← Back
BuildNYC
Elevator apt, fireproof with stores
23-15 44TH ROAD
QUEENS · BIN 4619459
💬 Discuss this project
2022Year Built
67Stories
D6Building Class
M1-6/R10Zoning
992,460 sfGross Floor Area
939Units
LL97 CoveredRent Stabilized24 Active Violations ▸
Elevator apt, fireproof with stores · Owner of record: CP VIII Lic Owner · 56,459 sf lot · 17.58 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsCp Viii Lic Owner, LLC11 filings
RoofCp Viii Lic Owner, LLCUnder Construction7p · 9 filings · 10 docs
Floor 68Cp Viii Lic Owner, LLC1p · 3 filings · 14 docs
Floor 67Cp Viii Lic Owner, LLC1 filing · 6 docs
Floor 66Cp Viii Lic Owner, LLC1 filing · 6 docs
Floor 65
Floor 64
Floor 63
Floor 62
Floor 61
Floor 60
Floor 59
Floor 58
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43Temporary ADT access system installation, 43rd floor1p · 1 filing
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30Cp Viii Lic Owner, LLC. Carmel Partners1p · 1 filing · 4 docs
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8Cp Viii Lic Ownerllc1 filing
Floor 7Cp Viii Lic Ownerllc1 filing
Floor 6Cp Viii Lic Owner, LLC1p · 2 filings
Floor 5Cp Viii Lic Ownerllc1 filing
Floor 4Cp Viii Lic Owner, LLC3 filings · 6 docs
Floor 3Cp Viii Lic Owner, LLC4p · 7 filings · 8 docs
Floor 2Cp Viii Lic Owner, LLC1p · 4 filings · 6 docs
Floor 1CorePower Yoga, Unit 2CUnder Construction19p · 12 filings · 20 docs
CellarCp Viii Lic Owner, LLCUnder Construction1p · 3 filings · 20 docs
Site & exteriorCp Viii Lic Owner, LLCUnder Construction12 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CP VIII Lic Owner19410/13/2026
Long Island City Center II2403/21/2026
Carmel Partners1507/08/2026
Studio Pilates Long Island City810/17/2026
Walsh Facade Services503/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patuxent Engineering3603/21/2026
Metropolis Group3203/21/2026
Rigid Structural Design803/21/2026
Louis Striar403/21/2026
Lombardo Building Consultants1103/21/2026
Eurocelt Expediting1003/21/2026
KD Designs403/21/2026
Lombardo Professional Engineering403/21/2026
Howard I Shapiro Associates603/21/2026
A1 Expediting Service403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DHS FracoScaffold2207/08/2026
Highbury ConcreteScaffold1607/08/2026
Carmel Construction EastScaffold1307/08/2026
Rael Automatic Sprinkler CoFire Protection1108/05/2026
BunlinScaffold807/08/2026
Greg LogisticsScaffold507/08/2026
Suspended SupplyScaffold407/08/2026
Carmel Construction EastGeneral Contractor407/08/2026
Walsh Facade ServicesScaffold303/21/2026
Exterior Wall & BuildingScaffold307/08/2026
R & R ScaffoldingScaffold308/04/2026
Universal Builders SupplyScaffold207/08/2026
Platform SolutionsScaffold207/08/2026
BunlinGeneral Contractor207/08/2026
Dynamic Hoisting ScaffScaffold207/08/2026
City SignsSign hanger207/08/2026
Tradeline PlumbingPlumbing107/08/2026
Kale ConstructionGeneral Contractor107/22/2026
Kriscorp Eletrical ContractingGeneral Contractor107/10/2026
Retail ExpertsGeneral Contractor106/28/2026
U B ContractingGeneral Contractor110/17/2026
Urban IntelligenceScaffold107/08/2026
Service Sign Erectors CoSign hanger109/23/2026
Vallesigns & AwningsSign hanger108/26/2026
Avon Plumbing & HeatingPlumbing107/10/2026
Buckmiller Automatic SprinklerFire Protection107/29/2026
Crossfield Plumbing & HeatingPlumbing108/26/2026
I Do Plumbing & HeatingPlumbing110/06/2026
Liquid Plumbing & Heating SCSPlumbing107/30/2026
Proff ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244510/09/2026
Prime Zone Building Consulting9474610/09/2026
Vincent J. Liotta P. E1974307/09/2026
Catalpa Special Inspectio2004107/07/2026
Winton Group Architecture4343406/04/2026
Domani Inspection Service8431301/22/2026
Lombardo Prof Engineering8566308/19/2024
Clarke Engineering Services3795205/16/2024
Building Lifecycle
All (284)Filed (80)Permit Issued (80)Signed Off (26)Violation (29)Inspection (15)Objection (24)Special Inspection (30)
10/16/2026
Permit issued — Mechanical Systems
Q01400445-S2-MS
10/09/2026
Filed — Alteration
Q01391967-P5
10/07/2026
Filed — Alteration
Q01391967-P2
10/05/2026
Permit issued — Plumbing
Q01391967-S2-PL
09/22/2026
Permit issued — Sign
Q01413266-I1-SG
09/18/2026
Filed — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
Q01413266-I1
09/11/2026
Signed off — Alteration
INSTALLATION OF CURB CUT ON 24 STREET
Q08004647-I1
09/11/2026
Signed off — Alteration
Q08004643-I1
09/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/02/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/28/2026
Objection resolved — Resolved
08/25/2026
Permit issued — Sign
Q01446762-I1-SG
08/24/2026
Filed — Alteration
Q01391967-P3
08/21/2026
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01446762-I1
08/19/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, PLYWOOD FENCE AND ROOF PROTECTION AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00757989-I1
08/19/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed and construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Q01061669-I1
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
08/17/2026
Special inspection requirement — Final
Israel Wertentheil
08/13/2026
Objection raised — Scope
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
08/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
08/13/2026
Special inspection requirement — Lighting controls
JICHEN SUN
08/13/2026
Special inspection requirement — Interior lighting power
JICHEN SUN
08/13/2026
Special inspection requirement — Exterior lighting power
JICHEN SUN
08/11/2026
Objection raised — Fire_Protection
08/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
NARESH MAHANGU
08/06/2026
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
08/06/2026
Special inspection requirement — Post-installed Anchors
NARESH MAHANGU
08/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
CHI WAI CHUNG
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
08/06/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
NARESH MAHANGU
08/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NARESH MAHANGU
08/06/2026
Special inspection requirement — Final
PETER CHO
08/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
NARESH MAHANGU
08/06/2026
Special inspection requirement — Maintenance information
NARESH MAHANGU
08/06/2026
Special inspection requirement — Shutoff dampers
NARESH MAHANGU
08/04/2026
Permit issued — Sprinklers
Q01400445-S3-EW-SP
08/03/2026
Filed — Alteration
Use of building maintenance unit (BMU) construction equipment as per plans filed herewith. Filed in conjunction with NB-420656695.
Q01440053-I1
08/03/2026
Permit issued — Protection and Mechanical Methods
Q01440053-I1-PMM
07/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2026
Permit issued — Plumbing
Q01415013-S2-PL
07/28/2026
Permit issued — Sprinklers
Q01415013-S1-EW-SP
07/27/2026
Signed off — Alteration
HEREWITH FILING FOR A TEMPORARY STANDPIPE PRESSURIZATION ALARM SYSTEM IN CONJUNCTION WITH NB# 420656695. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00791350-I1
07/21/2026
Permit issued — General Construction
Q01400445-I1-GC
07/09/2026
Filed — Alteration
INSTALLATION OF 14 UPRIGHT SPRINKLER HEADS AND 24 CONCEALED HEADS. REMOVAL OF 14 EXISTING UPRIGHT HEADS, 1 EXISTING UPRIGHT HEAD TO REMAIN. ALL WORK ON FLOOR 001. NO CHANGE TO EGRESS, USE, OCCUPANCY.
Q01415013-S2
07/09/2026
Filed — Alteration
INSTALLATION OF 14 UPRIGHT SPRINKLER HEADS AND 24 CONCEALED HEADS. REMOVAL OF 14 EXISTING UPRIGHT HEADS, 1 EXISTING UPRIGHT HEAD TO REMAIN. ALL WORK ON FLOOR 001. NO CHANGE TO EGRESS, USE, OCCUPANCY.
Q01415013-S1
07/08/2026
Permit issued — Plumbing
Q01391967-S2-PL
07/08/2026
Permit issued — General Construction
Q01391967-I1-GC
07/07/2026
Filed — Alteration
ALTERATION FOR INTERIOR WORK TO NON-BEARING PARTITIONS AT FIRST FLOOR
Q01424813-I1
07/07/2026
Permit issued — Plumbing
Q01400445-S1-PL
07/07/2026
Objection raised — Mechanical
06/30/2026
Special inspection requirement — Lighting controls
ERIC BERLENT
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
06/30/2026
Special inspection requirement — Final
ERIC BERLENT
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
06/30/2026
Special inspection requirement — Interior lighting power
ERIC BERLENT
Latest 60 of 284 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedU B Contracting10/16/2026
DOB NOWPlumbingPermit IssuedI Do Plumbing & Heating10/05/2026
DOB NOWSignPermit IssuedService Sign Erectors Co09/22/2026
DOB NOWSignPermit IssuedVallesigns & Awnings08/25/2026
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co08/04/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedR & R Scaffolding08/03/2026
DOB NOWPlumbingPermit IssuedLiquid Plumbing & Heating SCS07/29/2026
DOB NOWSprinklersPermit IssuedBuckmiller Automatic Sprinkler07/28/2026
DOB NOWGeneral ConstructionPermit IssuedKale Construction07/21/2026
DOB NOWPlumbingPermit IssuedAvon Plumbing & Heating07/08/2026
DOB NOWGeneral ConstructionPermit IssuedKriscorp Eletrical Contracting07/08/2026
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating07/07/2026
DOB NOWMechanical SystemsPermit IssuedRetail Experts06/26/2026
DOB NOWSidewalk ShedSigned-offDHS Fraco06/22/2026
DOB NOWSidewalk ShedSigned-offDHS Fraco06/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedDynamic Hoisting Scaff03/17/2026
DOB NOWSidewalk ShedSigned-offExterior Wall & Building12/30/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedDynamic Hoisting Scaff12/09/2025
DOB NOWSidewalk ShedSigned-offExterior Wall & Building12/02/2025
DOB NOWProtection and Mechanical MethodsSigned-offR & R Scaffolding09/24/2025
DOB NOWSupported ScaffoldSigned-offBunlin09/17/2025
DOB NOWSidewalk ShedSigned-offDHS Fraco06/02/2025
DOB NOWSidewalk ShedSigned-offDHS Fraco06/02/2025
DOB NOWConstruction FenceSigned-offDHS Fraco05/29/2025
DOB NOWSidewalk ShedSigned-offDHS Fraco05/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedGreg Logistics02/03/2025
DOB NOWStandpipePermit IssuedRael Automatic Sprinkler Co01/31/2025
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co01/31/2025
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co01/16/2025
DOB NOWCurb CutSigned-offCarmel Construction East01/09/2025
DOB NOWCurb CutSigned-offCarmel Construction East01/09/2025
DOB NOWGeneral ConstructionSigned-offCarmel Construction East01/02/2025
DOB NOWSidewalk ShedSigned-offExterior Wall & Building12/27/2024
DOB NOWSignSigned-offElmer Dawson12/03/2024
DOB NOWSignSigned-offElmer Dawson12/03/2024
DOB NOWSidewalk ShedSigned-offUrban Intelligence10/15/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedGreg Logistics09/27/2024
DOB NOWProtection and Mechanical MethodsSigned-offR & R Scaffolding09/03/2024
DOB NOWBoiler EquipmentSigned-offTradeline Plumbing08/28/2024
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz08/16/2024
+ 54 more permits on file
1 project · most recent 07/09/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/09/2026Permit IssuedRetail ExpertsAir Conditioning Systems
Cooling
Trane GEHK0723 6 tons · Wshp ×1
3 projects · most recent 07/09/2026
FiledStatusContractorScope
07/09/2026Permit IssuedBuckmiller Automatic Sprinkler52 heads
01/22/2026Permit IssuedRael Automatic Sprinkler Co18,593 heads, 318 outlets
04/19/2023Signed-offRael Automatic Sprinkler Co152 outlets
2 projects · most recent 07/09/2026
Water/Sanitary
FiledStatusContractorScope
07/09/2026Permit IssuedLiquid Plumbing & Heating SCSWater/Sanitary
01/22/2026———
17 projects · most recent 10/19/2026
General Wiring
FiledStatusContractorScope
10/19/2026Permit IssuedS. J. ElectricGeneral Wiring
09/03/2026Permit IssuedSpectrum on Broadway-Electric—
08/10/2026Permit IssuedProsto ElectricGeneral Wiring
07/30/2026Permit IssuedKJK ElectricGeneral Wiring
07/22/2026Permit IssuedKriscorp Electrical ContngGeneral Wiring
03/18/2026Permit IssuedRobert B SamuelsGeneral Wiring
08/15/2025CompleteReliant Power SystemsGeneral Wiring
11/21/2024CompleteProff Electrical—
11/21/2024CompleteProff Electrical—
11/08/2024Complete5 J'S Electl Conts—
04/08/2024CompleteS. J. ElectricGeneral Wiring
04/17/2023CompleteS. J. Electric—
04/17/2023Permit IssuedS. J. Electric—
03/23/2023CompleteS. J. Electric1 meters, 1 new_meters
02/13/2023CompleteS. J. Electric—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
09/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/02/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
07/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/02/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
01/02/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/19/2024Pass-Final SD - Fire PumpPassView ↗
12/12/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/29/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/24/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 131
DateRequirementInspectorRole
08/17/2026FinalIsrael Wertentheilprogress
08/13/2026Fire-Resistant Penetrations and JointsJICHEN SUNspecial
08/13/2026Tenant Protection Plan Compliance—special
08/13/2026Energy Code Compliance InspectionsJICHEN SUNprogress
08/13/2026Exterior lighting powerJICHEN SUNenergy_progress
08/13/2026Interior lighting powerJICHEN SUNenergy_progress
08/13/2026Lighting controlsJICHEN SUNenergy_progress
08/06/2026Exhaust and Vent Systems in Plenums and DuctsNARESH MAHANGUspecial
08/06/2026Shutoff dampersNARESH MAHANGUenergy_progress
08/06/2026HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
08/06/2026Maintenance informationNARESH MAHANGUenergy_progress
08/06/2026HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
08/06/2026HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
08/06/2026FinalPETER CHOprogress
08/06/2026Energy Code Compliance InspectionsJICHEN SUNprogress
08/06/2026Tenant Protection Plan ComplianceCHI WAI CHUNGspecial
08/06/2026Post-installed AnchorsNARESH MAHANGUspecial
08/06/2026Mechanical SystemsNARESH MAHANGUspecial
08/06/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
06/30/2026Energy Code Compliance InspectionsERIC BERLENTprogress
06/30/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
06/30/2026Tenant Protection Plan ComplianceERIC BERLENTspecial
06/30/2026FinalERIC BERLENTprogress
06/30/2026Lighting controlsERIC BERLENTenergy_progress
06/30/2026Interior lighting powerERIC BERLENTenergy_progress
Latest 25 of 131.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CorePower YogaFitness / RecreationFloor 1
Project Q01424813 Alteration · Objections · 07/07/2026
Project Q01415013 Alteration · Permit Entire · 06/12/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 660 on file (BIS + DOB NOW)
▸Plans & Drawings80
▸DOB NOWPlans/Sketch77
10/04/2026Q01413266-I1Request digital key ↗
08/26/2026Q00791350-I1Request digital key ↗
08/25/2026Q08004643-I1Request digital key ↗
Showing 3 of 77 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/27/2026Q00397987-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸Applications & Permits136
▸BISPLAN / WORK APPROVAL APPLICATION97
02/12/2026420656695Open ↗
02/10/2026420656695Open ↗
02/06/2026420656695Open ↗
Showing 3 of 97 on file for this type
▸BISWORK PERMIT APPLICATION36
07/15/2025420656695Open ↗
04/28/2025420656695Open ↗
03/28/2025440820738Open ↗
Showing 3 of 36 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING RESOLUTION DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
11/03/2025420656695Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/03/2025420656695Open ↗
▸Seals & Professional Certifications182
▸DOB NOWDPL-1: Design Professional Seal & Signature83
09/23/2026Q01413266-I1Open ↗
08/27/2026Q00397987-I1Open ↗
08/27/2026Q00397987-P2Open ↗
Showing 3 of 83 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature40
10/06/2026Q00994831-P2Open ↗
09/27/2026Q01400445-S1Open ↗
09/23/2026Q01391967-P2Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature39
10/06/2026Q00994831-P2Open ↗
09/27/2026Q01400445-S1Open ↗
09/27/2026Q01400445-S1Open ↗
Showing 3 of 39 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/02/2024440820738Open ↗
07/24/2023440786419Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/02/2024440820738Open ↗
07/24/2023440786419Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/02/2024440820738Open ↗
07/24/2023440786419Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING15
02/12/2026420656695Open ↗
02/10/2026420656695Open ↗
02/06/2026420656695Open ↗
Showing 3 of 15 on file for this type
▸BISEQUIPMENT USE PERMITS3
03/27/2025420656695Open ↗
03/27/2025420656695Open ↗
02/27/2025420656695Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/30/2026420656695Open ↗
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/27/2025420656695Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/27/2025420656695Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
07/10/2025440738089Open ↗
Showing 1 of 2 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
07/10/2025440738089Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
01/30/2026420656695Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/30/2026420656695Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/30/2026420656695Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY14
09/25/2024420656695Open ↗
07/24/2023440786419Open ↗
Showing 2 of 14 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
02/05/2026420656695Open ↗
07/01/2025440738089Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT2
07/10/2025440738089Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPOST-INSTALLED ANCHORS1
01/30/2026420656695Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/27/2023440786419Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/30/2026420656695Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
01/30/2026420656695Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
03/20/2025420656695Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
05/30/2023420656695Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/30/2026420656695Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/26/2024420656695Open ↗
▸Approvals, Objections & Sign-offs54
▸BISSUPERSEDING LETTER22
07/16/2025420656695Open ↗
04/28/2025420656695Open ↗
09/28/2023420656695Open ↗
Showing 3 of 22 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE17
11/06/2025420656695Open ↗
10/02/2024420656695Open ↗
10/01/2024420656695Open ↗
Showing 3 of 17 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION5
01/29/2025420656695Open ↗
06/19/2024420656695Open ↗
Showing 2 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/03/2024420656695Open ↗
Showing 1 of 5 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/13/2024440786419Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
03/12/2024440786419Open ↗
▸Cost, Insurance & Ownership15
▸BISPROJECT-SPECIFIC GL INSURANCE10
07/14/2023420656695Open ↗
07/12/2023420656695Open ↗
02/23/2023420656695Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT4
12/02/2024440820738Open ↗
07/24/2023440786419Open ↗
Showing 2 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/12/2024440786419Open ↗
▸Filing & Intake Forms62
▸BISADDITIONAL INFORMATION37
03/03/2026420656695Open ↗
12/09/2025440820738Open ↗
12/03/2025420656695Open ↗
Showing 3 of 37 on file for this type
▸BISEFILING COVER SHEET10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
12/02/2024440820738Open ↗
07/24/2023440786419Open ↗
Showing 2 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
07/16/2025420656695Open ↗
07/14/2023420656695Open ↗
07/12/2023420656695Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q01158877-P1Open ↗
▸Other Documents16
▸DOB NOWCalculations5
08/23/2026Q00984029-I1Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWManufacturer's Specifications5
08/23/2026Q00984029-I1Open ↗
Showing 1 of 5 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/10/2025440738089Open ↗
▸BISUNDERPINNING (2014)1
09/26/2024420656695Open ↗
▸BISMAINTENANCE INFORMATION1
01/30/2026420656695Open ↗
▸BISFIREPLACES1
01/30/2026420656695Open ↗