← Back
BuildNYC
Factory, heavy manufacturing, fireproof
227-15 NORTH CONDUIT AVENUE
QUEENS · Laurelton · BIN 4283770
💬 Discuss this project
1964Year Built
1Stories
F1Building Class
R3-2Zoning
108,350 sfGross Floor Area
1Units
LL97 Covered
Factory, heavy manufacturing, fireproof · Owner of record: EPIC RE HOLDCO, LLC · 212,383 sf lot · 0.51 FAR built · Flood zone X500
Locations of Work
StructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 1 filing · 11 docs
Floor 1Under Construction6p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EPIC RE HOLDCO, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TWIGCON LLC207/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDWISE PLUMBING HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METROSPEC SIA6420207/23/2026
Building Lifecycle
All (13)Filed (2)Permit Issued (1)Inspection (1)Objection (3)Special Inspection (6)
09/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
08/25/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
JOSEPH YOUNG
08/25/2026
Special inspection requirement — Post-installed Anchors
JOSEPH YOUNG
07/23/2026
Filed — Alteration
Per LL 152 of 2016 testing; removal of non compliant gas piping and replacement piping on first floor and roof level as shown on plans.
Q01355311-P1
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
07/14/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
JOSEPH YOUNG
07/14/2026
Special inspection requirement — Post-installed Anchors
JOSEPH YOUNG
05/14/2026
Permit issued — Plumbing
Q01355311-I1-PL
05/01/2026
Objection raised — Scope
05/01/2026
Objection raised — Other
05/01/2026
Objection raised — Scope
04/15/2026
Filed — Alteration
Per LL 152 of 2016 testing; removal of non compliant gas piping and replacement piping on first floor and roof level as shown on plans.
Q01355311-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBUILDWISE PLUMBING HEATING05/14/2026
1 project · most recent 07/23/2026
Gas
FiledStatusContractorScope
07/23/2026Permit IssuedBUILDWISE PLUMBING HEATINGas
1 project · most recent 11/21/2025
FiledStatusContractorScope
11/21/2025CompleteDAVEN ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/25/2026Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
08/25/2026High-Pressure Fuel-Gas Piping (Welding)JOSEPH YOUNGspecial
08/25/2026Post-installed AnchorsJOSEPH YOUNGspecial
07/14/2026Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
07/14/2026High-Pressure Fuel-Gas Piping (Welding)JOSEPH YOUNGspecial
07/14/2026Post-installed AnchorsJOSEPH YOUNGspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026Q01355311-P1Request digital key ↗
08/29/2026Q01355311-I1Request digital key ↗
08/17/2026Q01355311-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01355311-I1Open ↗
08/17/2026Q01355311-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q01355311-I1Open ↗
08/23/2026Q01355311-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026Q01355311-I1Open ↗
08/17/2026Q01355311-I1Open ↗
08/17/2026Q01355311-P1Open ↗