Condo, residential tower (mixed-use, multi-family elevator) [derived]
Pathways Children's Services
95 EAST HOUSTON STREET · Lower East Side · BIN 1087241
💬 Discuss this project
2003Year Built
14Stories
RMBuilding Class
R8XZoning
514,093 sfGross Floor Area
363Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 58,110 sf lot · 8.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingOther
Roof4p · 3 filings · 15 docs
Floor 218p · 1 filing · 12 docs
Floor 11p · 1 filing · 4 docs
Cellar2p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WHOLE FOODS907/08/2026
DERMOT REALTY MANAGEMENT2106/28/2026
DERMOT COMPANY404/09/2026
INDER CONSTRUCTION INC703/22/2026
SAFETECH ENTERPRISES703/22/2026
HGC PARTNERS LLC503/22/2026
AAC REALTY303/22/2026
ROSE ASSOCIATES203/22/2026
HOUSTON BOWERY CONNECTION LLC303/22/2026
CVPI303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SIGNS CAD203/21/2026
PEROTTO CONSULTING MANAGEMENT603/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
RPO403/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
ANDREW MAASS1003/21/2026
RIGGING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFETECH ENTERPRISES CORPGeneral Contractor704/09/2026
STRUCTURECRAFT CONTRACTINGeneral Contractor607/08/2026
INDER CONSTRUCTION INCGeneral Contractor603/21/2026
PMA CONSTRUCTION SERVICESGeneral Contractor303/21/2026
DARBY CONSTRUCTION SVC LLGeneral Contractor204/08/2026
COIL TECHS HVAC SERVICESGeneral Contractor204/09/2026
FULL CAPACITY FIRE CORPFire Protection207/08/2026
JAG PLBG & MECH INCPlumbing107/08/2026
WARD PLUMBING CORPPlumbing107/08/2026
ICONIC ELECTRIC CORPElectrical103/22/2026
SIGNS CADScaffold107/08/2026
RADOS MILOJKOVICElectrical103/21/2026
PLUMBING WORKS CORPFire Protection107/08/2026
AINSWORTH INCGeneral Contractor107/08/2026
DGC CAPITAL CONTRACTING CORPGeneral Contractor107/08/2026
ADVANCED PLBG LLCPlumbing107/08/2026
BLUEWATER PLBG& HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808102/10/2026
GREGORY V. PEROTTO, P.E.947305/07/2025
PCS ENGINEERING3745103/07/2025
PACE ENGINEERING P.C.1679107/08/2024
ASE ENGINEERING PLLC5785107/08/2024
SKYLINE ENGINEERING, PLLC267805/31/2024
M + K DEVELOPMENT VENTURE8486108/30/2023
CROSSCHECK INSPECTION SER544411/09/2021
Building Lifecycle
All (246)Filed (23)Permit Issued (27)Signed Off (15)Facade (FISP) (21)Violation (60)Inspection (12)Objection (58)Special Inspection (30)
04/20/2026
Signed off — Alteration
M01289488-I1
04/16/2026
Cycle 10 facade report submitted
03/31/2026
Cycle 10 facade inspection completed
03/31/2026
Cycle 10 facade report signed — SAFE
03/26/2026
Signed off — Alteration
INSTALL REPLACEMENT SPLIT HEAT PUMP SYSTEM FOR EXISTING ELEVATOR MACHINE ROOM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01356125-I1
02/19/2026
Permit issued — General Construction
M01356125-I1-GC
02/18/2026
Permit issued — Mechanical Systems
M01356125-I1-MS
02/10/2026
Filed — Alteration
INSTALL REPLACEMENT SPLIT HEAT PUMP SYSTEM FOR EXISTING ELEVATOR MACHINE ROOM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01356125-I1
02/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
02/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
02/05/2026
Special inspection requirement — Final
Joseph Bazini
02/05/2026
Special inspection requirement — Mechanical Systems
Joseph Bazini
01/14/2026
Cycle 9 facade report signed — SAFE
12/12/2025
Signed off — Alteration
M01049635-I1
11/18/2025
Cycle 9 facade inspection completed
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Cycle 9 facade report submitted
11/04/2025
Cycle 9 facade report signed — UNSAFE
10/29/2025
Cycle 9 facade report submitted
10/23/2025
Signed off — Alteration
#8923 - Plumbing modifications in Sugared + Bronzed space. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01182002-I1
10/23/2025
Cycle 9 facade inspection completed
10/08/2025
Signed off — Alteration
#8923 - Mechanical and Lighting modifications in Sugared + Bronzed UG 6 Space. No change in egress, use, or occupancy.
M01182005-I1
10/07/2025
Filed — Alteration
M01289488-I1
10/07/2025
Permit issued — Sign
M01289488-I1-SG
10/06/2025
Signed off — Alteration
#8923 - Interior renovations of existing UG 6 space for Sugared + Bronzed. No change in egress, use, or occupancy.
M01181999-I1
10/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/05/2025
Permit issued — Suspended Scaffold
M01178206-I1-SC
09/04/2025
Permit issued — Suspended Scaffold
M01178206-I1-SC
08/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2025
Permit issued — Mechanical Systems
M01182005-I1-MS
07/30/2025
Permit issued — Plumbing
M01182002-I1-PL
07/09/2025
Permit issued — General Construction
M01181999-I1-GC
07/08/2025
Objection resolved — Addressed
06/24/2025
Objection raised — Cost
06/24/2025
Objection resolved — Addressed
06/17/2025
Permit issued — Sidewalk Shed
M01217647-I1-SH
06/12/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
05/27/2025
Permit issued — Sidewalk Shed
M01217647-I1-SH
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/20/2025
Objection raised — Scope
05/20/2025
Objection raised — Plumbing
05/19/2025
Objection raised — Other
05/16/2025
Objection raised — Cost
05/16/2025
Objection raised — Scope
05/15/2025
Objection raised — Scope
05/15/2025
Objection raised — Scope
05/15/2025
Objection raised — Admin
05/07/2025
Filed — Alteration
#8923 - Plumbing modifications in Sugared + Bronzed space. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01182002-I1
05/07/2025
Filed — Alteration
#8923 - Mechanical and Lighting modifications in Sugared + Bronzed UG 6 Space. No change in egress, use, or occupancy.
M01182005-I1
05/07/2025
Filed — Alteration
#8923 - Interior renovations of existing UG 6 space for Sugared + Bronzed. No change in egress, use, or occupancy.
M01181999-I1
05/05/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01217647-I1
03/27/2025
Signed off — Alteration
MODIFY EXISTING SPRINKLER PROTECTION TO PROVIDE EXTRA HAZARD GROUP I (EH1) SPRINKLER PROTECTION IN ACCORDANCE WITH NFPA 13. PROTECTIONS ARE PROVIDED FOR BATTERY CHARGING AND STORAGE AS PER DRAWINGS AND FDNY RECORD ID 2022TMCOAP-005531-CER.
M00512662-S2
03/25/2025
Violation issued (ECB, closed)
Construction
03/18/2025
Permit issued — Suspended Scaffold
M01178206-I1-SC
03/17/2025
Signed off — Alteration
MODIFY EXISTING SPRINKLER PROTECTION TO PROVIDE EXTRA HAZARD GROUP I (EH1) SPRINKLER PROTECTION IN ACCORDANCE WITH NFPA 13. PROTECTIONS ARE PROVIDED FOR BATTERY CHARGING AND STORAGE AS PER DRAWINGS AND FDNY RECORD ID 2022TMCOAP-005531-CER.
M00512662-S1
Latest 60 of 246 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCOIL TECHS HVAC SERVICES02/19/2026
DOB NOWMechanical SystemsSigned-offCOIL TECHS HVAC SERVICES02/18/2026
DOB NOWSignSigned-offSIGNS CAD CORP10/07/2025
DOB NOWSuspended ScaffoldPermit IssuedSAFETECH ENTERPRISES CORP09/05/2025
DOB NOWSuspended ScaffoldPermit IssuedSAFETECH ENTERPRISES CORP09/04/2025
DOB NOWMechanical SystemsSigned-offDARBY CONSTRUCTION SVC LL07/31/2025
DOB NOWPlumbingSigned-offADVANCED PLBG LLC07/30/2025
DOB NOWGeneral ConstructionSigned-offDARBY CONSTRUCTION SVC LL07/09/2025
DOB NOWSidewalk ShedPermit IssuedSAFETECH ENTERPRISES CORP06/17/2025
DOB NOWSidewalk ShedPermit IssuedSAFETECH ENTERPRISES CORP05/27/2025
DOB NOWSuspended ScaffoldPermit IssuedSAFETECH ENTERPRISES CORP03/18/2025
DOB NOWGeneral ConstructionSigned-offSAFETECH ENTERPRISES CORP03/11/2025
DOB NOWSidewalk ShedPermit IssuedINDER CONSTRUCTION INC09/09/2024
DOB NOWMechanical SystemsSigned-offAINSWORTH INC06/11/2024
DOB NOWGeneral ConstructionSigned-offSTRUCTURECRAFT CONTRACTIN05/07/2024
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP04/25/2024
DOB NOWMechanical SystemsSigned-offSTRUCTURECRAFT CONTRACTIN04/15/2024
DOB NOWAntennaSigned-offPMA CONSTRUCTION SERVICES12/19/2023
DOB NOWSidewalk ShedPermit IssuedINDER CONSTRUCTION INC09/05/2023
DOB NOWPlumbingSigned-offBLUEWATER P&H, INC10/08/2021
DOB NOWSprinklersSigned-offBLUEWATER PLBG& HTG INC10/06/2021
DOB NOWGeneral ConstructionSigned-offDGC CAPITAL CONTRACTING CORP10/05/2021
DOB NOWPlumbingSigned-offWARD PLUMBING CORP08/23/2021
DOB NOWPlumbingPermit IssuedFULL CAPACITY FIRE CORP01/21/2021
DOB NOWPlumbingPermit IssuedJAG PLBG & MECH INC01/19/2021
DOB NOWMechanical SystemsSigned-offSTRUCTURECRAFT CONTRACTIN10/20/2020
DOB NOWMechanical SystemsSigned-offSTRUCTURECRAFT CONTRACTIN07/27/2020
BISOTISSUEDSTRUCTURECRAFT CONTRACTIN07/29/2020
BISOTISSUEDCONSTRUCTION MANAGEMENT &08/01/2017
BISMHISSUEDCONSTRUCTION MANAGEMENT &08/01/2017
BISPLISSUEDTRISTATE PLBG SVCS CORP02/21/2017
BISOTISSUEDCONSTRUCTION MANAGEMENT &01/12/2017
BISMHISSUEDCONSTRUCTION MANAGEMENT &01/12/2017
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C04/21/2016
BISOTISSUEDZ&Z'S INC08/03/2015
BISPLISSUEDWEXLER PLUMBING LLC07/09/2015
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C04/21/2015
BISPLISSUEDCLOVERDALE MASTER P&H INC04/25/2014
BISPLISSUEDRRP PLUMBING CORP05/30/2013
BISOTISSUEDTITAN REALTY & CONSTRUCTI04/09/2013
+ 37 more permits on file
1 project · most recent 11/09/2021
FiledStatusContractorScope
11/09/2021Permit IssuedFULL CAPACITY FIRE CORP94 heads
1 project · most recent 11/09/2021
Water/Sanitary
FiledStatusContractorScope
11/09/2021Permit IssuedJAG PLBG & MECH INCWater/Sanitary
13 projects · most recent 11/19/2025
General Wiring
FiledStatusContractorScope
11/19/2025CompleteSIGNS CAD CORP—
10/23/2025Permit IssuedCENTENNIAL ELEVATOR INDUSGeneral Wiring
07/14/2025CompleteT. MCCAFFREY-T. MCGOVERN—
07/09/2025Permit IssuedINFINITI ELECTRIC CORP1 meters, 1 new_meters
05/06/2025Permit IssuedLINA ELECTRIC, CORPGeneral Wiring
02/18/2025CompleteICON ELECTRIC INCGeneral Wiring
12/10/2024Permit IssuedVERTEX ELECTRIC CORP.General Wiring
10/24/2024Permit IssuedRICHARD NEU—
06/20/2024CompleteICONIC ELECTRIC CORPGeneral Wiring
10/12/2021CompleteETRICITY ELECTRICAL CO INGeneral Wiring
01/14/2021CompleteMARCEL ELEC'L CONTRG CORPGeneral Wiring
08/28/2019Permit IssuedINTERSTATE ELECTRIC, LLCGeneral Wiring
05/20/2019Permit IssuedEIA ELECTRIC, INCGeneral Wiring
2 projects · most recent 05/05/2025
Sidewalk Shed
FiledStatusContractorScope
05/05/2025Permit IssuedSAFETECH ENTERPRISES CORPSidewalk Shed
08/28/2023Permit IssuedINDER CONSTRUCTION INCSidewalk Shed
1 project · most recent 03/07/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/07/2025Permit IssuedSAFETECH ENTERPRISES CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/13/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/23/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/23/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/19/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/28/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
02/10/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
02/05/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
02/05/2026FinalJoseph Baziniprogress
02/05/2026Mechanical SystemsJoseph Bazinispecial
02/15/2025Tenant Protection Plan ComplianceGregory Perottospecial
02/15/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
02/15/2025Tenant Protection Plan ComplianceGregory Perottospecial
02/15/2025HVAC-R and service water heating equipmentGregory Perottoenergy_progress
02/15/2025Energy Code Compliance InspectionsGregory Perottoprogress
02/15/2025FinalGregory Perottoprogress
02/07/2025Post-installed AnchorsMichael Walshspecial
02/07/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
07/08/2024MasonryBaris Acarspecial
07/08/2024Energy Code Compliance InspectionsBaris Acarprogress
05/30/2024Energy Code Compliance InspectionsMatthew Wavroprogress
05/30/2024Post-installed AnchorsMatthew Wavrospecial
05/30/2024HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
05/30/2024Maintenance informationMatthew Wavroenergy_progress
05/30/2024Shutoff dampersMatthew Wavroenergy_progress
05/30/2024HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
05/30/2024HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
05/29/2024FinalMatthew Wavroprogress
05/29/2024Tenant Protection Plan ComplianceMatthew Wavrospecial
05/29/2024Mechanical SystemsMatthew Wavrospecial
05/16/2024Tenant Protection Plan Compliancealon egozispecial
Latest 25 of 52.
▾Documents — 382 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch19
09/03/2026M00566895-I1Request digital key ↗
09/03/2026M00562589-P2Request digital key ↗
09/03/2026M00562589-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/15/2026M00346085-I1Request digital key ↗
08/15/2026M00346085-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/15/2026M00346085-I1Request digital key ↗
08/15/2026M00346085-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00346083-P1Request digital key ↗
08/15/2026M00346083-I1Request digital key ↗
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION38
09/17/2025140900167Open ↗
03/25/2021140900167Open ↗
06/29/2020140901102Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION26
07/29/2020140901102Open ↗
07/08/2020140901102Open ↗
08/10/2017122946606Open ↗
Showing 3 of 26 on file for this type
▸BISPLACE OF ASSEMBLY1
12/05/2019104634816Open ↗
▸Seals & Professional Certifications113
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
03/07/2018122946606Open ↗
03/07/2018122946606Open ↗
12/20/2016122946606Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/29/2026M00512662-S2Open ↗
09/02/2026M01181999-I1Open ↗
09/01/2026M00512662-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/03/2026M00562589-P1Open ↗
09/03/2026M00562589-I1Open ↗
09/03/2026M00346085-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/02/2026M01181999-I1Open ↗
09/01/2026M00512662-I1Open ↗
09/01/2026M01058356-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
11/23/2016122946606Open ↗
07/15/2015122456476Open ↗
04/30/2015122382233Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
11/23/2016122946606Open ↗
11/23/2016122946606Open ↗
07/31/2015140383485Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
02/04/2013121521308Open ↗
12/14/2012121159806Open ↗
08/23/2010120446785Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/25/2021140900167Open ↗
05/18/2020140901102Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/31/2015140383485Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/31/2015140383485Open ↗
▸Trade Schedules & Equipment32
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
01/10/2018122946606Open ↗
11/23/2016122946606Open ↗
05/26/2016122456476Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING9
07/31/2015140383485Open ↗
07/25/2013121521308Open ↗
07/24/2013121521308Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
06/12/2014121988803Open ↗
09/03/2013121521308Open ↗
11/26/2010120446785Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/01/2010120446785Open ↗
11/24/2010120446785Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/11/2018122815490Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
11/01/2010120286948Open ↗
▸BISEQUIPMENT USE PERMITS1
11/24/2010120446785Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan4
08/15/2026M00346085-I1Open ↗
08/13/2026M00346083-P1Open ↗
08/13/2026M00346083-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
05/18/2020140901102Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)4
04/29/2014121988803Open ↗
02/04/2013121521308Open ↗
07/31/2015140383485Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
08/23/2010120446785Open ↗
08/23/2010120446785Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026M01049635-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/16/2021140901102Open ↗
06/16/2021140901102Open ↗
06/11/2020140901102Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/07/2018122946606Open ↗
12/20/2016122946606Open ↗
11/23/2016122946606Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/07/2018122946606Open ↗
06/14/2013121159806Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00566895-I1Open ↗
08/13/2026M00562596-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/18/2021140901102Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/31/2015140383485Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
08/18/2021140901102Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/13/2012121159806Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/18/2021140901102Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY7
06/16/2021140901102Open ↗
06/16/2021140901102Open ↗
06/11/2020140901102Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
08/19/2021140901102Open ↗
03/07/2018122946606Open ↗
01/11/2018122815490Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
02/04/2013121521308Open ↗
08/23/2010120446785Open ↗
Showing 2 of 8 on file for this type
▸BISSUPERSEDING LETTER1
06/11/2020140901102Open ↗
▸BISFINAL1
08/18/2021140901102Open ↗
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT28
06/29/2020140901102Open ↗
05/27/2020140901102Open ↗
03/07/2018122946606Open ↗
Showing 3 of 28 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/19/2021140901102Open ↗
▸Filing & Intake Forms37
▸BISEFILING COVER SHEET14
11/23/2016122946606Open ↗
11/23/2016122946606Open ↗
06/24/2016122815490Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION13
11/05/2020140901102Open ↗
06/29/2020140901102Open ↗
06/11/2020140901102Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM6
09/17/2025140900167Open ↗
07/08/2020140901102Open ↗
11/26/2019104634816Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
03/25/2021140900167Open ↗
05/18/2020140901102Open ↗
07/31/2015140383485Open ↗
Showing 3 of 4 on file for this type
▸Other Documents11
▸DOB NOWDHCR Document7
09/03/2026M00562589-I1Open ↗
09/03/2026M00562589-P1Open ↗
08/15/2026M00346085-I1Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/11/2011120379447Open ↗
12/01/2010120446785Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01178206-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01178206-I1Open ↗