← Back
BuildNYC
Walk-up cooperative
23 FISKE PLACE
BROOKLYN · Park Slope · BIN 3024921
💬 Discuss this project
1904Year Built
4Stories
C6Building Class
R7BZoning
6,032 sfGross Floor Area
4Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Walk-up cooperative · Owner of record: 23 Fiske Place · 2,162 sf lot · 2.79 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof9p · 1 filing · 16 docs
Floor 4Unit 47p · 1 filing · 16 docs
Floor 3Unit 38p · 1 filing · 16 docs
Floor 2
Floor 1Unit 18p · 1 filing · 16 docs
Sub-Basement7p · 1 filing · 16 docs
Site & exterior7p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
23 Fiske Place1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering210/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J Building Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MR Air NYCspecialty_contractor303/21/2026
Stanley Lewis ContractingPlumbing103/21/2026
Tredent Contracting ServicesGeneral Contractor109/29/2009
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781210/27/2023
Building Lifecycle
04/10/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
12/29/2023
Signed off — Alteration
INSTALL SPLIT A.C. SYSTEM AT APARTMENT#1,3,4 OF EXISTING 4 STORY BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OF CERTIFICATE OF OCCUPANCY
B00896902-I1
11/20/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
10/30/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
10/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
19 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMr. Air NYC07/14/2023
BISPLISSUEDPlumbing-It Mechanical04/27/2010
BISOTISSUEDTredent Contracting Services09/29/2009
4 projects · most recent 12/19/2023
HVAC Wiring General Wiring
FiledStatusContractorScope
12/19/2023Permit IssuedAccurate ElectricalGeneral Wiring
11/22/2023CompleteIntelogic ElectricHVAC Wiring
11/22/2023CompleteIntelogic ElectricHVAC Wiring
10/13/2023CompleteIntelogic ElectricHVAC Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/30/2023Mechanical SystemsCHRISTIAN LOZADAspecial
10/30/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/30/2023Tenant Protection Plan ComplianceCHRISTIAN LOZADAspecial
10/30/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
10/30/2023FinalCHRISTIAN LOZADAprogress
10/30/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
10/30/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
10/30/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
10/30/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
10/30/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
34 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account