One story retail building
226 DEKALB AVENUE
BROOKLYN · BIN 3059083
💬 Discuss this project
1920Year Built
1Stories
K1Building Class
R6BZoning
1,450 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: S & SONS HOLDINGS LLC · 1,452 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof16p · 5 filings · 20 docs
Floor 114p · 3 filings · 20 docs
Cellar11p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/14/2022$3.0M—BUI BROS PROPERTIES LLC → S & SONS HOLDINGS LLC$2,069/sf building
01/09/2020$2.0M—— → —$1,384/sf building
09/26/2019$1.1M—— → —$793/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALTA INDELMAN ARCHITECT507/10/2026
JACK GREEN ASSOCIATES1101/23/2026
THE EIPEL ENGINEERING GROUP, D.P.C.202/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASS3403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CPM BUILDERS INCGeneral Contractor707/08/2026
TORRES & BUILDERS GROUPGeneral Contractor303/21/2026
HENRY MYERS P & H, INCPlumbing207/08/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
STEVEN IRBYElectrical103/21/2026
COMMODORE CONSTRUCTElectrical103/21/2026
ENER-CON TECHNICAL SERVICGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALTA INDELMAN, ARCHITECT4155507/10/2026
JACK GREEN ASSOCIATES4221001/23/2026
THE EIPEL ENGINEERING GRO2714408/23/2023
A DEGREE OF FREEDOM STRUC925102/03/2023
INTEGRITY CONSULTING SERV666101/05/2023
Building Lifecycle
All (160)Filed (18)Permit Issued (8)Signed Off (6)Violation (10)Inspection (8)Objection (80)Special Inspection (30)
07/21/2026
Signed off — Alteration
It is proposed to modify existing plumbing system to remove, relocate and/or install new plumbing fixtures & modify SP system off domestic PL line as shown on plans. Application filed in conjunction with B01143650-I1 (GC) and B01143650-S1(MS).
B01143650-I1
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Alta Indelman
07/21/2026
Special inspection requirement — Final
Alta Indelman
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alta Indelman
07/10/2026
Filed — Alteration
It is proposed to modify existing plumbing system to remove, relocate and/or install new plumbing fixtures & modify SP system off domestic PL line as shown on plans. Application filed in conjunction with B01143650-I1 (GC) and B01143650-S1(MS).
B01143650-P5
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Alta Indelman
07/08/2026
Special inspection requirement — Final
Alta Indelman
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alta Indelman
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
02/17/2026
Objection resolved — Addressed
02/03/2026
Objection resolved — Addressed
02/02/2026
Objection raised — Plumbing
02/02/2026
Objection raised — Cost
01/23/2026
Filed — Alteration
It is proposed to modify existing plumbing system to remove, relocate and/or install new plumbing fixtures & modify SP system off domestic PL line as shown on plans. Application filed in conjunction with B01143650-I1 (GC) and B01143650-S1(MS).
B01143650-P4
10/15/2025
Filed — Alteration
It is proposed to modify existing plumbing system to remove, relocate and/or install new plumbing fixtures & modify SP system off domestic PL line as shown on plans. Application filed in conjunction with B01143650-I1 (GC) and B01143650-S1(MS).
B01143650-P3
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
10/07/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/30/2025
Objection raised — Plumbing
07/30/2025
Objection resolved — Addressed
07/23/2025
Filed — Alteration
It is proposed to modify existing plumbing system to remove, relocate and/or install new plumbing fixtures & modify SP system off domestic PL line as shown on plans. Application filed in conjunction with B01143650-I1 (GC) and B01143650-S1(MS).
B01143650-P2
07/21/2025
Special inspection requirement — Post-installed Anchors
LAWRENCE GREEN
07/21/2025
Special inspection requirement — Mechanical Systems
LAWRENCE GREEN
07/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
07/21/2025
Special inspection requirement — Final
LAWRENCE GREEN
07/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/24/2025
Permit issued — Plumbing
B01143650-S2-PL
06/13/2025
Permit issued — Mechanical Systems
B01143650-S1-MS
06/13/2025
Permit issued — General Construction
B01143650-I1-GC
06/09/2025
Objection resolved — Addressed
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Admin
06/06/2025
Objection resolved — Addressed
06/03/2025
Filed — Alteration
It is proposed to modify existing plumbing system to remove, relocate and/or install new plumbing fixtures & modify SP system off domestic PL line as shown on plans. Application filed in conjunction with B01143650-I1 (GC) and B01143650-S1(MS).
B01143650-P1
06/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/12/2025
Objection resolved — Addressed
05/08/2025
Objection raised — Energy
05/08/2025
Objection resolved — Addressed
05/08/2025
Objection raised — Mechanical
05/05/2025
Filed — Alteration
It is proposed to modify existing plumbing system to remove, relocate and/or install new plumbing fixtures & modify SP system off domestic PL line as shown on plans. Application filed in conjunction with B01143650-I1 (GC) and B01143650-S1(MS).
B01143650-S1
04/30/2025
Filed — Alteration
It is proposed to modify existing plumbing system to remove, relocate and/or install new plumbing fixtures & modify SP system off domestic PL line as shown on plans. Application filed in conjunction with B01143650-I1 (GC) and B01143650-S1(MS).
B01143650-S2
11/27/2024
Filed — Alteration
It is proposed to modify existing plumbing system to remove, relocate and/or install new plumbing fixtures & modify SP system off domestic PL line as shown on plans. Application filed in conjunction with B01143650-I1 (GC) and B01143650-S1(MS).
B01143650-I1
12/06/2023
Signed off — Alteration
Int. Fit-out & Ext. repairs (incl re-roofing, masonry re-pointing, repair & painting of existing storefront) of existing store in existing 1-story commercial bldg.. No Change of Use, Egress or Occ. App filed in conj. w/B08054435, B08054436 & B08054439
B08054430-I1
12/06/2023
Signed off — Alteration
HVAC EQUIPMENT AND DUCTWORK TO REPLACE EXISTING. INSTALL NEW SPLIT SYSTEM HVAC AND RELATED PIPING. Application filed in conjunction with B08054430 (GC), B08054435 (ST) & B08054439 (PL)
B08054436-I1
11/27/2023
Signed off — Alteration
Structural repairs & modifications of exist floor framing incl joist reinforcement or replacement due to existing conditions. Level and replace existing slab on grade to match adjacent. App filed in conjunction with (see comments)
B08054435-S1
11/27/2023
Signed off — Alteration
Structural repairs & modifications of exist floor framing incl joist reinforcement or replacement due to existing conditions. Level and replace existing slab on grade to match adjacent. App filed in conjunction with (see comments)
B08054435-I1
11/09/2023
Signed off — Alteration
It is proposed to install new plumbing fixtures and related piping as shown on plans. Application filed in conjunction with B08054430 (GC), B08054435 (ST) & B08054436 (MS)
B08054439-I1
10/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
10/24/2023
Special inspection requirement — Sprinkler Systems
JACK GREEN
10/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
10/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
10/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
10/11/2023
Filed — Alteration
It is proposed to install new plumbing fixtures and related piping as shown on plans. Application filed in conjunction with B08054430 (GC), B08054435 (ST) & B08054436 (MS)
B08054439-P2
09/29/2023
Special inspection requirement — Interior lighting power
Alta Indelman
09/29/2023
Special inspection requirement — Lighting controls
Alta Indelman
09/29/2023
Special inspection requirement — Final
Alta Indelman
09/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Alta Indelman
09/29/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ALEKSANDR LEVIN
Latest 60 of 160 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC06/24/2025
DOB NOWMechanical SystemsPermit IssuedENER-CON TECHNICAL SERVIC06/13/2025
DOB NOWGeneral ConstructionSigned-offTORRES & BUILDERS GROUP06/13/2025
DOB NOWStructuralSigned-offMEDCON SERVICES, LLC03/15/2023
DOB NOWFoundationSigned-offMEDCON SERVICES, LLC03/07/2023
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC02/24/2023
DOB NOWMechanical SystemsSigned-offMEDCON SERVICES, LLC02/17/2023
DOB NOWGeneral ConstructionSigned-offMEDCON SERVICES, LLC02/17/2023
BISMHISSUEDEDGE RENOVATION LLC09/04/2020
BISFPISSUEDLUND FIRE PRODUCTS CO INC11/30/2001
BISPLISSUEDV I P SEWER CLEANING SERVICES11/20/2001
BISOTISSUEDJ B C CONTRACTING CO INC10/09/2001
BISEQISSUEDJ B C CONTRACTING CO INC10/09/2001
1 project · most recent 07/10/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/10/2026Permit IssuedENER-CON TECHNICAL SERVICHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARNU543NKA4 5,400 CFM · Vrf Indoor ×2
ARUN060GSS4 64,000 CFM · Vrf Outdoor ×2
Ventilation
__Junk__ GC-166 150 CFM ×4
Carrier 300CPA 5,986 CFM ×2
1 project · most recent 07/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/10/2026Signed-offHENRY MYERS P & H, INCGas, Water/Sanitary
2 projects · most recent 06/11/2025
General Wiring
FiledStatusContractorScope
06/11/2025CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
03/20/2023CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/07/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/29/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
07/21/2026FinalAlta Indelmanprogress
07/21/2026Energy Code Compliance InspectionsAlta Indelmanprogress
07/21/2026Fire-Resistant Penetrations and JointsAlta Indelmanspecial
07/08/2026FinalAlta Indelmanprogress
07/08/2026Fire-Resistant Penetrations and JointsAlta Indelmanspecial
07/08/2026Energy Code Compliance InspectionsAlta Indelmanprogress
02/25/2026Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
10/08/2025Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
07/21/2025Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
07/21/2025Mechanical SystemsLAWRENCE GREENspecial
07/21/2025Post-installed AnchorsLAWRENCE GREENspecial
07/21/2025FinalLAWRENCE GREENprogress
06/02/2025Fire-Resistant Penetrations and Joints—special
10/24/2023Sprinkler SystemsJACK GREENspecial
10/24/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
10/24/2023HVAC-R and service water heating system controlsJACK GREENenergy_progress
10/24/2023HVAC-R and service water heating equipmentJACK GREENenergy_progress
10/24/2023HVAC-R and service water piping design and insulationJACK GREENenergy_progress
10/24/2023Energy Code Compliance InspectionsJACK GREENprogress
09/29/2023Fire-Resistant Penetrations and JointsAlta Indelmanspecial
09/29/2023Mastic and Intumescent Fire-resistant CoatingsALEKSANDR LEVINspecial
09/29/2023Energy Code Compliance InspectionsAlta Indelmanprogress
09/29/2023FinalAlta Indelmanprogress
09/29/2023Lighting controlsAlta Indelmanenergy_progress
09/29/2023Interior lighting powerAlta Indelmanenergy_progress
Latest 25 of 70.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/28/2026B08054430-P1Request digital key ↗
08/28/2026B08054430-I1Request digital key ↗
08/26/2026B08054439-P2Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits18
▸DOB NOWLPC Approval/Permit17
08/18/2026B01143650-P5Open ↗
08/13/2026B01143650-S1Open ↗
08/13/2026B08054430-I1Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION1
09/04/2020301271923Open ↗
▸Seals & Professional Certifications77
▸DOB NOWProgress Inspector Seal & Signature34
09/01/2026B08054436-I1Open ↗
09/01/2026B08054436-I1Open ↗
09/01/2026B08054436-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/01/2026B08054436-I1Open ↗
09/01/2026B08054436-I1Open ↗
09/01/2026B08054430-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/28/2026B08054430-P1Open ↗
08/28/2026B08054430-P2Open ↗
08/28/2026B08054430-I1Open ↗
Showing 3 of 18 on file for this type
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/28/2026B08054430-P1Open ↗
08/28/2026B08054430-I1Open ↗
08/26/2026B08054439-P1Open ↗
Showing 3 of 18 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B08054435-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08054435-S1Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/18/2026B01143650-P5Open ↗
08/13/2026B01143650-I1Open ↗