← Back
Walk-up apt, over six families with stores
230 7 AVENUE
BROOKLYN · BIN 3324971
💬 Discuss this project
1920Year Built
4Stories
C7Building Class
R6AZoning
5,802 sfGross Floor Area
8Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: MARIANNA DELFINO, LLC · 2,228 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof5p · 1 filing · 20 docs
Floor 114p · 3 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSTRUCTION GERMAN, R.A.103/22/2026
J G CONSTRUCTION SRVCS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANTHONY BONSIGNORE, RA607/20/2026
LU ENGINEERING SERVICE PC612/29/2022
HALO ARCHITECTURE PLLC112/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY1203/21/2026
MODERN BUILDING CONSULTANT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ON TIME CONSTRUCTION INCGeneral Contractor507/08/2026
PROCRAFT DS LLCGeneral Contractor303/21/2026
DASILVA PLBG & HTG CORPPlumbing206/28/2026
J Y ELECTRIC INCElectrical103/22/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AVT ENGINEERING345407/20/2026
LU ENGINEERING SERVICE PC6575612/29/2022
Building Lifecycle
All (78)Filed (13)Permit Issued (7)Signed Off (1)Violation (19)Inspection (8)Special Inspection (30)
08/17/2026
Signed off — Alteration
CREATE NEW BOILER ROOM ENCLOSURE ON THE 1ST FLOOR AS PER PLANS FILED NO CHANGE IN EGRESS USE OR OCCUPANCY
B01331607-I1
08/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/20/2026
Filed — Alteration
NEW BOILER ON THE 1ST FLOOR AS PER PLANS FILED
B01331659-P1
07/20/2026
Filed — Alteration
NEW BOILER ON THE 1ST FLOOR AS PER PLANS FILED
B01331659-P2
07/20/2026
Filed — Alteration
CREATE NEW BOILER ROOM ENCLOSURE ON THE 1ST FLOOR AS PER PLANS FILED NO CHANGE IN EGRESS USE OR OCCUPANCY
B01331607-P1
07/20/2026
Special inspection requirement — Final
JOSEPH PASATURO
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH PASATURO
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH PASATURO
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH PASATURO
07/20/2026
Special inspection requirement — Maintenance information
JOSEPH PASATURO
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH PASATURO
07/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH PASATURO
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH PASATURO
07/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH PASATURO
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
07/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2026
Special inspection requirement — Final
JOSEPH PASATURO
07/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH PASATURO
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
07/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH PASATURO
07/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH PASATURO
07/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH PASATURO
07/17/2026
Special inspection requirement — Maintenance information
JOSEPH PASATURO
07/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH PASATURO
07/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/22/2026
Permit issued — Plumbing
B01331659-I1-PL
06/22/2026
Permit issued — Boiler Equipment
B01331659-S1-BE
02/18/2026
Permit issued — General Construction
B01331607-I1-GC
01/08/2026
Filed — Alteration
CREATE NEW BOILER ROOM ENCLOSURE ON THE 1ST FLOOR AS PER PLANS FILED NO CHANGE IN EGRESS USE OR OCCUPANCY
B01331607-I1
01/08/2026
Filed — Alteration
NEW BOILER ON THE 1ST FLOOR AS PER PLANS FILED
B01331659-I1
01/08/2026
Filed — Alteration
NEW BOILER ON THE 1ST FLOOR AS PER PLANS FILED
B01331659-S1
04/01/2024
Violation issued (FDNY_NOV, closed)
12/29/2022
Filed — Alteration
PROPOSED MECHANICAL WORK ON 1ST FLOOR, OSP AND ROOF, WITH INSTALLING NEW KITCHEN HOOD/DUCT WORK AND NEW AC UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00677239-P2
12/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
DONGSHENG LU
12/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
DONGSHENG LU
12/29/2022
Special inspection requirement — Heating Systems
DONGSHENG LU
12/29/2022
Special inspection requirement — Mechanical Systems
DONGSHENG LU
12/29/2022
Special inspection requirement — Tenant Protection Plan Compliance
DONGSHENG LU
12/29/2022
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
12/29/2022
Special inspection requirement — Final
DONGSHENG LU
12/23/2022
Permit issued — Mechanical Systems
B00677239-S1-MS
12/22/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/03/2022
Filed — Alteration
PROPOSED MECHANICAL WORK ON 1ST FLOOR, OSP AND ROOF, WITH INSTALLING NEW KITCHEN HOOD/DUCT WORK AND NEW AC UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00677239-P1
11/30/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/25/2022
Filed — Alteration
PROPOSED MECHANICAL WORK ON 1ST FLOOR, OSP AND ROOF, WITH INSTALLING NEW KITCHEN HOOD/DUCT WORK AND NEW AC UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00677239-S1
11/02/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/12/2022
Filed — Alteration
SUBMIT PLUMBING WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION #B00677239.
B00682786-P1
05/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/30/2022
Permit issued — Plumbing
B00682786-I1-PL
03/18/2022
Filed — Alteration
SUBMIT PLUMBING WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION #B00677239.
B00682786-I1
03/14/2022
Permit issued — General Construction
B00677239-I1-GC
02/11/2022
Filed — Alteration
PROPOSED MECHANICAL WORK ON 1ST FLOOR, OSP AND ROOF, WITH INSTALLING NEW KITCHEN HOOD/DUCT WORK AND NEW AC UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00677239-I1
02/04/2022
Permit issued — Construction Fence
B00655119-I1-FN
12/30/2021
Filed — Alteration
Installation of temporary construction fence in conjunction with alteration application #B00629826. No change in use, egress, or occupancy under this application.
B00655119-I1
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDASILVA PLBG & HTG CORP06/22/2026
DOB NOWBoiler EquipmentSigned-offDASILVA PLBG & HTG CORP06/22/2026
DOB NOWGeneral ConstructionSigned-offPROCRAFT DS LLC02/18/2026
DOB NOWMechanical SystemsPermit IssuedON TIME CONSTRUCTION INC12/23/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG03/30/2022
DOB NOWGeneral ConstructionSigned-offON TIME CONSTRUCTION INC03/14/2022
DOB NOWConstruction FencePermit IssuedON TIME CONSTRUCTION INC02/04/2022
BISMHISSUED2260 MAG CORP09/12/2017
BISEQISSUEDJ & G CONSTRUCTION SVCS08/22/2017
BISMHISSUEDDIVISION ONE CONST CORP05/01/2012
BISPLISSUEDMMI PLUMBING & HEATING INC.03/16/2012
BISOTISSUEDDIVISION ONE CONST CORP02/10/2012
BISOTISSUEDN & M DEMOLITION INC11/10/2009
1 project · most recent 12/29/2022
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/29/2022Permit IssuedON TIME CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MUZ-GL24NA 22,400 BTU · Condensing Unit ×2
MXZ-3C24NA3 22,000 BTU · Condensing Unit ×1
Ventilation
Captiveaire NCA18FA 3,000 CFM · Kitchen Exhaust ×1
2 projects · most recent 07/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/20/2026Signed-offDASILVA PLBG & HTG CORPGas, Water/Sanitary
10/12/2022Signed-offCROSSFIELD P & H CORPGas, Water/Sanitary
2 projects · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedAMPCO TECH ELECTRIC CORP.General Wiring
04/11/2022CompleteJ Y ELECTRIC INCGeneral Wiring
1 project · most recent 12/30/2021
Fence
FiledStatusContractorScope
12/30/2021Permit IssuedON TIME CONSTRUCTION INCFence
1 project · most recent 07/20/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/20/2026Signed-offPROCRAFT DS LLCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/30/2022Fail-Final General Construction Non-Directive 14FailView ↗
11/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
07/20/2026FinalJOSEPH PASATUROprogress
07/20/2026Energy Code Compliance InspectionsJOSEPH PASATUROprogress
07/20/2026Tenant Protection Plan ComplianceJOSEPH PASATUROspecial
07/20/2026Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
07/20/2026Tenant Protection Plan Compliance—special
07/20/2026HVAC-R and service water heating system controlsJOSEPH PASATUROenergy_progress
07/20/2026Maintenance informationJOSEPH PASATUROenergy_progress
07/20/2026HVAC-R and service water piping design and insulationJOSEPH PASATUROenergy_progress
07/20/2026HVAC-R and service water heating equipmentJOSEPH PASATUROenergy_progress
07/20/2026Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
07/20/2026Tenant Protection Plan ComplianceJOSEPH PASATUROspecial
07/20/2026Fire-Resistance Rated ConstructionJOSEPH PASATUROprogress
07/17/2026Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
07/17/2026Tenant Protection Plan Compliance—special
07/17/2026FinalJOSEPH PASATUROprogress
07/17/2026Fire-Resistance Rated ConstructionJOSEPH PASATUROprogress
07/17/2026Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
07/17/2026Tenant Protection Plan Compliance—special
07/17/2026Energy Code Compliance InspectionsJOSEPH PASATUROprogress
07/17/2026HVAC-R and service water heating equipmentJOSEPH PASATUROenergy_progress
07/17/2026HVAC-R and service water piping design and insulationJOSEPH PASATUROenergy_progress
07/17/2026Maintenance informationJOSEPH PASATUROenergy_progress
07/17/2026HVAC-R and service water heating system controlsJOSEPH PASATUROenergy_progress
12/29/2022HVAC-R and service water heating equipmentDONGSHENG LUenergy_progress
12/29/2022HVAC-R and service water heating system controlsDONGSHENG LUenergy_progress
Latest 25 of 44.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/31/2026B00655119-I1Request digital key ↗
08/30/2026B00682786-P1Request digital key ↗
08/30/2026B00682786-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION8
09/18/2017321623052Open ↗
08/20/2017340534764Open ↗
05/02/2012320245926Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
08/20/2017340534764Open ↗
07/20/2017321623052Open ↗
04/19/2013320107530Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/23/2010320107530Open ↗
▸Seals & Professional Certifications65
▸DOB NOWProgress Inspector Seal & Signature21
09/19/2026B01331607-I1Open ↗
09/02/2026B01331659-P1Open ↗
09/02/2026B01331659-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026B00677239-P2Open ↗
08/28/2026B00677239-P1Open ↗
08/28/2026B00677239-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/19/2026B01331607-I1Open ↗
09/19/2026B01331607-I1Open ↗
09/02/2026B01331659-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
10/30/2017321623052Open ↗
07/20/2017321623052Open ↗
12/24/2012320245926Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/20/2017321623052Open ↗
12/03/2010320245926Open ↗
11/10/2009320096793Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
12/03/2010320245926Open ↗
11/10/2009320096793Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/20/2017340534764Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/20/2017340534764Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/20/2017340534764Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/20/2017321623052Open ↗
▸Trade Schedules & Equipment10
▸BISSELF-CERT PLUMBING NOTICE5
06/21/2012320245926Open ↗
06/07/2012320245926Open ↗
04/10/2012320245926Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS2
10/30/2017321623052Open ↗
07/20/2017321623052Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/30/2017321623052Open ↗
07/20/2017321623052Open ↗
▸BISSCHEDULE B - PLUMBING1
12/03/2010320245926Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
08/20/2017340534764Open ↗
07/20/2017321623052Open ↗
▸BISSTREET TREE CHECKLIST1
01/28/2010320107530Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/28/2026B00677239-P2Open ↗
08/28/2026B00677239-P1Open ↗
08/28/2026B00677239-S1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
12/03/2010320245926Open ↗
04/07/2010320107530Open ↗
04/15/2010320107530Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/10/2009320096793Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/30/2017321623052Open ↗
07/20/2017321623052Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/30/2017321623052Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/20/2017340534764Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/20/2017340534764Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/30/2017321623052Open ↗
12/24/2012320245926Open ↗
12/19/2011320096793Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
11/10/2010320107530Open ↗
11/10/2010320107530Open ↗
05/09/2013320107530Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
12/03/2010320245926Open ↗
01/28/2010320107530Open ↗
11/10/2009320096793Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
12/19/2011320096793Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
10/30/2017321623052Open ↗
07/20/2017321623052Open ↗
07/24/2013320107530Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
07/20/2017321623052Open ↗
12/03/2010320245926Open ↗
01/28/2010320107530Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/20/2017340534764Open ↗
▸BISBOROUGH INTAKE FORM1
10/30/2017321623052Open ↗
▸BISADDITIONAL INFORMATION1
07/24/2013320107530Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM2
04/19/2013320107530Open ↗
01/28/2010320107530Open ↗