16/2026 | Contractor SHL BUILDERS INC Filer DOMANI CONSULTING | Herewith file foundation plans in conjunction with structural plans permitted under Job #B00849359 and B00846245 permitted general construct… |
| M00962965 ↗ | 243 EAST 48 STREET MANHATTAN | Alteration CO | Permit Issued | 12/01/2023 | 05/21/2026 | Design ABS ENGINEERING, PLLC Owner IUU48 LLC Contractor HIICOMPANY CORP | THIS WORK INVOLVES THE MODIFICATION AND REINFORCING OF THE FLOOR FRAMING FROM BASEMENT TO ROOF, INSTALLATION OF NEW ELEVATOR SHAFT AND NEW R… |
| Q01185386 ↗ | 168-42 HILLSIDE AVENUE QUEENS | Alteration CO | Permit Issued | 03/11/2025 | 05/19/2026 | Owner MALIK MANAGEMENT Contractor TRIBORO CONSTR ASSOC INC | FILE HERRWITH FOUNDATION WORK OF THE EXISITNG TWO-STORY COMMERCIAL BUILDING. FILED IN CONJUCTION WITL ALT-1 Q1185386-I1 |
| B01070887 ↗ | 162 DIAMOND STREET BROOKLYN | Alteration | Permit Issued | 07/30/2024 | 05/04/2026 | Contractor L&L CONSTRUCTION DEVELOP | FOUNDATION WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01237637 ↗ | 86 2 STREET BROOKLYN | Alteration | Permit Issued | 07/25/2025 | 04/29/2026 | Design STUDIO LYON/SZOT Contractor TECHCREW INC | TEMPORARY CONSTRUCTION FENCE FILED IN CONJUCTION WITH RENOVATION OF EXISTING 2-FAMILY RESIDENCE AND PROPOSED HORIZONTAL ENLARGEMENT AT REAR. |
| B01268646 ↗ | 285 5 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 11/05/2025 | — | — | — |
| M01187878 ↗ | 188 GRAND STREET MANHATTAN | Alteration | Signed-off | 04/24/2025 | 10/03/2025 | Design BILOW ENGINEERING, LLC Contractor TRIBORO CONSTR ASSOC INC Filer METROPOLIS GROUP INC | Excavation to expose existing underpinning piers to verify their strength and their compliance with NYC BC, per plans filed herewith. No Ch… |
| B01037683 ↗ | 413 BERGEN STREET BROOKLYN | Alteration | Signed-off | 04/25/2024 | 08/11/2025 | Design NOROOF ARCHITECTS Contractor LANZO CONSTRUCTION & HOME Filer ADAM MAISER | One new interior shallow footing for new post |
| B00668083 ↗ | 19 TOMPKINS PLACE BROOKLYN | Alteration CO | Permit Issued | 02/04/2022 | 07/25/2025 | Design DEVIN MILLS ARCHITECT Contractor HATCHET WORKS CORP | Subsequent Filing for Structural Work in conjunction with Alt-CO # B00668083-I1 |
| X00704897 ↗ | 1879 GLEASON AVENUE BRONX | Alteration | Signed-off | 03/28/2022 | 07/01/2025 | Design BILOW ENGINEERING, LLC Owner KABAET 3 LLC Contractor AVC GENERAL CONTRACTING L Filer KC EXPEDITING INC | SUPPORT OF EXCAVATION FOR NB PURPOSES |
| B00760665 ↗ | 2743 WHITMAN DRIVE BROOKLYN | New Building | Permit Issued | 07/16/2022 | 06/12/2025 | Design ZPROEKT ARCHITECTURE Contractor YAFE MEOD CORP | installation of new air conditioning, ventilation, boiler and heating system in new house |
| M00663059 ↗ | 225 WEST 99 STREET MANHATTAN | Alteration | Signed-off | 02/08/2022 | 10/30/2024 | Owner ST. MICHAEL'S CHURCH Contractor CYPRESS GREEN CONST CO Filer NYCCODE LLC | Underpinning scope associated with a new elevator pit at the St.Michael's church. No change or use, egress, or occupancy. |
| B00901648 ↗ | 456 6 STREET BROOKLYN | Alteration | Signed-off | 07/31/2023 | 04/16/2024 | Owner BROWNSTONE MANAGEMENT Contractor BROWNSTONE MANAGEMENT LLC Filer EAST COAST EXPEDITING | STRUCTURAL WORK ASSOCIATED WITH THE CONSTRUCTION OF A NEW STEEL DECK AT REAR OF THE RESIDENTIAL BUILDING. NO CHNAGE IN OCCUPANCY, USE OR EGR… |
| M00898614 ↗ | 200 WEST 97 STREET MANHATTAN | Alteration | Signed-off | 07/27/2023 | 02/15/2024 | Design PBDW ARCHITECTS Contractor QWEST CONTRACTING CORP Filer JM ZONING, LLC. | Herewith filing to erect new convenience stair and replace existing exterior stair with ramp . No change to use, egress or occupancy |
| M00510155 ↗ | 29 EAST 11 STREET MANHATTAN | Alteration | Signed-off | 11/12/2021 | 11/09/2023 | Design OLD STRUCTURES ENGINEERING Contractor LODUCA ASSOCIATES INC | STRUCTURAL FILING FOR REAR HORIZONTAL ADDITION ON CEL, BAS, 001-004. GREEN ROOF AND RECREATION OF FRONT STOOP AS PER PLANS. IN CONJUNCTION… |
| M00646892 ↗ | 29 EAST 11 STREET MANHATTAN | Alteration | Signed-off | 05/05/2022 | 11/09/2023 | Design OLD STRUCTURES ENGINEERING Contractor LODUCA ASSOCIATES INC Filer SATWIN ARCHITECT, PC | FOUNDATION APPLICATION IN CONJUNCTION WITH ALT-1 140940551 AND STRUCTURAL APPLICATION M00510155-I1. |
| B00924247 ↗ | 59 80 STREET BROOKLYN | Alteration | Filed — no permit on record | 08/30/2023 | — | Design BILOW ENGINEERING, LLC Filer METROPOLIS GROUP INC | — |
| M00886801 ↗ | 9 EAST 9 STREET MANHATTAN | Alteration | Filed — no permit on record | 06/14/2023 | — | Design BILOW ENGINEERING, LLC Owner 9E9 LLC Filer DOMANI CONSULTING | — |
| B00477469 ↗ | 69 CRANBERRY STREET BROOKLYN | Alteration | Signed-off | 04/06/2021 | 05/08/2023 | Design BILOW ENGINEERING, LLC Contractor RA SOMERBY | SOE work in conjunction with repair of east wall of foundation. Excavation filed as a subsequent application. Foundation work filed as sepa… |
| X00548508 ↗ | 4174 WHITE PLAINS ROAD BRONX | Alteration | Signed-off | 07/22/2021 | 03/06/2023 | Design BILOW ENGINEERING, LLC Contractor KMN BUILDERS INC | SUPPORT OF EXCAVATION FILING, REPAIR BRICK RETAINING WALL AS NECESSARY, SHORING AT SOUTH AND EAST ELEVATION |
| B00651901 ↗ | 541 3 AVENUE BROOKLYN | Alteration | Signed-off | 01/13/2022 | 09/30/2022 | Contractor SHL BUILDERS INC Filer JOSEPH FELLNER | Two concrete footings associated with the structural work approved under the initial application. |
| Q00700443 ↗ | 11-32 31 AVENUE QUEENS | Alteration | Signed-off | 03/18/2022 | 04/06/2022 | Design BILOW ENGINEERING, LLC Owner NPL MORTAR LLC Contractor STEEL TONE CONSTRUCTION Filer JM ZONING, LLC. | Application filed for emergency lagging/bracing work. |
| B00460383 ↗ | 38 WINDSOR PLACE BROOKLYN | Alteration | Signed-off | 02/10/2021 | 01/26/2022 | Design BRAUDE PANKIEWICZ ARCHITECTS Contractor INWOOD INTERIOR GROUP COR | Filing interior renovation of 2 family dwelling with partitions, doors, windows, finishes. Also creating opening associated with replacing … |
| Building | Filings | Most Recent |
|---|---|---|
| 51 EAST 73 STREET ↗ | 1 | 07/06/2026 |
| 162 DIAMOND STREET ↗ | 2 | 01/06/2026 |
| 285 5 AVENUE ↗ | 1 | 11/05/2025 |
| 188 GRAND STREET ↗ | 2 | 10/03/2025 |
| 86 2 STREET ↗ | 1 | 09/12/2025 |
| 168-42 HILLSIDE AVENUE ↗ | 1 | 05/07/2025 |
| 611 2 STREET ↗ | 1 | 02/04/2025 |
| 2743 WHITMAN DRIVE ↗ | 2 | 12/16/2024 |
| 287 COURT STREET ↗ | 2 | 11/18/2024 |
| 413 BERGEN STREET ↗ | 1 | 05/30/2024 |
| 29 EAST 11 STREET ↗ | 4 | 04/09/2024 |
| 11-32 31 AVENUE ↗ | 3 | 01/29/2024 |
| 456 6 STREET ↗ | 1 | 12/07/2023 |
| 243 EAST 48 STREET ↗ | 1 | 12/07/2023 |
| 9 EAST 9 STREET ↗ | 2 | 09/15/2023 |
| 59 80 STREET ↗ | 1 | 08/30/2023 |
| 200 WEST 97 STREET ↗ | 1 | 08/29/2023 |
| 19 TOMPKINS PLACE ↗ | 3 | 02/15/2023 |
| 69 CRANBERRY STREET ↗ | 3 | 10/21/2022 |
| 225 WEST 99 STREET ↗ | 2 | 06/29/2022 |
| 1879 GLEASON AVENUE ↗ | 2 | 03/28/2022 |
| 541 3 AVENUE ↗ | 1 | 01/19/2022 |
| BIN 1091952 ↗ | 1 | 12/14/2021 |
| 4174 WHITE PLAINS ROAD ↗ | 1 | 07/22/2021 |
| 38 WINDSOR PLACE ↗ | 1 | 02/10/2021 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/06/2026 | Concrete - Cast-In-Place | 51 EAST 73 STREET | — | special |
| 07/06/2026 | Structural Stability – Alterations of existing buildings | 51 EAST 73 STREET | — | special |
| 07/06/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 51 EAST 73 STREET | JONATHAN BILOW | special |
| 07/06/2026 | Underpinning | 51 EAST 73 STREET | JONATHAN BILOW | special |
| 07/02/2026 | Footing and Foundation | 51 EAST 73 STREET | JONATHAN BILOW | progress |
| 07/02/2026 | Final | 51 EAST 73 STREET | JONATHAN BILOW | progress |
| 01/14/2026 | Structural Stability – Alterations of existing buildings | 162 DIAMOND STREET | ANTHONY UGBEBOR | special |
| 01/14/2026 | Subgrade Inspections | 162 DIAMOND STREET | JONATHAN BILOW | special |
| 01/14/2026 | Concrete - Cast-In-Place | 162 DIAMOND STREET | ANTHONY UGBEBOR | special |
| 01/14/2026 | Final | 162 DIAMOND STREET | ANTHONY UGBEBOR | progress |
| 01/14/2026 | Footing and Foundation | 162 DIAMOND STREET | ANTHONY UGBEBOR | progress |
| 01/14/2026 | Subsurface Investigations (Borings/Test Pits) | 162 DIAMOND STREET | JONATHAN BILOW | special |
| 01/14/2026 | Post-installed Anchors | 162 DIAMOND STREET | ANTHONY UGBEBOR | special |
| 01/14/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 162 DIAMOND STREET | JONATHAN BILOW | special |
| 12/15/2025 | Concrete - Cast-In-Place | 162 DIAMOND STREET | ANTHONY UGBEBOR | special |
| 12/15/2025 | Post-installed Anchors | 162 DIAMOND STREET | ANTHONY UGBEBOR | special |
| 12/15/2025 | Structural Stability – Alterations of existing buildings | 162 DIAMOND STREET | ANTHONY UGBEBOR | special |
| 12/15/2025 | Subgrade Inspections | 162 DIAMOND STREET | JONATHAN BILOW | special |
| 12/15/2025 | Subsurface Conditions – Fill Placement & In-Place Density | 162 DIAMOND STREET | JONATHAN BILOW | special |
| 12/15/2025 | Subsurface Investigations (Borings/Test Pits) | 162 DIAMOND STREET | JONATHAN BILOW | special |
| 12/15/2025 | Final | 162 DIAMOND STREET | ANTHONY UGBEBOR | progress |
| 12/15/2025 | Footing and Foundation | 162 DIAMOND STREET | ANTHONY UGBEBOR | progress |
| 10/01/2025 | Concrete - Cast-In-Place | 188 GRAND STREET | Dominic Cullen | special |
| 10/01/2025 | Excavations - Sheeting, Shoring, and Bracing | 188 GRAND STREET | JONATHAN BILOW | special |
| 10/01/2025 | Structural Stability – Alterations of existing buildings | 188 GRAND STREET | Dominic Cullen | special |
| 10/01/2025 | Subgrade Inspections | 188 GRAND STREET | JONATHAN BILOW | special |
| 10/01/2025 | Subsurface Conditions – Fill Placement & In-Place Density | 188 GRAND STREET | JONATHAN BILOW | special |
| 10/01/2025 | Underpinning | 188 GRAND STREET | JONATHAN BILOW | special |
| 10/01/2025 | Final | 188 GRAND STREET | JONATHAN BILOW | progress |
| 10/01/2025 | Footing and Foundation | 188 GRAND STREET | JONATHAN BILOW | progress |
| 10/01/2025 | Preliminary | 188 GRAND STREET | JONATHAN BILOW | progress |
| 08/05/2025 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | 86 2 STREET | JONATHAN BILOW | special |
| 07/14/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 86 2 STREET | SOORJBALLY HARILALL | special |
| 06/26/2025 | Subsurface Investigations (Borings/Test Pits) | 168-42 HILLSIDE AVENUE | JONATHAN BILOW | special |
| 06/26/2025 | Subgrade Inspections | 168-42 HILLSIDE AVENUE | JONATHAN BILOW | special |
| 06/26/2025 | Excavations - Sheeting, Shoring, and Bracing | 168-42 HILLSIDE AVENUE | JONATHAN BILOW | special |
| 06/26/2025 | Masonry | 168-42 HILLSIDE AVENUE | TENZIN NYANDAK | special |
| 06/26/2025 | Deep Foundation Elements | 168-42 HILLSIDE AVENUE | JONATHAN BILOW | special |
| 06/26/2025 | Final | 168-42 HILLSIDE AVENUE | JOSEPH GULINO | progress |
| 06/26/2025 | Footing and Foundation | 168-42 HILLSIDE AVENUE | JONATHAN BILOW | progress |
| 06/26/2025 | Structural Steel - High Strength Bolting | 168-42 HILLSIDE AVENUE | TENZIN NYANDAK | special |
| 06/26/2025 | Concrete - Cast-In-Place | 168-42 HILLSIDE AVENUE | TENZIN NYANDAK | special |
| 06/26/2025 | Structural Cold-Formed Steel | 168-42 HILLSIDE AVENUE | TENZIN NYANDAK | special |
| 03/21/2025 | Insulation placement and R values | BIN 1091952 | SHAHRIAR QUAYYUM | energy_progress |
| 03/21/2025 | Fenestration and door U-factor and product ratings | BIN 1091952 | SHAHRIAR QUAYYUM | energy_progress |
| 03/21/2025 | Fenestration areas | BIN 1091952 | SHAHRIAR QUAYYUM | energy_progress |
| 03/21/2025 | Air barrier - visual inspection | BIN 1091952 | SHAHRIAR QUAYYUM | energy_progress |
| 03/21/2025 | Fenestration air leakage | BIN 1091952 | SHAHRIAR QUAYYUM | energy_progress |
| 03/21/2025 | Protection of exposed foundation insulation | BIN 1091952 | JUAN GOMEZ | energy_progress |
| 03/21/2025 | Final | BIN 1091952 | JUAN GOMEZ | progress |