← Back
BuildNYC
Home for indigent children, aged, homeless
Fordham-Tremont Comm Mental Health Center
2250 RYER AVENUE · BIN 2013560
💬 Discuss this project
1951Year Built
4Stories
N2Building Class
R7-1Zoning
18,000 sfGross Floor Area
1Units
0 Active Violations 1 likely answered 1 old, status unconfirmed ▸
Home for indigent children, aged, homeless · 7,506 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRising Ground, Fordham-Tremont Comm Mental Health Center3 filings · 17 docs
Floor 4Fordham-Tremont Comm Mental Health Center, Rising Ground5 filings · 20 docs
Floor 3Fordham-Tremont Comm Mental Health Center, Rising Ground5 filings · 20 docs
Floor 2Fordham-Tremont Comm Mental Health Center, Rising Ground5 filings · 20 docs
Floor 1Fordham-Tremont Comm Mental Health Center2p · 3 filings · 20 docs
CellarFordham-Tremont Comm Mental Health Center10p · 3 filings · 20 docs
BasementFordham-Tremont Comm Mental Health Center10p · 1 filing · 20 docs
Filed — no permit issuedFordham-Tremont Comm Mental Health Center1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Church of St Simon Stock1003/21/2026
Leake & Watts Services303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates810/06/2026
Method Design Architecture and Urba201/13/2025
New Age301/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bell Fuel OilPlumbing310/04/2026
Guaranteed Home ImprovemeGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metrospec Sia6420810/06/2026
New Age Engineering7746401/09/2025
Building Lifecycle
All (92)Filed (13)Permit Issued (4)Violation (32)Inspection (3)Objection (10)Special Inspection (30)
10/06/2026
Filed — Alteration
PROPOSE TO PROVIDE NEW INCOMING GAS PIPING SERVICE FOR A NEW GAS METER AND A DUAL FUEL BOILER IN THE BASEMENT AS PER PLANS SUBMITTED HEREWITH. THE BOILER APPLICATION AND CHIMNEY (GC) APPLICATION ARE TO BE FILED SUBSEQUENTLY.
X00905789-P6
09/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Risbergs
09/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Michael Risbergs
09/04/2026
Permit issued — Plumbing
X00905789-I1-PL
08/31/2026
Filed — Alteration
PROPOSE TO PROVIDE NEW INCOMING GAS PIPING SERVICE FOR A NEW GAS METER AND A DUAL FUEL BOILER IN THE BASEMENT AS PER PLANS SUBMITTED HEREWITH. THE BOILER APPLICATION AND CHIMNEY (GC) APPLICATION ARE TO BE FILED SUBSEQUENTLY.
X00905789-P5
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Risbergs
08/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Michael Risbergs
08/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Michael Risbergs
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Risbergs
06/06/2025
Filed — Alteration
PROPOSE TO PROVIDE NEW INCOMING GAS PIPING SERVICE FOR A NEW GAS METER AND A DUAL FUEL BOILER IN THE BASEMENT AS PER PLANS SUBMITTED HEREWITH. THE BOILER APPLICATION AND CHIMNEY (GC) APPLICATION ARE TO BE FILED SUBSEQUENTLY.
X00905789-P4
05/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Risbergs
05/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Michael Risbergs
04/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2025
Objection raised — Other
04/15/2025
Objection resolved — Addressed
04/07/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/14/2025
Filed — Alteration
PROPOSE TO PROVIDE NEW INCOMING GAS PIPING SERVICE FOR A NEW GAS METER AND A DUAL FUEL BOILER IN THE BASEMENT AS PER PLANS SUBMITTED HEREWITH. THE BOILER APPLICATION AND CHIMNEY (GC) APPLICATION ARE TO BE FILED SUBSEQUENTLY.
X00905789-P3
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Risbergs
03/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Michael Risbergs
03/05/2025
Special inspection requirement — Interior lighting power
03/05/2025
Special inspection requirement — Lighting controls
03/05/2025
Special inspection requirement — Maintenance information
02/18/2025
Objection raised — Energy
02/18/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Other
01/24/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Other
01/24/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Other
01/24/2025
Objection resolved — Addressed
01/13/2025
Filed — Alteration CO
ALT 1 FILED FOR A PROPOSED CHANGE IN USE FOR THE CELLAR, FIRST, SECOND, THIRD AND FOURTH FLOORS. PROPOSED CHANGED FROM 1-3 TO USE GROUP I-1 (J-2). THERE WILL BE NO CHANGES TO THE BUILDING BULK, MASSING, FOOTPRINTS, ZONING, OR EGRESS.
X01147226-I1
01/09/2025
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEMFOR BATHROOM RENOVATION AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01160442-I1
01/09/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND ASSOCIATED PLUMBING PIPING FOR BATHROOM RENOVATIONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01160438-I1
01/09/2025
Filed — Alteration
INSTALL NEW BATHROOM EXHAUST VENTS AND EXHAUST FAN FOR BATHROOM RENOVATIONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01160437-I1
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
01/08/2025
Filed — Alteration
INTERIOR RENOVATION AS PER PLANS FILED HEREWITH.
X01152126-I1
01/03/2025
Special inspection requirement — Heating Systems
Michael Risbergs
01/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Risbergs
01/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Michael Risbergs
01/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Michael Risbergs
12/27/2024
Special inspection requirement — Mechanical Systems
Stephen Shishko
12/27/2024
Special inspection requirement — Sprinkler Systems
Stephen Shishko
12/27/2024
Special inspection requirement — Final
Stephen Shishko
12/17/2024
Filed — Alteration
PROPOSE TO PROVIDE NEW INCOMING GAS PIPING SERVICE FOR A NEW GAS METER AND A DUAL FUEL BOILER IN THE BASEMENT AS PER PLANS SUBMITTED HEREWITH. THE BOILER APPLICATION AND CHIMNEY (GC) APPLICATION ARE TO BE FILED SUBSEQUENTLY.
X00905789-P1
12/12/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
12/10/2024
Special inspection requirement — Lighting controls
Reese Campbell
12/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
Reese Campbell
12/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Reese Campbell
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
12/10/2024
Special inspection requirement — Interior lighting power
Reese Campbell
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/06/2024
Special inspection requirement — Final
Reese Campbell
07/29/2024
Permit issued — General Construction
X00905789-S2-GC
07/29/2024
Permit issued — Plumbing
X00905789-I1-PL
07/29/2024
Permit issued — Boiler Equipment
X00905789-S1-BE
07/08/2024
Filed — Alteration
PROPOSE TO PROVIDE NEW INCOMING GAS PIPING SERVICE FOR A NEW GAS METER AND A DUAL FUEL BOILER IN THE BASEMENT AS PER PLANS SUBMITTED HEREWITH. THE BOILER APPLICATION AND CHIMNEY (GC) APPLICATION ARE TO BE FILED SUBSEQUENTLY.
X00905789-S2
06/13/2024
Filed — Alteration
PROPOSE TO PROVIDE NEW INCOMING GAS PIPING SERVICE FOR A NEW GAS METER AND A DUAL FUEL BOILER IN THE BASEMENT AS PER PLANS SUBMITTED HEREWITH. THE BOILER APPLICATION AND CHIMNEY (GC) APPLICATION ARE TO BE FILED SUBSEQUENTLY.
X00905789-S1
06/07/2024
Filed — Alteration
PROPOSE TO PROVIDE NEW INCOMING GAS PIPING SERVICE FOR A NEW GAS METER AND A DUAL FUEL BOILER IN THE BASEMENT AS PER PLANS SUBMITTED HEREWITH. THE BOILER APPLICATION AND CHIMNEY (GC) APPLICATION ARE TO BE FILED SUBSEQUENTLY.
X00905789-I1
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBell Fuel Oil09/04/2026
DOB NOWGeneral ConstructionPermit IssuedGuaranteed Home Improveme07/29/2024
DOB NOWPlumbingPermit IssuedBell Fuel Oil07/29/2024
DOB NOWBoiler EquipmentSigned-offBell Fuel Oil07/29/2024
BISPLISSUEDAspro Plumbing06/18/2015
BISFPISSUEDSentinel Fire Safety03/23/2015
BIS—ISSUEDFazio Construction Group12/04/2014
BISPLISSUEDAspro Plumbing10/02/2014
BIS—ISSUEDFazio Construction Group09/19/2014
BISFPISSUEDMaster Fire Systems05/22/2002
BISFPISSUEDMaster Fire Systems05/02/1995
1 project · most recent 01/09/2025
Others
FiledStatusContractorScope
01/09/2025——Others
1 project · most recent 01/09/2025
FiledStatusContractorScope
01/09/2025———
2 projects · most recent 10/06/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/06/2026Permit IssuedBell Fuel OilGas, Water/Sanitary
01/09/2025——Water/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/07/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/12/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
09/15/2026Fire-Resistant Penetrations and JointsMichael Risbergsspecial
09/15/2026Energy Code Compliance InspectionsMichael Risbergsprogress
08/31/2026Fire-Resistant Penetrations and JointsMichael Risbergsspecial
08/31/2026Energy Code Compliance InspectionsMichael Risbergsprogress
08/21/2026Energy Code Compliance InspectionsMichael Risbergsprogress
08/21/2026Fire-Resistant Penetrations and JointsMichael Risbergsspecial
05/02/2025Fire-Resistant Penetrations and JointsMichael Risbergsspecial
05/02/2025Energy Code Compliance InspectionsMichael Risbergsprogress
03/14/2025Fire-Resistant Penetrations and JointsMichael Risbergsspecial
03/14/2025Energy Code Compliance InspectionsMichael Risbergsprogress
03/05/2025Interior lighting power—energy_progress
03/05/2025Lighting controls—energy_progress
03/05/2025Maintenance information—energy_progress
01/09/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
01/09/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
01/03/2025Heating SystemsMichael Risbergsspecial
01/03/2025HVAC-R and service water piping design and insulationMichael Risbergsenergy_progress
01/03/2025HVAC-R and service water heating equipmentMichael Risbergsenergy_progress
01/03/2025HVAC-R and service water heating system controlsMichael Risbergsenergy_progress
12/27/2024Mechanical SystemsStephen Shishkospecial
12/27/2024Sprinkler SystemsStephen Shishkospecial
12/27/2024FinalStephen Shishkoprogress
12/10/2024Fire-Resistance Rated Construction—progress
12/10/2024Lighting controlsReese Campbellenergy_progress
12/10/2024Fire-Resistance Rated ConstructionReese Campbellprogress
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fordham-Tremont Comm Mental Health CenterMedical / HealthcareCellar, Floors 1–4, Roof
Project X01147226 Alteration CO · Approved · 01/13/2025
Project X01160438 Alteration · Approved · 01/09/2025
Project X01152126 Alteration · Approved · 01/08/2025
Project X00905789 Alteration · Permit Entire · 06/07/2024
Rising GroundCommunity FacilityFloors 2–4, Roof
Project X01160437 Alteration · Approved · 01/09/2025
Project X01160442 Alteration · Approved · 01/09/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026X00905789-P3Request digital key ↗
08/21/2026X00905789-P1Request digital key ↗
08/21/2026X00905789-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION16
04/26/2019220698305Open ↗
03/09/2016220356585Open ↗
07/20/2015220428455Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION6
06/30/2015220428455Open ↗
03/23/2015220428455Open ↗
12/05/2014220356585Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/20/2015220356585Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/02/2015220356585Open ↗
▸Seals & Professional Certifications44
▸DOB NOWSpecial Inspector Seal & Signature14
10/08/2026X00905789-P5Open ↗
10/08/2026X00905789-P6Open ↗
09/02/2026X00905789-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
10/08/2026X00905789-P6Open ↗
10/08/2026X00905789-P5Open ↗
08/21/2026X00905789-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
10/08/2026X00905789-P6Open ↗
10/08/2026X00905789-P5Open ↗
09/02/2026X00905789-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
09/28/2015220428455Open ↗
09/18/2015220356585Open ↗
09/18/2015220356585Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment24
▸BISSELF-CERT PLUMBING NOTICE9
10/19/2015220428455Open ↗
07/13/2015220428455Open ↗
06/22/2015220356585Open ↗
Showing 3 of 9 on file for this type
▸BISWATER METER PERMIT : DEP-METER4
06/22/2015220356585Open ↗
06/22/2015220356585Open ↗
03/20/2015220356585Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
07/20/2015220428455Open ↗
03/02/2015220428455Open ↗
01/21/2015220356585Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
01/21/2016220356576Open ↗
09/28/2015220428455Open ↗
07/13/2015220428455Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
06/22/2015220356585Open ↗
06/22/2015220356585Open ↗
06/22/2015220356585Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
03/20/2015220356585Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
04/26/2019220698305Open ↗
03/02/2015220428455Open ↗
02/18/2014220356585Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026X01160442-I1Open ↗
08/20/2026X01160438-I1Open ↗
08/13/2026X01152126-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/21/2026X00905789-S2Open ↗
08/21/2026X00905789-S1Open ↗
08/21/2026X00905789-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
09/18/2015220356585Open ↗
06/25/2015220356585Open ↗
06/03/2015220356585Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports2
▸BISHYDRAULIC FLOW CALCULATIONS1
02/18/2014220356585Open ↗
▸BISHYDRO FLOW TEST LETTER1
02/18/2014220356585Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
10/08/2026X00905789-P6Open ↗
10/08/2026X00905789-P5Open ↗
08/21/2026X00905789-P3Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
03/08/2016220356585Open ↗
03/08/2016220356585Open ↗
03/04/2016220356585Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
04/26/2019220698305Open ↗
02/29/2016220356585Open ↗
09/28/2015220428455Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
06/25/2015220356585Open ↗
06/03/2015220356585Open ↗
03/19/2014220356585Open ↗
Showing 3 of 5 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
03/20/2015220356585Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
04/26/2019220698305Open ↗
02/29/2016220356585Open ↗
01/26/2016220356576Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET6
04/26/2019220698305Open ↗
03/02/2015220428455Open ↗
03/18/2014220356585Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
02/29/2016220356585Open ↗
06/25/2015220356585Open ↗
10/20/2014220356585Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
02/18/2014220356585Open ↗