← Back
BuildNYC
Two family converted from one family
226 CARLTON AVENUE
BROOKLYN · Fort Greene · BIN 3058454
💬 Discuss this project
1864Year Built
3Stories
B3Building Class
R6BZoning
3,459 sfGross Floor Area
2Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two family converted from one family · 2,000 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 310p · 1 filing · 3 docs
Floor 29p · 1 filing · 3 docs
Floor 19p · 1 filing · 3 docs
CellarInground pool and gas pool heater installation22p · 2 filings · 20 docs
Basement1p · 1 filing · 3 docs
Sub-Basement9p · 1 filing · 3 docs
Site & exteriorInground pool and gas pool heater installation16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pepsico1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/10/2014$1.9M—Private party → Private party$549/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M Just Architecture507/24/2024
Bazini Engineering109/03/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Just Architecture503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vardaro ConstructionGeneral Contractor303/22/2026
Arco Plumbing and HeatingPlumbing307/08/2026
Arco Plumbing and HeatingFire Protection307/08/2026
Big Apple Sewer & Drain IPlumbing207/08/2026
G & R Precision ContractingGeneral Contractor203/21/2026
Peter J. CatanzaroElectrical103/21/2026
WCK ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519307/24/2024
Lauria Associates7570201/08/2024
Benazzi Engineering5603109/03/2019
Building Lifecycle
09/26/2024
Signed off — Alteration
GENERAL CONSTRUCTION TO INSTALL NEW IN-GROUND POOL AT REAR YARD. THERE ARE NO PROPOSED CHANGES TO THE USE, BULK, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00904499-I1
09/20/2024
Signed off — Alteration
Install inground pool and Gas Pool Heater at rear yard OSP with gas piping to cellar indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
B00904536-I1
09/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBig Apple Sewer & Drain I05/07/2024
DOB NOWGeneral ConstructionSigned-offG R Precision Contract11/08/2023
DOB NOWSprinklersSigned-offArco Plumbing and Heating06/11/2021
DOB NOWPlumbingSigned-offArco Plumbing and Heating06/11/2021
DOB NOWSprinklersSigned-offArco Plumbing and Heating01/29/2020
DOB NOWPlumbingSigned-offArco Plumbing and Heating01/29/2020
DOB NOWPlumbingSigned-offArco Plumbing and Heating09/05/2019
DOB NOWSprinklersSigned-offArco Plumbing and Heating09/05/2019
BISPLISSUEDArco Plumbing and Heating06/10/2021
BIS—ISSUEDNo Limit Contracting04/15/2021
BIS—ISSUEDNo Limit Contracting12/28/2020
BISPLISSUEDArco Plumbing and Heating01/15/2020
BIS—ISSUEDNo Limit Contracting11/01/2019
BIS—ISSUEDNo Limit Contracting01/17/2019
BIS—ISSUEDNo Limit Contracting11/05/2018
BISPLISSUEDArco Plumbing and Heating09/10/2018
BIS—ISSUEDNo Limit Contracting02/14/2018
BISEQISSUEDBilly Enterprises07/12/2017
BISPLISSUEDArco Plumbing and Heating06/01/2017
BIS—ISSUEDNo Limit Contracting02/28/2017
2 projects · most recent 07/24/2024
General Wiring
FiledStatusContractorScope
07/24/2024CompletePeter J. CatanzaroGeneral Wiring
08/15/2020CompleteWCK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/04/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/04/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/04/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/01/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
07/01/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/01/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/05/2024Subsurface Investigations (Borings/Test Pits)John Natolispecial
02/05/2024Subgrade InspectionsYounes Abouyaalaspecial
02/05/2024FinalNAVEEN KUMARprogress
12/27/2023HVAC-R and service water piping design and insulationEDWARD LAURIAenergy_progress
12/27/2023Subsurface Investigations (Borings/Test Pits)John Natolispecial
12/27/2023Subgrade InspectionsEDWARD LAURIAspecial
12/27/2023FinalEDWARD LAURIAprogress
12/27/2023Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
12/27/2023Energy Code Compliance InspectionsEDWARD LAURIAprogress
129 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account